CN207646615U - A kind of New-Type Bridge Girder Erection Machine - Google Patents
A kind of New-Type Bridge Girder Erection Machine Download PDFInfo
- Publication number
- CN207646615U CN207646615U CN201721571192.7U CN201721571192U CN207646615U CN 207646615 U CN207646615 U CN 207646615U CN 201721571192 U CN201721571192 U CN 201721571192U CN 207646615 U CN207646615 U CN 207646615U
- Authority
- CN
- China
- Prior art keywords
- main body
- bridge erector
- trolley
- bridge
- erector main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229920001971 elastomer Polymers 0.000 claims abstract description 19
- 239000000806 elastomer Substances 0.000 claims abstract description 16
- 230000032258 transport Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000013016 damping Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 244000062793 Sorghum vulgare Species 0.000 abstract description 21
- 235000019713 millet Nutrition 0.000 abstract description 21
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of New-Type Bridge Girder Erection Machines, including Bridge Erector main body, it is welded with fore-stock below the Bridge Erector main body right end, lower section is welded with middle holder in the middle part of the Bridge Erector main body, it is fixedly connected with after-poppet on the left of the Bridge Erector main body, it is bonded with shaft on the left of the after-poppet, it is rotatably connected solar panel on the left of the shaft, it is electrically connected with the first trolley and the second trolley above the Bridge Erector main body, it is welded with auxiliary device below second trolley, it is provided with the beam car on Ji Liang between the middle holder and after-poppet, the auxiliary device includes crossbeam, longeron, connecting rod, push-rod electric machine, bracket and elastomer block.The New-Type Bridge Girder Erection Machine, when the first trolley and the second trolley transport prefabricated fine strain of millet piece, the push-rod electric machine of auxiliary device can make elastomer block push prefabricated fine strain of millet piece, and preferably to adjust the location status of prefabricated fine strain of millet piece, solar energy can be efficiently used using solar panel.
Description
Technical field
The utility model belongs to Bridge Erector technical field, and in particular to a kind of New-Type Bridge Girder Erection Machine.
Background technology
Bridge Erector is exactly that prefabricated beam piece is placed into the equipment that prefabricated bridge pier gets on.Bridge Erector belongs to crane
Scope is put down because its major function is to lift beam piece after being then transported to position.But itself and crane in general sense
It is very different.Its desired condition is harsh, and there are beam on piece travelings, or cries vertical shift.It is public that Bridge Erector is divided into erection
Road and bridge, conventional railway bridge, railway of passengers' private line bridge etc. are several.In order to preferably make Bridge Erector complete work, Bridge Erector should be directed to and established
A set of perfect maintenance system.Sealed up for safekeeping from installation, mode, running, storage etc., each link have stringent pipe
Reason method makes Bridge Erector be in good technology status always.In addition, the monitoring of reply Bridge Erector strengthened condition and fault diagnosis,
Ensure Bridge Erector safe operation.Certain structure auxiliary, preferably to be conveyed, current New-Type Bridge Girder Erection Machine are also needed to simultaneously
There is also deficiencies, how preferably to convey prefabricated fine strain of millet piece and need to develop.
It is now sought after a kind of New-Type Bridge Girder Erection Machine, the push-rod electric machine of auxiliary device can make elastomer block push prefabricated fine strain of millet piece,
To push fine strain of millet piece to shift, meanwhile, shaft drives solar panel can also preferably utilize solar energy.
Invention content
The purpose of this utility model is to provide a kind of New-Type Bridge Girder Erection Machines, to solve mentioned above in the background art ask
Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of New-Type Bridge Girder Erection Machine, including bridge formation owner
Body, the Bridge Erector main body right end lower section are welded with fore-stock, and lower section is welded with middle holder in the middle part of the Bridge Erector main body, described
It is fixedly connected with after-poppet on the left of Bridge Erector main body, shaft, the rotatable company in shaft left side are bonded on the left of the after-poppet
It is connected to the solar panel being electrically connected with Bridge Erector main body, is slidably connected and is electrically connected with above the Bridge Erector main body
First trolley and the second trolley, first trolley are located at the left side of two the second trolleys, and described
It is welded with two auxiliary devices for being located at Bridge Erector body side below two trolleys, is set between the middle holder and after-poppet
It is equipped with the beam car on the Ji Liang, the auxiliary device includes crossbeam, longeron, connecting rod, push-rod electric machine, bracket and elastomer block,
It is welded with the longeron positioned at Bridge Erector body side below the crossbeam left end, longeron lower half portion is fixedly connected with company
Bar, the connecting rod lower section are bonded with push-rod electric machine, and the push-rod electric machine right end is fixedly connected on bracket, the bracket surface bonding
Flexible piece.
Preferably, the shaft is Damping rotation shaft.
Preferably, the beam car is generator beam car.
Preferably, the Bridge Erector main body includes the girder being made of multiple tilting reinforcing bars and four girder steels, four masters
Beam right end is integrated by connecting reinforcement welding.
Preferably, the elastomer block is rubber block.
The technique effect and advantage of the utility model:The New-Type Bridge Girder Erection Machine, by being provided with shaft and solar panel,
Pivot is manually controlled, the position of solar panel can be changed, preferably to receive the energy of the sun, while fine land productivity
The characteristics of with Bridge Erector long-time outside work, by being provided with the second trolley and auxiliary device, in the first trolley
When transporting prefabricated fine strain of millet piece with the second trolley, the push-rod electric machine of auxiliary device can drive bracket to move, and elastomer block is made to push away
It moves prefabricated fine strain of millet piece and certain movement occurs, to adapt to actual needs;The New-Type Bridge Girder Erection Machine, in the first trolley and
When two trolleys transport prefabricated fine strain of millet piece, the push-rod electric machine of auxiliary device can make elastomer block push prefabricated fine strain of millet piece, with
The location status for preferably adjusting prefabricated beam piece can efficiently use solar energy using solar panel.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the auxiliary device concrete structure schematic diagram in Fig. 1.
In figure:Holder, 4 after-poppets, 5 solar panels, 51 shafts, 6 first in 1 Bridge Erector main body, 2 fore-stocks, 3
Trolley, 7 second trolleys, 8 beam cars, 9 auxiliary devices, 91 crossbeams, 92 longerons, 93 connecting rods, 94 push-rod electric machines, 95
Bracket, 96 elastomer blocks.
Specific implementation mode
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Referring to Fig. 1, a kind of New-Type Bridge Girder Erection Machine, including Bridge Erector main body 1, the Bridge Erector main body 1 include by multiple oblique
The girder of the reinforcing bar set and four girder steels composition, four girder right ends are integrated by connecting reinforcement welding, the bridge formation owner
It is welded with fore-stock 2 below 1 right end of body, in supporting bridge formation owner body 1,1 middle part lower section of the Bridge Erector main body to be welded with
Holder 3 is fixedly connected with after-poppet 4, for supporting Bridge Erector for supporting bridge formation owner body 1 on the left of the Bridge Erector main body
Main body 1,4 left side of the after-poppet are bonded with shaft 51, and the shaft 51 is Damping rotation shaft, has preferable stability, described
51 left side of shaft is rotatably connected the solar panel 5 being electrically connected with Bridge Erector main body 1, and the sun can be changed in shaft 51
The position of energy solar panel 5 absorbs the electric energy that solar energy is converted to Bridge Erector main body 1, and 1 top of Bridge Erector main body is slided described in electric energy
The first trolley 6 and the second trolley 7 are connected and are electrically connected with, the first trolley 6 and the second trolley 7 can
Prefabricated fine strain of millet piece is risen, and drives prefabricated fine strain of millet piece horizontal motion, first trolley 6 is located at two the
The left side of two trolleys 7, second trolley, 7 lower section are welded with the auxiliary that two are located at 1 side of Bridge Erector main body and fill
9 are set, the lifting of the second trolley 7 can be assisted to transport work, be provided with positioned at base between the middle holder 3 and after-poppet 4
Beam car 8 on beam transports prefabricated fine strain of millet piece to 1 lower section of Bridge Erector main body, and the beam car 8 is generator beam car, profit
With generator, help to adapt to working environment.
Please refer to Fig. 1 and Fig. 2, the auxiliary device 9 include crossbeam 91, longeron 92, connecting rod 93, push-rod electric machine 94,
Bracket 95 and elastomer block 96,91 left end of crossbeam lower section are welded with the longeron 92 positioned at 1 side of Bridge Erector main body, the longeron
92 lower half portion are fixedly connected with connecting rod 93, and 93 lower section of the connecting rod is bonded with push-rod electric machine 94, and connecting rod 93 makes push-rod electric machine 94
It steadily works, 94 right end of the push-rod electric machine is fixedly connected on bracket 95, and push-rod electric machine 94 drives bracket 95 or so past
Multiple movement, 95 surface of the bracket are bonded with elastomer block 96, and it is rubber block that bracket 95, which supports elastomer block 96, the elastomer block 96,.
With preferable elasticity.
The course of work:By fore-stock frame on bridge pier, on Ji Liang, beam car 8 will be prefabricated for middle holder 3 and 4 frame of after-poppet
Good fine strain of millet piece transports 1 lower section of Bridge Erector main body, is hung the suspension hook of the first trolley 6 and the second trolley 7 using manpower
Firmly prefabricated fine strain of millet piece controls the fortune to the right of the first trolley 6 and the second trolley 7 by controlling bridge formation owner body 1
It is dynamic, then push-rod electric machine 94 is manually controlled, make push-rod electric machine 94 that bracket 95 be driven to move, elastomer block 96 touch prefabricated fine strain of millet piece one
Face simultaneously pushes prefabricated fine strain of millet piece to change position, and the position of prefabricated fine strain of millet piece can be preferably adjusted by four auxiliary devices 9
Then prefabricated fine strain of millet piece puts down and supported by bridge pier by state, further complete the transport of multiple prefabricated fine strain of millet pieces, in advance
During the fine strain of millet piece movement made, solar panel 5 gives Bridge Erector main body 1 to provide electric energy using solar power generation, can be compared with
The characteristics of utilizing Bridge Erector outside work well.
Finally it is pointed out that above example is only the more representational example of the utility model.Obviously, this practicality is new
Type is not limited to the above embodiments, and acceptable there are many deformations.Every foundation the technical essence of the utility model is to above example
Made by any simple modification, equivalent change and modification, be considered as belonging to the scope of protection of the utility model.
Claims (5)
1. a kind of New-Type Bridge Girder Erection Machine, including Bridge Erector main body (1), it is characterised in that:Weldering below Bridge Erector main body (1) right end
It is connected to fore-stock (2), lower section is welded with middle holder (3) in the middle part of the Bridge Erector main body (1), is fixed on the left of the Bridge Erector main body
It is connected with after-poppet (4), shaft (51) is bonded on the left of the after-poppet (4), has been rotatably connected on the left of the shaft (51)
The solar panel (5) being electrically connected with Bridge Erector main body (1), is slidably connected above the Bridge Erector main body (1) and electrically
It is connected with the first trolley (6) and the second trolley (7), it is small that first trolley (6) is located at two the second liftings
The left side of vehicle (7), the second trolley (7) lower section are welded with two auxiliary devices for being located at Bridge Erector main body (1) side
(9), the beam car (8) on Ji Liang, auxiliary device (9) packet are provided between the middle holder (3) and after-poppet (4)
Crossbeam (91), longeron (92), connecting rod (93), push-rod electric machine (94), bracket (95) and elastomer block (96) are included, the crossbeam (91) is left
End lower section is welded with the longeron (92) positioned at Bridge Erector main body (1) side, and the longeron (92) lower half portion is fixedly connected with company
Bar (93), connecting rod (93) lower section are bonded with push-rod electric machine (94), and push-rod electric machine (94) right end is fixedly connected on bracket
(95), bracket (95) surface is bonded with elastomer block (96).
2. a kind of New-Type Bridge Girder Erection Machine according to claim 1, it is characterised in that:The shaft (51) is Damping rotation shaft.
3. a kind of New-Type Bridge Girder Erection Machine according to claim 1, it is characterised in that:The beam car (8) is that generator transports beam
Vehicle.
4. a kind of New-Type Bridge Girder Erection Machine according to claim 1, it is characterised in that:The Bridge Erector main body (1) includes by more
The girder of a tilting reinforcing bar and four girder steels composition, four girder right ends are integrated by connecting reinforcement welding.
5. a kind of New-Type Bridge Girder Erection Machine according to claim 1, it is characterised in that:The elastomer block (96) is rubber block.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721571192.7U CN207646615U (en) | 2017-11-22 | 2017-11-22 | A kind of New-Type Bridge Girder Erection Machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721571192.7U CN207646615U (en) | 2017-11-22 | 2017-11-22 | A kind of New-Type Bridge Girder Erection Machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207646615U true CN207646615U (en) | 2018-07-24 |
Family
ID=62889491
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721571192.7U Active CN207646615U (en) | 2017-11-22 | 2017-11-22 | A kind of New-Type Bridge Girder Erection Machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207646615U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304551A (en) * | 2019-08-08 | 2019-10-08 | 陕西理工大学 | Precise girder drop wireless control system and method for bridge erecting machine based on machine vision |
| CN111455869A (en) * | 2020-04-15 | 2020-07-28 | 河南邦特威机电设备有限公司 | Steel truss accurate positioning device with transverse beam moving and longitudinal beam moving functions |
-
2017
- 2017-11-22 CN CN201721571192.7U patent/CN207646615U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304551A (en) * | 2019-08-08 | 2019-10-08 | 陕西理工大学 | Precise girder drop wireless control system and method for bridge erecting machine based on machine vision |
| CN110304551B (en) * | 2019-08-08 | 2024-05-07 | 陕西理工大学 | Machine vision-based bridge girder erection machine accurate girder dropping wireless control system and method |
| CN111455869A (en) * | 2020-04-15 | 2020-07-28 | 河南邦特威机电设备有限公司 | Steel truss accurate positioning device with transverse beam moving and longitudinal beam moving functions |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207192167U (en) | A kind of four-wheel, which synchronously switches tracks, welds material transfer vehicle | |
| CN201660380U (en) | Novel hoisting transportation vehicle | |
| CN201980846U (en) | Air turnover hoisting tool used for sleeper mold | |
| CN212609137U (en) | L-shaped cantilever type gantry crane | |
| CN102849627A (en) | Cathode transporting crown block of transfer system for centralized overhaul of electrolytic bath | |
| CN207646615U (en) | A kind of New-Type Bridge Girder Erection Machine | |
| CN201284462Y (en) | Bridging machine for both highway and railway | |
| CN103787203B (en) | For installing the bracing frame of precast beam jack | |
| CN101417770B (en) | Turnable positioner for turning over large-sized extruding press housing window and construction method using the same | |
| CN203602254U (en) | Support frame for installing precast beam jack | |
| CN206233099U (en) | A kind of Collison fence for bridge construction and security protection platform | |
| CN202879487U (en) | Transfer carriage in steel box | |
| CN201428112Y (en) | Push trolley device for installation and removal of steel side template | |
| CN204368955U (en) | A kind of convertible concrete conveyance stack pallet | |
| CN108275579A (en) | Pipeline fast dismounting device in a kind of tunnel | |
| CN206955487U (en) | It is exclusively used in lifting steel pipes and the crane device of welding | |
| CN111006068A (en) | Large steel pipe transportation welding alignment tool car and use method thereof | |
| CN206503081U (en) | Packaged type box girder formwork | |
| CN115432603A (en) | Chassis device of trackless mobile tower crane | |
| CN207293955U (en) | The railway track construction for possessing new derricking gear is hung with just beam is traversing | |
| CN207293991U (en) | The railway track construction for possessing lifting beam end support function is hung with just beam is traversing | |
| CN107867300B (en) | A kind of rail flat car for transporting beam on steel truss girder main framing | |
| CN205677642U (en) | The transport laying apparatus of permanent dividing plate in a kind of electric power tunnel | |
| CN222961005U (en) | Arch beam type lifting equipment | |
| CN206429256U (en) | A kind of tunnel duct piece automatic turnover machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |