CN207571786U - A kind of Fast-driving Road Construction construction management system - Google Patents
A kind of Fast-driving Road Construction construction management system Download PDFInfo
- Publication number
- CN207571786U CN207571786U CN201721595361.0U CN201721595361U CN207571786U CN 207571786 U CN207571786 U CN 207571786U CN 201721595361 U CN201721595361 U CN 201721595361U CN 207571786 U CN207571786 U CN 207571786U
- Authority
- CN
- China
- Prior art keywords
- construction
- road construction
- support column
- outer tube
- fast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of Fast-driving Road Construction construction management systems, including fixed seat, the top centre position of the fixed seat is provided with support column outer tube, limit hole has been symmetrically arranged at left and right sides of the support column outer tube, and support column outer tube is internally provided with accommodating chamber, the accommodating chamber is internally provided with inner tube, and flexible protrusion is symmetrically arranged at left and right sides of said inner tube, and the side of the support column outer tube far from fixed seat is provided with camera.The utility model is based on network and information-based acquisition is carried out to Fast-driving Road Construction condition of construction, and time saving and energy saving, working efficiency is high, and collection result is accurate;Collection result is delivered to through signal receiver in the memory of administrative center, Real-Time Sharing, can collect useful information when needing to greatest extent, simple in structure, reasonable design, management is clearly, the management level of Fast-driving Road Construction construction is improved, suitable for the requirement of modern management.
Description
Technical field
The utility model belongs to road equipment electronic technology administrative skill field, and in particular to a kind of Fast-driving Road Construction is applied
Work manages system.
Background technology
As domestic economy and urbanization rapidly develop, Fast-driving Road Construction is quickly grown, to through street construction technology
Higher and higher with the requirement of technique, while country continues to increase the input of Fast-driving Road Construction, engineering quantity is therewith not yet yet
Disconnected to increase, enterprise and the number for participating in construction are more and more, but its construction quality supervisory system is unsound, the horizontal ginseng of construction
Poor uneven, constructing operation not bery specification, be easy for causing some mass defects, the serious threat life security of the people, because
This management for carrying out through street construction quality just seems particularly significant.
The Fast-driving Road Construction construction management system of the prior art has the following problems:1st, existing Fast-driving Road Construction is applied
Work management system is to be measured or assessed by manual site to obtain mostly, and time-consuming and laborious and efficiency is low, and execute-in-place is dangerous, and ties
Fruit is easily influenced by human factor, while the information acquired is isolated, and lack relevance, can not be from the data maximum of magnanimity
The excavation useful information of limit can not construct to Fast-driving Road Construction and carry out efficient maintenance management, far can not adapt to existing
Manage on behalf of another the requirement of reason;2nd, existing Fast-driving Road Construction construction management system is by the way that information is fed back to road equipment pipe mostly
Reason center can just send out command adapted thereto after being handled, this slow cumbersome processing procedure is adapted to the prison of daily through street
It examines, when emergency case occurs for through street, this processing procedure can be delayed best processing time, cause unit in charge of construction not
The loss that can be estimated, entail dangers to personal safety when serious.
Utility model content
The purpose of this utility model is to provide a kind of Fast-driving Road Construction construction management system, to solve above-mentioned background skill
The existing Fast-driving Road Construction construction management system limitation proposed in art far can not excessively adapt to wanting for modern management
Ask and existing Fast-driving Road Construction construction management system information exchanging process excessively it is cumbersome be not suitable for it is unexpected in face of burst
The problem of accident.
To achieve the above object, the utility model provides following technical solution:A kind of Fast-driving Road Construction construction management system
System, including fixed seat, the top centre position of the fixed seat is provided with support column outer tube, the left and right two of the support column outer tube
Side has been symmetrically arranged limit hole, and support column outer tube is internally provided with accommodating chamber, and the accommodating chamber is internally provided with
Inner tube is symmetrically arranged flexible protrusion, the side of the support column outer tube far from fixed seat at left and right sides of said inner tube
Camera is provided with, the side of the camera is provided with position indicator, and the side of camera is provided at road construction construction
Device is managed, side of the position indicator far from camera is provided with contingency alarm, and the road construction construction processing device is remote
Side from camera is provided with road construction construction information library, and the road construction construction information library is constructed far from road construction
The side of processor is provided with wireless terminal generator, is provided with signal receiver below the wireless terminal generator, institute
It states side of the signal receiver far from wireless terminal generator and is provided with road construction construction management center, the road construction is applied
Memory is provided with below the left side of work administrative center, the lower section centre position at the road construction construction management center is provided with
Printer, and the lower right-hand side at road construction construction management center is provided with display screen, the road construction construction management center
Side far from memory is provided with operating terminal, and public's medium, the operating terminal are provided with above the operating terminal
Side far from road construction construction management center is provided with execution terminal.
Preferably, pass through fixed structure between the camera and support column outer tube and support column outer tube and fixed seat
It is fixedly connected.
Preferably, the fixed seat is internally provided with holding tank, and the internal diameter of the holding tank is outer with support column outer tube
Diameter size is identical.
Preferably, the inner surface of the accommodating chamber and holding tank is both provided with sliding sleeve.
Preferably, it is connected by spring between described two elastic bumps, led between the elastic bumps and spring
Spring mounting seat is crossed to be fixedly connected.
Preferably, bolt hole, the bolt hole and ground have been symmetrically arranged at left and right sides of the bottom of the fixed seat
Between be bolted to connection.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model is based on network and information-based acquisition, time saving and energy saving, work is carried out to Fast-driving Road Construction condition of construction
Make efficient, collection result is accurate;Collection result is delivered to through signal receiver in the memory of administrative center, Real-Time Sharing,
Useful information can be collected when needing to greatest extent, simple in structure, reasonable design, management is clear and definite, improves Fast-driving Road Construction
The management level of construction, suitable for the requirement of modern management.
2nd, the composite structure of the utility model processor, position indicator and contingency alarm, allow management system in face of
Trouble-signal during burst accident can be quickly sent to nearest execution terminal, save processing contingency to greatest extent
Time avoids causing irremediable consequence, and simultaneous processor transmits signals to administrative center, by administrative center staff
Further safeguard procedures are carried out to contingency, there is perfect processing mechanism for burst accident, there is good market
Prospect.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model camera installation site;
Fig. 3 is the structure diagram of the utility model support column;
In figure:1st, camera;2nd, position indicator;3rd, contingency alarm;4th, wireless terminal generator;5th, public's medium;
6th, terminal is performed;7th, operating terminal;8th, display screen;9th, printer;10th, memory;11st, road construction construction management center;12、
Signal receiver;13rd, road construction construction information library;14th, road construction construction processing device;15th, support column outer tube;16th, it is fixed
Seat;17th, accommodating chamber;18th, inner tube;19th, elastic bumps;20th, limit hole.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides following technical scheme:A kind of Fast-driving Road Construction construction management system,
Including fixed seat 16, fixed seat 16 is internally provided with holding tank, the internal diameter of holding tank and the outer diameter size of support column outer tube 15
It is identical, support column outer tube 15 is shunk for convenience, bolt has been symmetrically arranged at left and right sides of the bottom of fixed seat 16
Hole is bolted to connection between bolt hole and ground, fixed seat 16 is fixed for convenience, the top of fixed seat 16
Centre position is provided with support column outer tube 15, and the left and right sides of support column outer tube 15 has been symmetrically arranged limit hole 20, and prop up
Dagger outer tube 15 is internally provided with accommodating chamber 17, and the inner surface of accommodating chamber 17 and holding tank is both provided with sliding sleeve, for side
Just it slides inside it, accommodating chamber 17 is internally provided with inner tube 18, and the left and right sides of inner tube 18 is symmetrically arranged flexible
Protrusion 19 is connected between two elastic bumps 19 by spring, passes through spring mounting seat between elastic bumps 19 and spring
It is fixedly connected, in order to be connected between two elastic bumps 19 more securely, side of the support column outer tube 15 far from fixed seat 16 is set
Camera 1 is equipped with, passes through fixed structure between camera 1 and support column outer tube 15 and support column outer tube 15 and fixed seat 16
It is fixedly connected, firmer in order to be connected, the side of camera 1 is provided with position indicator 2, and the side setting of camera 1
There is road construction construction processing device 14, side of the position indicator 2 far from camera 1 is provided with contingency alarm 3, road construction
Side of the construction processing device 14 far from camera 1 is provided with road construction construction information library 13, road construction construction information library 13
Side far from road construction construction processing device 14 is provided with wireless terminal generator 4, the lower section setting of wireless terminal generator 4
There is signal receiver 12, side of the signal receiver 12 far from wireless terminal generator 4 is provided in road construction construction management
The heart 11, the left side lower section at road construction construction management center 11 are provided with memory 10, road construction construction management center 11
Lower section centre position is provided with printer 9, and the lower right-hand side at road construction construction management center 11 is provided with display screen 8, road
11 side far from memory 10 of road construction administrative center is provided with operating terminal 7, and the top of operating terminal 7 is provided with public affairs
Many media 5, side of the operating terminal 7 far from road construction construction management center 11, which is provided with, performs terminal 6.
The operation principle and process for using of the utility model:After the utility model installs, fixed using fixed seat 16
The firmly position of support column outer tube 15, then determine that best camera 1 is believed by adjusting the height of support column outer tube 15 and inner tube 18
Breath acquisition position, finally determines pavement detection sensor suitable location, and installment work is completed;Camera 1 is sensed with pavement detection
Device acquires relevant Fast-driving Road Construction condition of construction and is sent to inside road construction construction processing device 14 through signal wire, free way
For road construction situation without abnormal, road construction construction processing device 14 stores information into road construction information bank 13
In, then through wireless terminal generator 4 signal being reached into road construction construction management center 11, information is presented on display screen 8, with
Just staff goes and finds out what's going in real time, while its information is printed and stayed in shelves and final stored into memory 10 by printer 9,
Fast-driving Road Construction condition of construction carries out presentation of information after the processing of operating terminal 7 by information sample platform, is carried out for public's medium 5
It consults;When camera 1 has with the collected Fast-driving Road Construction condition of construction of pavement detection sensor different, signal reaches road and builds
Inside facility work processor 14, road construction construction processing device 14 is started to work, and transmits a signal to position indicator 2, and position indicator 2 is true
Fixed nearest 6 position of execution terminal, while accident spot signal is sent to by contingency alarm 3 and performs terminal 6, it holds
Row terminal 6 starts to act, and saves processing time;Road construction construction processing device 14 transmits signals to road construction and applies simultaneously
Work administrative center 11, so that staff takes contingency further step, guidance performs the work of terminal 6, simultaneously
Contingency information can be printed and be achieved, to carry out related data query.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of Fast-driving Road Construction construction management system, including fixed seat (16), it is characterised in that:The fixed seat (16)
Top centre position is provided with support column outer tube (15), is symmetrically arranged at left and right sides of the support column outer tube (15) limited
Position hole (20), and support column outer tube (15) is internally provided with accommodating chamber (17), in being internally provided with of the accommodating chamber (17)
It manages (18), flexible raised (19) is symmetrically arranged at left and right sides of said inner tube (18), the support column outer tube (15) is remote
Side from fixed seat (16) is provided with camera (1), and the side of the camera (1) is provided with position indicator (2), and camera
(1) side is provided with road construction construction processing device (14), and side of the position indicator (2) far from camera (1) is provided with
Contingency alarm (3), side of the road construction construction processing device (14) far from camera (1) are provided with road construction
Construction information library (13), side of the road construction construction information library (13) far from road construction construction processing device (14) are set
There is wireless terminal generator (4), signal receiver (12), the signal are provided with below the wireless terminal generator (4)
Side of the receiver (12) far from wireless terminal generator (4) is provided with road construction construction management center (11), the road
Memory (10) is provided with below the left side of construction administrative center (11), the road construction construction management center (11)
Lower section centre position is provided with printer (9), and the lower right-hand side at road construction construction management center (11) is provided with display screen
(8), side of the road construction construction management center (11) far from memory (10) is provided with operating terminal (7), the behaviour
Make to be provided with public's medium (5) above terminal (7), the operating terminal (7) is far from road construction construction management center (11)
Side be provided with perform terminal (6).
2. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The camera
(1) it is fixedly connected between support column outer tube (15) and support column outer tube (15) and fixed seat (16) by fixed structure.
3. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The fixed seat
(16) be internally provided with holding tank, the internal diameter of the holding tank is identical with the outer diameter size of support column outer tube (15).
4. a kind of Fast-driving Road Construction construction management system according to claim 1 or 3, it is characterised in that:The receiving
The inner surface of chamber (17) and holding tank is both provided with sliding sleeve.
5. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:Described two elasticity
It is connected between raised (19) by spring, the elastic bumps (19) are fixed between spring by spring mounting seat to be connected
It connects.
6. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The fixed seat
(16) bolt hole has been symmetrically arranged at left and right sides of bottom, has been bolted to connection between the bolt hole and ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721595361.0U CN207571786U (en) | 2017-11-25 | 2017-11-25 | A kind of Fast-driving Road Construction construction management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721595361.0U CN207571786U (en) | 2017-11-25 | 2017-11-25 | A kind of Fast-driving Road Construction construction management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207571786U true CN207571786U (en) | 2018-07-03 |
Family
ID=62692075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721595361.0U Active CN207571786U (en) | 2017-11-25 | 2017-11-25 | A kind of Fast-driving Road Construction construction management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207571786U (en) |
-
2017
- 2017-11-25 CN CN201721595361.0U patent/CN207571786U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257062B (en) | Power transmission and transformation shake self-adapting type shaft tower | |
CN201917812U (en) | Iron tower state detecting system based on wireless network technology | |
CN201638948U (en) | Throw-pull earth wire for transmission line | |
CN107783034A (en) | A kind of open side type high voltage isolator condition line monitoring device and method | |
CN207571786U (en) | A kind of Fast-driving Road Construction construction management system | |
CN205691241U (en) | A kind of transformator operating temperature detection device | |
CN207348572U (en) | It is a kind of to position firm transmission line of electricity welding tower | |
CN105954660A (en) | Online insulation monitoring device for high-low voltage equipment | |
CN211142957U (en) | Solar energy building site spray dust removal device utilizing recovered rainwater | |
CN206074695U (en) | A kind of high-voltage capacitor is wirelessly transferred automatic discharging detection means | |
CN205857881U (en) | A kind of railway communication steel tower supervising device | |
CN110006483B (en) | Electric power iron tower | |
CN206702921U (en) | A kind of natural gas vertical filter filter core extracting tool | |
CN110702161A (en) | Device and method for monitoring and positioning dropping of pins of insulators of transmission towers | |
CN206648609U (en) | A kind of road and bridge concrete structure real-time detection apparatus | |
CN205280778U (en) | Draw wire sleeve under telescopic | |
CN206258547U (en) | A kind of remote monitoring electric anti-theft device | |
CN202059472U (en) | Intelligent mobile phone street lamp monitoring system | |
CN105201755B (en) | A kind of identification device of wind-power blade superficial failure | |
CN204858312U (en) | Switch board for distribution system | |
CN209484521U (en) | A kind of crashworthiness type illiciumverum lamp stand | |
CN207846533U (en) | A kind of cell Intelligent rainwater reclaiming system | |
CN214540109U (en) | Soil erosion and water loss and rainfall real-time monitoring device | |
CN206846313U (en) | High consequence data acquisition and analysis system of gas pipeline | |
CN204027560U (en) | Electric transmission pole tower bar monitor system |