CN207582314U - Assembled displacement steel pipe column coupling bar - Google Patents

Assembled displacement steel pipe column coupling bar Download PDF

Info

Publication number
CN207582314U
CN207582314U CN201721276297.XU CN201721276297U CN207582314U CN 207582314 U CN207582314 U CN 207582314U CN 201721276297 U CN201721276297 U CN 201721276297U CN 207582314 U CN207582314 U CN 207582314U
Authority
CN
China
Prior art keywords
rod
steel pipe
pipe column
connecting plate
coupling bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721276297.XU
Other languages
Chinese (zh)
Inventor
敬成进
陈佛赐
蒋本俊
王吉连
王新平
郭焕
李勇波
杨蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
7th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
7th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 7th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201721276297.XU priority Critical patent/CN207582314U/en
Application granted granted Critical
Publication of CN207582314U publication Critical patent/CN207582314U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of assembled displacement steel pipe column coupling bars, are related to field of bridge construction, including:Connecting-rods with constant lengh, including first body of rod, one end of first body of rod is fixed with the first connecting plate, and the first connecting plate is used to be assemblied in steel pipe column.Adjusting rod, including second body of rod, one end of second body of rod is fixed with the second connecting plate, and the second connecting plate is for being assemblied in steel pipe column, and the one end of second body of rod far from the second connecting plate is fixed with casing, and casing is extending at least partially into first body of rod.Regulating part is arranged on casing, and regulating part stretches into the length in first body of rod for adjusting sleeve pipe, and regulating part is fixed with the one end of first body of rod far from the first connecting plate.Assembled displacement steel pipe column coupling bar in the utility model can reduce the requirement of steel pipe column construction precision, reduce steel pipe column damage.

Description

Assembled displacement steel pipe column coupling bar
Technical field
The utility model is related to field of bridge construction, and in particular to a kind of assembled displacement steel pipe column coupling bar.
Background technology
Steel pipe column as temporary structure, using extensive, be commonly used as beam-type support, trestle, cable tower, buckle in bridge construction Tower etc..Steel pipe column is primarily subjected to vertical load, is main bearing member, due to stability requirement, when steel pipe column is excessively high, needs Coupling bar is installed every a distance between steel pipe column, coupling bar is primarily subjected to axial tension or pressure so that more steel pipes Column plays the role of lateral support between each other, strengthens the stability of steel pipe column, while it is certain that steel pipe column is resisted Horizontal force.
Steel pipe column generally use vibration hammer inserting piling or on basic built-in fitting, the control of the accuracy of the distance between steel pipe column System it is poor, and routine coupling bar to be installed with assembled, requirement of entering to the installation of steel pipe column is high, and construction precision reaches at all Less than, therefore based on still connecting with welding at present, but shortcoming is apparent, revolving difference, and the requirement of rapid construction is not achieved.In addition Often welding or cutting connecting portion can damage steel pipe column, and overhead welding difficulty and risk are big, be unfavorable for underwater coupling bar Assembly and disassembly.
There is the form for the connection for taking anchor ear transition at present, anchor ear is sleeved on steel pipe column, connecting rod is welded again with anchor ear It connects, but such method can only play the role of avoiding damage to steel pipe column, and such mode power transmission reliability is poor, works as steel pipe column When being relatively large in diameter, hooping structure will be extremely heavy.
Utility model content
For defect in the prior art, steel pipe column construction can be reduced the purpose of this utility model is to provide a kind of Required precision, the assembled displacement steel pipe column coupling bar for reducing steel pipe column damage.
To achieve the above objectives, the technical scheme adopted by the utility model is that:
A kind of assembled displacement steel pipe column coupling bar, is used to be assemblied between steel pipe column, including:
Connecting-rods with constant lengh, including first body of rod, one end of first body of rod is fixed with the first connecting plate, first connection Plate is used to be assemblied in the steel pipe column;
Adjusting rod, including second body of rod, one end of second body of rod is fixed with the second connecting plate, second connection For plate for being assemblied in the steel pipe column, the one end of second body of rod far from second connecting plate is fixed with casing, described Casing is extending at least partially into first body of rod;And
Regulating part is arranged in described sleeve pipe, and the regulating part stretches into first body of rod for adjusting described sleeve pipe Interior length, and the regulating part is fixed with the one end of first body of rod far from first connecting plate.
Based on the above technical solution, described sleeve pipe includes thread segment and respectively positioned at the thread segment both ends Inside stretch section and lap segment, it is described in stretch section and be extending at least partially into first body of rod, the lap segment is fixed on described second On the body of rod, the regulating part includes threaded sleeve, and the threaded sleeve is arranged on the thread segment, and the threaded sleeve is along institute When stating thread segment slip, adjust in described and stretch the length that section is stretched into first body of rod.
Based on the above technical solution, the bearing of second body of rod and lap segment offers multiple slots.
Based on the above technical solution, second body of rod is connect with lap segment by circumferential welded seam, and passes through institute It states slot and carries out short weld seam reinforcing connection.
Based on the above technical solution, the one end of first body of rod far from first connecting plate is equipped with circular hole method Blue disk, one end of the threaded sleeve are equipped with long screw hole ring flange, and the long screw hole ring flange is removably attached to circular hole method On blue disk.
Based on the above technical solution, the regulating part further includes multiple stiffeners, and multiple stiffeners are along institute The circumferentially disposed of threaded sleeve is stated, and each stiffener is respectively fixed with the threaded sleeve and long screw hole ring flange.
Based on the above technical solution, first connecting plate and the second connecting plate are spaced including two Axis pin connecting plate, each axis pin connecting plate are equipped with circular hole.
Compared with prior art, the utility model has the advantage of:
(1) the assembled displacement steel pipe column coupling bar of the utility model include the first connecting plate and the second connecting plate, first Connecting plate and the second connecting plate complete the assembling with steel pipe column by connecting pin and connecting pin lock, when constructing for high-altitude, Especially the cable tower of cable crane or buckle tower construction, avoid the problem of overhead welding is difficult, reduce high-altitude construction risk.For water Upper construction avoids the installation of the isostructural steel pipe column underwater portion coupling bar of such as drilling platform, trestle and removes problem.
(2) the assembled displacement steel pipe column coupling bar of the utility model includes adjusting rod and regulating part, and adjusting rod is equipped with Casing, casing include thread segment and stretch section and lap segment positioned at the interior of thread segment both ends respectively.Regulating part includes threaded sleeve, Threaded sleeve is arranged on thread segment, and threaded sleeve stretches the length that section is stretched into first body of rod in adjusting when threadingly section is slided. The threaded adjusting mode of the utility model realizes coupling bar and realizes electrodeless displacement in allowed limits, reduces steel pipe column and applies Work required precision, solves installation question.In addition, when connection length exceeds electrodeless displacement adjustable range, it can will be in adjusting rod Between cut open, need adjust in short-term, cut one section, need lengthen when, be welded with one section.The revolving of component is substantially increased, is saved Construction cost.
Description of the drawings
Fig. 1 is the structure diagram of assembled displacement steel pipe column coupling bar in the utility model;
Fig. 2 is the front view of connecting-rods with constant lengh in the utility model;
Fig. 3 is the vertical view of connecting-rods with constant lengh in the utility model;
Fig. 4 is the structure diagram of adjusting rod in the utility model;
Fig. 5 is the structure diagram of the utility model middle sleeve;
Fig. 6 is the structure diagram that adjusting rod is equipped with slot in the utility model;
Fig. 7 is the front view of regulating part in the utility model;
Fig. 8 is the right view of regulating part in the utility model;
Fig. 9 is coupling bar and steel pipe column assembling schematic diagram in the utility model.
In figure:1- connecting-rods with constant lenghs, first bodies of rod of 11-, the first connecting plates of 12-, 13- circular hole ring flanges, 2- adjusting rods, 21- Bipole body, the second connecting plates of 22-, 23- casings, 231- thread segments stretch section in 232-, 233- lap segments, 234- slots, and 3- is adjusted Part, 31- threaded sleeves, 32- long screw hole ring flanges, 33- stiffeners, 4- circular holes, 5- steel pipe columns, 51- fix otic placode.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to shown in Fig. 1 and Fig. 9, the utility model provides a kind of assembled displacement steel pipe column coupling bar, is used to assemble Between steel pipe column 5, including connecting-rods with constant lengh 1, adjusting rod 2 and regulating part 3.
Referring to shown in Fig. 2 and Fig. 3, connecting-rods with constant lengh 1 includes first body of rod 11, and one end of first body of rod 11 is fixed with the first connection Plate 12, the first connecting plate 12 are used to be assemblied in steel pipe column 5.
The first connecting plate 12 in the utility model includes two spaced axis pin connecting plates, each axis pin connecting plate Circular hole 4 is equipped with, fixed otic placode 51 is equipped on the steel pipe column 5 for needing to connect, fixed otic placode 51 is equipped with what is coordinated with circular hole 4 The fixation otic placode 51 of two steel pipe columns 5 is individually positioned in 22 spaced pin of the first connecting plate 12 and the second connecting plate by hole Between axis connection plate, the assembling of the first connecting plate 12 and steel pipe column 5 is completed by connecting pin and connecting pin lock.Coupling bar with 5 pin joint of steel pipe column when constructing for high-altitude, especially the cable tower of cable crane or buckles tower construction, avoids that overhead welding is difficult to ask Topic, reduces high-altitude construction risk.For over-water construction, it is underwater to avoid the isostructural steel pipe column 5 of such as drilling platform, trestle The installation of part coupling bar and dismounting problem.
Shown in Figure 4, adjusting rod 2 includes second body of rod 21, and one end of second body of rod 21 is fixed with the second connecting plate 22, Second connecting plate 22 is for being assemblied in steel pipe column 5, and the second connecting plate 22 also includes two spaced axis pin connecting plates, often A axis pin connecting plate is equipped with circular hole 4, with the mode of the assembling of steel pipe column 5 and the assembling of the first connecting plate 12 and steel pipe column 5 Mode it is identical.The one end of second body of rod 21 far from the second connecting plate 22 is fixed with casing 23, and casing 23 is extending at least partially into In one body of rod 11.
Regulating part 3 is arranged on casing 23, and regulating part 3 stretches into the length in first body of rod 11 for adjusting sleeve pipe 23, and Regulating part 3 is fixed with the one end of first body of rod 11 far from the first connecting plate 12.
Specifically, referring to shown in Fig. 7 and Fig. 8, regulating part 3 includes threaded sleeve 31, and one end of threaded sleeve 31 is equipped with length Screw hole ring flange 32, the one end of first body of rod 11 far from the first connecting plate 12 are equipped with circular hole ring flange 13, long screw hole ring flange 32 It is removably attached on circular hole ring flange 13.Long screw hole ring flange 32 and circular hole ring flange 13 are in assembling, arbitrary rotation angle Degree can meet six high-strength bolts of installation.In order to increase the intensity of regulating part 3, regulating part 3 further includes multiple stiffeners 33, more A stiffener 33 threadingly casing 31 it is circumferentially disposed, and each stiffener 33 respectively with threaded sleeve 31 and long screw hole flange Disk 32 is fixed.
Shown in Figure 5, the casing 23 in the utility model includes thread segment 231 and is located at 231 liang of thread segment respectively Section 232 and lap segment 233 are stretched in end, section 232 is inside stretched and is extending at least partially into first body of rod 11, lap segment 233 is fixed on the On bipole body 21.The threaded sleeve 31 of regulating part 3 is arranged on thread segment 231, threaded sleeve 31 threadingly section 231 slide when, The length that section 232 is stretched into first body of rod 11 is stretched in adjusting.The threaded adjusting mode of the utility model realizes coupling bar and is permitting Perhaps electrodeless displacement is realized in the range of, 5 construction precision requirement of steel pipe column is reduced, solves installation question.In addition, when connection length It when degree is beyond electrodeless displacement adjustable range, can will be cut open among adjusting rod 2, need to adjust in short-term, cut one section, when needing to lengthen, It is welded with one section.The revolving of component is substantially increased, has saved construction cost.
In addition, shown in Figure 6, the bearing of second body of rod 21 and lap segment 233 offers multiple slots 234, second The body of rod 21 is connect with lap segment 233 by circumferential welded seam, and is passed through slot 234 and carried out short weld seam reinforcing connection, is increased so as to play The effect of strong ties.
In addition, also providing a kind of assembly method of above-mentioned assembled displacement steel pipe column coupling bar, this method includes following step Suddenly:
S1. regulating part 3 is set on casing 23, and one end of casing 23 is stretched into first body of rod 11;
S2. the initial length of first body of rod 11 is stretched into using 3 adjusting sleeve pipe 23 of regulating part, by 3 and first body of rod of regulating part 11 one end far from the first connecting plate 12 are fixed temporarily;
S3. the first connecting plate 12 is assembled on a steel pipe column 5;
S4. moving the second connecting plate 22 makes it close to another steel pipe column 5, releases facing for regulating part 3 and first body of rod 11 When fix, adjust regulating part 3, adjustment casing 23 stretches into the length of first body of rod 11, the second connecting plate 22 is assembled in steel pipe column 5 On;
The first connecting plate 12 in the utility model is connected with the second connecting plate 22 including two spaced axis pins Plate, each axis pin connecting plate are equipped with circular hole 4, and fixed otic placode 51, fixed ear are equipped on two steel pipe columns 5 for needing to connect Plate 51 is equipped with the hole that coordinates with circular hole 4, and the fixation otic placode 51 of two steel pipe columns 5 is individually positioned in the first connecting plate 12 and the Between two connecting plates, 22 spaced axis pin connecting plate, 12 He of the first connecting plate is completed by connecting pin and connecting pin lock The assembling of second connecting plate 22 and two steel pipe columns 5.
Casing 23 includes thread segment 231 and stretches section 232 and lap segment 233 positioned at the interior of 231 both ends of thread segment respectively, interior It stretches section 232 to be extending at least partially into first body of rod 11, lap segment 233 is fixed on second body of rod 21, and regulating part 3 includes thread bush Pipe 31, threaded sleeve 31 are arranged on thread segment 231, and adjusting threaded sleeve 31 makes it, and threadingly section 231 is slided, and section is stretched in adjusting 232 stretch into the length in first body of rod 11.
S5. regulating part 3 and the one end of first body of rod 11 far from the first connecting plate 12 are fixed, completes assembling.
The utility model is not limited to the above embodiment, for those skilled in the art, not Under the premise of being detached from the utility model principle, several improvements and modifications can also be made, these improvements and modifications are also considered as this reality Within novel protection domain.The content not being described in detail in this specification belongs to well known to professional and technical personnel in the field The prior art.

Claims (7)

1. a kind of assembled displacement steel pipe column coupling bar is used to be assemblied between steel pipe column (5), which is characterized in that including:
Connecting-rods with constant lengh (1), including first body of rod (11), one end of first body of rod (11) is fixed with the first connecting plate (12), First connecting plate (12) is for being assemblied in the steel pipe column (5);
Adjusting rod (2), including second body of rod (21), one end of second body of rod (21) is fixed with the second connecting plate (22), Second connecting plate (22) is for being assemblied in the steel pipe column (5), and second body of rod (21) is far from the described second connection One end of plate (22) is fixed with casing (23), and described sleeve pipe (23) is extending at least partially into first body of rod (11);And
Regulating part (3) is arranged in described sleeve pipe (23), and the regulating part (3) stretches into institute for adjusting described sleeve pipe (23) State the length in first body of rod (11), and the regulating part (3) and separate first connecting plate of first body of rod (11) (12) one end is fixed.
2. assembled displacement steel pipe column coupling bar as described in claim 1, it is characterised in that:Described sleeve pipe (23) is including screw thread Section (231) and section (232) and lap segment (233) are stretched in the thread segment (231) both ends respectively, it is described interior to stretch section (232) it being extending at least partially into first body of rod (11), the lap segment (233) is fixed on second body of rod (21), The regulating part (3) includes threaded sleeve (31), and the threaded sleeve (31) is arranged on the thread segment (231), the spiral shell Line casing (31) along the thread segment (231) slide when, adjust and stretch section (232) in described and stretch into first body of rod (11) Length.
3. assembled displacement steel pipe column coupling bar as claimed in claim 2, it is characterised in that:Second body of rod (21) is with taking The bearing for connecing section (233) offers multiple slots (234).
4. assembled displacement steel pipe column coupling bar as claimed in claim 3, it is characterised in that:Second body of rod (21) is with taking It connects section (233) to connect by circumferential welded seam, and passes through the slot (234) and carry out short weld seam reinforcing connection.
5. assembled displacement steel pipe column coupling bar as claimed in claim 2, it is characterised in that:First body of rod (11) is separate One end of first connecting plate (12) is equipped with circular hole ring flange (13), and one end of the threaded sleeve (31) is equipped with long screw hole method Blue disk (32), the long screw hole ring flange (32) are removably attached on circular hole ring flange (13).
6. assembled displacement steel pipe column coupling bar as claimed in claim 5, it is characterised in that:The regulating part (3) further includes Multiple stiffeners (33), multiple stiffeners (33) each described are put more energy into along the circumferentially disposed of the threaded sleeve (31) Plate (33) is respectively fixed with the threaded sleeve (31) and long screw hole ring flange (32).
7. assembled displacement steel pipe column coupling bar as described in claim 1, it is characterised in that:First connecting plate (12) and Second connecting plate (22) includes two spaced axis pin connecting plates, and each axis pin connecting plate is equipped with circular hole (4).
CN201721276297.XU 2017-09-30 2017-09-30 Assembled displacement steel pipe column coupling bar Active CN207582314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721276297.XU CN207582314U (en) 2017-09-30 2017-09-30 Assembled displacement steel pipe column coupling bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721276297.XU CN207582314U (en) 2017-09-30 2017-09-30 Assembled displacement steel pipe column coupling bar

Publications (1)

Publication Number Publication Date
CN207582314U true CN207582314U (en) 2018-07-06

Family

ID=62728743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721276297.XU Active CN207582314U (en) 2017-09-30 2017-09-30 Assembled displacement steel pipe column coupling bar

Country Status (1)

Country Link
CN (1) CN207582314U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574760A (en) * 2017-09-30 2018-01-12 中铁大桥局第七工程有限公司 Assembled displacement steel pipe column coupling bar and its installation method
CN113833286A (en) * 2021-11-01 2021-12-24 浙江精工钢结构集团有限公司 Steel pipe column on-site butt joint positioning device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574760A (en) * 2017-09-30 2018-01-12 中铁大桥局第七工程有限公司 Assembled displacement steel pipe column coupling bar and its installation method
CN107574760B (en) * 2017-09-30 2023-10-20 中铁大桥局第七工程有限公司 Assembled variable-pitch steel pipe column connecting rod and installation method thereof
CN113833286A (en) * 2021-11-01 2021-12-24 浙江精工钢结构集团有限公司 Steel pipe column on-site butt joint positioning device and construction method

Similar Documents

Publication Publication Date Title
CN207582314U (en) Assembled displacement steel pipe column coupling bar
CN106677591A (en) Anti-buckling reinforcing device for angle steel of power transmission tower
CN103898991A (en) Sleeve-type pipe node
CN108979678B (en) Multistage yielding and compressing type steel frame based on constant-resistance sliding hole shearing loss and connecting method
CN113356664A (en) Beam column connected node suitable for assembled steel construction
CN201943361U (en) Rapid positioning device for installation of steel pipe truss structures
CN205382565U (en) Hollow hub node of high strength bolt
CN103967508A (en) Stretchable quick stress compensation type steel frame connection structure
CN107574760A (en) Assembled displacement steel pipe column coupling bar and its installation method
CN109779024A (en) It is a kind of can quick assembling telescopic connecting node and its assembly method
CN211172434U (en) Pipe truss butt joint interface
CN108412037A (en) A kind of assembled hollow hub node applied to grid shell
CN204703310U (en) Concrete column reinforcing joint structure
CN211228140U (en) High-strength connecting device for top plate construction bracket
CN204771840U (en) Hole alignment frock is joined in marriage with shafting flange hinge to boats and ships host computer
CN207331961U (en) A kind of bolt connection node for single-layer lattice shell
CN209400326U (en) A kind of shield tunnel screwed joint tensile property multifunction test device
CN208249671U (en) Spherical tank integral shift supporting leg reinforcement tools
CN209276998U (en) Stiff skeleton arch bridge of concrete filled steel tube closure joint structure
CN208884716U (en) A kind of rigid connection node of steel construction rectangle rod piece
CN208919529U (en) A kind of down-hole pipe Quick Connect Kit
CN202299117U (en) Double-flange section steel support
CN206034270U (en) Upper and lower string of module combination type steel pipe truss landing stage supports connected node
CN205442465U (en) Vaulting pole is adhered to to combined type infinitely variable control tower machine on a large scale
CN104759837A (en) Process for fabricating cross brace standard parts of thickener stand column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190328

Address after: 430050 Bridge Industrial Park, Headquarters District, Wuhan Economic and Technological Development Zone, Hubei Province

Patentee after: The 7th Engineering Co., Ltd., MBEC

Address before: 430056 Bridge Industrial Park, Headquarters District, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province

Co-patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau

Patentee before: The 7th Engineering Co., Ltd., MBEC

TR01 Transfer of patent right