CN207597242U - A kind of ring orientation prestress bridge pier structure - Google Patents

A kind of ring orientation prestress bridge pier structure Download PDF

Info

Publication number
CN207597242U
CN207597242U CN201721660847.8U CN201721660847U CN207597242U CN 207597242 U CN207597242 U CN 207597242U CN 201721660847 U CN201721660847 U CN 201721660847U CN 207597242 U CN207597242 U CN 207597242U
Authority
CN
China
Prior art keywords
anchor head
fixed link
hole
steel hinge
annular groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721660847.8U
Other languages
Chinese (zh)
Inventor
邢小兵
韩宏
杨三红
王诗蕾
邢建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hui Chun Construction Co Ltd
Original Assignee
Jiangsu Hui Chun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hui Chun Construction Co Ltd filed Critical Jiangsu Hui Chun Construction Co Ltd
Priority to CN201721660847.8U priority Critical patent/CN207597242U/en
Application granted granted Critical
Publication of CN207597242U publication Critical patent/CN207597242U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of ring orientation prestress bridge pier structures, and including pier stud, the pier stud lateral wall is provided with several annular grooves, and the steel being bonded with annular groove bottom wall is provided in the mounting groove and cuts with scissors band;The steel hinge is separately provided for the anchor head and fixed block of tensioning steel hinge band with both ends;The fixed block is radially provided with through-hole along pier stud, and the mounting hole communicated with through-hole is provided on the anchor head;Sliding setting fixed link in the through-hole, when the anchor head and fixed block are bonded, the fixed link is inserted into mounting hole, its key points of the technical solution are that steel hinge band is tensioned in annular groove using anchor head and fixed block, and after using fixed link, anchor head is mutually fixed with fixed block, steel hinge can be made to apply pressure with the state for keeping tensioning to pier stud in advance, have the advantages that convenient for construction.

Description

A kind of ring orientation prestress bridge pier structure
Technical field
The utility model is related to a kind of bridge pier structure, more specifically, it relates to a kind of ring orientation prestress bridge pier structure.
Background technology
Prestressing force is in order to improve structure military service performance, in the compression that construction period is previously applied to structure, structure clothes Tensile stress caused by pre-compression stress can completely or partially offset load during labour, avoids structure from destroying.It is usually used in concrete knot Structure.Prestressed reinforced concrete construction is before structure bearing load, applies pressure to it in advance, makes it in outer load action Concrete in tension zone internal force generate compression, to offset or reduce external load generation tensile stress, structure is made normally to make It does not generate crack in the case of or splits than later.
Existing Authorization Notice No. is that the Chinese patent of CN205711744U discloses a kind of ring orientation prestress bridge pier structure, Including tower hat, steel anchor box, upper king-post strut, middle king-post, steel box-girder, lower king-post strut;Tower hat is arranged on whole top;Lower king-post strut is arranged on Whole bottom;Middle king-post setting is mounted on whole middle level, and tapered with tower hat, lower king-post strut and upper king-post strut;Upper king-post strut It is arranged on the upside of middle king-post;Steel anchor box is arranged between tower hat and upper king-post strut;Steel box-girder is horizontally installed on middle king-post and lower tower Between column, and insertion is supported on the inside of tower wall.
But the prestressing apparatus such as steel anchor box, steel box-girder of this ring orientation prestress bridge pier structure are arranged on the interior of king-post Portion, construction is more inconvenient, and therefore, this problem has to be solved.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of ring orientation prestress bridge pier knots Structure has the advantage convenient for construction.
To achieve the above object, the utility model provides following technical solution:
A kind of ring orientation prestress bridge pier structure, including pier stud, it is characterised in that:The pier stud lateral wall is provided with several Annular groove is provided with steel hinge band be bonded with annular groove bottom wall in the annular groove;The steel hinge band both ends are respectively arranged with use In the anchor head and fixed block of tensioning steel hinge band;The fixed block along pier stud radially be provided with through-hole, be provided on the anchor head with The mounting hole that through-hole communicates;Sliding setting fixed link in the through-hole, when the anchor head and fixed block are bonded, the fixed link It is inserted into mounting hole.
By using above-mentioned technical proposal, during construction, after pier stud pours completion and final set, steel hinge band is placed on to the ring of pier stud In shape slot.Then, steel is cut with scissors into band tensioning using anchor head and fixed block, makes steel hinge band that pressure be previously applied to pier stud.Treat through-hole and When mounting hole communicates, fixed link is inserted into through-hole and mounting hole, fixed block is made mutually to be fixed with anchor head, so that steel hinge band is protected The state of tensioning is held, there is the effect convenient for construction.
Further, the madial wall of the through-hole is provided with installation annular groove, described to install outside annular groove madial wall and fixed link The elastic component for fixed link to be prevented to be detached from mounting hole is connected between side wall.
By using above-mentioned technical proposal, since the elastic force direction of elastic component is identical with fixed link axis direction, so solid Fixed pole can keep stretching into the state in mounting hole.It when fixed link is not acted on by external force, will not be detached from, improve from mounting hole automatically The stability of fixed link.
Further, the fixed link is provided with taper guide pad close to one end of pier stud.
By using above-mentioned technical proposal, taper guide pad has guiding role, convenient for fixed link is inserted into mounting hole.
Further, one end rotation of the fixed link far from pier stud is provided with draw ring.
By using above-mentioned technical proposal, draw ring is pulled, it may be convenient to pull out fixed link from mounting hole.
Further, it is arranged with elastic cushion cover on the draw ring.
By using above-mentioned technical proposal, the upper stiction of cushion set is larger, convenient for exerting a force to draw ring.The opposing party Face, cushion tackling is flexible, and finger is enable to be come into full contact with elastic cushion cover, is increased comfortable when finger is contacted with draw ring Degree.
Further, the cushion, which is put on, is provided with several protrusions.
By using above-mentioned technical proposal, protrusion increases the frictional force between elastic cushion cover and finger, more easily will Fixed link is pulled out from mounting hole.
Further, the steel hinge band is made of more steel hinge lines.
By using above-mentioned technical proposal, steel hinge line has the advantages that intensity is high, elastic limit is high, stress relaxation is low etc., by The intensity higher of the steel hinge band of more steel hinge line compositions, effect are more preferable.
Further, the annular groove madial wall is provided with the caulking groove coordinated with anchor head inlay card.
By using above-mentioned technical proposal, after anchor head is stuck in caulking groove, you can pull fixed block using tool, make solid Determine block to be bonded with anchor head.Fixed block with after anchor head is bonded and through-hole is communicated with mounting hole, fixed link will be in the elastic force of elastic component It is inserted into mounting hole under effect, has the function of to facilitate tensioning steel hinge band.
In conclusion the utility model has the advantages that:
1st, the design that steel hinge band is placed in annular groove is employed, after steel hinge band tensioning, pressure can be previously applied to pier stud, With the effect that can offset or reduce the tensile stress that external load generates pier stud;
2nd, the design of anchor head and fixed block is employed, after anchor head is stuck in caulking groove, you can pull and fix using tool Block makes fixed block be bonded with anchor head, and after through-hole is communicated with mounting hole, fixed link will be inserted under the effect of the elastic force of elastic component Into mounting hole, there is the effect convenient for construction;
3rd, the design of more steel hinge line composition steel hinge bands is employed, intensity is high, elastic limit is high, should since steel hinge line has The low advantage of power relaxation, so that the intensity higher of steel hinge band, it is more preferable to apply pier stud stressed effect.
Description of the drawings
Fig. 1 is the overall structure diagram of circumferential prestressed bridge pier structure in embodiment;
Fig. 2 is the sectional view of circumferential prestressed bridge pier structure in embodiment;
Fig. 3 is the enlarged drawing of part A in Fig. 2.
In figure:1st, pier stud;11st, annular groove;12nd, caulking groove;2nd, steel hinge band;3rd, anchor head;31st, mounting hole;4th, fixed block; 41st, through-hole;The 42nd, annular groove is installed;43rd, elastic component;5th, fixed link;51st, taper guide pad;52nd, draw ring;53rd, elastic cushion cover;54、 Protrusion.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.
Embodiment:
A kind of ring orientation prestress bridge pier structure, with reference to Fig. 1, including pier stud 1, the lateral wall of pier stud 1 offers several Annular groove 11.Steel hinge band 2 is cased in annular groove 11, steel hinge band 2 is fitted closely with 11 bottom wall of annular groove.
With reference to Fig. 2,2 both ends of steel hinge band are fixedly installed anchor head 3 and fixed block 4 respectively, for steel hinge band 2 to be tensioned, with Pressure is previously applied to pier stud 1, has the function of to offset or reduce the tensile stress that external load generates pier stud 1.Steel cuts with scissors band 2 It is made of more steel hinge lines so that steel cuts with scissors the intensity higher of band 2, and it is more preferable to apply stressed effect to pier stud 1.
With reference to Fig. 3, fixed block 4 offers through-hole 41 along 1 radial direction of pier stud, offers on anchor head 3 and consolidate with what through-hole 41 communicated Determine hole 31.Sliding is provided with fixed link 5 in through-hole 41, when anchor head 3 and fixed block 4 are bonded and through-hole 41 is communicated with mounting hole 31, Fixed link 5 is inserted into mounting hole 31, and steel hinge band 2 can be made to keep the state of tensioning.The madial wall of through-hole 41 offers Annular groove 42 is installed, elastic component 43 is provided between installation 5 lateral wall of 42 madial wall of annular groove and fixed link.Elastic component in the present embodiment 43 be spring, and spring is fixedly connected close to one end of mounting hole 31 with 5 lateral wall of fixed link, the other end and 42 inside of installation annular groove Wall is fixedly connected, for fixed link 5 to be prevented to be detached from mounting hole 31.During original state, fixed link 5 is stretched into mounting hole 31, spring In non-stress.
With reference to Fig. 3,11 madial wall of annular groove offers caulking groove 12, and caulking groove 12 coordinates with 3 inlay card of anchor head.By anchor head 3 After being stuck in caulking groove 12, you can pull fixed block 4 using tool, be tensioned steel hinge band 2.Be bonded with anchor head 3 for be fixed piece 4 and After through-hole 41 is communicated with mounting hole 31, fixed link 5 will be inserted under the effect of the elastic force of elastic component 43 in mounting hole 31, will be solid Determine block 4 to fix with 3 phase of anchor head, have the function of to facilitate tensioning steel hinge band 2.
With reference to Fig. 3, fixed link 5 is fixedly installed taper guide pad 51 close to one end of pier stud 1, and taper guide pad 51 has Guiding role so that fixed link 5 is easier to insert into mounting hole 31.One end rotation of the fixed link 5 far from pier stud 1 is provided with drawing Ring 52 pulls draw ring 52, it may be convenient to pull out fixed link 5 from mounting hole 31.Elastic cushion cover 53 is arranged on draw ring 52, Increase comfort level when finger is contacted with draw ring 52.Several protrusions 54 are provided on elastic cushion cover 53, increase cushion Frictional force between set 53 and finger so that fixed link 5 is easier to be drawn out from mounting hole 31.
Operation principle is as follows:
After pier stud 1 pours completion and final set, steel hinge band 2 is placed in the installation annular groove 42 of pier stud 1.Anchor head 3 is stuck in card After in caulking groove 12, fixed block 4 is pulled using tool, is tensioned steel hinge band 2, pressure is previously applied to pier stud 1.Then, pass through Draw ring 52 pulls draw ring 52, and 51 one end of taper guide pad of fixed link 5 is made to be reduced in through-hole 41.It is bonded with anchor head 3 for be fixed piece 4 And after through-hole 41 is communicated with mounting hole 31, draw ring 52 is unclamped, fixed link 5 can be inserted into fixation under the elastic force effect of elastic component 43 In hole 31, fixed block 4 is made mutually to be fixed with anchor head 3, so that steel hinge band 2 keeps the state of tensioning, there is the effect convenient for construction Fruit.
When needing replacing steel hinge band 2, fixed link 5 is pulled by draw ring 52, fixed link 5 is made to be detached from mounting hole 31.Fixed link 5 After being detached from mounting hole 31, fixed block 4 and the effect of being fixed to each other of anchor head 3 release.At this point, pull out fixed block 4, you can need to The steel to be replaced hinge band 2 is removed, and band 2 is cut with scissors in order to change new steel.

Claims (8)

1. a kind of ring orientation prestress bridge pier structure, including pier stud (1), it is characterised in that:The pier stud (1) is if lateral wall is provided with Dry annular groove (11), the annular groove (11) is interior to be provided with the steel hinge band (2) being bonded with annular groove (11) bottom wall;The steel hinge Band (2) both ends are separately provided for tensioning steel hinge the band anchor head (3) of (2) and fixed block (4);The fixed block (4) is along pier stud (1) through-hole (41) is radially provided with, the mounting hole (31) communicated with through-hole (41) is provided on the anchor head (3);The through-hole (41) sliding setting fixed link (5) in, when the anchor head (3) and fixed block (4) are bonded, the fixed link (5) is inserted into Into mounting hole (31).
2. ring orientation prestress bridge pier structure according to claim 1, it is characterised in that:The madial wall of the through-hole (41) is set Installation annular groove (42) is equipped with, is connected between installation annular groove (42) madial wall and fixed link (5) lateral wall solid for preventing Fixed pole (5) is detached from the elastic component (43) of mounting hole (31).
3. ring orientation prestress bridge pier structure according to claim 2, it is characterised in that:The fixed link (5) is close to pier stud (1) one end is provided with taper guide pad (51).
4. ring orientation prestress bridge pier structure according to claim 3, it is characterised in that:The fixed link (5) is far from pier stud (1) one end rotation is provided with draw ring (52).
5. ring orientation prestress bridge pier structure according to claim 4, it is characterised in that:Bullet is arranged on the draw ring (52) Property cushion cover (53).
6. ring orientation prestress bridge pier structure according to claim 5, it is characterised in that:It is set on the elasticity cushion cover (53) Have several raised (54).
7. according to the ring orientation prestress bridge pier structure described in any one of claim 1-6 claims, it is characterised in that:It is described Steel hinge band (2) is made of more steel hinge lines.
8. ring orientation prestress bridge pier structure according to claim 7, it is characterised in that:Annular groove (11) madial wall is set It is equipped with the caulking groove (12) with the cooperation of anchor head (3) inlay card.
CN201721660847.8U 2017-12-02 2017-12-02 A kind of ring orientation prestress bridge pier structure Expired - Fee Related CN207597242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721660847.8U CN207597242U (en) 2017-12-02 2017-12-02 A kind of ring orientation prestress bridge pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721660847.8U CN207597242U (en) 2017-12-02 2017-12-02 A kind of ring orientation prestress bridge pier structure

Publications (1)

Publication Number Publication Date
CN207597242U true CN207597242U (en) 2018-07-10

Family

ID=62763079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721660847.8U Expired - Fee Related CN207597242U (en) 2017-12-02 2017-12-02 A kind of ring orientation prestress bridge pier structure

Country Status (1)

Country Link
CN (1) CN207597242U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960432A (en) * 2022-05-16 2022-08-30 安徽省路桥工程集团有限责任公司 Annular prestress structure for bridge tower column and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960432A (en) * 2022-05-16 2022-08-30 安徽省路桥工程集团有限责任公司 Annular prestress structure for bridge tower column and construction method
CN114960432B (en) * 2022-05-16 2023-09-05 安徽省路桥工程集团有限责任公司 Circumferential prestress structure for bridge tower column and construction method

Similar Documents

Publication Publication Date Title
CN107237254B (en) A kind of high pier bridge vibration absorption and isolation support of chute-type friction pendulum
WO2018036519A1 (en) Method for improving anti-seismic performance of bridge by means of girder body, and energy-consumption and vibration-reduction bridge bearing
CN203096950U (en) Automatic reset frame beam column node
CN103132602A (en) Self-resetting frame joint
CN201778394U (en) Prestress rubber support seat
CN207597242U (en) A kind of ring orientation prestress bridge pier structure
CN105220616A (en) A kind of rope net damping system being used for oblique pull-suspension cable cooperation bridge
CN106812226A (en) A kind of anti-buckling support composite buffer of viscoplasticity
CN201526010U (en) Shape memory alloy vibration damping lazy halyard apparatus for suspension bridge
CN116065479A (en) Railway self-resetting bridge pier with external SMA energy consumption device
CN203114315U (en) Yielding anchor rod capable of monitoring prestress by itself
CN202954449U (en) Horizontal type tuned mass damper
CN203296059U (en) Self-reset frame column base joint
CN207921612U (en) A kind of fixing device of Weaving device
CN207295423U (en) A kind of high pier bridge vibration absorption and isolation support of chute-type friction pendulum
CN203890902U (en) External prestressed cable vibration reduction device
CN206928182U (en) A kind of rubber support of damping shock-absorbing
CN207195528U (en) Steel-wire isolator limiter
CN204385606U (en) Bridge buffer
CN102364834B (en) Device and method for assembling tensioning wedge block and disc spring on end part of generator stator
CN208280316U (en) A kind of vertical micro-stretching shock isolating pedestal
CN211420840U (en) Circumferential damping shock absorption device and damping shock absorption support using same
CN105256816A (en) High-performance passive protective net structure
CN206409563U (en) A kind of multi-piston type viscous damper
CN106382317B (en) A kind of complex spring damper that early stage rigidity is predeterminable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710