CN207582678U - A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder - Google Patents

A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder Download PDF

Info

Publication number
CN207582678U
CN207582678U CN201721355559.1U CN201721355559U CN207582678U CN 207582678 U CN207582678 U CN 207582678U CN 201721355559 U CN201721355559 U CN 201721355559U CN 207582678 U CN207582678 U CN 207582678U
Authority
CN
China
Prior art keywords
reinforced
steel
secondary beam
girder
connection node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721355559.1U
Other languages
Chinese (zh)
Inventor
张林俊
彭菲菲
张代刚
梁天生
肖坦
李良
任月芬
何明春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Sinogy Electric Engineering Co Ltd
Original Assignee
China Sinogy Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Sinogy Electric Engineering Co Ltd filed Critical China Sinogy Electric Engineering Co Ltd
Priority to CN201721355559.1U priority Critical patent/CN207582678U/en
Application granted granted Critical
Publication of CN207582678U publication Critical patent/CN207582678U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model is related to industrial building fields, more particularly to a kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder, including Bars In Poured Concrete Slab, the firm secondary beam being arranged on Bars In Poured Concrete Slab, the girder being arranged on Bars In Poured Concrete Slab, reserved floor joint bar, it is characterised in that:Further include reinforced embedded part and connector.The beneficial effects of the utility model are:Pass through the transformation for the node that is articulated and connected to steel secondary beam and reinforced concrete girder, one side form of architecture joints is in close proximity to hinged, design assumption and reality are more identical, on the other hand, it reduces that civil construction expense, construction is convenient, speed of application is fast, is highly suitable for the engineering that industrial premises load is big, Shear force within the beam end is big.

Description

A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder
Technical field
The utility model is related to industrial building field more particularly to a kind of steel secondary beam and the reinforced hinges of reinforced concrete girder Connect connecting node.
Background technology
In industrial building field, the structure type of reinforced concrete frame+steel secondary beam composite floor is usually used in main building etc. Important building.In general, reinforced concrete beam column forms stable main structure, steel secondary beam and floor, which only play, transmits floow load extremely Main beam action.Just because of this, the connection of steel secondary beam and reinforced concrete girder is only transmitted mostly using hinged joint Vertical shear does not transmit moment of flexure and axle power.There are two types of current existing connecting nodes:
1st, ear formula is chosen:The girder 3 of armored concrete chooses ear 8 secondary beam side is cast-in-place, and the general 250mm of width is highly not less than 300mm.Steel secondary beam is shelved and chosen on ear 8, and chooses 9 slugging of youngster with the top surface and beam side for choosing ear 8.The advantages of node Be armored concrete to choose 8 shear resistance of ear strong, it is most widely used at present;Shortcoming is that node is hinged feature unobvious, and beam side Increase chooses ear 8 and increases concrete construction difficulty, and increase civil engineering costs, while the duration is also longer.
2nd, plug-in type:After the cutting of 2 top flange of steel secondary beam, straight cutting enter reinforced concrete girder 3 and it is whole therewith pour, be inserted into deep Spend general 200mm.The advantages of node is girder 3 chooses ear 8 without setting, and plug-in type can realize floor and armored concrete Girder 3 pours simultaneously, and speed of application is fast, and indivedual engineerings have application at present;Shortcoming is to interrupt girder 3 after steel secondary beam 2 is inserted into bind round Muscle, while 2 volume of steel secondary beam is big, stress concentration is apparent after being inserted into girder 3, and structural reliability is affected by construction quality.
Therefore, it for disadvantages described above, needs effectively to innovate the prior art.
Utility model content
To overcome above-mentioned the deficiencies in the prior art, the utility model, which provides, can be suitable for that industrial premises load is big, beam A kind of steel secondary beam of the big engineering of end shear and the reinforced articulated connection node of reinforced concrete girder, including Bars In Poured Concrete Slab, setting Firm secondary beam on Bars In Poured Concrete Slab, the girder being arranged on Bars In Poured Concrete Slab, reserved floor joint bar, it is characterised in that:It further includes reinforced Embedded part and connector;
The firm secondary beam is fixed at left and right sides of the main beam exterior;
The reinforced embedded part is arranged on the left and right sides, reinforced embedded part inside the girder and passes through the connector and institute State firm secondary beam connection;The reserved floor joint bar is inserted into the Bars In Poured Concrete Slab top end;Wherein,
The reinforced embedded part includes steel plate, band steel;Steel plate square corresponding with setting size on the band steel respectively Shape hole, the band steel long side are vertically inserted through the rectangular opening and are welded on the steel plate.
Preferably, the connector is unilateral steel plate or unilateral angle steel or bilateral plate fixation or bilateral angle steel.
Preferably, an installation angle steel is added at the just time bottom elevation.
Preferably, the band steel is equipped with eight, is distributed on two steel plate.
Preferably, an at least round steel stirrup is equipped between each band steel.
Preferably, one end is equipped with a crotch outside the band steel.
Compared with prior art, the utility model has the characteristics that following have:
By the transformation for the node that is articulated and connected to steel secondary beam and reinforced concrete girder, one side form of architecture joints is very Close to being hinged, design assumption and practical more identical, another aspect reduce civil construction expense, convenient, speed of application of constructing Soon, it is highly suitable for the engineering that industrial premises load is big, Shear force within the beam end is big.
Description of the drawings
Fig. 1 is chooses ear formula steel secondary beam and reinforced concrete girder articulated connection node structure schematic diagram;
Fig. 2 is chooses ear formula steel secondary beam and reinforced concrete girder articulated connection node structure schematic diagram;
Fig. 3 is the utility model structure diagram;
Fig. 4 is reinforced embedded parts structure schematic diagram;
Fig. 5 is reinforced embedded part sectional view;
In figure:
1st, Bars In Poured Concrete Slab, 2, firm secondary beam, 3, girder, 4, reserved floor joint bar, 5, reinforced embedded part, 51, steel plate, 52, band steel, 53rd, round steel stirrup, 54, rectangular opening, 6, connecting plate, 7, installation angle steel, 8, choose ear, 9, choose ear embedded part.
Specific embodiment
To achieve the above object, the utility model provides following technical scheme:
As shown in Figure 3-Figure 5, a kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder, including Bars In Poured Concrete Slab 1st, the firm secondary beam 2 being arranged on Bars In Poured Concrete Slab 1, the girder 3, the reserved floor joint bar 4 that are arranged on Bars In Poured Concrete Slab 1, it is characterised in that:Also Including reinforced embedded part 5 and connector 6;
The firm secondary beam 2 is fixed at the 3 outside left and right sides of girder;
The reinforced embedded part 5 is arranged on the 3 inside left and right sides of girder, and reinforced embedded part passes through the connector 6 It is connect with the firm secondary beam 2;The reserved floor joint bar 4 is horizontal to be inserted into 1 top end of Bars In Poured Concrete Slab;Wherein,
The reinforced embedded part 5 includes steel plate 51, band steel 52;Size is set respectively on the steel plate 51 and the band steel 52 Corresponding rectangular opening 54,52 long side of band steel are vertically inserted through the rectangular opening 54 and are welded on the steel plate 51, using adding It is closer, more reliable that strong type embedded part 5 can so that steel secondary beam 2 is connect with girder 3, and construction is very convenient.
Further, the connector 6 is unilateral steel plate or unilateral angle steel or bilateral plate fixation or bilateral angle steel, in this way may be used More neatly to select connector 6 according to 2 stress of steel secondary beam.
Further, an installation angle steel 7 is added at the 2 bottom absolute altitude of firm secondary beam, it in this way can be in order to the peace of steel secondary beam 2 Dress, plays the role of shelving temporarily.
Further, the band steel 52 is equipped with eight, is distributed on two steel plate 51.
Further, between each band steel 52 be equipped with an at least round steel stirrup 53, can strengthen so each band steel 52 it Between intercoordination.
Further, described 52 outside one end of band steel is equipped with a crotch, can thus improve the tension of reinforced embedded part 5 Ability.
The above-mentioned description to embodiment is it will be appreciated that and using this for the ease of those skilled in the art Case technology, person skilled in the art obviously can easily make these examples various modifications, and described herein one As principle be applied in other embodiments without having to go through creative labor.Therefore, this case is not limited to above example, ability The technical staff in domain according to the announcement of this case, the improvement made for this case and repair this all should be in the protection domain of this case.

Claims (6)

1. a kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder, including Bars In Poured Concrete Slab (1), are arranged on Bars In Poured Concrete Slab (1) firm secondary beam (2) on, the girder (3) being arranged on Bars In Poured Concrete Slab (1), reserved floor joint bar (4), it is characterised in that:It further includes Reinforced embedded part (5) and connector (6);
The firm secondary beam (2) is fixed at the external left and right sides of the girder (3);
The reinforced embedded part (5) is arranged on the internal left and right sides of the girder (3), and reinforced embedded part passes through the connector (6) it is connect with the firm secondary beam (2);
The reserved floor joint bar (4) is inserted into Bars In Poured Concrete Slab (1) top end;Wherein,
The reinforced embedded part (5) includes steel plate (51), band steel (52);The steel plate (51) with setting respectively on the band steel (52) The corresponding rectangular opening of size (54) is put, band steel (52) long side is vertically inserted through the rectangular opening (54) and is welded on the steel plate (51) on.
2. a kind of steel secondary beam according to claim 1 and the reinforced articulated connection node of reinforced concrete girder, feature It is:The connector (6) is unilateral steel plate or unilateral angle steel or bilateral plate fixation or bilateral angle steel.
3. a kind of steel secondary beam according to claim 1 and the reinforced articulated connection node of reinforced concrete girder, feature It is:An installation angle steel (7) is equipped at the absolute altitude of firm secondary beam (2) bottom.
4. a kind of steel secondary beam according to claim 1 and the reinforced articulated connection node of reinforced concrete girder, feature It is:The band steel (52) is distributed on equipped with eight on two steel plate (51).
5. a kind of steel secondary beam according to claim 1 and the reinforced articulated connection node of reinforced concrete girder, feature It is:An at least round steel stirrup (53) is equipped between each band steel (52).
6. a kind of steel secondary beam according to claim 1 and the reinforced articulated connection node of reinforced concrete girder, feature It is:The external one end of the band steel (52) is equipped with a crotch.
CN201721355559.1U 2017-10-20 2017-10-20 A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder Expired - Fee Related CN207582678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721355559.1U CN207582678U (en) 2017-10-20 2017-10-20 A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721355559.1U CN207582678U (en) 2017-10-20 2017-10-20 A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder

Publications (1)

Publication Number Publication Date
CN207582678U true CN207582678U (en) 2018-07-06

Family

ID=62729092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721355559.1U Expired - Fee Related CN207582678U (en) 2017-10-20 2017-10-20 A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder

Country Status (1)

Country Link
CN (1) CN207582678U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112696023A (en) * 2020-12-24 2021-04-23 中建四局第六建设有限公司 Opening-free and formwork-free construction method for cast-in-place beam of assembled integral frame structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112696023A (en) * 2020-12-24 2021-04-23 中建四局第六建设有限公司 Opening-free and formwork-free construction method for cast-in-place beam of assembled integral frame structure

Similar Documents

Publication Publication Date Title
CN206015877U (en) Prefabricated assembled concrete frame construction
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN207003651U (en) A kind of assembling steel plate barrel shape RCS space nodes
CN107700667A (en) A kind of precast floor slab and girder steel lower flange connecting node
CN208201914U (en) One kind is faced forever in conjunction with covered back-digging structure
CN110145023A (en) A kind of prefabricated assembled concrete rectangle beam-column connection
CN207582678U (en) A kind of steel secondary beam and the reinforced articulated connection node of reinforced concrete girder
CN206034639U (en) A I shaped steel connects bracket for prefabricating assembled concrete corner post
CN207314537U (en) A kind of assembled Outsourcing-type steel chain type combining structure
CN203008130U (en) Connection node of steel rib column and steel beam
CN208122030U (en) It is a kind of enclosed as steel plate made of shear wall slab assemble shear wall house
CN207228355U (en) A kind of assembling steel plate Combined concrete wall and steel bar truss floor support plate connecting structure
CN207017489U (en) There is the reinforced prefabricated member of biasing hole wall for assembling steel building
CN206174144U (en) Novel ring beam does ring shear connected node of steel corbel and steel pipe concrete post
CN206360116U (en) The round steel pipe constraint reinforced column steel girder frame node of ring flat-plate insertion
CN205153144U (en) Joint construction of shear force corner portion and slant girder steel
CN209369054U (en) A kind of connecting node of concrete filled steel tube combined special-shaped column and reinforced beam
CN207846658U (en) The modularization node of prefabricated buildings
CN203834743U (en) Prefabricated steel beam joint cross-shaped mixed coupled wall
CN208701910U (en) Prestressed concrete beam and profile steel concrete column beam column combined joint construct
CN207296081U (en) T-shaped assembled Steel Reinforced Concrete Shear Walls
CN106320600A (en) Architectural assembly-type double-hole-row self-insulation load-bearing wallboard
CN207959528U (en) Overlap wall vertically with horizontal member roof connecting node
CN207538228U (en) A kind of steel reinforced concrete rectangular column-L-shaped column switching node
CN110453850A (en) A kind of assembled steel Combined concrete coupling beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20211020