CN207647143U - A kind of construction coherent-wall scaffolding cantilever arrangement - Google Patents

A kind of construction coherent-wall scaffolding cantilever arrangement Download PDF

Info

Publication number
CN207647143U
CN207647143U CN201721627588.9U CN201721627588U CN207647143U CN 207647143 U CN207647143 U CN 207647143U CN 201721627588 U CN201721627588 U CN 201721627588U CN 207647143 U CN207647143 U CN 207647143U
Authority
CN
China
Prior art keywords
frustum
guardrail
welded
support column
fixed pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721627588.9U
Other languages
Chinese (zh)
Inventor
邓元存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Albo Decoration Engineering Co Ltd
Original Assignee
Jiangsu Albo Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Albo Decoration Engineering Co Ltd filed Critical Jiangsu Albo Decoration Engineering Co Ltd
Priority to CN201721627588.9U priority Critical patent/CN207647143U/en
Application granted granted Critical
Publication of CN207647143U publication Critical patent/CN207647143U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of construction coherent-wall scaffolding cantilever arrangements, including frustum of a cone support column, universal wheel, lamp stand, wheel bar is respectively arranged in the frustum of a cone support column bottom surface both ends, the universal wheel is arranged in the wheel bar end, guide rail is arranged in frustum of a cone support column both sides, first support bar is arranged in frustum of a cone support top end both sides, fixed pulley is arranged in the first support bar end, guardrail is set on the guide rail, block is set on the guardrail, second support bar is arranged in the guardrail lower part, draw ring is arranged in the guardrail top, steel wire rope is set on the draw ring, the fixed pulley is set among the steel wire rope, the fixed pulley end setting volume machine drawing, the volume machine drawing is arranged in frustum of a cone support top end.Advantageous effect is:The utility model can be realized the lifting of construction personnel without labor intensive and move in parallel, and small and consumable quantity is small, can provide light at night, safe and reliable steady.

Description

A kind of construction coherent-wall scaffolding cantilever arrangement
Technical field
The utility model is related to coherent-wall scaffolding type cantilever device fields of constructing, and in particular to a kind of construction attached wall foot hand Frame cantilever arrangement.
Background technology
Scaffold is construction site for operation and solves vertically and horizontally to transport the various holders set up, architecture field Generic term, refer on construction site be used in exterior wall, interior decoration or the higher place that can not directly construct of floor height, mainly for Construction personnel up and down go along with sb. to guard him and high-altitude installation component etc. by operation or perimeter security net, is a kind of common tool in construction, Currently, in the construction in many places, scaffold is mostly the pole type scaffold for pricking foot and ground, although this foot hand Frame is widely used, but there are problems, and the scaffold volume of structure this first is larger, and consumable quantity is big, especially for For skyscraper, this consumable quantity is especially huge, and in build process, time-consuming and laborious, slightly neglects when in use just It can cause very big hidden danger.
Utility model content
The purpose of this utility model be that solve the above-mentioned problems and to provide a kind of construction coherent-wall scaffolding outstanding Arm assembly.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of construction coherent-wall scaffolding cantilever arrangement, including frustum of a cone support column, universal wheel, lamp stand, the circular cone Wheel bar is respectively arranged in platform support column bottom surface both ends, and the universal wheel, frustum of a cone support column both sides are arranged in the wheel bar end Guide rail is set, first support bar is arranged in frustum of a cone support top end both sides, and fixed pulley is arranged in the first support bar end, Guardrail is set on the guide rail, block is set on the guardrail, second support bar, the guardrail top is arranged in the guardrail lower part Draw ring is set, steel wire rope is set on the draw ring, the fixed pulley, the fixed pulley end setting are set among the steel wire rope Machine drawing is rolled up, the volume machine drawing is arranged in frustum of a cone support top end, and the lamp stand, the lamp is arranged in volume machine drawing upper surface Lamp cantilever is arranged in bar upper surface, and the lamp cantilevered distal end is arranged lampshade, headlamp is arranged in the lampshade.
In above structure, construction personnel's pushing meanss, the universal wheel drives the wheel bar movement, the wheel bar to drive institute The movement of frustum of a cone support column is stated, the frustum of a cone support column driving device is moved to the position for needing to construct, and staff enters In the guardrail, start the volume machine drawing, the volume machine drawing work pulls the steel wire rope, the steel wire rope to determine cunning by described Wheel pulls the draw ring to rise, and the draw ring pulls the guardrail, the block to rise, while construction personnel being driven to rise to one Positioning postpones, and closes the volume machine drawing, you can the carry out working at height of safety and firmness, if at night, the photograph can be opened Bright lamp illuminates construction area, and construction personnel can also work at night, after the completion of work, starts the volume machine drawing, the volume is drawn Machine rotates backward, and loosens the steel wire rope, and the block and construction personnel are put back to ground, push back device to original position.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the wheel bar is welded on the frustum of a cone support column On, the universal wheel bearing is connected on the wheel bar, and the rail welding is on the frustum of a cone support column.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the first support bar is welded on the frustum of a cone On support column, the fixed pulley bearing is connected in the first support bar, and the guardrail sliding slot is connected on the guide rail.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the block is welded on the guardrail, described Second support bar is welded on the guardrail, and the draw ring is welded on the guardrail.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the steel wire rope is hingedly connected at the draw ring On, the steel wire rope rolling is connected on the fixed pulley, and the fixed pulley is welded in the volume machine drawing.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the volume machine drawing is welded on the frustum of a cone support On column, the lamp stand is welded in the volume machine drawing, and the lamp cantilever is welded on the lamp stand.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, the lampshade is welded on the lamp cantilever, institute Headlamp is stated to be welded on the lampshade.
Advantageous effect is:The utility model can be realized the lifting of construction personnel without labor intensive and move in parallel, Small and consumable quantity is small, can provide light at night, safe and reliable steady.
Description of the drawings
Fig. 1 is a kind of front view of construction coherent-wall scaffolding cantilever arrangement described in the utility model;
Fig. 2 is a kind of side view of construction coherent-wall scaffolding cantilever arrangement described in the utility model;
Fig. 3 is a kind of structural schematic diagram of construction coherent-wall scaffolding cantilever arrangement described in the utility model.
The reference numerals are as follows:
1, frustum of a cone support column;2, guide rail;3, guardrail;4, it blocks;5, draw ring;6, steel wire rope;7, fixed pulley;8, first Strut;9, machine drawing is rolled up;10, headlamp;11, lampshade;12, lamp cantilever;13, lamp stand;14, second support bar;15, bar, 16, ten thousand are taken turns To wheel.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1-Figure 3, a kind of construction coherent-wall scaffolding cantilever arrangement, including frustum of a cone support column 1, universal wheel 16, lamp stand 13, frustum of a cone support column 1 is following thick using frustum design, strengthens stability, 1 bottom surface two of frustum of a cone support column Hold each setting wheel bar 15,15 end of wheel bar is arranged universal wheel 16, and 1 both sides of frustum of a cone support column are arranged guide rail 2, guide rail 2 it is main It is act as the position of fixed block 4, first support bar 8 is arranged in 1 top both sides of frustum of a cone support column, and 8 end of first support bar is set Fixed pulley 7 is set, fixed pulley 7 is mainly used for that steel wire rope 6 is allowed to roll on it, and guardrail 3 is arranged on guide rail 2, block is arranged on guardrail 3 4, guardrail 3, block 4 play the role of security protection, and second support bar 14 is arranged in 3 lower part of guardrail, and draw ring 5 is arranged in 3 top of guardrail, Steel wire rope 6 is set on draw ring 5, fixed pulley 7,7 end of fixed pulley setting volume machine drawing 9, frustum of a cone support column are set among steel wire rope 6 1 top setting volume machine drawing 9, steel wire rope 6 are mainly used for pulling draw ring 5,9 upper surface of volume machine drawing that lamp stand 13,13 upper table of lamp stand is arranged Lamp cantilever 12 is arranged in face, and lampshade 11 is arranged in 12 end of lamp cantilever, is arranged headlamp 10 in lampshade 11, the effect of volume machine drawing 9 be for The rise and fall of guardrail 3 provide power, and lamp stand 13 is mainly used for that the position of high lamp cantilever 12, headlamp 10 is dragged to be mainly used for night Illumination.
In above structure, construction personnel's pushing meanss, universal wheel 16 is moved with driving wheel bar 15, and wheel bar 15 drives frustum of a cone branch Dagger 1 moves, and 1 driving device of frustum of a cone support column is moved to the position for needing to construct, and staff enters in guardrail 3, starts Machine drawing 9 is rolled up, the volume work of machine drawing 9 pulls steel wire rope 6, steel wire rope 6 to pull draw ring 5 to rise by fixed pulley 7, and draw ring 5 pulls guardrail 3, block 4 rises, while after driving construction personnel to rise to certain position, closes volume machine drawing 9, you can safety and firmness carries out high-altitude Construction personnel can also work at night, has worked if at night, can open headlamp 10 and illuminate construction area for operation Cheng Hou starts volume machine drawing 9, and volume machine drawing 9 rotates backward, and loosens steel wire rope 6, and block 4 and construction personnel are put back to ground, push back dress Set original position.
In order to further increase the quality of construction coherent-wall scaffolding cantilever, wheel bar 15 is welded on frustum of a cone support column 1, and ten thousand It is connected on wheel bar 15 to 16 bearings of wheel, guide rail 2 is welded on frustum of a cone support column 1, and first support bar 8 is welded on frustum of a cone branch On dagger 1,7 bearing of fixed pulley is connected in first support bar 8, and 3 sliding slot of guardrail is connected on guide rail 2, and block 4 is welded on guardrail On 3, second support bar 14 is welded on guardrail 3, and draw ring 5 is welded on guardrail 3, and steel wire rope 6 is hingedly connected on draw ring 5, steel The rolling of cord 6 is connected on fixed pulley 7, and fixed pulley 7 is welded in volume machine drawing 9, and volume machine drawing 9 is welded on frustum of a cone support column 1, Lamp stand 13 is welded in volume machine drawing 9, and lamp cantilever 12 is welded on lamp stand 13, and lampshade 11 is welded on lamp cantilever 12, headlamp 10 It is welded on lampshade 11.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by appending claims and equivalents.

Claims (7)

1. a kind of construction coherent-wall scaffolding cantilever arrangement, it is characterised in that:Including frustum of a cone support column (1), universal wheel (16), wheel bar (15) is respectively arranged in lamp stand (13), frustum of a cone support column (1) the bottom surface both ends, and wheel bar (15) end is set Set the universal wheel (16), frustum of a cone support column (1) the both sides setting guide rail (2), frustum of a cone support column (1) top two First support bar (8) is arranged in side, and first support bar (8) end is arranged fixed pulley (7), guardrail is arranged on the guide rail (2) (3), setting is blocked (4) on the guardrail (3), guardrail (3) the lower part setting second support bar (14), on the guardrail (3) Draw ring (5) is arranged in portion, and steel wire rope (6) is arranged on the draw ring (5), the fixed pulley (7) is arranged among the steel wire rope (6), Fixed pulley (7) the end setting volume machine drawing (9), the volume machine drawing (9) is arranged in frustum of a cone support column (1) top, described It rolls up machine drawing (9) upper surface and the lamp stand (13), lamp stand (13) the upper surface setting lamp cantilever (12), the lamp cantilever is set (12) end setting lampshade (11), the interior setting headlamp (10) of the lampshade (11).
2. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The wheel bar (15) it is welded on the frustum of a cone support column (1), universal wheel (16) bearing is connected on the wheel bar (15), described to lead Rail (2) is welded on the frustum of a cone support column (1).
3. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:Described first Strut (8) is welded on the frustum of a cone support column (1), and fixed pulley (7) bearing is connected to the first support bar (8) On, guardrail (3) sliding slot is connected on the guide rail (2).
4. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The block (4) it is welded on the guardrail (3), the second support bar (14) is welded on the guardrail (3), draw ring (5) welding On the guardrail (3).
5. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The steel wire rope (6) it is hingedly connected on the draw ring (5), the steel wire rope (6) rolls and is connected on the fixed pulley (7), the fixed pulley (7) it is welded on the volume machine drawing (9).
6. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The volume machine drawing (9) it is welded on the frustum of a cone support column (1), the lamp stand (13) is welded on the volume machine drawing (9), the lamp cantilever (12) it is welded on the lamp stand (13).
7. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The lampshade (11) it is welded on the lamp cantilever (12), the headlamp (10) is welded on the lampshade (11).
CN201721627588.9U 2017-11-29 2017-11-29 A kind of construction coherent-wall scaffolding cantilever arrangement Expired - Fee Related CN207647143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721627588.9U CN207647143U (en) 2017-11-29 2017-11-29 A kind of construction coherent-wall scaffolding cantilever arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721627588.9U CN207647143U (en) 2017-11-29 2017-11-29 A kind of construction coherent-wall scaffolding cantilever arrangement

Publications (1)

Publication Number Publication Date
CN207647143U true CN207647143U (en) 2018-07-24

Family

ID=62881616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721627588.9U Expired - Fee Related CN207647143U (en) 2017-11-29 2017-11-29 A kind of construction coherent-wall scaffolding cantilever arrangement

Country Status (1)

Country Link
CN (1) CN207647143U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118882A (en) * 2017-11-29 2018-06-05 江苏阿尔博装饰工程有限公司 A kind of construction coherent-wall scaffolding cantilever arrangement
CN108979119A (en) * 2018-08-20 2018-12-11 安徽长青建筑制品有限公司 A kind of construction coherent-wall scaffolding cantilever arrangement easy to use

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118882A (en) * 2017-11-29 2018-06-05 江苏阿尔博装饰工程有限公司 A kind of construction coherent-wall scaffolding cantilever arrangement
CN108979119A (en) * 2018-08-20 2018-12-11 安徽长青建筑制品有限公司 A kind of construction coherent-wall scaffolding cantilever arrangement easy to use
CN108979119B (en) * 2018-08-20 2021-01-08 安徽长青建筑制品有限公司 Construction attaches wall scaffold cantilever device convenient to use

Similar Documents

Publication Publication Date Title
CN207647143U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN211973504U (en) Hydraulic engineering concrete placement flat storehouse machine
CN210103356U (en) Device for safely and quickly transferring CCTV robot into pipeline
CN108118882A (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN207633732U (en) A kind of scaffold of architectural engineering
CN206321522U (en) A kind of section of jurisdiction experimental rig
CN211379063U (en) Edible mushroom cultivation big-arch shelter
CN112681711B (en) Building hanging basket for high-altitude operation of building engineering
CN212453549U (en) Liftable scaffold for building decoration
CN204109063U (en) Tube collecting device
CN209177937U (en) A kind of novel multi-use formula promotion vehicle
CN209261192U (en) A kind of Portable scaffold
CN203156957U (en) Cutting machine frame for laterally hung sliding block portable electric cutting machine
CN205558949U (en) A lower face -end support is adopted to anxious oblique coal seam longwell
CN208355043U (en) A kind of counter weight construction of Height-adjustable
CN214462364U (en) Scaffold frame for fitment construction that can freely go up and down
CN206108790U (en) Simple hoister
CN2637458Y (en) Light type goods crane machine
CN2748565Y (en) Electric lifting platform support for exterior wall operation
CN216406109U (en) Construction hanging basket for house building engineering
CN211873757U (en) Lifting multifunctional scaffold
CN207988468U (en) It is a kind of to stablize fixed building hanging basket
CN220867043U (en) Safe, reliable and quick high-altitude illumination lamp replacement device
CN211569967U (en) Coil of wire car device of putting on shelf
CN214462354U (en) Guide-insertion type scaffold for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724

Termination date: 20181129