CN207597839U - A kind of construction platform easy to remove - Google Patents

A kind of construction platform easy to remove Download PDF

Info

Publication number
CN207597839U
CN207597839U CN201721608246.2U CN201721608246U CN207597839U CN 207597839 U CN207597839 U CN 207597839U CN 201721608246 U CN201721608246 U CN 201721608246U CN 207597839 U CN207597839 U CN 207597839U
Authority
CN
China
Prior art keywords
plate
mounting base
motion bar
fixed
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721608246.2U
Other languages
Chinese (zh)
Inventor
邓杨
张晨
钱浩
凌畅
罗曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kaiyun Construction Development Co ltd
Original Assignee
Anhui Tai Ji Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tai Ji Construction Co Ltd filed Critical Anhui Tai Ji Construction Co Ltd
Priority to CN201721608246.2U priority Critical patent/CN207597839U/en
Application granted granted Critical
Publication of CN207597839U publication Critical patent/CN207597839U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a kind of construction platforms easy to remove, including bottom plate and support platform, lifting unit are equipped between the bottom plate and the support platform, the bottom base plate is equipped with mobile unit;The lifting unit includes symmetrically arranged a pair of of crane, the crane includes the first sliding rail set on the plate top surface side, set on the second sliding rail of the support platform bottom side, first sliding rail is equipped with the first sliding block, second sliding rail is equipped with the second sliding block, and the first motion bar and the second motion bar are equipped between the support platform and the bottom plate;The mobile unit includes movable pulley group, and the movable pulley group includes roller box, elastic compression part, movable plate and movable pulley.The beneficial effects of the utility model are:Realize that, according to the corresponding height of construction demand adjustment, applicability improves by adjusting crane height.

Description

A kind of construction platform easy to remove
Technical field
The utility model is related to a kind of construction equipment, particularly a kind of construction platform easy to remove.
Background technology
At present, it in building construction process, is required for using scaffold, with the construction that is convenient for people to ascend a height, people can lead to It crosses cat ladder station to construct on pedal, however its bottom of existing scaffold is usually stationary structure, it has not been convenient to it is mobile, be This defect is improved, some scaffold bottoms can be welded and fixed universal wheel, so as to make it have locomotive function, and use process In, universal wheel needs to carry larger gravity, breakage easily occurs, while in use, and bottom is supported using universal wheel There are it is unstable the phenomenon that, there are security risks.In addition, traditional scaffold is substantially using fixed structure, scaffold Height can not be adjusted, it is impossible to meet the construction demand of different eminences.
Utility model content
The purpose of this utility model is to provide a kind of construction platform easy to remove, is asked with solving technology of the prior art Topic, it can need to adjust the height of construction platform, and safety and stability according to construction.
The utility model provides a kind of construction platform easy to remove, including bottom plate and support platform, the bottom plate with Lifting unit is equipped between the support platform, the bottom base plate is equipped with mobile unit;The lifting unit includes symmetrically setting A pair of of the crane put, the crane includes the first sliding rail set on the plate top surface side, set on the support platform Second sliding rail of bottom side, first sliding rail is corresponding with second sled position, and first sliding rail is equipped with the One sliding block, second sliding rail are equipped with the second sliding block, fixed first mounting base on first sliding block, on second sliding block Fixed second mounting base, the plate top surface opposite side are equipped with third mounting base, the third mounting base and the described first installation Seat is located along the same line, and support platform bottom opposite side is equipped with the 4th mounting base, the 4th mounting base and described the Two mounting bases are located along the same line, and the third mounting base is corresponding with the 4th mounting base position, the support platform Intersect the first motion bar and the second motion bar, first motion bar and the described second activity are equipped between the bottom plate Hinged in the middle part of bar, described first motion bar one end is articulated with first mounting base, and the first motion bar other end is articulated with 4th mounting base, described second motion bar one end are articulated with second mounting base, and the second motion bar other end is articulated with The third mounting base is equipped with push rod between two first sliding blocks, fixed plate and pusher cylinder is additionally provided on the bottom plate, The pusher cylinder is fixed in the fixed plate, and the piston-rod end of the pusher cylinder is connect with the push rod;The shifting Moving cell include set on the bottom plate quadrangle movable pulley group, the movable pulley group include roller box, elastic compression part, movable plate and Movable pulley, the roller box are fixed on the bottom plate bottom surface, and the roller box bottom is equipped with opening, and the elastic compression part is set on described In roller box and the bottom plate bottom surface is fixed on, movable plate is fixed in described elastic compression part one end, and the movable plate can be along roller box Side wall moves, and the movable plate bottom connects movable pulley, and the movable pulley may pass through the opening of the roller box bottom.
Preferably, the elastic compression part is spring.
Preferably, the support platform is equipped with protective fence.
Compared with prior art, the beneficial effects of the utility model are:It is realized by adjusting crane height according to construction The corresponding height of demand adjustment, applicability improve;In construction, the movable pulley of mobile unit can be stored to roller box, ensured Safety and stability during construction, during mobile construction platform, movable pulley stretches out roller box and realizes movement, convenient and efficient.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
Reference sign:1- bottom plates, 2- support platforms, the first sliding rails of 3-, the second sliding rails of 4-, the first sliding blocks of 5-, 6- Two sliding blocks, the first mounting bases of 7-, the second mounting bases of 8-, 9- third mounting bases, the 4th mounting bases of 10-, the first motion bars of 11-, 12- Second motion bar, 13- fixed plates, 14- pusher cylinders, 15- roller boxs, 16- elastic compression parts, 17- movable plates, 18- movable pulleys, 19- protective fences.
Specific embodiment
The embodiment of the utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning Same or similar element is represented to same or similar label eventually or there is the element of same or like function.Below by ginseng The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and cannot be construed to the utility model Limitation.
The embodiment of the utility model:A kind of construction platform easy to remove, including bottom plate 1 and support platform 2, the bottom Lifting unit is equipped between plate 1 and the support platform 2,1 bottom of bottom plate is equipped with mobile unit;The lifting unit includes Symmetrically arranged a pair of crane, the crane includes the first sliding rail 3 set on the 1 top surface side of bottom plate, set on described Second sliding rail 4 of 2 bottom side of support platform, first sliding rail 3 is corresponding with 4 position of the second sliding rail, and described first Sliding rail 3 is equipped with the first sliding block 5, and second sliding rail 4 is equipped with the second sliding block 6, and fixed first installs on first sliding block 5 Seat 7, fixed second mounting base 8 on second sliding block 6, the 1 top surface opposite side of bottom plate are equipped with third mounting base 9, and described the Three mounting bases 9 are located along the same line with first mounting base 7, and the 2 bottom opposite side of support platform is equipped with the 4th installation Seat 10, the 4th mounting base 10 is located along the same line with second mounting base 8, the third mounting base 9 and described the Four mounting bases, 10 position is corresponding, and intersect the first motion bar 11 and the are equipped between the support platform 2 and the bottom plate 1 Two motion bars 12, first motion bar 11 and 12 middle part of the second motion bar are hinged, 11 one end of the first motion bar hinge First mounting base 7 is connected to, 11 other end of the first motion bar is articulated with the 4th mounting base 10, second motion bar 12 One end is articulated with second mounting base 8, and 12 other end of the second motion bar is articulated with the third mounting base 9, two institutes It states and push rod is equipped between the first sliding block 5, fixed plate 13 and pusher cylinder 14, the pusher cylinder 14 are additionally provided on the bottom plate 1 It is fixed in the fixed plate 13, the piston-rod end of the pusher cylinder 14 is connect with the push rod;The mobile unit packet 18 groups of the movable pulley set on 1 four jiaos of the bottom plate is included, 18 groups of the movable pulley includes roller box 15, elastic compression part 16, movable plate 17 and movable pulley 18, the roller box 15 is fixed on 1 bottom surface of bottom plate, and 15 bottom of roller box is equipped with opening, the elasticity pressure Contracting part 16 is set in the roller box 15 and is fixed on 1 bottom surface of bottom plate, and movable plate 17 is fixed in described 16 one end of elastic compression part, The movable plate 17 can be moved along 15 madial wall of roller box, and 17 bottom of movable plate connects movable pulley 18, and the movable pulley 18 can Across the opening of 15 bottom of roller box.
The elastic compression part 16 is spring.
In order to improve the safety of construction personnel's work, protective fence 19 is equipped in the support platform 2.
The application method of the utility model is:When not constructing, since the gravity of construction platform is less than elastic compression part 16 The elastic force of offer, therefore movable pulley 18 is now placed in the outside of roller box 15, can push construction platform to corresponding place.
After reaching job location, staff is moved in support platform 2, and the whole gravity of construction platform is more than bullet at this time Property the elastic force that provides of compression piece 16, therefore movable plate 17 moves upwards along 15 side wall of roller box and receives movable pulley 18 to roller box 15, 15 bottom of roller box is contacted with ground, so as to ensure the stability of construction platform.
During construction, start pusher cylinder 14, the piston rod of pusher cylinder 14, which stretches, drives pushrod movement, and push rod drives two First sliding block 5 moves on corresponding first sliding rail 3, meanwhile, the first motion bar 11 and the second motion bar 12 make corresponding fortune Dynamic, the sliding block on two the second sliding rails 4 also moves, so as to adjust the height of support platform 2 according to construction demand.
The structure, feature and effect of the utility model are described in detail based on the embodiments shown in the drawings, with Upper described is only the preferred embodiment of the utility model, but the utility model is to limit practical range shown in drawing, it is every according to Change that conception according to the utility model is made or the equivalent embodiment for being revised as equivalent variations, still without departing from specification and figure When showing covered spirit, it should be within the protection scope of the present utility model.

Claims (3)

1. a kind of construction platform easy to remove, including bottom plate and support platform, it is characterised in that:The bottom plate and the support Lifting unit is equipped between platform, the bottom base plate is equipped with mobile unit;
The lifting unit includes symmetrically arranged a pair of of crane, and the crane is included set on the plate top surface side First sliding rail, set on the second sliding rail of the support platform bottom side, first sliding rail and the second sled position phase Corresponding, first sliding rail is equipped with the first sliding block, and second sliding rail is equipped with the second sliding block, fixed on first sliding block First mounting base, fixed second mounting base on second sliding block, the plate top surface opposite side is equipped with third mounting base, described Third mounting base is located along the same line with first mounting base, and support platform bottom opposite side is equipped with the 4th installation Seat, the 4th mounting base are located along the same line with second mounting base, the third mounting base and the described 4th installation Seat is put corresponding, is equipped with and intersects the first motion bar and the second motion bar between the support platform and the bottom plate, institute The first motion bar is stated with hinged in the middle part of second motion bar, described first motion bar one end is articulated with first mounting base, The first motion bar other end is articulated with the 4th mounting base, and described second motion bar one end is articulated with second mounting base, The second motion bar other end is articulated with the third mounting base, and push rod, the bottom are equipped between two first sliding blocks Fixed plate and pusher cylinder are additionally provided on plate, the pusher cylinder is fixed in the fixed plate, the piston of the pusher cylinder Bar end is connect with the push rod;
The mobile unit includes the movable pulley group set on the bottom plate quadrangle, and the movable pulley group includes roller box, elastic compression Part, movable plate and movable pulley, the roller box are fixed on the bottom plate bottom surface, and the roller box bottom is equipped with opening, the elasticity pressure Contracting part is set in the roller box and is fixed on the bottom plate bottom surface, and movable plate, the movement are fixed in described elastic compression part one end Plate can be moved along wheel box inner wall, and the movable plate bottom connects movable pulley, and the movable pulley may pass through the roller box bottom Opening.
2. construction platform easy to remove according to claim 1, it is characterised in that:The elastic compression part is spring.
3. construction platform easy to remove according to claim 1, it is characterised in that:The support platform is equipped with anti- Guardrail.
CN201721608246.2U 2017-11-27 2017-11-27 A kind of construction platform easy to remove Active CN207597839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721608246.2U CN207597839U (en) 2017-11-27 2017-11-27 A kind of construction platform easy to remove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721608246.2U CN207597839U (en) 2017-11-27 2017-11-27 A kind of construction platform easy to remove

Publications (1)

Publication Number Publication Date
CN207597839U true CN207597839U (en) 2018-07-10

Family

ID=62760642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721608246.2U Active CN207597839U (en) 2017-11-27 2017-11-27 A kind of construction platform easy to remove

Country Status (1)

Country Link
CN (1) CN207597839U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206511A (en) * 2020-03-25 2020-05-29 郑州铁路职业技术学院 Convenient bridge construction of adjusting is with support frame
CN112122412A (en) * 2020-08-07 2020-12-25 黄石麦斯特机械设备有限公司 Numerical control bending machine
CN112978438A (en) * 2019-12-17 2021-06-18 青岛甜昊新材料科技有限公司 Coating machine suitable for tarpaulin production

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112978438A (en) * 2019-12-17 2021-06-18 青岛甜昊新材料科技有限公司 Coating machine suitable for tarpaulin production
CN111206511A (en) * 2020-03-25 2020-05-29 郑州铁路职业技术学院 Convenient bridge construction of adjusting is with support frame
CN112122412A (en) * 2020-08-07 2020-12-25 黄石麦斯特机械设备有限公司 Numerical control bending machine

Similar Documents

Publication Publication Date Title
CN207597839U (en) A kind of construction platform easy to remove
CN106629481B (en) Hydraulic pressure well-repairing well head lifting platform and its application method
CN201292224Y (en) Movable weight counterbalance apparatus of crawler crane
CN207226920U (en) A kind of tower crane lifting body
CN108118620B (en) Integral self-climbing integrated platform for bridge tower construction and construction method thereof
CN207183924U (en) A kind of electric power overhaul frame
CN106006363A (en) Mobile switch cabinet lifting platform
CN220081041U (en) Protective equipment for subway operation maintenance
CN210031529U (en) Automatic climbing platform for construction of hanging cable
CN110902616A (en) Platform driving hydraulic device for engineering
CN215358395U (en) Colliery hydraulic support maintenance platform
CN205472520U (en) Hanging flower basket is removed in high altitude
CN207880310U (en) A kind of counterweight frame of roller type and Elevator weight sensor using the counterweight frame
CN208843609U (en) A kind of harbour bridge crane simulator
CN210366804U (en) Access cover lifter
CN209699495U (en) A kind of prestressed stretch-draw platform
CN207420202U (en) A kind of rail traffic platform protective fence
CN206090316U (en) Little case roof beam adjustment jacking frame
CN201128648Y (en) Mobile elevator
CN214615340U (en) Safe type removes scaffold frame with adjustable height
CN207030790U (en) Circulating pump overhauls balance hanger
CN212712492U (en) Tower crane safety device
CN201459602U (en) Equipment for bridge construction
CN214883016U (en) Descending type movable formwork support leg lifting mechanism
CN211623171U (en) Industrial automation safety isolation overhead door

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 230000 room 708, floor 7, Yunzhang building, No. 535, Wangjiang West Road, high tech Zone, Hefei, Anhui Province

Patentee after: Anhui Taiji Construction Engineering Co.,Ltd.

Address before: 230000 room 1109, block C, Lanhai international building, Greenland, Hefei Municipal District, Anhui Province

Patentee before: ANHUI TAIJI CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 230000 room 708, floor 7, Yunzhang building, No. 535, Wangjiang West Road, high tech Zone, Hefei, Anhui Province

Patentee after: Anhui Kaiyun Construction Development Co.,Ltd.

Address before: 230000 room 708, floor 7, Yunzhang building, No. 535, Wangjiang West Road, high tech Zone, Hefei, Anhui Province

Patentee before: Anhui Taiji Construction Engineering Co.,Ltd.