CN207634076U - Device is edited and recorded in a kind of more attributes drillings of semi-automation - Google Patents
Device is edited and recorded in a kind of more attributes drillings of semi-automation Download PDFInfo
- Publication number
- CN207634076U CN207634076U CN201721733803.3U CN201721733803U CN207634076U CN 207634076 U CN207634076 U CN 207634076U CN 201721733803 U CN201721733803 U CN 201721733803U CN 207634076 U CN207634076 U CN 207634076U
- Authority
- CN
- China
- Prior art keywords
- probe
- attribute
- drillings
- semi
- edited
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Earth Drilling (AREA)
Abstract
The utility model is related to geological drilling apparatus structure technical fields, and device is edited and recorded in particular to a kind of more attribute drillings of semi-automation.Including the detection device extending into well head and video data terminal;The detection device includes the probe of the different geological attribute datas of multiple acquisitions;Probe is integrated in detection device and is connected by the delivering stent of collection terminal data cable and well head;Collection terminal data cable is connect with the control terminal Data Wireline data being wrapped on fixing bracket;The control terminal data cable and video data terminal data connection.The utility model is integrated together by editing and recording Multi probe test with drilling, form the semi-automatic eliting and recording system of a set of more attribute drillings, it solves the problems, such as that lithology sentences difficult knowledge, the additional repeated detection of borehole test and drilling quality and supervises three aspects, can realize the effect achieved many things at one stroke.Compared to the method that existing substep operates stage by stage, no matter there is the promotion of matter from work quality or working effect.
Description
Technical field
The utility model is related to geological drilling apparatus structure technical fields, drill in particular to a kind of more attributes of semi-automation
Edit and record device.
Background technology
Engineering geological drilling traditional work mode is:Using drilling machine to earth drilling, extracts soil sample or core and showed
Field identification records (editing and recording), selected part soil sample or rock sample progress indoor test chemical examination, after the completion of field operation, in conjunction with soil sample and rock sample
Test assay result to field operation catalog data carry out arrange form log sheet.Drilling depth is usually tens of rice to hundreds of
Rice, varying aperture are generally 36~205mm, and diameter is also used to reach the large-diameter borehole of 1m sometimes.
After the completion of drilling, it will usually test and the borehole test of one or more attributes are carried out to stratum using drilling,
Borehole test is typically once to place particular device into hole to obtain a kind of physical parameter.One drilling can be by repeatedly launching not
Same equipment obtains a variety of layer attributes, in engineer geological prospecting common test have sound wave borehole test, resistivity drilling survey
Examination, borehole television camera shooting etc..
As described above, on the one hand, due to editing and recording be first to extract soil sample or core by the means of core drilling process, then
What the process by manually sentencing knowledge was edited and recorded.In this process, edit and record result by sampling coring sample rate influence compared with
Greatly.When different components in the earth formation are there are the sampling rate different time, frequently can lead to judge by accident.For example, in clay layer containing gravel, due to
The sampling rate of clay and gravel differs greatly, and sampling result may be rendered as gravel, leads to the result of mistake;On the other hand, sentence
The method of disconnected formation lithology is outer except through directly observing sampling, also can carry out comprehensive descision by other attributes on stratum, often
That sees has formation velocity (sound wave borehole test), resistivity (resistivity borehole test) and appearance (borehole television camera shooting) in situ,
A generic attribute can only once be detected, it usually needs carry out repeated detection;In addition, in daily test boring, whole hole is checked and accepted
It is an important ring for drilling quality management, main relay by the way of brill measures using technical staff scene is carried out, supervision quality
The quality of technical staff is limited by with efficiency.
Invention content
The purpose of this utility model seeks to the detection operations needs for the prior art for solving to mention in above-mentioned background technology
Sampling and scene the problem of can not completing quick logging is repeated several times, a kind of more attributes of semi-automation are provided drill and edit and record device.
The technical solution of the utility model is:Device is edited and recorded in a kind of more attributes drillings of semi-automation, it is characterised in that:Including
The detection device extending into well head and video data terminal;The detection device includes the different geology attribute numbers of multiple acquisitions
According to probe;The probe is integrated in detection device and is connected by the delivering stent of collection terminal data cable and well head;
The collection terminal data cable is connect with the control terminal Data Wireline data being wrapped on fixing bracket;The control terminal number
According to cable and video data terminal data connection.
The upper and lower ends of the further probe are provided with general-purpose interface, and multiple probes pass sequentially through system from top to bottom
One general-purpose interface is cascaded, and the probe in the top is connect with collection terminal data cable.
Further the detection device includes vertically arranged supporting rod;It is offered on the supporting rod multiple
Vertically spaced apart screw hole;The connecting plate being slidably connected with supporting rod is disposed on the probe;The connecting plate
It is fixed on supporting rod with the bolt in screw hole by being arranged in connecting plate.
The restricted postive stop baffle popped one's head in and moved down is arranged in the further supporting rod lower end;The limiting block
Plate is vertically fixed on supporting rod lower end, and end surface supporting is in the probe lower end in bottom thereon.
The further delivering stent includes the first tripod being fixed on well head and is fixed on the first tripod
On fixed pulley;The collection terminal data cable is wrapped on fixed pulley.
The further fixing bracket includes the second tripod to play a supportive role and is fixed on the second tripod
Capstan winch;The control terminal data cable is wrapped on capstan winch.
The video data terminal is integrated with control module for controlling fixed pulley and capstan winch rotation, adopts
The display module for collecting the data acquisition module of probe collection receipt and gathered data being shown.
The utility model is integrated together by editing and recording Multi probe test with drilling, forms a set of more attribute drillings half certainly
Dynamic eliting and recording system solves lithology and sentences asking in terms of knowing difficulty, the additional repeated detection of borehole test and drilling quality supervision three
Topic, can realize the effect achieved many things at one stroke.Compared to the method that existing substep operates stage by stage, no matter from work quality or working
There is the promotion of matter in effect.
Description of the drawings
Fig. 1:The arrangement schematic diagram of the utility model;
Fig. 2:The mounting structure schematic diagram of the detection device of the utility model;
Wherein:1-video data terminal;2-probes;3-collection terminal data cables;4-control terminal data cables;5—
Supporting rod;6-screw holes;7-connecting plates;8-postive stop baffles;9-the first tripod;10-fixed pulleys;11-the second tripod;
12-capstan winches.
Specific implementation mode
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Such as Fig. 1~2, device is edited and recorded in a kind of more attributes drillings of semi-automation, and the present embodiment is in order to disposably detect drilling rock
Multiple attributes of layer are disposed with multiple spies for acquiring different geological attribute datas on extending into the detection device in well head
First 2, as shown in Fig. 1~2,2 upper and lower ends of popping one's head in are provided with general-purpose interface, and multiple probes 2 pass sequentially through unification from top to bottom
General-purpose interface be cascaded, connect with collection terminal data cable 3 in the probe 2 of the top.
Wherein, detection device supports all probes 2 by being used as the supporting rod 5 of skeleton, as shown in Fig. 2, 5 edge of supporting rod
It is vertically arranged, multiple vertically spaced apart screw holes 6 is offered on supporting rod 5, is disposed on probe 2 and is slided with supporting rod 5
The connecting plate 7 of connection, connecting plate 7 are fixed on the bolt in screw hole 6 on supporting rod 5 by being arranged in connecting plate 7.
When 2 installation of probe, then position of the adjustment probe 2 on supporting rod 5 is connected adjacent probes 2 by interface
Come, then the probe 2 of the top is connect with collection terminal data cable 3.Probe 2 is fixed on supporting rod 5 by bolt, is completed
The installation of probe 2.The postive stop baffle 8 that restricted probe 2 moves down is arranged in 5 lower end of supporting rod, and postive stop baffle 8 is vertically fixed on
5 lower end of supporting rod, end surface supporting is in 2 lower end of probe in bottom thereon.
Collection terminal data cable 3 is wrapped in the delivering stent of well head.Delivering stent includes first be fixed on well head
Tripod 9 and the fixed pulley 10 being fixed on the first tripod 9, collection terminal data cable 3 are wrapped on fixed pulley 10.
Collection terminal data cable 3 is connect with control terminal data cable 4, control terminal data cable 4 and is supported on ground
Fixing bracket connects.As shown in Figure 1, fixing bracket includes the second tripod 11 to play a supportive role and is fixed on the second tripod
Capstan winch 12 on 11, control terminal data cable 4 are wrapped on capstan winch 12.Keyboard 12 is driven by manual control or motor.
Collected data transmission to video data terminal 1, video data terminal 1 are integrated with by control terminal data cable 4
For control capstan winch 12 rotation control module, acquisition probe 2 collect receipt data acquisition module and to gathered data into
The display module of row display.
Quickly rock stratum data can be edited and recorded by video data terminal 1, work is edited and recorded without later carrying out data
Make, edits and records more efficient.
In use, probe 2 is fixed on supporting rod 5, it is then that fixing bracket and delivering stent frame is good, it is aobvious by data
Show that terminal 1 controls capstan winch 12 or manual drive capstan winch 12 rotates, slowly in decentralization probe 2 to well, by popping one's head in 2 pairs of wells
Rock stratum carries out data acquisition, and the data of acquisition are transferred to data by collection terminal data cable 3 and control terminal data cable 3 and show
Terminal 1 edits and records data by video data terminal 1.
Basic principles, main features, and advantages of the present invention has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description
Only illustrate the principles of the present invention, the utility model can also on the premise of not departing from the spirit and scope of the utility model
There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model is wanted
Protection domain is asked to be defined by appended claims and its equivalent.
Claims (7)
1. device is edited and recorded in a kind of more attribute drillings of semi-automation, it is characterised in that:Including the detection device that extend into well head and
Video data terminal (1);The detection device includes multiple probes (2) for acquiring different geological attribute datas;It is described
Probe (2) be integrated in detection device and connect with the delivering stent of well head by collection terminal data cable (3);Described adopts
Collect control terminal data cable (4) data connection end data cable (3) and be wrapped on fixing bracket;The control end data
Cable (4) and video data terminal (1) data connection.
2. device is edited and recorded in the more attribute drillings of a kind of semi-automation as described in claim 1, it is characterised in that:The probe
(2) upper and lower ends are provided with general-purpose interface, and multiple probes (2) pass sequentially through unified general-purpose interface and are connected on one from top to bottom
It rises, the probe (2) in the top is connect with collection terminal data cable (3).
3. device is edited and recorded in the more attribute drillings of a kind of semi-automation as claimed in claim 2, it is characterised in that:The detection dress
It sets including vertically arranged supporting rod (5);Multiple vertically spaced apart screw holes are offered on the supporting rod (5)
(6);The connecting plate (7) being slidably connected with supporting rod (5) is disposed on the probe (2);The connecting plate (7) is by wearing
Bolt in connecting plate (7) and screw hole (6) is fixed on supporting rod (5).
4. device is edited and recorded in the more attribute drillings of a kind of semi-automation as claimed in claim 3, it is characterised in that:The supporting rod
(5) postive stop baffle (8) that setting restricted probe (2) in lower end moves down;The postive stop baffle (8) is vertically fixed on support
Bar (5) lower end, end surface supporting is in probe (2) lower end in bottom thereon.
5. device is edited and recorded in the more attribute drillings of a kind of semi-automation as described in claim 1, it is characterised in that:The dispensing branch
Frame includes the first tripod (9) being fixed on well head and the fixed pulley (10) being fixed on the first tripod (9);Described adopts
Collection end data cable (3) is wrapped on fixed pulley (10).
6. device is edited and recorded in the more attribute drillings of a kind of semi-automation as described in claim 1, it is characterised in that:The fixed branch
Frame includes the second tripod (11) to play a supportive role and the capstan winch (12) being fixed on the second tripod (11);The control
End data cable (4) is wrapped on capstan winch (12).
7. device is edited and recorded in the more attribute drillings of a kind of semi-automation as described in claim 1, it is characterised in that:The data are aobvious
Show that terminal (1) is integrated with for controlling the control module of fixed pulley (10) and capstan winch (12) rotation, acquisition probe (2) collects receipt
Data acquisition module and display module that gathered data is shown.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721733803.3U CN207634076U (en) | 2017-12-13 | 2017-12-13 | Device is edited and recorded in a kind of more attributes drillings of semi-automation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721733803.3U CN207634076U (en) | 2017-12-13 | 2017-12-13 | Device is edited and recorded in a kind of more attributes drillings of semi-automation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207634076U true CN207634076U (en) | 2018-07-20 |
Family
ID=62862678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721733803.3U Active CN207634076U (en) | 2017-12-13 | 2017-12-13 | Device is edited and recorded in a kind of more attributes drillings of semi-automation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207634076U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113466228A (en) * | 2021-06-28 | 2021-10-01 | 水利部交通运输部国家能源局南京水利科学研究院 | Method for detecting quality of lower part of mud surface of in-service pipe pile |
-
2017
- 2017-12-13 CN CN201721733803.3U patent/CN207634076U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113466228A (en) * | 2021-06-28 | 2021-10-01 | 水利部交通运输部国家能源局南京水利科学研究院 | Method for detecting quality of lower part of mud surface of in-service pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2369738C2 (en) | Method and system of well drilling | |
DE602005004383T2 (en) | CONTINUOUS REDUCTION FOR FORMAT PRESSURE TESTING | |
US7588083B2 (en) | Method and system for scanning tubing | |
US9063250B2 (en) | Interference testing while drilling | |
US7518526B2 (en) | Method and system for displaying scanning data for oil well tubing based on scanning speed | |
CN102435543B (en) | Steady flow pumping test device for on-line full-hole continuous detection and detection method thereof | |
DE60212868T2 (en) | Method and device for time-delayed analysis of cause and effect | |
CN101353962A (en) | Apparatus and methods to perform operations in a wellbore using downhole tools having movable sections | |
CN104156624B (en) | Logging equipment when deep data treating method and apparatus | |
US8120357B2 (en) | Method and system for fluid characterization of a reservoir | |
US20150371344A1 (en) | Automated Rig Activity Report Generation | |
EP3394381B1 (en) | Seabed drill system | |
JP2015524523A (en) | Equipment and methods for underwater testing | |
CN207634076U (en) | Device is edited and recorded in a kind of more attributes drillings of semi-automation | |
CN110656927A (en) | Fracture image measuring method based on borehole television | |
CN202330235U (en) | Steady flow pumping test equipment for online full-hole continuous detection | |
CN210180968U (en) | Soil salinity survey device | |
CN103758101B (en) | Static cone penetration equipment and static cone penetration method | |
DE112017007034B4 (en) | System, method and apparatus for monitoring a parameter in a well | |
CN207673330U (en) | The real-time measurement apparatus of earth-boring depth | |
CN113029652A (en) | Sampling equipment capable of accurately positioning depth for soil layer survey | |
EP3329305A1 (en) | Apparatus and method for determining earth fluid formation | |
CN106545334B (en) | Porous automatic inclination measuring device | |
CN214584184U (en) | Environmental sample collection device | |
US20170284193A1 (en) | Collection And Display Of Acoustic Data For Integrated Quality Control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |