CN207609048U - Wall body structure - Google Patents

Wall body structure Download PDF

Info

Publication number
CN207609048U
CN207609048U CN201721493622.8U CN201721493622U CN207609048U CN 207609048 U CN207609048 U CN 207609048U CN 201721493622 U CN201721493622 U CN 201721493622U CN 207609048 U CN207609048 U CN 207609048U
Authority
CN
China
Prior art keywords
wall body
keel
body structure
support frame
body plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721493622.8U
Other languages
Chinese (zh)
Inventor
李艮杰
吴成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Interest Building Technology Co Ltd
Original Assignee
Shanghai Interest Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Interest Building Technology Co Ltd filed Critical Shanghai Interest Building Technology Co Ltd
Priority to CN201721493622.8U priority Critical patent/CN207609048U/en
Application granted granted Critical
Publication of CN207609048U publication Critical patent/CN207609048U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

A kind of wall body structure, including:There is support frame the mounting surface for ash wall body plate to be fixedly mounted, the mounting surface at least to have three installation sites on the support frame axial direction;Ash wall body plate is fixedly installed at least one installation site.Therefore, by the way that the ash wall body plate of different number is arranged on mounting surface, or by the way that different packing materials is perfused between two neighboring ash wall body plate, the keeping the temperature of wall body structure, heat-insulated and sound insulation effect can be changed.It thus can be under the premise of not changing the concrete structure of support frame and ash wall body plate so that wall body structure has different functional effects, meets different requirements, to be conducive to construction, reduces construction cost.

Description

Wall body structure
Technical field
The utility model is related to technical field of buildings, and in particular to a kind of wall body structure.
Background technology
Wall is the important component of building, its role is to load-bearing, is gone along with sb. to guard him or the compartment.Wall can be divided into Exterior wall and inner wall, exterior wall is along building edge arrangement, the inner space for separating building and exterior space;It is interior Wall is arranged in the inside of building, is surrounded by exterior wall, to separate the inner space of building.
Since exterior wall separates building interior space and exterior space, therefore, it is necessary to preferably keep the temperature, heat-insulated and sound insulation Effect.And interior wall is arranged in the inside of building, to heat preservation, heat-insulated etc., there is no too high requirements.In addition, on different ground The requirement in area, the heat insulation effect that can reach for skin body is also different, so as to cause wall body structure (including wall The support frame of body plate and fixed ash wall body plate) it is varied, it is unfavorable for construction, increases construction cost.
Meanwhile the heat insulation effect of exterior wall in the prior art is unsatisfactory, cannot preferably completely cut off external environment and building Heat transfer inside object increases interior of building air conditioner load, promotes energy consumption.
Utility model content
It is wall body structure in the prior art to meet different requirements that the utility model, which solves the problems, such as, ash wall body plate and The structure of support frame is varied, is unfavorable for construction, increases construction cost.
To solve the above problems, the utility model provides a kind of wall body structure, including:
There is support frame the mounting surface for ash wall body plate to be fixedly mounted, the mounting surface at least to have perpendicular to described Three installation sites on support frame axial direction;
Ash wall body plate is fixedly installed at least one installation site.
Optionally, the support frame includes Core Walls Structure and around the Core Walls Structure and be fixedly connected with the Core Walls Structure Multiple shirt rims, the installation site are located on the shirt rim.
Optionally, the support frame includes four shirt rims, and four shirt rims are along the circumferential equal of the Core Walls Structure Even distribution.
Optionally, the ash wall body plate is fixedly installed on the top of the shirt rim or is fixedly installed on the both sides of the shirt rim.
Optionally, the ash wall body plate includes:
Two composite plates being arranged face-to-face;
Keel are set between two composite plates, to be fixedly connected with two composite plates;Two composite plates are enclosed At region in be suitable for fill concrete.
Optionally, the keel include:Multiple first keel and edge in axial direction extended prolong perpendicular to axial direction Multiple second keel stretched, first keel are fixedly connected with two composite plates, and second keel are fixedly connected described First keel.
Optionally, first keel are steel plate, and second keel are pipe, and the second keel fixation is arranged in institute State the first keel.
Optionally, the ash wall body plate is fixedly installed in the support frame by second keel.
Optionally, the two neighboring ash wall body plate on same mounting surface and surrounded between support frame filling space.
Optionally, the shirt rim is filled with concrete by steel plate around forming in the shirt rim area defined;With/ It is formed or, the Core Walls Structure is surrounded by steel plate, concrete is filled in the Core Walls Structure area defined.
Compared with prior art, the technical solution of the utility model has the following advantages:
The wall body structure, including support frame and ash wall body plate, wherein at least have three on the mounting surface of support frame A installation site for being suitable for installing ash wall body plate.Therefore, by mounting surface be arranged different number ash wall body plate, or by Different packing materials is perfused between two neighboring ash wall body plate, the keeping the temperature of wall body structure, heat-insulated and sound insulation effect can be changed Fruit.It thus can be under the premise of not changing the concrete structure of support frame and ash wall body plate so that wall body structure has different Functional effect meets different requirements, to be conducive to construction, reduces construction cost.
Further, two ash wall body plates are correspondingly arranged on a mounting surface of the support frame, two be oppositely arranged Ash wall body plate surrounds filling space, and client can select the fill concrete in the filling space or be not filled with coagulation as needed Soil, so that wall body structure can reach the technique effect of preferable insulation in suitable cost.
Further, there are four the shirt rim being uniformly distributed circumferentially, an installations of support frame for the support frame tool An ash wall body plate, and the top surface of ash wall body plate fixed setting shirt rim are correspondingly arranged on face.Therefore, the space between two neighboring shirt rim It can be as a part for the interior space.Compared to the prior art, the occupied space of wall body structure can be reduced, increased indoor Effective area.
Description of the drawings
Fig. 1 is the schematic diagram of the utility model first embodiment wall body structure;
Fig. 2 is the enlarged drawing of a-quadrant shown in Fig. 1;
Fig. 3 is another wall body structure schematic diagram of the utility model first embodiment;
Fig. 4 is the schematic diagram of the utility model second embodiment wall body structure;
Fig. 5 is the enlarged drawing of B area shown in Fig. 4;
Fig. 6 is the schematic diagram of the utility model 3rd embodiment wall body structure;
Fig. 7 is the enlarged drawing of C regions shown in Fig. 6.
Specific implementation mode
It is understandable to enable the above objects, features, and advantages of the utility model to become apparent, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.
First embodiment
Referring to Fig.1, a kind of wall body structure 100, including support frame 10 and ash wall body plate 20.Wherein, the support frame 10 Be suitable for beam column construction, play the role of it is load bearing, support frame 10 have at least one mounting surface (not marked in figure); Ash wall body plate 20 is fixedly installed on the mounting surface, to be fixedly connected with support frame 10, plays the role of the compartment.
Specifically, mounting surface, respectively the first mounting surface and the second mounting surface there are two the tools of the support frame 10, and institute The first mounting surface is stated perpendicular to the second mounting surface.Correspondingly, the wall body structure 100 includes two groups of ash wall body plates 20, two groups of walls Plate 20 is correspondingly arranged with first mounting surface, the second mounting surface respectively, common to connect support frame 10, and two groups of ash wall body plates 20 Between form right angle.
The present embodiment carries out specifically the wall body structure 100 by taking the first mounting surface and corresponding ash wall body plate 20 as an example It is bright.As shown in Fig. 2, along the first direction x perpendicular to support frame axial direction (perpendicular to the direction of paper), first peace Mask is filled there are three installation site, respectively the first installation site aa, the second installation site bb and third installation site cc are described Ash wall body plate 20 can be fixedly installed on position described at least one of which.
Therefore, by the ash wall body plate 20 in the first mounting surface setting different number, or by two neighboring ash wall body plate Different packing materials is perfused between 20, the keeping the temperature of wall body structure, heat-insulated and sound insulation effect can be changed.For example, only existing Ash wall body plate 20 is installed on the positions one of first installation site aa, the second installation site bb, third installation site cc, this When, since an ash wall body plate 20 is only arranged, the wall body structure 100 occupies little space, but keeps the temperature, heat-insulated and sound insulation effect It can decline, wall body structure 100 at this time is suitable for inner wall;Alternatively, in the first installation site aa, third installation site cc It is upper that ash wall body plate 20 is installed respectively, and the fill concrete between two ash wall body plates 20, at this point, the wall body structure 100 have compared with It is good keep the temperature, heat-insulated and sound insulation effect, but 100 occupied space of wall body structure is larger, and wall body structure 100 at this time is suitable for Exterior wall.
To sum up, under the premise of not changing the concrete structure of support frame 10 and ash wall body plate 20 so that wall body structure 100 has Have it is different keep the temperature, heat-insulated and sound insulation functional effect, meet different requirements, to be conducive to construction, reduce and build Cost.
Specifically in the present embodiment, the ash wall body plate 20 for corresponding to first mounting surface is two, is fixedly installed on respectively The first installation site aa and third installation site cc, two ash wall body plates 20 being oppositely arranged, which surround, fills space 20a, described Second installation site bb is located in the filling space 20a.This filling space 20a can be as needed, Selective filling or not The materials such as fill concrete.
If wishing, the wall body structure 100 has preferable heat insulating effect, can fill and be filled out in the 20a of space herein Concrete is filled, concrete has smaller thermal coefficient, can slow down the heat transfer inside and outside wall;If to the wall body structure 100 heat insulating effect is of less demanding, then can be not filled with any material, to reduce construction cost.
With continued reference to Fig. 2, the support frame 10 includes Core Walls Structure 11 and surrounds the Core Walls Structure 11, and is fixedly connected with institute State multiple shirt rims 12 of Core Walls Structure 11.Wherein, Core Walls Structure 11 refers to the central part of beam column construction, be suitable for casting concrete with Bear a large amount of load;Shirt rim 12 refers to being fixedly installed on 11 periphery of Core Walls Structure, and outwardly extending protrusion.Described first Installation site aa, the second installation site bb and third installation site cc are respectively positioned on the shirt rim 12.
Since installation site may be contained on shirt rim 12, the ash wall body plate 20 is fixedly connected with the shirt rim 12, thus The Core Walls Structure 11 will not be impacted during the installation process, so as to ensure the intensity of Core Walls Structure 11, core will not be reduced The bearing capacity of heart cylinder 11.
Specifically, there are four shirt rims 12 for the tool of the support frame 10.Four shirt rims 12 are along the circumferential equal of the Core Walls Structure 11 Even distribution.The wherein described first installation site aa is located in one of the side of shirt rim 12, and the second installation site bb is located at The top surface of other in which shirt rim 12, the third installation site cc are located therein the side of another shirt rim 12.When two walls When body plate 20 is mounted respectively to the first installation site aa, third installation site cc, there is the second installation site bb Shirt rim 12 be arranged between two ash wall body plates 20 just.
Optionally, make the distance between two ash wall body plates 20 L1 with the shirt rim 12 with the second installation site bb along the Distance L2 on one direction x is equal.At this point, two ash wall body plates 20 can clamp the shirt rim 12, so that wall body structure 100 is more It is compact, avoids between support frame 10, ash wall body plate 20 due to shaking there are gap.
With continued reference to Fig. 1, Fig. 2, the ash wall body plate 20 includes two composite plates 21 being arranged face-to-face and is set to two Keel 22 between composite plate 21, the keel 22 are for being fixedly connected with two composite plates 21 to form the ash wall body plate 20.Its In, the composite plate 21 can be composite metal plate, wood composite board, rock wool-steel plywood etc., and specific material is unrestricted.Tool In the present embodiment, the composite plate 21 is wood cement board or polyurethane sheet to body.
Two composite plates 21, which surround in filling space 21a, the filling space 21a, is suitable for the materials such as fill concrete Material, if wish the wall body structure 100 have preferable heat insulating effect, can in this space fill concrete, with Reduce heat transfer;If of less demanding to the heat insulating effect of the wall body structure 100, it can be not filled with any material, with Reduce construction cost.
In the present embodiment, the keel 22 include the first keel 22a and the second keel 22b.The first keel 22a is more A, the axial direction along support frame extends, and y is set gradually multiple first keel 22a in a second direction, wherein described second Axial directions of the direction y perpendicular to first direction x and support frame.The first keel 22a is fixedly connected to be arranged face-to-face Two composite plates 21.The second keel 22b is multiple, and y extends in a second direction, and multiple second keel 22b are along support frame Axial direction set gradually.The second keel 22b is fixedly connected with the first keel 22a, the first keel 22a, the second dragon Bone 22b forms reticular structure between two composite plates 21.
Specifically, the first keel 22a is steel plate, the second keel 22b is pipe, on the first keel 22a Equipped with multiple hole (not shown)s, the second keel 22b passes through the hole, so that the first keel 22a and described Second keel 22b is fixedly connected.
Due to the second keel 22b be pipe, when to the inside of the ash wall body plate 20 (i.e. fill space 21a It is interior) materials such as concrete perfusion when, the second keel 22b will not largely hinder the perfusion of concrete so that mixed Solidifying soil easier can flow to each position, fill up the entire space between two composite plates 21, avoid in regional area On due to being not filled by concrete reduce the intensity of wall, weaken the effect of insulation.
Further, the second keel 22b is hollow circular-tube reduces cost can reduce material.
The end on y is equipped with the first keel 22a, the first keel 22a to the ash wall body plate 20 in a second direction is steel plate, The shirt rim 12 is equally surrounded by steel plate and is formed.Therefore, the ash wall body plate 20 can be spirally connected by the first keel 22a and be fixed on institute It states on shirt rim 12.It is set as shown in Fig. 2, the ash wall body plate 20 being correspondingly arranged with the third installation site cc can be fixed by screw It sets on third installation site cc.
In the present embodiment, connector is additionally provided between the first installation site aa and the ash wall body plate 20 of corresponding setting 30, the connector 30 is fixedly installed on shirt rim 12, and the ash wall body plate 20 is fixedly installed on the connector 30.The ash wall body plate 20 are fixedly installed on the first installation site aa by connector 30, it is intended that making to have between ash wall body plate 20 and shirt rim 12 Certain gap, so as to facilitate the installation of the ash wall body plate 20 on the second mounting surface adjacent thereto.
Specifically, the connector 30 is steel plate, including vertically disposed first connects when 31 and second connect 32, institute It states the first connection side 31 and is spirally connected and be fixed on the shirt rim 12, the ash wall body plate 20 is spirally connected by the first keel 22a is fixed on institute the On two connection sides 32.
In other variations, other than be spirally connected fixed ash wall body plate 20 and support frame 10, welding can also be passed through Mode fixes ash wall body plate 20 and support frame 10, does not influence the implementation of the technical program.
Second mounting surface and the set-up mode of corresponding ash wall body plate 20 are referred to above-mentioned first mounting surface and correspondence Ash wall body plate 20 set-up mode, repeat no more.
With continued reference to Fig. 2, the shirt rim 12, around forming, can be surrounded in the shirt rim 12 as needed by steel plate The materials such as fill concrete in region.The Core Walls Structure 11 is surrounded by steel plate and is formed, can be as needed in the Core Walls Structure 11 The materials such as fill concrete in area defined.
If wishing, the wall body structure 100 has preferable heat insulating effect, can fill coagulation in this area Soil, to reduce heat transfer;If of less demanding to the heat insulating effect of the wall body structure 100, any material can be not filled with Material, to reduce construction cost.
In the present embodiment, there are two mounting surfaces for the tool of the support frame 10, and are vertically arranged between two mounting surfaces.At it In his variation, the support frame 10 can have more mounting surfaces.As shown in figure 3, the support frame 10 has four A mounting surface, and be vertically arranged between two neighboring mounting surface.At this point, corresponding to the two adjacent groups ash wall body plate 20 of different mounting surfaces Between form right angle.
May be used also in other variations there are three installation site in addition, being set on the mounting surface of support frame in the present embodiment More installation sites are arranged.At this point, more ash wall body plates 20 can be arranged on corresponding mounting surface, by adjacent two The materials such as concrete are filled or unfilled between a ash wall body plate 20, so as to adjust wall body structure 100 in wide range Heat insulation and preservation effect.
Second embodiment
With reference to Fig. 4, Fig. 5, the support frame 10 has the first mounting surface, and there are three installation positions for the first mounting surface tool It sets, respectively the first installation site aa, the second installation site bb and third installation site cc.The present embodiment and first embodiment The difference is that:Ash wall body plate 20 corresponding to first mounting surface is one, is fixedly installed on second installation site bb。
In the present embodiment, since an ash wall body plate 20 is only arranged, the wall body structure 100 occupies little space.But it protects Warm, heat-insulated and sound insulation effect is relatively poor, and wall body structure 100 at this time is relatively suitable for inner wall.Moreover, because four shirt rims 12 are circumferentially uniformly distributed in the periphery of Core Walls Structure 11, and the space between two neighboring shirt rim 12 can be as the interior space A part.Compared to the prior art, 100 occupied space of wall body structure can be further decreased, indoor effective area is increased.
3rd embodiment
With reference to Fig. 6, Fig. 7, the support frame 10 has the first mounting surface, the second mounting surface, the first installation mask There are three installation site, respectively the first installation site aa, the second installation site bb and third installation site cc;Second peace Filling mask, there are three installation sites, respectively the 4th installation site dd, the 5th installation site ee and the 6th installation site ff.
The present embodiment and first embodiment the difference is that:Ash wall body plate 20 corresponding to second mounting surface is one It is a, it is fixedly installed on the 5th installation site ee.
In the present embodiment, due to being only arranged an ash wall body plate 20 on the second mounting surface, and the 4th installation site dd, Ash wall body plate 20 is not set on 6th installation site ff.Therefore, second mounting surface and the first mounting surface adjacent thereto it Between can be not provided with connector.As shown in fig. 7, ash wall body plate corresponding with the first installation site aa on first mounting surface 20 is straight It connects and is fixed on the shirt rim 12.
At this point, 20 occupied space of ash wall body plate corresponding to the second mounting surface is smaller, but keep the temperature, heat-insulated and sound insulation effect phase To poor, it is suitable for interior wall;It is larger corresponding to 20 occupied space of ash wall body plate of the first mounting surface, but keep the temperature, heat-insulated and sound insulation Effect it is relatively preferable, be suitable for exterior wall.
Although the utility model discloses as above, the utility model is not limited to this.Any those skilled in the art, It does not depart from the spirit and scope of the utility model, can make various changes or modifications, therefore the scope of protection of the utility model It should be subject to claim limited range.

Claims (10)

1. a kind of wall body structure, which is characterized in that including:
There is support frame the mounting surface for ash wall body plate to be fixedly mounted, the mounting surface at least to have perpendicular to the support Three installation sites on skeleton axial direction;
Ash wall body plate is fixedly installed at least one installation site.
2. wall body structure as described in claim 1, which is characterized in that the support frame include Core Walls Structure and surround the core Heart cylinder and the multiple shirt rims for being fixedly connected with the Core Walls Structure, the installation site are located on the shirt rim.
3. wall body structure as claimed in claim 2, which is characterized in that the support frame include four shirt rims, four The shirt rim is uniformly distributed along the circumferential direction of the Core Walls Structure.
4. wall body structure as claimed in claim 3, which is characterized in that the ash wall body plate is fixedly installed on the top of the shirt rim Or it is fixedly installed on the both sides of the shirt rim.
5. wall body structure as described in claim 1, which is characterized in that the ash wall body plate includes:
Two composite plates being arranged face-to-face;
Keel are set between two composite plates, to be fixedly connected with two composite plates;What two composite plates were surrounded It is suitable for fill concrete in region.
6. wall body structure as claimed in claim 5, which is characterized in that the keel include:What is in axial direction extended is multiple First keel and along perpendicular to axial direction extend multiple second keel, first keel be fixedly connected two it is described compound Plate, second keel are fixedly connected with first keel.
7. wall body structure as claimed in claim 6, which is characterized in that first keel are steel plate, and second keel are Pipe, the second keel fixation are arranged in first keel.
8. wall body structure as claimed in claim 6, which is characterized in that the ash wall body plate is fixedly mounted by second keel In the support frame.
9. wall body structure as described in claim 1, which is characterized in that be located at same mounting surface on two neighboring ash wall body plate with Filling space is surrounded between support frame.
10. wall body structure as claimed in claim 2, which is characterized in that the shirt rim is surrounded by steel plate and formed, the shirt rim institute Concrete is filled in the region surrounded;And/or the Core Walls Structure is surrounded by steel plate and is formed, the area that the Core Walls Structure is surrounded Concrete is filled in domain.
CN201721493622.8U 2017-11-10 2017-11-10 Wall body structure Expired - Fee Related CN207609048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721493622.8U CN207609048U (en) 2017-11-10 2017-11-10 Wall body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721493622.8U CN207609048U (en) 2017-11-10 2017-11-10 Wall body structure

Publications (1)

Publication Number Publication Date
CN207609048U true CN207609048U (en) 2018-07-13

Family

ID=62795271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721493622.8U Expired - Fee Related CN207609048U (en) 2017-11-10 2017-11-10 Wall body structure

Country Status (1)

Country Link
CN (1) CN207609048U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653998A (en) * 2017-11-10 2018-02-02 上海息数建筑科技有限公司 Wall body structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653998A (en) * 2017-11-10 2018-02-02 上海息数建筑科技有限公司 Wall body structure

Similar Documents

Publication Publication Date Title
CN208501974U (en) A kind of foam concrete light steel-framed composite wall with rectangular steel tube connector
CN207609048U (en) Wall body structure
CN107165314A (en) Assembled sandwich heat preservation concrete shear wall structure non-dismantling formwork system
CN109572070A (en) A kind of foam filling hollow round tube pyramid dot-matrix sandwich panel and preparation method thereof
WO2021164792A1 (en) Method for 3d printing insulated concrete wall body, and concrete wall body
CN206503282U (en) Alienable integral type wafer board
CN107653998A (en) Wall body structure
CN104453076A (en) Phase-change-material composite hollow building block
CN110241946B (en) Horizontal connection structure of assembled energy-consuming frame shear wall and construction method thereof
CN203569700U (en) Transition node from concrete filled steel tube combination column to reinforced concrete column
CN216516375U (en) Heat insulation bridge connection structure of wall body and outer curtain wall keel
CN209686654U (en) Cast-in-place light material steel member building
CN207761170U (en) A kind of outer packet portion coupled column of abnormity steel reinforced concrete
CN107700696A (en) The anti-buckling steel plate shear force wall of concrete for steel house bottom reinforcement area
CN206707031U (en) A kind of bindiny mechanism with the light steel foamed concrete composite wallboard for lifting function
CN207761169U (en) A kind of profiled section coupled column
CN110219386B (en) Non-welding assembled grid plate
CN204804089U (en) Thermal insulation wall body
CN208023879U (en) A kind of horizontal dress mounting structure of building exterior wall panel
CN207568069U (en) For the support frame and beam column construction of beam column construction
CN208267175U (en) It is cast-in-place to use skeleton and structural wall
CN211425188U (en) Cooling water tower cooling water flow defoaming and overflow preventing device
CN206646676U (en) A kind of prefabricated bearing wall
CN220486809U (en) Building cornice thermal insulation wall
CN208347203U (en) A kind of ribbed stiffener decoration panel and its connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180713

Termination date: 20211110

CF01 Termination of patent right due to non-payment of annual fee