CN207606793U - The angle controller of stop hole is bored for real bridge - Google Patents
The angle controller of stop hole is bored for real bridge Download PDFInfo
- Publication number
- CN207606793U CN207606793U CN201721341469.7U CN201721341469U CN207606793U CN 207606793 U CN207606793 U CN 207606793U CN 201721341469 U CN201721341469 U CN 201721341469U CN 207606793 U CN207606793 U CN 207606793U
- Authority
- CN
- China
- Prior art keywords
- plate
- sliding rail
- angle
- sliding
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model discloses a kind of angle controllers boring stop hole for real bridge, including fixed support unit, angle control unit, pilot unit and hand drill unit, fixed support unit includes permanent-magnetic plate, upper plate and lower plate, and the first sliding rail and the second sliding rail are equipped between upper plate and lower plate;The angle control unit includes sliding sleeve, and sliding sleeve both ends are slidably connected with first sliding rail and the second sliding rail respectively, for determining bore angle;The pilot unit includes the guide sleeve being connect with the sliding sleeve.The utility model meets the needs that difference is drilled with crack arrest orifice angle;By the guiding role of guide sleeve, ensure hand drill always towards a certain fixed boring direction, it is bad that deviation occurs in avoidable boring direction;The sundries such as the iron filings generated when permanent-magnetic plate absorption drilling, reduce the on-site cleanup work amount after drilling.
Description
Technical field
The utility model is related to steel bridge drilling crack arrest recovery technique fields, are related to a kind of angle for boring stop hole for real bridge
Control device.
Background technology
Orthotropic Steel Bridge Deck by torsional rigidity is big, intensity is high, from heavy and light, good integrity the advantages that, extensive use
In the construction of Large Span Bridges.But with the increase of bridge Years Of Service, Orthotropic Steel Bridge Deck problem of Cracking is increasingly tight
It is high, at the attachment weld of especially various structure details.For make bridge structure remain to maintain the operation phase safe condition, at present compared with
It is to take interim crack arrester for widespread practice, i.e., stop hole is drilled in crack tip using drilling machine, when crackle is further
After extension, then using other technologies means fatigue crack is further repaired.
But since local structure is complicated, operating space is limited in real bridge, is mostly actually to bore crack arrest the problems such as looking up operation
It is difficult to control bore angle during hole, often will appear bore angle bias phenomenon.Unsuitable bore angle can not have
The further cracking of delay fatigue crackle is imitated, What is more may cause new fatigue crack.In addition, working as bore angle
When deviation, less serious case can make drill bit stuck, and drill rod breaking, the drilling rod of fracture can be caused quickly to fly out and can very likely accidentally injure when serious
Operating personnel.
Utility model content
Goal of the invention:The utility model provides a kind of angle controller boring stop hole for real bridge, the device solution
Practical brill stop hole of having determined is difficult to control bore angle in the process, the problem of bore angle deviation occurs and drilling rod flies out and accidentally injures behaviour
The problem of making personnel, while reducing the workload of scene cleaning.
Technical solution:The angle controller that stop hole is bored for real bridge of the utility model, including fixed support unit,
Angle control unit, pilot unit and hand drill unit.
The fixed support unit includes permanent-magnetic plate, and the permanent-magnetic plate is equipped with the through-hole worn for drill bit, and institute
The two opposite sides side for stating permanent-magnetic plate is connected separately with the upper plate and lower plate contradicted with bridge floor, the upper plate and lower plate
Between be equipped with arc the first sliding rail and the second sliding rail;Permanent-magnetic plate is one piece of iron plate with permanent magnetism, and it acts as suctions
The sundries such as the iron filings generated when attached drilling reduce the on-site cleanup work amount after drilling.
The angle control unit includes sliding sleeve, and the sliding sleeve both ends respectively with first sliding rail and
Two sliding rails are slidably connected, for determining bore angle.
The pilot unit includes guide sleeve, and the guide sleeve is connect with the sliding sleeve, and is used for pilot bore hole side
To.
The hand drill unit includes hand-held part, drill bit and the fixed plate being socketed with the drill bit, and passes through fixed plate and institute
Guide sleeve is stated to be slidably connected.
Fixed support body system supports by the way that upper and lower bottom plate and bridge deck structure are inconsistent to fix, and then angle is utilized to control
Sliding sleeve in device is slidably connected with the first and second sliding rail, determines that bore angle, guide sleeve guide advance when hand drill drilling
Direction avoids the occurrence of and trains off.
Hand drill unexpected disequilibrium control when drilling when avoiding punching, which further includes buffer cell, and the buffering is single
Member includes the buffer stopper being connect with the guide sleeve, is equipped with gas chamber in the buffer stopper and is equipped with mobile piston, and described slow
It rushes block and offers the stomata being externally vented, wherein the mobile piston contradicts with the fixed plate and can be with fixed plate
It pushes and moves.The buffer stopper is equipped with 4, and is connected to that 4 sides of the guide sleeve open up and coordinates with its shape
Card slot in.
When drilling, the end thereof contacts of fixed plate and mobile piston, and with the propulsion of boring procedure, fixed plate constantly pushes
Mobile piston, the gas in gas chamber are squeezed by mobile piston, are discharged by stomata, due to the air vent aperture very little,
It can guarantee that fltting speed maintains at the uniform velocity state.When drilling drills component, hand drill loses the inhibition power of component, fltting speed
Increase suddenly in a flash, due to air vent aperture very little, the gas in gas chamber can not be discharged rapidly and rapidly be compressed, and form one
A inhibition power, the inhibition power of alternative means avoid other components of bit hits to slow down hand drill fltting speed,
Cause secondary destruction.
Further to realize that the stability of fixed support, the fixed support unit are equipped with control upper plate and lower plate
Magnetic magnetic base switch.When the magnetic base, which switchs, to be opened, the upper plate shows as one block of magnetic with lower plate
Iron can be adsorbed on the top plate and U rib plate of steel bridge deck;When the magnetic base, which switchs, closes, the upper plate is under
The magnetic of bottom plate disappears, and the fixed support unit can be removed.
The sleeve both ends offer respectively with first sliding rail and the matched the first sliding groove of the second sliding rail shape and second
Sliding slot, and be slidably connected by fixing clip and bolt;Angle controller can slide between the first sliding rail and the second sliding rail,
Form different bore angles.The bolt is screwed, the fixing clip will be by first sliding rail and the sliding sleeve
Cylinder tightly fits together, to ensure that bore angle is not in change in boring procedure.
The guide sleeve both sides are respectively equipped with gib block, and are offered in the fixed plate matched with the guiding bar shaped
Guide groove, and can be slided along the gib block.When drilling, the hand drill is by the guide groove in the fixed plate along institute
Gib block advance is stated, passes through the guiding role of the guide sleeve and the guide groove, it is ensured that the hand drill is always towards certain
One fixed boring direction, avoids boring direction from deviation occur.
Support plate is equipped between the upper plate and lower plate.Support plate is used to fix the opposite position of upper plate and lower plate
It sets, three forms the monnolithic case frame of the fixed support body system.
Advantageous effect:1, the utility model, which realizes, meets the need that difference is drilled with crack arrest orifice angle when repairing steel box-girder crackle
It wants;2, by the guiding role of guide sleeve and guide groove, ensure that hand drill always towards a certain fixed boring direction, can avoid boring
There is deviation in hole direction;3, ensure that drilling fltting speed maintains at the uniform velocity state, and can be to avoid top plate be punched when, hand drill loses suddenly
It goes to balance, causes the secondary destruction of other structures;It 4, can be to avoid the iron generated when drilling by the adsorption effect of permanent-magnetic plate
The sundries such as bits are flown upward everywhere, reduce the on-site cleanup work amount after drilling.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram that support unit is fixed in the utility model;
Fig. 3 is the structural schematic diagram of angle control unit in the utility model;
Fig. 4 is the connection of the first sliding rail and sliding sleeve and decomposition diagram in the utility model;
Fig. 5 is the connection of the second sliding rail and sliding sleeve and decomposition diagram in the utility model;
Fig. 6 is that pilot unit is connect and the structural schematic diagram of buffer stopper with buffer stopper in the utility model;
The a quarter schematic cross-sectional view of pilot unit in Fig. 7 the utility model;
Fig. 8 is buffer stopper half section schematic in the utility model;
Fig. 9 is hand drill cellular construction schematic diagram in the utility model;
Figure 10 is the practical application of bridge schematic diagram of the utility model.
Specific implementation mode
Referring to Fig. 1 to Figure 10, control when being repaired for steel bridge deck crack arrest described in one embodiment of the utility model drills
The device of angle, controls bore angle when for drilling, including fixed support unit 1, angle control unit 2, pilot unit 3,
Hand drill unit 4 and buffer cell 5.
Fixed support unit 1 is opened including upper plate 12, permanent-magnetic plate 11, lower plate 13, support plate 17, magnetic base control
Close the 16, first sliding rail 14 and the second sliding rail 15.Permanent-magnetic plate 11 and trapezoidal, permanent magnetism are connected between upper plate 12 and lower plate 13
Property plate 11 on be provided with drill bit by through-hole, support plate 17 is used to fix the relative position of upper plate 12 and lower plate 13, three
The monnolithic case frame of fixed support unit 1 is formed, and is connected with bridge deck structure by upper plate 12 and lower plate 13.Upper bottom
Arc the first sliding rail 14 and the second sliding rail 15 for adjusting bore angle are equipped between plate 12 and lower plate 13;Magnetic base is opened
16 magnetism for controlling upper plate 12 and lower plate 13 is closed, when magnetic base switch 16 is opened, upper plate 12 and lower plate
13 show as one block of magnet, can be adsorbed on the top plate and U rib plate of steel bridge deck;When magnetic base switch 16 is closed, upper bottom
Plate 12 disappears with the magnetic of lower plate 13, and fixed support unit 1 can be removed.
Angle control unit 2 includes sliding sleeve 21, fixing clip 22 and bolt 23, and 21 both ends of sliding sleeve are equipped with and the
The first sliding groove 24 and second sliding slot 25 of one sliding rail 14 and the cooperation of 15 shape of the second sliding rail, and by fixing clip 22 and bolt 23 with
The first sliding rail 14 and the second sliding rail 15 of fixed support unit 1 are slidably connected, different to be formed by sliding sliding sleeve 21
Bore angle;First sliding rail 13 will be tightly bonded by screwing bolts 23, fixing clip 22 with wherein one end of sliding sleeve 21
Together, to ensure that bore angle is not in change in boring procedure.
Pilot unit 3 includes guide sleeve 31, is fixed on the sliding sleeve 21 of angle control unit 2, for guiding hand drill
Direction of advance when drilling, avoids the occurrence of and trains off;And guide sleeve 31 is equipped with gib block 32, and 4 sides offer card slot 33.
Hand drill unit 4 includes hand-held part 41, drill bit 42 and the fixed plate 43 being socketed with drill bit 42, is offered in fixed plate 43
The guide groove 44 being used cooperatively with the gib block 32 on guide sleeve 31, and be slidably connected by fixed plate 43 and guide sleeve 31.It bores
Kong Shi, hand drill unit 4 are advanced by the guide groove 44 in fixed plate 43 along gib block 32, and guide sleeve 31 and guide groove 44 are passed through
Guiding role, it is ensured that drill bit 42 towards a certain fixed boring direction, avoids boring direction from deviation occur always.
Buffer cell 5 includes buffer stopper 51, and gas chamber 52 is equipped in buffer stopper 51, mobile piston 53 is equipped in gas chamber 52,
And the stomata 54 being vented outward is offered, buffer stopper 51 is fixed on guide sleeve 31, hand drill unexpected disequilibrium when avoiding punching
Control;Mobile piston 53 is contradicted with fixed plate 43, and can be moved under the promotion of fixed plate 43.Wherein, buffer stopper 51 is equipped with 4
It is a, and be connected in the card slot 33 of guide sleeve 31 coordinated with its shape.
The specifically used method of the utility model is as follows:
Before drilling, the crack tip position for needing to bore stop hole is first determined.Magnetic base switch 16 is closed, fixed branch is adjusted
Relative position of the unit 1 on steel bridge deck is supportted, ensures that drill bit is located at crack tip position when follow-up drilling, pays attention to upper plate
12 and top plate contact, lower plate 13 contacted with U rib plate.After adjusting good position, magnetic base switch 16 is opened, upper plate 12 is under
Bottom plate 13 generates magnetic and is adsorbed on top plate respectively and in U rib plate, completes the fixation of fixed support unit 1.
Control unit 2 is adjusted the angle, bolt 23 is unscrewed, sliding sleeve 21 is moved along the first sliding rail 14 and the second sliding rail 15
To the bore angle of needs, screwing bolts 23 ensure to be bonded between fixing clip 22 and the first sliding rail 14, complete bore angle
It determines.
Buffer cell 5 is adjusted, mobile piston 53 is pulled out, ensures that 4 mobile pistons 53 can be contacted with fixed plate 43.
Hand drill unit 4 is installed, by the gib block 32 on 44 alignment guide of the guide groove set 31 in fixed plate 43, opens hand drill
4 power switch of unit, at the uniform velocity promotes, and starts drilling operation.
After specified drilling depth to be achieved requires, hand drill unit 4 is closed and removed, magnetic base switch 16 is closed, removes
Fixed support unit 1 and angle control unit 2, clear up the sundries such as the iron filings of 11 adsorption of permanent-magnetic plate, complete specified angle
Drilling operation.
Claims (8)
1. a kind of angle controller boring stop hole for real bridge, it is characterised in that:Including fixed support unit (1), angle
Control unit (2), pilot unit (3) and hand drill unit (4);
The fixed support unit (1) includes permanent-magnetic plate (11), and the permanent-magnetic plate (11) is equipped with leads to for what drill bit was worn
Hole, and the two opposite sides side of the permanent-magnetic plate (11) is connected separately with the upper plate (12) and lower plate contradicted with bridge floor
(13), the first sliding rail (14) and the second sliding rail (15) of arc are equipped between the upper plate (12) and lower plate (13);
The angle control unit (2) includes sliding sleeve (21), and the sliding sleeve (21) both ends are respectively with described first
Sliding rail (14) and the second sliding rail (15) are slidably connected, for determining bore angle;
The pilot unit (3) includes guide sleeve (31), and the guide sleeve (31) connect with the sliding sleeve (21), and is used for
Pilot bore hole direction;
The hand drill unit (4) includes hand-held part (41), drill bit (42) and the fixed plate (43) being socketed with the drill bit (42), and
It is slidably connected by fixed plate (43) and the guide sleeve (31).
2. the angle controller according to claim 1 for boring stop hole for real bridge, it is characterised in that:It further include buffering
Unit (5), the buffer cell (5) include the buffer stopper (51) being connect with the guide sleeve (31), and the buffer stopper (51) is interior
Equipped with gas chamber (52) and it is equipped with mobile piston (53), and the buffer stopper (51) offers the stomata (54) being externally vented,
In, the mobile piston (53) is inconsistent with the fixed plate (43) and can be moved with the promotion of fixed plate (43).
3. the angle controller according to claim 2 for boring stop hole for real bridge, it is characterised in that:The buffer stopper
Equipped with 4, and it is connected in card slot (33) that is that 4 sides of the guide sleeve open up and coordinating with its shape.
4. the angle controller according to claim 3 for boring stop hole for real bridge, it is characterised in that:The fixed branch
Support the magnetic base switch (16) that unit (1) is equipped with control upper plate (12) and lower plate (13) magnetism.
5. the angle controller according to claim 3 for boring stop hole for real bridge, it is characterised in that:The sliding sleeve
It is slided respectively by fixing clip (22) and bolt (23) with first sliding rail (14) and the second sliding rail (15) at cylinder (21) both ends
Connection.
6. the angle controller according to claim 3 for boring stop hole for real bridge, it is characterised in that:The sliding sleeve
Cylinder (21) both ends offer respectively with first sliding rail (14) and the matched the first sliding groove of the second sliding rail (15) shape (24) and the
Two sliding slots (25).
7. the angle controller according to claim 3 for boring stop hole for real bridge, it is characterised in that:The guide sleeve
(31) both sides are respectively equipped with gib block (32), and are offered in the fixed plate (43) and the gib block (32) shape is matched leads
To slot (44), and can be slided along the gib block (32).
8. the angle controller according to claim 3 for boring stop hole for real bridge, it is characterised in that:The upper plate
(12) support plate (17) is equipped between lower plate (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721341469.7U CN207606793U (en) | 2017-10-18 | 2017-10-18 | The angle controller of stop hole is bored for real bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721341469.7U CN207606793U (en) | 2017-10-18 | 2017-10-18 | The angle controller of stop hole is bored for real bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207606793U true CN207606793U (en) | 2018-07-13 |
Family
ID=62793469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721341469.7U Active CN207606793U (en) | 2017-10-18 | 2017-10-18 | The angle controller of stop hole is bored for real bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207606793U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111085974A (en) * | 2019-12-02 | 2020-05-01 | 国家电网有限公司 | Auxiliary mounting device for sulfur hexafluoride switch in electrical cabinet |
CN114012351A (en) * | 2021-09-30 | 2022-02-08 | 河海大学 | Steel bridge deck fatigue crack punching device and drilling crack stopping method |
-
2017
- 2017-10-18 CN CN201721341469.7U patent/CN207606793U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111085974A (en) * | 2019-12-02 | 2020-05-01 | 国家电网有限公司 | Auxiliary mounting device for sulfur hexafluoride switch in electrical cabinet |
CN111085974B (en) * | 2019-12-02 | 2023-06-16 | 国家电网有限公司 | Auxiliary installation device of sulfur hexafluoride switch in electrical cabinet |
CN114012351A (en) * | 2021-09-30 | 2022-02-08 | 河海大学 | Steel bridge deck fatigue crack punching device and drilling crack stopping method |
CN114012351B (en) * | 2021-09-30 | 2023-01-17 | 河海大学 | Steel bridge deck fatigue crack punching device and drilling crack stopping method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612581B (en) | The noiseless brill of rock splits all-in-one | |
CN207606793U (en) | The angle controller of stop hole is bored for real bridge | |
GB0709953D0 (en) | Downhole flow control tool and method | |
BRPI1007764A8 (en) | DOWN HOLE DRILLING TOOL AND METHOD FOR OPERATING A DOWN HOLE DRILLING TOOL | |
CN106351572A (en) | Roof positioning device, drilling device comprising same as well as grouting device and method | |
CN107013165A (en) | Rock drill forward beam is swung and rotating device | |
CN210239716U (en) | Pneumatic jumbolter combination supporting device | |
CN108436144A (en) | A kind of engineering drilling machine | |
CN103470256A (en) | Propulsion device of gadder | |
CN204827221U (en) | Novel valveless does not have pneumatic downhole air hammer of nylon tail pipe | |
CN104453897A (en) | Crawler-type mountain drilling machine | |
CN206737819U (en) | Rock drill forward beam is swung and rotating device | |
CN207919262U (en) | Prefabricated road bed board positions fixing tool | |
CN202388008U (en) | Reverse countersink | |
CN109655359A (en) | A kind of hydraulic fatigue machine suitable for tunnel protection door | |
CN109108661A (en) | A kind of multi-function steel structure cutting drilling device | |
CN207900279U (en) | Prevent from weakening the drilling equipment of top plate | |
CN209621209U (en) | A kind of three-level waterpower drilling tool | |
CN207728317U (en) | Quick-replaceable drilling machine lifting pattern mechanism | |
CN204715441U (en) | A kind of multifunctional excavator | |
CN208402236U (en) | A kind of anti-bias jig of pcb board material riveted | |
CN204495591U (en) | Concrete test block sampler | |
CN112208001A (en) | Dustproof positioning device for punching in constructional engineering and use method thereof | |
CN205955640U (en) | Quartering hammer pore -forming drill rod | |
CN207479671U (en) | The fixing device of bore angle can be adjusted |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |