CN207609125U - A kind of parking lot epoxide terrace - Google Patents
A kind of parking lot epoxide terrace Download PDFInfo
- Publication number
- CN207609125U CN207609125U CN201721687113.9U CN201721687113U CN207609125U CN 207609125 U CN207609125 U CN 207609125U CN 201721687113 U CN201721687113 U CN 201721687113U CN 207609125 U CN207609125 U CN 207609125U
- Authority
- CN
- China
- Prior art keywords
- layer
- parking lot
- middle level
- epoxy resin
- intermediate structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laminated Bodies (AREA)
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of parking lot epoxide terraces, the main points of its technical scheme are that:Including plain stratum, the intermediate structure on plain stratum and the top surface layer in intermediate structure, intermediate structure includes the epoxy primer set gradually from bottom to top, epoxy resin mortar middle level;Steel fabric sheet is embedded with inside epoxy resin mortar middle level, steel fabric sheet is horizontally disposed;By the way that carbon fibre cloth layer and steel fabric sheet is arranged, the tensile strength of parking lot terrace is improved, has achieved the effect that reducing crack generates.
Description
Technical field
The utility model is related to epoxide terrace, more particularly to a kind of parking lot epoxide terrace.
Background technology
Epoxide terrace is a kind of high intensity, wear-resistant, beautiful floor, has that seamless, quality be solid, resistance to chemical reagents
The advantages that good, anti-corrosion, dust-proof, easy maintenance, cheap maintenance cost.Epoxide terrace with extensively, often adopt by the ground in parking lot
Use epoxide terrace.
The Chinese patent that Authorization Notice No. is CN205046809U, authorized announcement date is on February 24th, 2016 discloses one
The kind anti-skidding terrace of parking lot polyurethane, including base, the base are cement production systD, and the upper surface of the base is provided with envelope
Layer is closed, side of the confining bed far from base is provided with wearing layer, which further includes aqueous polyurethane coating, poly- ammonia
Ester slurry skid resistant course, layer of rubber particles, elastic polyurethane coating, side of the wearing layer far from confining bed are provided with aqueous poly-
Urethane coating, side of the aqueous polyurethane coating far from wearing layer are provided with polyurethane slurry skid resistant course, the polyurethane
Side of the slurry skid resistant course far from aqueous polyurethane coating is provided with layer of rubber particles, and the layer of rubber particles is starched far from polyurethane
The side of material skid resistant course is provided with elastic polyurethane coating.
It is in place of the deficiencies in the prior art, parking lot is the place of numerous vehicle parkings, and vehicle carries out parking period
In need turning, advance, brake, retreat etc. a series of actions, and these action all can to parking face terrace generate horizontal direction
Active force, the parking lot terrace of the prior art do not bear the construction of horizontal applied force, and parking lot terrace can be caused to crack.
Utility model content
The purpose of this utility model is to provide a kind of parking lot epoxide terrace, by the way that carbon fibre cloth layer and steel wire is arranged
Piece improves the tensile strength of parking lot terrace, has achieved the effect that reducing crack generates.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of parking lot epoxide terrace, including plain stratum, the intermediate structure on the plain stratum and set on intermediate knot
Top surface layer on structure, the intermediate structure include the epoxy primer set gradually from bottom to top, epoxy resin mortar middle level;The ring
Steel fabric sheet is embedded with inside oxygen mortar middle level, the steel fabric sheet is horizontally disposed.
Using above-mentioned technical proposal, steel fabric sheet has extremely strong tensile strength, and under tension is transmitted on top surface layer
On steel fabric sheet, it is converted into the elastic potential energy of steel fabric sheet, when reducing top surface layer and intermediate structure due under tension
Deformation reduces the case where generating crack.
Further preferably:Have additional carbon fibre cloth layer on the epoxy resin mortar middle level, the carbon fibre cloth layer gluing in
On the epoxy resin mortar middle level.
Using above-mentioned technical proposal, carbon cloth is a kind of unidirectional carbon reinforcing product, have intensity is high, density is small,
The thin advantage of thickness, does not increase strenthening member dead weight and sectional dimension substantially.Carbon fibre cloth layer is set to the upper of epoxy resin mortar layer
The horizontal force that the slave top surface layer that side is capable of the tensile strength of reinforced epoxy screed, and then can bear bigger transmits,
Reduce the generation in crack.
