CN207634542U - Ball assembly tooling and with its bearing group installing it is standby - Google Patents

Ball assembly tooling and with its bearing group installing it is standby Download PDF

Info

Publication number
CN207634542U
CN207634542U CN201721741286.4U CN201721741286U CN207634542U CN 207634542 U CN207634542 U CN 207634542U CN 201721741286 U CN201721741286 U CN 201721741286U CN 207634542 U CN207634542 U CN 207634542U
Authority
CN
China
Prior art keywords
ball
assembly
retainer
arrangement board
assembly tooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721741286.4U
Other languages
Chinese (zh)
Inventor
姜益民
刘佳强
宋家涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Gree Intelligent Equipment Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201721741286.4U priority Critical patent/CN207634542U/en
Application granted granted Critical
Publication of CN207634542U publication Critical patent/CN207634542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model provide a kind of ball assembly tooling and with its bearing group installing it is standby, ball assembly tooling includes:Assemble rack;Ball arrangement board, ball arrangement board is mounted in assembly rack, the ball holding tank for accommodating ball is provided on ball arrangement board, ball holding tank is multiple, and multiple ball holding tanks are circumferentially spaced to be arranged so that the multiple balls being distributed in multiple ball holding tanks are adapted with the retainer of bearing assembly;Storage bin, storage bin are arranged between the top of ball arrangement board, the discharge port and ball arrangement board of storage bin with for making the ball in storage bin fall into the ball feeding gap in simultaneously detent ball holding tank;Wherein, ball arrangement board is movably disposed relative to storage bin, so as to be arranged in multiple ball holding tanks by the ball dropped out in storage bin.The ball assembly tooling solves the problems, such as that the packaging efficiency in the prior art to plastic bearing is relatively low.

Description

Ball assembly tooling and with its bearing group installing it is standby
Technical field
The utility model is related to bearings to assemble field, in particular to a kind of ball assembly tooling and with its axis Hold assembling equipment.
Background technology
In recent years, engineering plastic product is more and more widely used with its excellent performance.Engineering plastics are in bearing On have broad prospects, plastic bearing is just welcome by more and more users.
Since engineering plastics have the characteristics that excellent self lubricity, wear-resisting, low friction and special seizure resistance, even if Also it can work normally in the case that lubricating condition is undesirable, thus it is ideal that it, which is used as bearing material,.
Currently, the plastic bearing used can be generally divided into plastics rolling bearing and plastic sliding bearing;The plastics axis of rolling Holding can be distinguished with the operation principle of plastic sliding bearing by title, what plastics rolling bearing occurred when working Friction is rolling friction, and the material for depending mainly on the size of bearing sliding surface of plastic sliding bearing frictional force.
However, in the prior art for the assembling of plastic bearing, using manually being assembled, this packaging efficiency compared with It is low, it is unfavorable for the production efficiency of plastic bearing.
Utility model content
The main purpose of the utility model is to provide a kind of ball assembly tooling and with its bearing group installing it is standby, with Solve the problems, such as that the packaging efficiency in the prior art to plastic bearing is relatively low.
To achieve the goals above, one side according to the present utility model provides a kind of ball assembly tooling, packet It includes:Assemble rack;Ball arrangement board, ball arrangement board are mounted in assembly rack, are provided on ball arrangement board for accommodating The ball holding tank of ball, ball holding tank are multiple, and multiple ball holding tanks are circumferentially spaced to be arranged so as to be distributed in Multiple balls in multiple ball holding tanks are adapted with the retainer of bearing assembly;Storage bin, storage bin setting are arranged in ball The top of strake has between the discharge port and ball arrangement board of storage bin for making the ball in storage bin fall into and positioning rolling Ball feeding gap in pearl holding tank;Wherein, ball arrangement board is movably disposed relative to storage bin, so that by storage bin The ball inside dropped out is arranged in multiple ball holding tanks.
Further, ball assembly tooling further includes:Retainer working plate, retainer working plate are mounted on assembly rack On, to carry and position the retainer of bearing assembly;There are multiple ball suckers, multiple balls to inhale for Suction cup assembly, Suction cup assembly Disk is arranged correspondingly with the ball in multiple ball holding tanks, to draw multiple balls and be placed on multiple balls On the retainer on retainer working plate.
Further, ball assembly tooling further includes:Ball presses bottom plate, and ball pressing bottom plate vertically moves Ground is arranged in the ball indentation retainer that will be placed in the top of retainer working plate on retainer.
Further, ball assembly tooling further includes:Ball presses panel, and ball pressing panel vertically moves Ground is arranged, and ball pressing bottom plate, which is arranged, to be pressed the lower section of panel in ball and connect with ball pressing bottom plate, to drive ball pressure Close bottom plate movement.
Further, ball assembly tooling further includes:Cylinder is pressed, pressing cylinder is mounted in assembly rack, presses gas The piston rod of cylinder is connect with ball pressing panel, to drive ball pressing panel movement.
Further, assembly rack includes:Cylinder mount bracket, Cylinder mount bracket at least partly prolong in the horizontal direction It stretches, the cylinder body for pressing cylinder is mounted on Cylinder mount bracket.
Further, assembly rack includes:Main frame body is assembled, ball arrangement board is movably mounted at assembly main frame body On;Frame body is pressed, pressing frame body connect with assembly main frame body and is located at the top of assembly main frame body, and retainer working plate is mounted on It assembles on main frame body;Connecting bracket, connecting bracket setting is between assembly main frame body and pressing frame body, with the main frame body that is linked and packed With pressing frame body.
Further, ball assembly tooling further includes:Ball detection plate is provided with multiple balls detections in ball detection plate Hole, multiple ball detection holes are arranged correspondingly with the multiple balls being equipped on the retainer of ball, so that on retainer Multiple balls block correspondingly in corresponding ball detection hole;Multiple detection parts, multiple detection part settings exist The lower section of ball detection plate, multiple detection parts are arranged correspondingly with multiple ball detection holes, are examined with detecting each ball Whether ball has been blocked in gaging hole.
Further, ball assembly tooling further includes:Arrangement board pusher cylinder, arrangement board pusher cylinder are mounted on assembly machine On frame, piston rod and the ball arrangement board of arrangement board pusher cylinder are drivingly connected, to drive ball arrangement board to move.
Another aspect according to the present utility model, it is standby to provide a kind of installing of bearing group, for assembling plastic bearing, bearing Assembling equipment includes ball assembly tooling, and ball assembly tooling is above-mentioned ball assembly tooling.
Ball assembly tooling in the utility model includes assembly rack, ball arrangement board and storage bin, ball arrangement board In assembly rack, be provided with the ball holding tank for accommodating ball on ball arrangement board, ball holding tank be it is multiple, Multiple ball holding tanks are circumferentially spaced to be arranged so that the multiple balls and bearing group being distributed in multiple ball holding tanks The retainer of part is adapted;Storage bin is arranged between the top of ball arrangement board, the discharge port and ball arrangement board of storage bin With for making the ball in storage bin fall into the ball feeding gap in simultaneously detent ball holding tank.In this way, ball is made to arrange Plate is movably disposed relative to storage bin, can be so as to be arranged in multiple ball holding tanks by the ball dropped out in storage bin It is interior, and then the arrangement of ball corresponding retainer is realized, at this point, captured each ball to retainer using sucker, More easily to realize the assembling between retainer and ball, to solve the assembling in the prior art to plastic bearing Less efficient problem.
Description of the drawings
The accompanying drawings which form a part of this application are used to provide a further understanding of the present invention, this practicality Novel illustrative embodiments and their description are not constituted improper limits to the present invention for explaining the utility model. In the accompanying drawings:
Fig. 1 shows the structural schematic diagram of the embodiment of ball assembly tooling according to the present utility model;
Fig. 2 shows the front views of the ball assembly tooling in Fig. 1;And
Fig. 3 shows the side view of the ball assembly tooling in Fig. 1.
Wherein, above-mentioned attached drawing includes the following drawings label:
13, retainer;610, rack is assembled;611, Cylinder mount bracket;612, main frame body is assembled;613, frame body is pressed; 614, connecting bracket;620, ball arrangement board;621, ball holding tank;630, storage bin;641, retainer working plate;642, it rolls Pearl presses bottom plate;643, ball presses panel;650, cylinder is pressed;660, ball detection plate;661, ball detection hole;670, it arranges Strake pusher cylinder.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
The utility model provides a kind of ball assembly tooling, please refers to Fig.1 to Fig. 3, ball assembly tooling includes:Assembly Rack 610;Ball arrangement board 620, ball arrangement board 620 are mounted in assembly rack 610, are provided on ball arrangement board 620 Ball holding tank 621 for accommodating ball, ball holding tank 621 be it is multiple, multiple ball holding tanks 621 along the circumferential direction between Every setting so that the multiple balls being distributed in multiple ball holding tanks 621 are adapted with the retainer 13 of bearing assembly;Storing Storehouse 630, storage bin 630 are arranged between the top of ball arrangement board 620, the discharge port and ball arrangement board 620 of storage bin 630 With for making the ball in storage bin 630 fall into the ball feeding gap in simultaneously detent ball holding tank 621;Wherein, ball Arrangement board 620 is movably disposed relative to storage bin 630, so as to be arranged in multiple rollings by the ball dropped out in storage bin 630 In pearl holding tank 621.
Ball assembly tooling in the utility model includes assembly rack 610, ball arrangement board 620 and storage bin 630, rolling Pearl arrangement board 620 is mounted in assembly rack 610, and the ball holding tank for accommodating ball is provided on ball arrangement board 620 621, ball holding tank 621 is multiple, and multiple ball holding tanks 621 are circumferentially spaced to be arranged so as to be distributed in multiple balls Multiple balls in holding tank 621 are adapted with the retainer 13 of bearing assembly;Storage bin 630 is arranged in ball arrangement board 620 Top, between the discharge port and ball arrangement board 620 of storage bin 630 have for making the ball in storage bin 630 fall into simultaneously Ball feeding gap in detent ball holding tank 621.In this way, make ball arrangement board 620 relative to storage bin 630 movably Setting, can be so as to be arranged in by the ball dropped out in storage bin 630 in multiple ball holding tanks 621, and then realizes ball The arrangement of corresponding retainer can more easily realize guarantor at this point, capturing each ball to retainer using sucker The assembling between frame and ball is held, to solve the problems, such as that the packaging efficiency in the prior art to plastic bearing is relatively low.
Preferably, ball feeding gap is less than the diameter of a ball.In this way, blanking can more easily be realized, just In ball is arranged on ball arrangement board 620.
In order to realize the positioning to retainer 13, as shown in Figure 1, ball assembly tooling further includes:Retainer working plate 641, retainer working plate 641 is mounted in assembly rack 610, to carry and position the retainer 13 of bearing assembly;Sucker group Part, Suction cup assembly have multiple ball suckers, multiple ball suckers and the ball one in multiple ball holding tanks 621 a pair of It is arranged with answering, on the retainer drawing multiple balls and multiple balls are placed on retainer working plate 641.Pass through Suction cup assembly is set, more easily multiple balls can be transported on retainer 13.
Preferably, Suction cup assembly includes multiple suckers, and multiple suckers are set correspondingly with multiple ball holding tanks 621 It sets, to draw the ball in each ball holding tank 621.Preferably, ball holding tank 621 is 16, and Suction cup assembly includes 16 A sucker.
Preferably, retainer mounting groove is provided on retainer working plate 641, retainer is mounted on the retainer mounting groove It is interior.
In order to which more easily ball is pressed into retainer 13, as shown in Figure 1, ball assembly tooling further includes:Ball Bottom plate 642 is pressed, ball pressing bottom plate 642 is disposed movably in a vertical direction to the top of retainer working plate 641, will It is placed in the ball indentation retainer on retainer.
In order to realize that ball presses the vertical shift of bottom plate 642, as shown in Figure 1, ball assembly tooling further includes:Ball pressure Panel 643 is closed, ball pressing panel 643 is arranged movably in a vertical direction, and ball presses the setting of bottom plate 642 and pressed in ball The lower section of panel 643 is simultaneously connect with ball pressing bottom plate 642, to drive ball pressing bottom plate 642 to move.
In order to drive ball pressing panel 643 to move, as shown in Figure 1 to Figure 3, ball assembly tooling further includes:Pressing Cylinder 650, pressing cylinder 650 are mounted in assembly rack 610, and the piston rod and ball pressing panel 643 for pressing cylinder 650 connect It connects, to drive ball pressing panel 643 to move.
In the present embodiment, assembly rack 610 includes:Cylinder mount bracket 611, at least portion of Cylinder mount bracket 611 Point horizontally extending, the cylinder body of pressing cylinder 650 is mounted on Cylinder mount bracket 611.Branch is installed by the way that cylinder is arranged Frame 611 can more easily realize the installation of pressing cylinder 650.
The concrete structure of assembly rack 610 in the present embodiment is, as shown in Figure 1, assembly rack 610 includes:Assembly master Frame body 612, ball arrangement board 620 are movably mounted on assembly main frame body 612;Press frame body 613, pressing frame body 613 with The top that main frame body 612 connects and is located at assembly main frame body 612 is assembled, retainer working plate 641 is mounted on assembly main frame body 612 On;Connecting bracket 614, the setting of connecting bracket 614 is between assembly main frame body 612 and pressing frame body 613, with the body frame that is linked and packed Body 612 and pressing frame body 613.
In the present embodiment, ball assembly tooling further includes:Ball detection plate 660 is provided in ball detection plate 660 more A ball detection hole 661, multiple ball detection holes 661 are set correspondingly with the multiple balls being equipped on the retainer of ball It sets, so that multiple balls on retainer are blocked correspondingly in corresponding ball detection hole 661;Multiple detection parts, Multiple detection parts are arranged in the lower section of ball detection plate 660, and multiple detection parts are corresponded with multiple ball detection holes 661 Ground is arranged, to detect in each ball detection hole 661 whether blocked ball.
Preferably, ball is at least partially disposed in ball detection hole 661.
In order to push ball arrangement board 620 to move, as shown in Figure 1, ball assembly tooling further includes:Arrangement board pusher cylinder 670, arrangement board pusher cylinder 670 is mounted in assembly rack 610, and piston rod and the ball of arrangement board pusher cylinder 670 arrange Plate 620 is drivingly connected, to drive ball arrangement board 620 to move.
The utility model provides that a kind of installing of bearing group is standby, and for assembling plastic bearing, standby bearing group installing includes rolling Pearl assembly tooling, ball assembly tooling are above-mentioned ball assembly tooling.
It can be seen from the above description that the above embodiments of the present invention achieve the following technical effects:
Ball assembly tooling in the utility model includes assembly rack 610, ball arrangement board 620 and storage bin 630, rolling Pearl arrangement board 620 is mounted in assembly rack 610, and the ball holding tank for accommodating ball is provided on ball arrangement board 620 621, ball holding tank 621 is multiple, and multiple ball holding tanks 621 are circumferentially spaced to be arranged so as to be distributed in multiple balls Multiple balls in holding tank 621 are adapted with the retainer 13 of bearing assembly;Storage bin 630 is arranged in ball arrangement board 620 Top, between the discharge port and ball arrangement board 620 of storage bin 630 have for making the ball in storage bin 630 fall into simultaneously Ball feeding gap in detent ball holding tank 621.In this way, make ball arrangement board 620 relative to storage bin 630 movably Setting, can be so as to be arranged in by the ball dropped out in storage bin 630 in multiple ball holding tanks 621, and then realizes ball The arrangement of corresponding retainer can more easily realize guarantor at this point, capturing each ball to retainer using sucker The assembling between frame and ball is held, to solve the problems, such as that the packaging efficiency in the prior art to plastic bearing is relatively low.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of ball assembly tooling, which is characterized in that including:
Assemble rack (610);
Ball arrangement board (620), the ball arrangement board (620) are mounted on the assembly rack (610), the ball arrangement The ball holding tank (621) for accommodating ball is provided on plate (620), the ball holding tank (621) is multiple, Duo Gesuo The circumferentially spaced setting of ball holding tank (621) is stated so as to be distributed in multiple in multiple ball holding tanks (621) Ball is adapted with the retainer (13) of bearing assembly;
Storage bin (630), the storage bin (630) are arranged in the top of the ball arrangement board (620), the storage bin (630) have for making the ball in the storage bin (630) fall into simultaneously between discharge port and the ball arrangement board (620) Position the ball feeding gap in the ball holding tank (621);
Wherein, the ball arrangement board (620) is movably disposed relative to the storage bin (630), so that by the storing The ball dropped out in storehouse (630) is arranged in multiple ball holding tanks (621).
2. ball assembly tooling according to claim 1, which is characterized in that the ball assembly tooling further includes:
Retainer working plate (641), the retainer working plate (641) are mounted on the assembly rack (610), to carry simultaneously Position the retainer (13) of the bearing assembly;
Suction cup assembly, the Suction cup assembly is with multiple ball suckers, multiple ball suckers and positioned at multiple balls Ball in holding tank (621) is arranged correspondingly, to draw multiple balls and place multiple balls in place In on the retainer on the retainer working plate (641).
3. ball assembly tooling according to claim 2, which is characterized in that the ball assembly tooling further includes:
Ball presses bottom plate (642), and the ball pressing bottom plate (642) is disposed movably in a vertical direction to the retainer The top of working plate (641) will be placed on the ball on retainer and be pressed into the retainer.
4. ball assembly tooling according to claim 3, which is characterized in that the ball assembly tooling further includes:
Ball presses panel (643), and the ball pressing panel (643) is arranged movably in a vertical direction, the ball pressure Bottom plate (642) is closed to be arranged in the lower section of ball pressing panel (643) and connect with ball pressing bottom plate (642), with Drive the ball pressing bottom plate (642) mobile.
5. ball assembly tooling according to claim 4, which is characterized in that the ball assembly tooling further includes:
Cylinder (650) is pressed, the pressing cylinder (650) is mounted on the assembly rack (610), the pressing cylinder (650) piston rod is connect with ball pressing panel (643), to drive the ball pressing panel (643) mobile.
6. ball assembly tooling according to claim 5, which is characterized in that the assembly rack (610) includes:
Cylinder mount bracket (611), the Cylinder mount bracket (611) at least partly extend in the horizontal direction, the pressing The cylinder body of cylinder (650) is mounted on the Cylinder mount bracket (611).
7. ball assembly tooling according to claim 5, which is characterized in that the assembly rack (610) includes:
Main frame body (612) is assembled, the ball arrangement board (620) is movably mounted on the assembly main frame body (612);
Frame body (613) is pressed, the pressing frame body (613) connect with the assembly main frame body (612) and led positioned at the assembly The top of frame body (612), the retainer working plate (641) are mounted on the assembly main frame body (612);
Connecting bracket (614), the connecting bracket (614) are arranged in the assembly main frame body (612) and the pressing frame body (613) between, to connect the assembly main frame body (612) and the pressing frame body (613).
8. ball assembly tooling according to claim 1, which is characterized in that the ball assembly tooling further includes:
Ball detection plate (660) is provided with multiple ball detection holes (661), multiple rollings on the ball detection plate (660) Pearl detection hole (661) is arranged correspondingly with the multiple balls being equipped on the retainer of ball, so that on the retainer Multiple balls block correspondingly in the corresponding ball detection hole (661);
Multiple detection parts, multiple detection parts are arranged in the lower section of the ball detection plate (660), multiple detections Component is arranged correspondingly with multiple ball detection holes (661), is to detect in each ball detection hole (661) No closure has the ball.
9. ball assembly tooling according to claim 1, which is characterized in that the ball assembly tooling further includes:
Arrangement board pusher cylinder (670), the arrangement board pusher cylinder (670) is mounted on the assembly rack (610), described The piston rod of arrangement board pusher cylinder (670) is drivingly connected with the ball arrangement board (620), to drive the ball arrangement board (620) mobile.
10. a kind of bearing group installing is standby, for assembling plastic bearing, the standby bearing group installing includes ball assembly tooling, institute State ball assembly tooling ball assembly tooling as claimed in any one of claims 1 to 9.
CN201721741286.4U 2017-12-12 2017-12-12 Ball assembly tooling and with its bearing group installing it is standby Active CN207634542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721741286.4U CN207634542U (en) 2017-12-12 2017-12-12 Ball assembly tooling and with its bearing group installing it is standby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721741286.4U CN207634542U (en) 2017-12-12 2017-12-12 Ball assembly tooling and with its bearing group installing it is standby

Publications (1)

Publication Number Publication Date
CN207634542U true CN207634542U (en) 2018-07-20

Family

ID=62862766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721741286.4U Active CN207634542U (en) 2017-12-12 2017-12-12 Ball assembly tooling and with its bearing group installing it is standby

Country Status (1)

Country Link
CN (1) CN207634542U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108105267A (en) * 2017-12-12 2018-06-01 珠海格力智能装备有限公司 Ball assembly tooling and with its bearing group installing it is standby

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108105267A (en) * 2017-12-12 2018-06-01 珠海格力智能装备有限公司 Ball assembly tooling and with its bearing group installing it is standby

Similar Documents

Publication Publication Date Title
CN108105267A (en) Ball assembly tooling and with its bearing group installing it is standby
CN207634542U (en) Ball assembly tooling and with its bearing group installing it is standby
CN207271987U (en) A kind of undergauge equipment automatic blanking component
CN208485280U (en) Tooling plate positioning device
CN207630542U (en) Bearing group installing is standby
CN205572429U (en) Fecund article carry device with time shift
CN101798029B (en) Automatic rewinding device and automatic rewinding method
CN207634540U (en) Support plate feeder and with its bearing group installing it is standby
CN207634539U (en) Support plate positioning tool and with its bearing group installing it is standby
CN203558506U (en) Stopping device
CN215583076U (en) Extrusion device for tea processing
CN207634541U (en) Parts of bearings feeder and with its bearing group installing it is standby
CN211804834U (en) Linear guide rail
CN113291671A (en) Effectual environmental protection machinery of shock attenuation
CN208373955U (en) A kind of punching machine
CN206690732U (en) A kind of finance bill storage box
CN114809437B (en) Assembling equipment for assembling back rib type composite board
CN205820144U (en) A kind of shoveling mechanism for movable trash compactor
CN216760942U (en) Material leakage preventing structure for blanking of punch press
CN216582267U (en) Baffle goods shelves convenient to it is categorised
CN208462221U (en) A kind of leakproofness outdoor electric appliance cabinet
CN216334780U (en) Novel belt conveyor carrier roller
CN106702832B (en) A kind of rolling guide mechanism
CN217401436U (en) Novel leaf spring round pin axle
CN213711606U (en) Ball joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant