CN207572884U - A kind of crane span structure convenient for fixed cable - Google Patents

A kind of crane span structure convenient for fixed cable Download PDF

Info

Publication number
CN207572884U
CN207572884U CN201721589238.8U CN201721589238U CN207572884U CN 207572884 U CN207572884 U CN 207572884U CN 201721589238 U CN201721589238 U CN 201721589238U CN 207572884 U CN207572884 U CN 207572884U
Authority
CN
China
Prior art keywords
installs case
pulley
mounting bracket
fixture block
crane span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721589238.8U
Other languages
Chinese (zh)
Inventor
李文灿
丁志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xingyang Energy Technology Co Ltd
Original Assignee
Jiangsu Xingyang Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xingyang Energy Technology Co Ltd filed Critical Jiangsu Xingyang Energy Technology Co Ltd
Priority to CN201721589238.8U priority Critical patent/CN207572884U/en
Application granted granted Critical
Publication of CN207572884U publication Critical patent/CN207572884U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of crane span structures convenient for fixed cable, including installing plate, installs case, first pulley, cable hole and fixing bolt, both sides are provided with mounting bracket below the installing plate, and the side of mounting bracket is provided with fixing card, the inside of the fixing card is inlaid with fixture block, and the side of fixture block is equipped with slide bar, spring is provided between the slide bar and fixture block, the first pulley is set to the lower section of installing plate, and the both sides of first pulley are provided with second pulley, the first pulley has hawser with running through in second pulley, and the bottom end of hawser is connected with each other with supporting plate, the fixing bolt is connected with each other through head cover and connecting shaft.This is convenient for the crane span structure of fixed cable, installs case can be fixed by the fixture block in fixing card, make installs case installation more quick, in addition the device is additionally provided with hawser, installs case can be drawn high between mounting bracket by hawser, and then the efficiency of installation is improved, reduce the labour of people.

Description

A kind of crane span structure convenient for fixed cable
Technical field
The utility model is related to cable bridge equipment technical field, specially a kind of crane span structure convenient for fixed cable.
Background technology
With the development of science and technology, nowadays equipment is improved and innovates constantly, improves the work of people Efficiency, cable bridge are one of equipment for being commonly used in people's life, and cable is supported and is arranged, and make cable can be with Preferably stored, it is excessively more in disorder than avoiding cable.
But cable bridge in the market is not easy to install, and it is complex during installation, consume a large amount of people Power, therefore in view of the above-mentioned problems, need to be improved on the basis of existing equipment, to meet the needs of market.
Utility model content
The purpose of this utility model is to provide a kind of crane span structure convenient for fixed cable, to solve to carry in above-mentioned background technology The cable bridge gone out is not easy to install, complex during installation, the problem of consuming a large amount of manpower.
To achieve the above object, the utility model provides following technical solution:A kind of crane span structure convenient for fixed cable, including Installing plate, installs case, first pulley, cable hole and fixing bolt, installing plate lower section both sides are provided with mounting bracket, and install The side of frame is provided with fixing card, and the inside of the fixing card is inlaid with fixture block, and the side of fixture block is equipped with slide bar, the cunning Spring is provided between bar and fixture block, the installs case is set between mounting bracket, and head cover is equipped with above installs case, institute It states and connecting shaft is provided between head cover and installs case, the first pulley is set to the lower section of installing plate, and the two of first pulley Side is provided with second pulley, and the first pulley has hawser, and the bottom end of hawser is mutually interconnected with supporting plate with running through in second pulley It connects, the cable hole is set to the side of mounting bracket, and the fixing bolt is connected with each other through head cover and connecting shaft.
Preferably, there are two the mounting bracket settings, and mounting bracket is symmetrical arranged about installing plate.
Preferably, the fixing card is provided with two groups, and there are two every group of fixing card settings, and fixing card and mounting bracket Between be structure as a whole.
Preferably, the fixture block section is right-angled trapezium, and the appearance and size of fixture block and the appearance and size of fixing card are mutual It coincide.
Preferably, the width between the width and mounting bracket of the installs case is equal in magnitude, and between installs case and head cover For snap-in structure.
Preferably, the connecting shaft is hollow-core construction, and is structure as a whole between connecting shaft and installs case, and connecting shaft It is symmetrical arranged about installs case.
Compared with prior art, the beneficial effects of the utility model are:This is convenient for the crane span structure of fixed cable to be provided with fixation Card is provided with two groups, and there are two every group of fixing card settings, and is structure as a whole between fixing card and mounting bracket, can pass through Installs case is fixed in fixture block in fixing card, installs installs case more quick, and in addition the device is additionally provided with hawser, Between can installs case being drawn high mounting bracket by hawser, the device is made more to be easy to use, and then improve installation Efficiency reduces the labour of people, therefore the device more meets the demand in market.
Description of the drawings
Fig. 1 is the utility model main view cross-sectional view;
Fig. 2 is the utility model side structure schematic view;
Fig. 3 is partial enlargement structural representation at A in the utility model Fig. 1.
In figure:1st, installing plate, 2, mounting bracket, 3, fixing card, 4, fixture block, 5, slide bar, 6, spring, 7, installs case, 8, connection Axis, 9, head cover, 10, first pulley, 11, second pulley, 12, hawser, 13, supporting plate, 14, cable hole, 15, fixing bolt.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of crane span structure convenient for fixed cable, including peace Loading board 1, mounting bracket 2, fixing card 3, fixture block 4, slide bar 5, spring 6, installs case 7, connecting shaft 8, head cover 9, first pulley 10, second Pulley 11, hawser 12, supporting plate 13, cable hole 14 and fixing bolt 15,1 lower section both sides of installing plate are provided with mounting bracket 2, and install The side of frame 2 is provided with fixing card 3, and there are two the settings of mounting bracket 2, and mounting bracket 2 is symmetrical arranged about installing plate 1, makes the dress It puts and more stablizes, the inside of fixing card 3 is inlaid with fixture block 4, and the side of fixture block 4 is equipped with slide bar 5, and fixing card 3 is provided with Two groups, and there are two every group of settings of fixing card 3, and be structure as a whole between fixing card 3 and mounting bracket 2, fixation can be passed through Installs case 7 is fixed in fixture block 4 in card 3, installs installs case 7 more quick, and 4 section of fixture block is right-angled trapezium, and The appearance and size of fixture block 4 is mutually coincide with the appearance and size of fixing card 3, and installs case 7 is fixed on the device convenient for passing through fixture block 4 On, spring 6 is provided between slide bar 5 and fixture block 4, installs case 7 is set between mounting bracket 2, and the top of installs case 7 is equipped with Head cover 9, the width between the width of installs case 7 and mounting bracket 2 is equal in magnitude, and to engage knot between installs case 7 and head cover 9 Structure is provided with connecting shaft 8 between head cover 9 and installs case 7, connecting shaft 8 is hollow-core construction, and is between connecting shaft 8 and installs case 7 Integral structure, and connecting shaft 8 is symmetrical arranged about installs case 7, and the device is made more to stablize, and connection is passed through convenient for hawser 12 Axis 8 pulls on installs case 7, and first pulley 10 is set to the lower section of installing plate 1, and the both sides of first pulley 10 are provided with Two pulleys 11, first pulley 10 have hawser 12, and the bottom end of hawser 12 is connected with each other with supporting plate 13 with running through in second pulley 11, Cable hole 14 is set to the side of mounting bracket 2, and fixing bolt 15 is connected with each other through head cover 9 with connecting shaft 8.
Operation principle:It, first will be convenient for the installation of the crane span structure of fixed cable when this is used to be convenient for the crane span structure of fixed cable Plate 1 and mounting bracket 2 are fixed on wall top, will carry out arrangement installation cable inside installs case 7 later, will after arrangement is completed Head cover 9 is mounted on the top of installs case 7, and passes through fixing bolt 15 and will be fixedly connected between head cover 9 and connecting shaft 8, then will Hawser 12 passes through first pulley 10 and second pulley 11, and the tail end of hawser 12 is passed through connecting shaft 8, later hawser 12 and support It is fixed between plate 13, then pulls hawser 12, supporting plate 13 starts to be contacted between installs case 7, then in hawser 12 Pulling force under the action of, installs case 7 starts to be gradually increasing, between installs case 7 initially enters mounting bracket 2 later, when installs case 7 When contacting with each other between fixture block 4, fixture block 4 starts the internal slide to fixing card 3, then when installs case 7 crosses fixation When blocking 3, fixture block 4 is ejected under the action of spring 6, completes the fixation to installs case 7, then loosens hawser 12, is being held in the palm Under the action of 13 gravity of plate, supporting plate 13 drives hawser 12 to slide on ground, later can be by cable hole by the way that supporting plate 13 is pulled to connect 14 take out from the inside of the device, and the content not being described in detail in this explanation belongs to existing well known to professional and technical personnel in the field There is technology.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come Say, can still modify to the technical solution recorded in foregoing embodiments or to which part technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (6)

1. a kind of crane span structure convenient for fixed cable, including installing plate(1), installs case(7), first pulley(10), cable hole(14) And fixing bolt(15), it is characterised in that:The installing plate(1)Lower section both sides are provided with mounting bracket(2), and mounting bracket(2)'s Side is provided with fixing card(3), the fixing card(3)Inside be inlaid with fixture block(4), and fixture block(4)Side cunning is installed Bar(5), the slide bar(5)With fixture block(4)Between be provided with spring(6), the installs case(7)It is set to mounting bracket(2)Between, And installs case(7)Top head cover is installed(9), the head cover(9)With installs case(7)Between be provided with connecting shaft(8), it is described First pulley(10)It is set to installing plate(1)Lower section, and first pulley(10)Both sides be provided with second pulley(11), it is described First pulley(10)With second pulley(11)Above running through has hawser(12), and hawser(12)Bottom end and supporting plate(13)Mutually interconnect It connects, the cable hole(14)It is set to mounting bracket(2)Side, the fixing bolt(15)Through head cover(9)With connecting shaft(8) It is connected with each other.
2. a kind of crane span structure convenient for fixed cable according to claim 1, it is characterised in that:The mounting bracket(2)Setting There are two, and mounting bracket(2)About installing plate(1)It is symmetrical arranged.
3. a kind of crane span structure convenient for fixed cable according to claim 1, it is characterised in that:The fixing card(3)Setting There are two groups, and every group of fixing card(3)There are two settings, and fixing card(3)With mounting bracket(2)Between be structure as a whole.
4. a kind of crane span structure convenient for fixed cable according to claim 1, it is characterised in that:The fixture block(4)Section is Right-angled trapezium, and fixture block(4)Appearance and size and fixing card(3)Appearance and size mutually coincide.
5. a kind of crane span structure convenient for fixed cable according to claim 1, it is characterised in that:The installs case(7)Width Degree and mounting bracket(2)Between width it is equal in magnitude, and installs case(7)With head cover(9)Between be snap-in structure.
6. a kind of crane span structure convenient for fixed cable according to claim 1, it is characterised in that:The connecting shaft(8)For sky Core structure, and connecting shaft(8)With installs case(7)Between be structure as a whole, and connecting shaft(8)About installs case(7)Symmetrically set It puts.
CN201721589238.8U 2017-11-24 2017-11-24 A kind of crane span structure convenient for fixed cable Expired - Fee Related CN207572884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721589238.8U CN207572884U (en) 2017-11-24 2017-11-24 A kind of crane span structure convenient for fixed cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721589238.8U CN207572884U (en) 2017-11-24 2017-11-24 A kind of crane span structure convenient for fixed cable

Publications (1)

Publication Number Publication Date
CN207572884U true CN207572884U (en) 2018-07-03

Family

ID=62692058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721589238.8U Expired - Fee Related CN207572884U (en) 2017-11-24 2017-11-24 A kind of crane span structure convenient for fixed cable

Country Status (1)

Country Link
CN (1) CN207572884U (en)

Similar Documents

Publication Publication Date Title
CN206575105U (en) A kind of computer network cable fixing device
CN210297123U (en) Cable bridge convenient to cable installation
CN207572884U (en) A kind of crane span structure convenient for fixed cable
CN201785144U (en) Gin pole crane
CN208257042U (en) A kind of computer networks integration device for being easily installed and fixing
CN208904577U (en) A kind of Split tray straight-through cable gantry
CN207200184U (en) A kind of practical channel-type cable bridge
CN201964100U (en) Hanging and connecting device
CN103668418B (en) A kind of automatic swinging electroplating machine
CN210957612U (en) Cable clamp convenient to install and use
CN209761949U (en) Splicing and buckling structure of assembled cabinet body
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN206391579U (en) A kind of pulley anchoring of stage curtain drawing machine
CN204632255U (en) A kind of cable warning board
CN209233331U (en) It is a kind of can be in order to the construction drawing machine of various lines
CN207753396U (en) A kind of cable testing bridge
CN203654159U (en) Inhaul cable fixing structure enabling replacement to be reliable and easy
CN210177939U (en) Combined safety support for building construction
CN213096927U (en) Detachable and reassembling article hanging device
CN202949198U (en) Paying-off pulley for cable overhead installation
CN208647085U (en) A kind of electric vehicle lithium battery shock-absorbing fixing support
CN107747604A (en) A kind of steel wire rope cushion omnidirectional shock absorber
CN212199590U (en) Efficient non-woven equipment
CN209562056U (en) A kind of ladder-type cable testing bridge
CN203892722U (en) Cut-off fixing hoop for optical cable on straight pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

Termination date: 20201124

CF01 Termination of patent right due to non-payment of annual fee