CN207646702U - A kind of Bridge Pier Construction stabilization dynamic formula ice breaker - Google Patents

A kind of Bridge Pier Construction stabilization dynamic formula ice breaker Download PDF

Info

Publication number
CN207646702U
CN207646702U CN201721464044.5U CN201721464044U CN207646702U CN 207646702 U CN207646702 U CN 207646702U CN 201721464044 U CN201721464044 U CN 201721464044U CN 207646702 U CN207646702 U CN 207646702U
Authority
CN
China
Prior art keywords
ice
fixedly connected
bridge pier
montant
breaking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721464044.5U
Other languages
Chinese (zh)
Inventor
刘佳君
赵广龙
李开阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang Shengjinqi Machinery Co Ltd
Original Assignee
Xinchang Shengjinqi Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Shengjinqi Machinery Co Ltd filed Critical Xinchang Shengjinqi Machinery Co Ltd
Priority to CN201721464044.5U priority Critical patent/CN207646702U/en
Application granted granted Critical
Publication of CN207646702U publication Critical patent/CN207646702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of Bridge Pier Construction stabilization dynamic formula ice breakers, including carrying platform, the middle part of the carrying platform, which is run through, is equipped with through-hole, the upper end of the carrying platform is arranged with two the first montants, the upper end of two the first montants is inserted into the guiding vertical slot of the second montant lower end, the quantity of second montant is two, the left and right sides for placing transverse slat is respectively fixedly connected on the inside of the upper end of two the second montants, the joint of the central shaft and small short slab is equipped with ball bearing, and round wheel is socketed on the outside of central shaft, the circle wheel of setting moves in a circle on the inside of annular external disk, greatly enhance stability when rotation is bored in ice-breaking, reduce ice-breaking and bores the shake generated when rotation, the locating rod and inserted link of setting, the position of motor is fixed, the rotation that ice-breaking is bored does not interfere with the operation of motor.

Description

A kind of Bridge Pier Construction stabilization dynamic formula ice breaker
Technical field
The utility model is related to bridge construction correlative technology field, the stabilization dynamic formula ice-breaking of specially a kind of Bridge Pier Construction Machine.
Background technology
With the development of science and technology, the progress and innovation of social technology, the construction industry in China is also continuous Growing, various mechanical equipments, which coordinate, to be used, and building great development is promoted, in Bridge Pier Construction, since northern second half year weather is cold, Cause bridge pier to freeze with the water surface or lake surface joint, influence the subsequent construction of bridge pier, is all to utilize ice breaker pair in the prior art Ice sheet around bridge pier is crushed, and there are following drawbacks for this mode:
1. existing ice breaker is due to that need to use demand, so powerful motor is needed to drive bit operation, this ice breaker Job stability it is poor, the rotation of drill bit can drive single unit system to generate certain jitter and shaking so that drill ice-breaking Position is not fixed, and causes drilling ice-breaking efficiency low;
2. the thickness due to ice sheet is different, so ice breaker will adjust the upper-lower height of drill bit according to the position of ice sheet, but It is that the position of ice breaker drill bit is fixed, leads to the bad practicality of single unit system.
Utility model content
The purpose of this utility model is to provide a kind of Bridge Pier Construction stabilization dynamic formula ice breakers, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides the following technical solutions:A kind of Bridge Pier Construction stabilization dynamic formula ice-breaking Machine, including carrying platform, the middle part of the carrying platform, which is run through, is equipped with through-hole, and the upper end of the carrying platform is arranged with two The upper end of first montant, two the first montants is inserted into the guiding vertical slot of the second montant lower end, the quantity of second montant It is two, the left and right sides for placing transverse slat, the placement transverse slat upper end is respectively fixedly connected on the inside of the upper end of two the second montants Middle part is equipped with motor, is fixedly connected with the side of the first extension board at left and right sides of motor, the lower end of first extension board with The upper end for placing transverse slat is fitted and connected, and the upper end both sides for placing transverse slat are fixedly connected with one end of locating rod by mounting rod Downside, the other end of locating rod, which runs through, is equipped with channel, and one end of inserted link is plugged in channel, and the other end of inserted link is inserted into first and prolongs In the shrinkage pool for stretching plate upper end, the other end of the inserted link extends to the raised intracavitary of raised frame, and it is another that raised frame is located at locating rod The upside at end, and the other end of locating rod runs through the upper center of raised frame and is fixedly connected with the lower end for carrying button, it is described to carry button position In the top of raised frame, the shaft of the motor runs through the centre bore placed in the middle part of transverse slat and extends to the lower section for placing transverse slat, And the shaft of motor is fixedly connected with the upper end of ice-breaking brill, the lower end that the ice-breaking is bored is inserted into through-hole, and the upper end two that ice-breaking is bored Side is equipped with the second extension board, and the quantity of second extension board is two, and the upper and lower side of two the second extension boards is symmetrically set There are two small short slab, and two one end of small short slab far from the second extension board in side close to each other by center axis connection, The joint of the central shaft and small short slab is equipped with ball bearing, and round wheel is socketed on the outside of central shaft, the circle wheel Quantity is four, and one end of four circle wheels is fitted and connected on the inside of annular external disk.
Preferably, the quantity of the locating rod is two, equal with the joint of mounting rod on the downside of one end of two locating rods Equipped with floating bearing.
Preferably, the both sides of the inserted link other end be fixedly connected with fitting block side, two fitting block lower ends with Locating rod is fitted and connected, the top that two other ends for being bonded blocks pass through resetting spring connection bump chamber.
Preferably, the quantity of the annular external disk is two, and two annular external disks are arranged in the inside of the second montant.
Preferably, the upper end both sides of the carrying platform are fixedly connected with the lower end of guide cylinder, the upper end of guide cylinder Side arrangement is set there are two annulus, and one end of L-shaped bumping post is plugged in two annulus.
Preferably, one end side of the L-shaped bumping post is fixedly connected with one end of poke rod, on the downside of the other end of poke rod with The upper end of guide cylinder is fitted and connected, and the upside and the lower end of the second montant of the L-shaped bumping post other end are fitted and connected.
Compared with prior art, the utility model has the beneficial effects that:It is reasonable for structure, it is highly practical, it has the following advantages:
1. the circle wheel being arranged moves in a circle on the inside of annular external disk, greatly enhance steady when ice-breaking brill rotates It is qualitative, reduce ice-breaking and bore the shake generated when rotation, the position of motor is fixed in the locating rod and inserted link of setting, breaks The rotation of ice auger does not interfere with the operation of motor;
It, can when L-shaped bumping post is detached with the second montant 2. the position for the second montant of L-shaped bumping post pair being arranged is defined To adjust the upper-lower height that ice-breaking is bored according to the position of ice sheet, the drilling ice-breaking efficiency of single unit system is improved, is solved well Shortcoming in the prior art.
Description of the drawings
Fig. 1 is the utility model structural profile illustration;
Fig. 2 is structure enlargement diagram at A in the utility model Fig. 1;
Fig. 3 is structure enlargement diagram at B in the utility model Fig. 1.
In figure:Carrying platform 1, through-hole 2, ice-breaking bore the 3, first montant 4, the second montant 5, are oriented to vertical slot 51, place transverse slat 6, motor 7, locating rod 8, raised frame 9, carry button 10, inserted link 11, the first extension board 12, the second extension board 13, small short slab 14, circle wheel 15, annular external disk 16, guide cylinder 17, L-shaped bumping post 18, poke rod 19.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Bridge Pier Construction stabilization dynamic formula ice breaker, Including carrying platform 1, the middle part of carrying platform 1, which is run through, is equipped with through-hole 2, and the upper end of carrying platform 1 is arranged with two first and erects The upper end of bar 4, two the first montants 4 is inserted into the guiding vertical slot 51 of 5 lower end of the second montant, and the quantity of the second montant 5 is two It is a, it is respectively fixedly connected with the left and right sides for placing transverse slat 6 on the inside of the upper end of two the second montants 5, places 6 upper center of transverse slat and sets There are motor 7, the left and right sides of motor 7 to be fixedly connected with the side of the first extension board 12, the lower end of the first extension board 12 and placement The upper end of transverse slat 6 is fitted and connected, and the upper end both sides for placing transverse slat 6 are fixedly connected on the downside of one end of locating rod 8 by mounting rod, The quantity of locating rod 8 is two, and floating bearing is equipped with the joint of mounting rod on the downside of one end of two locating rods 8;
The other end of locating rod 8, which runs through, is equipped with channel, and one end of inserted link 11 is plugged in channel, and the other end of inserted link 11 is inserted In the shrinkage pool for entering 12 upper end of the first extension board, the other end of inserted link 11 extends to the raised intracavitary of raised frame 9,11 other end of inserted link Both sides be fixedly connected with fitting block side, two fitting blocks lower ends be fitted and connected with locating rod 8, two be bonded block it is another One end is by the top of resetting spring connection bump chamber, and raised frame 9 is located at the upside of 8 other end of locating rod, and locating rod 8 is another One end runs through the upper center of raised frame 9 and is fixedly connected with the lower end for carrying button 10;
The top that button 10 is located at raised frame 9 is carried, the shaft of motor 7 through the centre bore for placing 6 middle part of transverse slat and extends to The lower section of transverse slat 6 is placed, and the shaft of motor 7 is fixedly connected with the upper end that ice-breaking bores 3, the lower end that ice-breaking bores 3 is inserted into through-hole 2, And the upper end both sides of ice-breaking brill 3 are equipped with the second extension board 13, the quantity of the second extension board 13 is two, two the second extension boards 13 upper and lower side is arranged with two small short slabs 14, and the one end of two small short slabs 14 far from the second extension board 13 is mutually being leaned on Close side is equipped with ball bearing, and the outside of central shaft by center axis connection, the joint of central shaft and small short slab 14 It is socketed with circle wheel 15, the quantity of circle wheel 15 is four, and inside of the one end with annular external disk 16 of four circle wheels 15 is fitted and connected;
The circle wheel 15 of setting moves in a circle in 16 inside of annular external disk, when greatly enhancing ice-breaking 3 rotation of brill Stability, reduce the shake that generates when 3 rotation is bored in ice-breaking, the locating rod 8 and inserted link 11 of setting, to the position of motor 7 into Row is fixed, and the rotation of ice-breaking brill 3 does not interfere with the operation of motor 7;
The quantity of annular external disk 16 is two, and two annular external disks 16 are arranged in the inside of the second montant 5, and carrying is flat The upper end both sides of platform 1 are fixedly connected with the lower end of guide cylinder 17, and the upper end side arrangement of guide cylinder 17 is set there are two annulus, And one end of L-shaped bumping post 18 is plugged in two annulus, one end side of L-shaped bumping post 18 is fixedly connected with the one of poke rod 19 End, the other end downside and the upper end of guide cylinder 17 of poke rod 19 are fitted and connected, the upside and second of 18 other end of L-shaped bumping post The lower end of montant 5 is fitted and connected;
The L-shaped bumping post 18 of setting is defined the position of the second montant 5, when L-shaped bumping post 18 is detached with the second montant 5 When, the upper-lower height that ice-breaking bores 3 can be adjusted according to the position of ice sheet, improve the drilling ice-breaking efficiency of single unit system.
Operation principle:Rotational positioning bar 8 carries button 10 pulling up, and makes on lower end and the first extension board 12 of inserted link 11 The shrinkage pool at end is located on same plumb line, unclamps again and carries button 10, carries button 10 and is resetted under the action of resetting spring so that inserted link 11 It is inserted into shrinkage pool so that the position of motor 7 is fixed;
When the position of ice-breaking brill 3 needs adjustment, 90 degree of rotation poke rods 19 so that L-shaped bumping post 18 and the second montant 5 Lower end separation, L-shaped bumping post 18 is not supporting the second montant 5, at this point, 3 upper and lower position is bored in adjustable ice-breaking.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. the middle part of a kind of Bridge Pier Construction stabilization dynamic formula ice breaker, including carrying platform (1), the carrying platform (1) is run through Equipped with through-hole (2), it is characterised in that:The upper end of the carrying platform (1) is arranged with two the first montants (4), two first The upper end of montant (4) is inserted into the guiding vertical slot (51) of the second montant (5) lower end, and the quantity of second montant (5) is two It is a, the left and right sides for placing transverse slat (6), the placement transverse slat (6) are respectively fixedly connected on the inside of the upper end of two the second montants (5) Upper center is equipped with motor (7), is fixedly connected with the side of the first extension board (12) at left and right sides of motor (7), and described first The lower end of extension board (12) is fitted and connected with the upper end for placing transverse slat (6), and the upper end both sides for placing transverse slat (6) pass through peace Dress bar is fixedly connected on the downside of one end of locating rod (8), and the other end of locating rod (8), which runs through, is equipped with channel, is plugged in channel slotting One end of bar (11), the other end of inserted link (11) are inserted into the shrinkage pool of the first extension board (12) upper end, the inserted link (11) it is another One end extends to the raised intracavitary of raised frame (9), and raised frame (9) is located at the upside of locating rod (8) other end, and locating rod (8) The other end run through the upper center of raised frame (9) and be fixedly connected with the lower end for carrying button (10), the button (10) that carries is located at protrusion The shaft of the top of frame (9), the motor (7) through the centre bore placed in the middle part of transverse slat (6) and extends to placement transverse slat (6) Lower section, and the shaft of motor (7) is fixedly connected with the upper end that (3) are bored in ice-breaking, the lower end that (3) are bored in the ice-breaking is inserted into through-hole (2), And the upper end both sides of ice-breaking brill (3) are equipped with the second extension board (13), the quantity of second extension board (13) is two, two The upper and lower side of second extension board (13) is arranged with two small short slab (14), and two small short slab (14) is far from the second extension board (13) one end is equipped in side close to each other by center axis connection, the central shaft and the joint of small short slab (14) Ball bearing, and be socketed with circle on the outside of central shaft and take turns (15), the quantity of the circle wheel (15) is four, and four circles are taken turns (15) One end is fitted and connected on the inside of annular external disk (16).
2. a kind of Bridge Pier Construction according to claim 1 stabilization dynamic formula ice breaker, it is characterised in that:The locating rod (8) quantity is two, and floating bearing is equipped with the joint of mounting rod on the downside of one end of two locating rods (8).
3. a kind of Bridge Pier Construction according to claim 1 stabilization dynamic formula ice breaker, it is characterised in that:The inserted link (11) The both sides of the other end are fixedly connected with the side of fitting block, and the lower end of two fitting blocks is fitted and connected with locating rod (8), two patches Close the top that the other end of block passes through resetting spring connection bump chamber.
4. a kind of Bridge Pier Construction according to claim 1 stabilization dynamic formula ice breaker, it is characterised in that:The annular external disk (16) quantity is two, and two annular external disks (16) are arranged in the inside of the second montant (5).
5. a kind of Bridge Pier Construction according to claim 1 stabilization dynamic formula ice breaker, it is characterised in that:The carrying platform (1) upper end both sides are fixedly connected with the lower end of guide cylinder (17), there are two the upper end side arrangement of guide cylinder (17) is set Annulus, and one end of L-shaped bumping post (18) is plugged in two annulus.
6. a kind of Bridge Pier Construction according to claim 5 stabilization dynamic formula ice breaker, it is characterised in that:The L-shaped bumping post (18) one end side is fixedly connected with one end of poke rod (19), other end downside and the guide cylinder (17) of poke rod (19) Upper end is fitted and connected, and the upside and the lower end of the second montant (5) of L-shaped bumping post (18) other end are fitted and connected.
CN201721464044.5U 2017-11-06 2017-11-06 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker Expired - Fee Related CN207646702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721464044.5U CN207646702U (en) 2017-11-06 2017-11-06 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721464044.5U CN207646702U (en) 2017-11-06 2017-11-06 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker

Publications (1)

Publication Number Publication Date
CN207646702U true CN207646702U (en) 2018-07-24

Family

ID=62884603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721464044.5U Expired - Fee Related CN207646702U (en) 2017-11-06 2017-11-06 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker

Country Status (1)

Country Link
CN (1) CN207646702U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630442A (en) * 2017-11-06 2018-01-26 刘佳君 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker
CN109629536A (en) * 2018-12-25 2019-04-16 大连交通大学 A kind of packaged type ice face perforating device for fishing
CN110529039A (en) * 2019-09-06 2019-12-03 绍兴多卡机械设备有限公司 A kind of ice sheet perforator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630442A (en) * 2017-11-06 2018-01-26 刘佳君 A kind of Bridge Pier Construction stabilization dynamic formula ice breaker
CN109629536A (en) * 2018-12-25 2019-04-16 大连交通大学 A kind of packaged type ice face perforating device for fishing
CN110529039A (en) * 2019-09-06 2019-12-03 绍兴多卡机械设备有限公司 A kind of ice sheet perforator

Similar Documents

Publication Publication Date Title
CN207646702U (en) A kind of Bridge Pier Construction stabilization dynamic formula ice breaker
CN109236183A (en) A kind of bridge construction rotary drilling rig
CN207263174U (en) A kind of engineering mapping surveying instrument positioner
CN111441611A (en) Energy-concerving and environment-protective building strutting arrangement for civil engineering
CN108487292A (en) A kind of bridge girder anti-seismic bearing
CN207177340U (en) A kind of building support
CN107630442A (en) A kind of Bridge Pier Construction stabilization dynamic formula ice breaker
CN208122756U (en) A kind of highway engineering road surface reparation lift drilling equipment
CN216791333U (en) Water level viewing device for hydraulic engineering
CN208945219U (en) Drilling tool and hole-drilling system for the drilling of rail washer
CN214247234U (en) Well drilling auxiliary positioning device
CN104831643A (en) Jacking device used for bridge construction
CN208323839U (en) A kind of building stone multi-directional drilling device
CN206055097U (en) A kind of lathe support meanss
CN104595359B (en) Slideway unit mechanism
CN108817479B (en) A kind of slant hole processing device
CN106812325A (en) A kind of civil construction ground device for planning
CN206351264U (en) A kind of depth drill support meanss
CN206812238U (en) A kind of stone oblique drilling machine easy to use
CN214615442U (en) Connecting frame for civil engineering
CN208043621U (en) A kind of device for wave cut experiment
CN208536850U (en) It is a kind of that the frame for line marking instrument adjusting seat of horizontal reference and plumb datum can be provided
CN207923044U (en) The space relative deformation measuring device of disk and lower wall in a kind of in-situ rock joint plane
CN206860088U (en) A kind of architectural engineering rig hole-forming device
CN207211142U (en) A kind of stake machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724

Termination date: 20181106