Further preferably:The steel fabric sheet is equipped with connector, and the connector is welded on the steel fabric sheet.
Using above-mentioned technical proposal, connector can increase the contact area of steel fabric sheet and epoxy resin mortar middle level, reinforce
The bonding strength of steel fabric sheet and epoxy resin mortar middle level, to improve the transmission force property of steel fabric sheet and epoxy resin mortar middle level;It will
Connector is welded in the bonding strength that can reinforce connector and steel fabric sheet on steel fabric sheet.
Further preferably:The carbon fibre cloth layer is equipped with vertical tension rib, and one end of the tension rib is located at institute
It states in top surface layer, the other end is located in intermediate structure.
Using above-mentioned technical proposal, the bonding strength that vertical tension rib can be between reinforced top face layer and intermediate structure,
To improve stress performance;Secondly, when top surface layer is under pressure, due to the structural behaviour of top surface layer and intermediate structure,
The inside of intermediate structure can be born this part by slanting shearing, vertical tension rib, reduce top surface layer and intermediate knot
Structure is cut the case where generating Vertical Cracks.
Further preferably:The upper and lower ends of tension rib are equipped with barb.
Using above-mentioned technical proposal, barb can enhance the bonding strength of tension rib and top surface layer and intermediate structure, subtract
When few top surface layer stress, the case where tension rib is detached with the two.
Further preferably:The surface of told tension rib is equipped with screw thread.
Using above-mentioned technical proposal, reinforces the mechanical snap power between tension rib and top surface layer and intermediate structure, carry
High structural integrity, further increases tensile strength, reduces the generation in crack.
Further preferably:The second face layer is had additional between the top surface layer and the intermediate structure.
Using above-mentioned technical proposal, after top surface layer is by horizontal force, it is transmitted in intermediate structure by the second face layer, one
Aspect increases top surface layer and is reduced intermediate to the distance of intermediate structure to make the second face layer that can share a part of pulling force
The stress of structure;On the other hand, the second face layer can work on after the damage of top surface layer instead of top surface layer, reach section
The effect of energy.
Further preferably:Mortar levelling layer, the mortar are had additional between the second face layer and epoxy resin mortar middle level
The upper surface of screed-coat is embedded with quartz sand.
Using above-mentioned technical proposal, quartz sand is the broken quartz particles being process of quartz warp, is had hard, resistance to
The advantages that mill, stable chemical performance, the wear-resisting property and surface roughness of epoxy resin mortar middle level upper surface, Jin Erti can be increased
The surface roughness of high second face layer and top surface layer reduces automobile at top to improve the anti-friction ability of top surface layer
The case where skidding on the layer of face, while quartz sand can also bear the part of horizontal pulling force being subject on top surface layer.
In conclusion the utility model has the advantages that:
1, by the way that steel fabric sheet is arranged inside epoxy resin mortar middle level, carbon fibre cloth layer is added on epoxy resin mortar middle level,
The tensile strength for improving parking lot epoxide terrace achievees the effect that reducing crack generates;
2, it is equipped with vertical tension rib on carbon fibre cloth layer, improves the tensile strength of parking lot epoxide terrace, reduces oblique
The generation of shear crack.
Description of the drawings
Fig. 1 is the overall structure diagram of embodiment.
In figure, 1, plain stratum;2, the second face layer;3, top surface layer;4, intermediate structure;41, epoxy primer;42, epoxy sand
Starch middle level;421, steel fabric sheet;422, connector;43, carbon fibre cloth layer;44, mortar levelling layer;441, quartz sand;5, drawknot
Muscle;51, barb.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of parking lot epoxide terrace, as shown in Figure 1, including plain stratum 1, second above plain stratum 1
Face layer 2 and the top surface layer 3 above the second face layer 2, the second face layer 2 and top surface layer 3 are all made of epoxy finish smearing.Element
It is folded with intermediate structure 4 between stratum 1 and the second face layer 2.Intermediate structure 4 includes the epoxy primer 41 set gradually from bottom to top
With epoxy resin mortar middle level 42.When top surface layer 3 is by horizontal active force, horizontal force is transmitted to plain stratum 1 from intermediate structure 4
On.
In order to improve the tensile strength of parking lot epoxide terrace, the generation in crack is reduced, 42 inside of epoxy resin mortar middle level is embedding
Equipped with horizontally disposed steel fabric sheet 421.Steel fabric sheet 421 is located at the point midway of 42 thickness of epoxy resin mortar middle level, and steel wire
The connector 422 being vertically arranged is set in mesh sheet 421, and connector 422 is welded on steel fabric sheet 421, to increase steel wire
The contact area of piece 421 and epoxy resin mortar middle level 42.
In order to further increase the tensile strength of parking lot epoxide terrace, between epoxy resin mortar middle level 42 and the second face layer 2
It is folded with carbon fibre cloth layer 43,43 gluing of carbon fibre cloth layer is on epoxy resin mortar middle level 42 and the second face layer 2.
In order to increase the intensity that parking lot terrace bears shearing, the generation of oblique shear crack is reduced, is worn on carbon fibre cloth layer 43
Equipped with tension rib 5.Tension rib 5 is vertically arranged, and one end is located in top surface layer 3, and the other end is located at epoxy resin mortar middle level 42
It is interior.The both ends of tension rib 5 are both provided with barb 51, and the direction of two barbs 51 is reversed.In order to improve tension rib 5 and top
The bonding strength of portion face the 3, second face of layer layer 2 and intermediate structure 4, the surface of tension rib 5 is equipped with screw thread(It is not shown in figure).
In order to increase frictional resistance of the automobile when parking lot terrace moves up dynamic, the second face layer 2 and epoxy resin mortar middle level 42 it
Between be folded with mortar levelling layer 44.The upper surface of mortar levelling layer 44 is embedded with quartz sand 441, can make the second face layer 2 and top
Coarse upper surface is formed on portion face layer 3.
The work progress of the utility model is as follows, uses pea gravel concreten or cement mortar to pour and smash plain stratum 1 first;It waits for
After plain stratum 1 solidifies, the epoxy primer 41 of layer of transparent is smeared in 1 upper surface of plain stratum, to enhance caking property;Then in epoxy
41 upper surface of priming paint, which is poured, smashes epoxy resin mortar middle level 42, first pours the half for smashing 42 thickness of epoxy resin mortar middle level, and then will the company of carrying
The steel fabric sheet 421 of fitting 422 is laid thereon;Then it pours again and smashes the other half epoxy resin mortar middle level 42, and barb will be carried
51 tension rib 5 is embedded in advance in the epoxy resin mortar middle level 42 of this half storey;After epoxy resin mortar middle level 42 solidifies, with structure glue or
Carbon cloth is pasted on epoxy resin mortar middle level 42 by other adhesive, forms carbon fibre cloth layer 43;Then in carbon fibre cloth layer
Smear one layer of structure glue or other adhesive on 43, rramming slurry screed-coat 44 poured when structure glue is not dry, pour smash after
Last layer quartz sand 441 is spread on surface on it at once so that quartz sand 441 is inlaid thereon to form coarse surface;Wait for that mortar is looked for
After flat bed 44 solidifies, the second face layer 2 and top surface layer 3 are smeared with epoxy finish so that the lucky position in top of tension rib 5 on it
In in top surface layer 3.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as within the protection scope of the present utility model all protected by Patent Law.
Claims (8)
1. a kind of parking lot epoxide terrace, including plain stratum (1), the intermediate structure (4) that is set on the plain stratum (1) and be set to
Top surface layer (3) in intermediate structure (4), which is characterized in that the intermediate structure (4) includes the ring set gradually from bottom to top
Oxygen priming paint (41), epoxy resin mortar middle level (42);It is embedded with steel fabric sheet (421) inside the epoxy resin mortar middle level (42), it is described
Steel fabric sheet (421) is horizontally disposed.
2. a kind of parking lot epoxide terrace according to claim 1, which is characterized in that on the epoxy resin mortar middle level (42)
Carbon fibre cloth layer (43) is had additional, carbon fibre cloth layer (43) gluing is on the epoxy resin mortar middle level (42).
3. a kind of parking lot epoxide terrace according to claim 1, which is characterized in that set on the steel fabric sheet (421)
There are connector (422), the connector (422) to be welded on the steel fabric sheet (421).
4. a kind of parking lot epoxide terrace according to claim 2, which is characterized in that set on the carbon fibre cloth layer (43)
There are vertical tension rib (5), one end of the tension rib (5) to be located in the top surface layer (3), the other end is located at intermediate structure
(4) in.
5. a kind of parking lot epoxide terrace according to claim 4, which is characterized in that the upper and lower ends of tension rib (5) are equal
Equipped with barb (51).
6. a kind of parking lot epoxide terrace according to claim 5, which is characterized in that the surface of told tension rib (5) is set
There is screw thread.
7. a kind of parking lot epoxide terrace according to claim 1, which is characterized in that the top surface layer (3) with it is described
The second face layer (2) is had additional between intermediate structure (4).
8. a kind of parking lot epoxide terrace according to claim 7, which is characterized in that the second face layer (2) and epoxy
Mortar levelling layer (44) is had additional between mortar middle level (42), the upper surface of the mortar levelling layer (44) is embedded with quartz sand
(441)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721687113.9U CN207609125U (en) | 2017-12-06 | 2017-12-06 | A kind of parking lot epoxide terrace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721687113.9U CN207609125U (en) | 2017-12-06 | 2017-12-06 | A kind of parking lot epoxide terrace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207609125U true CN207609125U (en) | 2018-07-13 |
Family
ID=62797858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721687113.9U Expired - Fee Related CN207609125U (en) | 2017-12-06 | 2017-12-06 | A kind of parking lot epoxide terrace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207609125U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109838068A (en) * | 2019-03-22 | 2019-06-04 | 成都市鹏程靓地新型地坪材料有限公司 | Diamond dust terrace color sand doping process |
CN111305510A (en) * | 2020-04-02 | 2020-06-19 | 杭州麟奇金属材料有限公司 | Anti-cracking construction process for building ground |
-
2017
- 2017-12-06 CN CN201721687113.9U patent/CN207609125U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109838068A (en) * | 2019-03-22 | 2019-06-04 | 成都市鹏程靓地新型地坪材料有限公司 | Diamond dust terrace color sand doping process |
CN111305510A (en) * | 2020-04-02 | 2020-06-19 | 杭州麟奇金属材料有限公司 | Anti-cracking construction process for building ground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207609125U (en) | A kind of parking lot epoxide terrace | |
CN1920176B (en) | Deck installation structure of big-span steel bridge | |
CN104264594B (en) | A kind of self-balancing tied arch system for improving PSC continuous box girder bridge bearing ability and the method using it to reinforce | |
CN103422435B (en) | Corrugated sheet punching block integrated combination structure bridge deck and construction technology thereof | |
CN205662924U (en) | But recovery gas bag triggers formula stock | |
CN206245157U (en) | A kind of pavior brick | |
CN208777448U (en) | A kind of prefabricated arches | |
CN107244113B (en) | Temporary pavement pallet device and method a kind of anti-skidding and that prevent buckling deformation | |
CN104763163B (en) | Method and process for reinforcing RC (Reinforced Concrete) beam of E-glass fiber fabric reinforced magnesium phosphate cement-based concrete thin-slab | |
CN201962604U (en) | Fiber reinforce plastic (FRP) combined plate | |
CN206158068U (en) | Artificial ecological stone of high strength | |
CN107724257A (en) | The ruggedized construction and its method of rc beam bridge | |
CN202936907U (en) | Hydrophobic rock wool board thermal insulating wall body structure | |
CN205443843U (en) | Epoxy wrinkle type antiskid terrace | |
CN108774936A (en) | A kind of anticorrosion kerbstone and its construction method | |
CN204662434U (en) | A kind of hot melt self-tipping type anchor head for reclaiming anchor cable | |
CN203960860U (en) | A kind of detachable anchoring piece | |
CN209907610U (en) | Toilet waterproof structure | |
CN207620302U (en) | A kind of fastener system of precast floor installation | |
CN202482897U (en) | Concrete structure | |
CN203285014U (en) | Flat-paving structure for floor decoration | |
CN202039265U (en) | Novel ground structure of gloss building | |
CN216476124U (en) | Super wear-resisting compound terrace | |
CN220283971U (en) | Double-base composite waterproof coiled material | |
CN214005293U (en) | Environment-friendly colored pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180713 Termination date: 20191206 |
|
CF01 | Termination of patent right due to non-payment of annual fee |