Prior art keywords
air knife
main air
strip
slag trap
blowing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721618646.1U
Other languages
Chinese (zh)
Inventor
张国堂
王海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201721618646.1U priority Critical patent/CN207608613U/en
Application granted granted Critical
Publication of CN207608613U publication Critical patent/CN207608613U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model is related to galvanizing high-speed production unit production equipment fields, disclose a kind of air knife component of the galvanizing with slag trap, the air knife component includes the first, second main air knife, the first, second main air knife is separately positioned on strip both sides, the first pre-blowing air knife is set in front of the first main air knife, the first slag trap is set between the first pre-blowing air knife and the first main air knife.The steel edge portion band steel plate type that the utility model solves the production of zinc-plated high-speed production unit is bad, the problem of be easy to causeing side thickness defect, and can greatly improve product quality, ensures production direct motion.

Description

A kind of air knife component of the galvanizing with slag trap
Technical field
The utility model is specifically related to galvanizing high-speed production unit production equipment field, relates more specifically to a kind of hot dip Air knife component of the zinc with slag trap.
Background technology
Traditional galvanizing high-speed production unit production equipment mainly uses air knife, produces the production of think gauge thickness coating In the process since air pressure is low, line speed is low, and air knife is low apart from zinc liquid level, and zinc pot face slag is easy with air pressure Effect, brought up from strip both sides, cause steel edge portion formed slag particle, band steel plate type it is bad, it is easy to cause side thickness defect, The uneven coating on strip both sides is even.
It produces since air pressure is low in the production process of Thin Specs thickness coating, line speed is high, and air knife is apart from zinc liquid Face is low, and zinc pot face slag is easy the effect with air pressure, is brought up from strip both sides, causes steel edge portion band steel plate type not It is good, it is easy to cause side thickness defect, the uneven coating on strip both sides even;It is unfavorable for steady production.
Utility model content
It is bad to solve the steel edge portion band steel plate type that zinc-plated high-speed production unit produces in the prior art, it be easy to cause side The uneven coating of thick defect, strip both sides is even and after main air knife Hand scarf, and air knife cleaning trace is led to the problem of, this reality With a kind of air knife component of the galvanizing of novel offer with slag trap.
The utility model adopts the following technical solution:A kind of air knife component of the galvanizing with slag trap, the air knife component Including the first, second main air knife, the first, second main air knife is separately positioned on strip both sides, the first main air knife front First pre-blowing air knife is set, the first slag trap is set between the first pre-blowing air knife and the first main air knife;Before the second main air knife The second pre-blowing air knife of side's setting, is arranged the second slag trap between the second pre-blowing air knife and the second main air knife.
The angulation of first slag trap and horizontal plane where the first pre-blowing air knife knife lip is 15 ° -45 °;Institute The angulation for stating the second slag trap and horizontal plane where the second pre-blowing air knife knife lip is 15 ° -45 °.
The distance of the first pre-blowing air knife away from strip is more than the first distance of the main air knife away from strip;Described second pre- air blowing Distance of the knife away from strip is more than the second distance of the main air knife away from strip.
The utility model opens main gas by increasing pre-blowing air knife in front of main air knife so as to reduce main air pressure Knife, the distance for closing pre-blowing air knife are cleared up again, and air knife clears up trace and can avoid generating, and improves product quality, ensures production Direct motion, slag trap setting effectively solve zinc pot face slag be easy with air pressure effect, taken from strip both sides Come, cause steel edge portion band steel plate type bad, it is easy to cause side thickness defect, the even problem of the uneven coating on strip both sides.
Description of the drawings
Fig. 1 is utility model diagram;
Symbol description
1, strip, the 2, first main air knife, the 3, first main air knife mounting bracket, the 4, first slag trap, the installation of the 5, first slag trap Frame, the 6, first pre-blowing air knife, the 7, first pre-blowing air knife mounting bracket, the 8, second main air knife, the 9, second main air knife mounting bracket, 10, Two slag traps, the 11, second slag trap mounting bracket, the 12, second pre-blowing air knife, the 13, second pre-blowing air knife mounting bracket.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
With reference to attached drawing, arrow direction is the strip direction of motion in attached drawing.The utility model provides a kind of galvanizing band pushing off the slag The air knife component of plate, the air knife component include the first, second main air knife 2,8, and the first, second main air knife 2,8 is set respectively It sets in strip both sides, the first main air knife 2 is arranged on the first main air knife mounting bracket 7, setting first in front of the first main air knife Pre-blowing air knife, i.e. strip first pass through pre-blowing air knife, after by main air blowing knife, arrow indicates strip traffic direction in attached drawing;First Pre-master air knife 6 is arranged on the first pre-blowing air knife mounting bracket 7, and the first pushing off the slag is arranged in the first pre-master air knife 6 and the first main air knife 2 Plate 4, first slag trap 4 are mounted on the first slag trap mounting bracket.
The second pre-blowing air knife 12 is arranged in the second main air knife, 8 front, between the second pre-blowing air knife 12 and the second main air knife 8 Second slag trap 10 is set, and the second main air knife 8 is arranged on the second main air knife mounting bracket 9, and the setting of the second pre-blowing air knife 12 is the On two pushing off the slag board mounting stands 12, medium is hot gas in pre-blowing air knife.
The angulation of first slag trap and horizontal plane where the first pre-blowing air knife knife lip is 15 ° -45 °;Institute The angulation for stating the second slag trap and horizontal plane where the second pre-blowing air knife knife lip is 15 ° -45 °.Along strip operation side To slag trap slant setting, which is conducive to pawn, is more simply pre-blowed the impurity that knife is blown down.The peace of slag trap and pushing off the slag board mounting stand Dress mode is preferably that the adjustable mode of activity is installed, when being blocked in main air knife or generating production accident and cannot come into operation, pre-blowing air knife to Strip moves, and slag trap angle deflects, and prevents scratch strip;The slag trap added between main air knife and pre-blowing air knife is prevented Only pre-blowing air knife is scraped in the zinc liquid secondary sputtered to strip and main air knife blown down, and effectively avoids the air knife of two-layer configuration that shadow is arranged The air knife for ringing up-down structure uses, and substantially increases the effect of slag trap, so that main air knife zinc liquid is splashed and causes main air knife blocking Probability declines, and the probability that cadmia is splashed to belt steel surface declines, and improves quality of coating, and can prevent from being adhered to due to cadmia Polishing machine working roll is caused to damage by polishing machine thing on strip.
The distance of the first pre-blowing air knife away from strip is more than the first distance of the main air knife away from strip;Described second pre- air blowing Distance of the knife away from strip is more than the second distance of the main air knife away from strip.Gap between pre-blowing air knife and strip is more than main air knife and band Gap between steel, pre-blowing air knife are more complete to the processing of strip, mitigate main air pressure.
Pre-blowing air knife and main knives gap range 10-600mm, after main air knife failure, adjusting pre-blowing air knife makes it be placed in Main air knife position substitutes main air knife work.
Medium is hot gas in pre-blowing air knife, and strip first passes around pre-blowing air knife and scrape blowing, the zinc that will adhere on strip Liquid is thinned, and is scraped and is blown zinc pot face slag off and main air knife scrapes the cooling zinc liquid blown, and treated strip is by main air knife to coating It is accurately controlled, since pre-blowing air knife has carried out pre-blowing to coating, the air pressure of main air knife is eased, strip both sides Coating uniformity is greatly improved, and prevents side thickness defect from generating;On the other hand, pre-blowing air knife can be by the zinc with cadmia Liquid is handled, and especially to the cadmia pre-blowing of steel edge portion, alleviate main air knife scrapes the pressure blown, and it is accurate to improve main air knife The ability for controlling coating, has certain effect to the promotion of product quality, lays a good foundation to subsequent production technology;It is pre- to blow Knife can effectively avoid air knife streak cleaning trace, prevent that zinc spends uneven defect and product to degrade;Two-stage air knife arrangement, Air pressure reduces, and is substantially reduced to the noise nuisance of site environment, improves working environment, reduces occupational hazards, improves Working efficiency;Double air knife band pushing off the slag harden structure air knife components, keep air knife modular construction compact, occupy little space, easy to repair. Main air knife blocking accident occurs when avoiding high-speed production for the setting of two-stage air knife, after generating air knife cord defects, Neng Gouli Coating control is carried out with pre-blowing air knife, not reduction of speed Hand scarf is not shut down, does not generate waste product, substantially increases the continuous of unit Property.
The utility model is to can be widely applied to continuous zinc coating production line, especially in production high quality appliance plate and Automobile Plate During, improve air knife component of the continuous hot galvanizing of product quality with slag trap.

Claims (3)

1. a kind of air knife component of galvanizing with slag trap, the air knife component includes the first, second main air knife, described first, Second main air knife is separately positioned on strip both sides, which is characterized in that the first main air knife(2)The first pre-blowing air knife is arranged in front (6), the first pre-blowing air knife(6)With the first main air knife(2)Between the first slag trap is set(4);The second main air knife(8)Front Second pre-blowing air knife is set(12), the second pre-blowing air knife(12)With the second main air knife(8)Between the second slag trap is set(10).
2. air knife component of the galvanizing according to claim 1 with slag trap, which is characterized in that first slag trap (4)With the first pre-blowing air knife(6)The angulation of horizontal plane where knife lip is 15 ° -45 °;Second slag trap(10) With the second pre-blowing air knife(12)The angulation of horizontal plane where knife lip is 15 ° -45 °.
3. air knife component of the galvanizing according to claim 2 with slag trap, which is characterized in that the first pre-blowing air knife (6)Away from strip(1)Distance be more than the first main air knife(2)Away from strip(1)Distance;The second pre-blowing air knife(12)Away from strip (1)Distance be more than the second main air knife(8)Away from strip(1)Distance.
CN201721618646.1U 2017-11-28 2017-11-28 A kind of air knife component of the galvanizing with slag trap Expired - Fee Related CN207608613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721618646.1U CN207608613U (en) 2017-11-28 2017-11-28 A kind of air knife component of the galvanizing with slag trap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721618646.1U CN207608613U (en) 2017-11-28 2017-11-28 A kind of air knife component of the galvanizing with slag trap

Publications (1)

Publication Number Publication Date
CN207608613U true CN207608613U (en) 2018-07-13

Family

ID=62796816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721618646.1U Expired - Fee Related CN207608613U (en) 2017-11-28 2017-11-28 A kind of air knife component of the galvanizing with slag trap

Country Status (1)

Country Link
CN (1) CN207608613U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826927A (en) * 2018-07-21 2018-11-16 洪波 A kind of spinneret blowing-dry apparatus
CN110643917A (en) * 2019-11-13 2020-01-03 甘肃酒钢集团宏兴钢铁股份有限公司 Production method of continuous hot-dip galvanizing aluminum magnesium, air knife device and air knife system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826927A (en) * 2018-07-21 2018-11-16 洪波 A kind of spinneret blowing-dry apparatus
CN110643917A (en) * 2019-11-13 2020-01-03 甘肃酒钢集团宏兴钢铁股份有限公司 Production method of continuous hot-dip galvanizing aluminum magnesium, air knife device and air knife system
CN110643917B (en) * 2019-11-13 2021-07-30 甘肃酒钢集团宏兴钢铁股份有限公司 Production method of continuous hot-dip galvanizing aluminum magnesium, air knife device and air knife system

Similar Documents

Publication Publication Date Title
CN207608613U (en) A kind of air knife component of the galvanizing with slag trap
JP6304395B2 (en) Cooling equipment for hot dipped steel sheet
CN203582945U (en) Hot galvanized and galvanized and aluminized air knife edge baffle device
JP2010215929A (en) Equipment for manufacturing hot-dip metal coated steel strip and method for manufacturing hot-dip metal coated steel strip
CN107574395B (en) Method and device for eliminating zinc flow lines
CN201406461Y (en) Edge baffle plate used for improving quality of strip steel zinc coating
JP6911474B2 (en) Edge mask shielding plate and hot-dip zinc scattering prevention method at the wiping nozzle of the hot-dip galvanizing line
CN102671968A (en) Active flow field controlling type five-machine-frame cold-rolling continuous-rolling board surface cleaning method
CN205498063U (en) Limit device is frequently got to soft gum cover clamp
CN109455951A (en) The plasma treatment appts and processing method of touch screen cover board
CN106163681A (en) Apparatus and method for contactless roller cleaning
CN114645234A (en) Leveling equipment for improving surface quality of zinc-aluminum-magnesium coating band steel
CN204307894U (en) A kind of cleaning mechanism of surface treatment liquid medicine
CN103111473A (en) Six-roll cold mill ultra-wide aluminum strip surface on-line degreasing device
CN209020957U (en) A kind of device improving the indentation of planisher foreign matter
CN102536890A (en) Impeller capable of preventing ash sticking of converter primary fan
CN207127743U (en) Sheet metal strip continuous processing unit ball blast defect Prevention device
CN205464687U (en) Wave -soldering spraying controller
KR101439633B1 (en) Electro-Magnetic Wiping Apparatus
CN217809614U (en) Anti-sticking zinc edge baffle guide wheel combination
KR20120045829A (en) Galvanizing apparatus with air knife system
CN204338588U (en) Metal plate and belt surface cleaning wiping arrangement on-line cleaning system
CN211360084U (en) Wire rod rolling EDC spray set
CN215433254U (en) Plane sand blasting device
CN208008870U (en) The adaptive air knife edge dam of Continuous Hot Dip Galvanizing Line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180713

Termination date: 20181128