CN207571786U - A kind of Fast-driving Road Construction construction management system - Google Patents

A kind of Fast-driving Road Construction construction management system Download PDF

Info

Publication number
CN207571786U
CN207571786U CN201721595361.0U CN201721595361U CN207571786U CN 207571786 U CN207571786 U CN 207571786U CN 201721595361 U CN201721595361 U CN 201721595361U CN 207571786 U CN207571786 U CN 207571786U
Authority
CN
China
Prior art keywords
construction
road construction
support column
outer tube
fast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721595361.0U
Other languages
Chinese (zh)
Inventor
邓珊
邬毅
徐晓芳
马尚荣
刘欢军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Lu Road Construction Engineering Management Consulting Co Ltd
Original Assignee
Hunan Lu Road Construction Engineering Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Lu Road Construction Engineering Management Consulting Co Ltd filed Critical Hunan Lu Road Construction Engineering Management Consulting Co Ltd
Priority to CN201721595361.0U priority Critical patent/CN207571786U/en
Application granted granted Critical
Publication of CN207571786U publication Critical patent/CN207571786U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Fast-driving Road Construction construction management systems, including fixed seat, the top centre position of the fixed seat is provided with support column outer tube, limit hole has been symmetrically arranged at left and right sides of the support column outer tube, and support column outer tube is internally provided with accommodating chamber, the accommodating chamber is internally provided with inner tube, and flexible protrusion is symmetrically arranged at left and right sides of said inner tube, and the side of the support column outer tube far from fixed seat is provided with camera.The utility model is based on network and information-based acquisition is carried out to Fast-driving Road Construction condition of construction, and time saving and energy saving, working efficiency is high, and collection result is accurate;Collection result is delivered to through signal receiver in the memory of administrative center, Real-Time Sharing, can collect useful information when needing to greatest extent, simple in structure, reasonable design, management is clearly, the management level of Fast-driving Road Construction construction is improved, suitable for the requirement of modern management.

Description

A kind of Fast-driving Road Construction construction management system
Technical field
The utility model belongs to road equipment electronic technology administrative skill field, and in particular to a kind of Fast-driving Road Construction is applied Work manages system.
Background technology
As domestic economy and urbanization rapidly develop, Fast-driving Road Construction is quickly grown, to through street construction technology Higher and higher with the requirement of technique, while country continues to increase the input of Fast-driving Road Construction, engineering quantity is therewith not yet yet Disconnected to increase, enterprise and the number for participating in construction are more and more, but its construction quality supervisory system is unsound, the horizontal ginseng of construction Poor uneven, constructing operation not bery specification, be easy for causing some mass defects, the serious threat life security of the people, because This management for carrying out through street construction quality just seems particularly significant.
The Fast-driving Road Construction construction management system of the prior art has the following problems:1st, existing Fast-driving Road Construction is applied Work management system is to be measured or assessed by manual site to obtain mostly, and time-consuming and laborious and efficiency is low, and execute-in-place is dangerous, and ties Fruit is easily influenced by human factor, while the information acquired is isolated, and lack relevance, can not be from the data maximum of magnanimity The excavation useful information of limit can not construct to Fast-driving Road Construction and carry out efficient maintenance management, far can not adapt to existing Manage on behalf of another the requirement of reason;2nd, existing Fast-driving Road Construction construction management system is by the way that information is fed back to road equipment pipe mostly Reason center can just send out command adapted thereto after being handled, this slow cumbersome processing procedure is adapted to the prison of daily through street It examines, when emergency case occurs for through street, this processing procedure can be delayed best processing time, cause unit in charge of construction not The loss that can be estimated, entail dangers to personal safety when serious.
Utility model content
The purpose of this utility model is to provide a kind of Fast-driving Road Construction construction management system, to solve above-mentioned background skill The existing Fast-driving Road Construction construction management system limitation proposed in art far can not excessively adapt to wanting for modern management Ask and existing Fast-driving Road Construction construction management system information exchanging process excessively it is cumbersome be not suitable for it is unexpected in face of burst The problem of accident.
To achieve the above object, the utility model provides following technical solution:A kind of Fast-driving Road Construction construction management system System, including fixed seat, the top centre position of the fixed seat is provided with support column outer tube, the left and right two of the support column outer tube Side has been symmetrically arranged limit hole, and support column outer tube is internally provided with accommodating chamber, and the accommodating chamber is internally provided with Inner tube is symmetrically arranged flexible protrusion, the side of the support column outer tube far from fixed seat at left and right sides of said inner tube Camera is provided with, the side of the camera is provided with position indicator, and the side of camera is provided at road construction construction Device is managed, side of the position indicator far from camera is provided with contingency alarm, and the road construction construction processing device is remote Side from camera is provided with road construction construction information library, and the road construction construction information library is constructed far from road construction The side of processor is provided with wireless terminal generator, is provided with signal receiver below the wireless terminal generator, institute It states side of the signal receiver far from wireless terminal generator and is provided with road construction construction management center, the road construction is applied Memory is provided with below the left side of work administrative center, the lower section centre position at the road construction construction management center is provided with Printer, and the lower right-hand side at road construction construction management center is provided with display screen, the road construction construction management center Side far from memory is provided with operating terminal, and public's medium, the operating terminal are provided with above the operating terminal Side far from road construction construction management center is provided with execution terminal.
Preferably, pass through fixed structure between the camera and support column outer tube and support column outer tube and fixed seat It is fixedly connected.
Preferably, the fixed seat is internally provided with holding tank, and the internal diameter of the holding tank is outer with support column outer tube Diameter size is identical.
Preferably, the inner surface of the accommodating chamber and holding tank is both provided with sliding sleeve.
Preferably, it is connected by spring between described two elastic bumps, led between the elastic bumps and spring Spring mounting seat is crossed to be fixedly connected.
Preferably, bolt hole, the bolt hole and ground have been symmetrically arranged at left and right sides of the bottom of the fixed seat Between be bolted to connection.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model is based on network and information-based acquisition, time saving and energy saving, work is carried out to Fast-driving Road Construction condition of construction Make efficient, collection result is accurate;Collection result is delivered to through signal receiver in the memory of administrative center, Real-Time Sharing, Useful information can be collected when needing to greatest extent, simple in structure, reasonable design, management is clear and definite, improves Fast-driving Road Construction The management level of construction, suitable for the requirement of modern management.
2nd, the composite structure of the utility model processor, position indicator and contingency alarm, allow management system in face of Trouble-signal during burst accident can be quickly sent to nearest execution terminal, save processing contingency to greatest extent Time avoids causing irremediable consequence, and simultaneous processor transmits signals to administrative center, by administrative center staff Further safeguard procedures are carried out to contingency, there is perfect processing mechanism for burst accident, there is good market Prospect.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model camera installation site;
Fig. 3 is the structure diagram of the utility model support column;
In figure:1st, camera;2nd, position indicator;3rd, contingency alarm;4th, wireless terminal generator;5th, public's medium; 6th, terminal is performed;7th, operating terminal;8th, display screen;9th, printer;10th, memory;11st, road construction construction management center;12、 Signal receiver;13rd, road construction construction information library;14th, road construction construction processing device;15th, support column outer tube;16th, it is fixed Seat;17th, accommodating chamber;18th, inner tube;19th, elastic bumps;20th, limit hole.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides following technical scheme:A kind of Fast-driving Road Construction construction management system, Including fixed seat 16, fixed seat 16 is internally provided with holding tank, the internal diameter of holding tank and the outer diameter size of support column outer tube 15 It is identical, support column outer tube 15 is shunk for convenience, bolt has been symmetrically arranged at left and right sides of the bottom of fixed seat 16 Hole is bolted to connection between bolt hole and ground, fixed seat 16 is fixed for convenience, the top of fixed seat 16 Centre position is provided with support column outer tube 15, and the left and right sides of support column outer tube 15 has been symmetrically arranged limit hole 20, and prop up Dagger outer tube 15 is internally provided with accommodating chamber 17, and the inner surface of accommodating chamber 17 and holding tank is both provided with sliding sleeve, for side Just it slides inside it, accommodating chamber 17 is internally provided with inner tube 18, and the left and right sides of inner tube 18 is symmetrically arranged flexible Protrusion 19 is connected between two elastic bumps 19 by spring, passes through spring mounting seat between elastic bumps 19 and spring It is fixedly connected, in order to be connected between two elastic bumps 19 more securely, side of the support column outer tube 15 far from fixed seat 16 is set Camera 1 is equipped with, passes through fixed structure between camera 1 and support column outer tube 15 and support column outer tube 15 and fixed seat 16 It is fixedly connected, firmer in order to be connected, the side of camera 1 is provided with position indicator 2, and the side setting of camera 1 There is road construction construction processing device 14, side of the position indicator 2 far from camera 1 is provided with contingency alarm 3, road construction Side of the construction processing device 14 far from camera 1 is provided with road construction construction information library 13, road construction construction information library 13 Side far from road construction construction processing device 14 is provided with wireless terminal generator 4, the lower section setting of wireless terminal generator 4 There is signal receiver 12, side of the signal receiver 12 far from wireless terminal generator 4 is provided in road construction construction management The heart 11, the left side lower section at road construction construction management center 11 are provided with memory 10, road construction construction management center 11 Lower section centre position is provided with printer 9, and the lower right-hand side at road construction construction management center 11 is provided with display screen 8, road 11 side far from memory 10 of road construction administrative center is provided with operating terminal 7, and the top of operating terminal 7 is provided with public affairs Many media 5, side of the operating terminal 7 far from road construction construction management center 11, which is provided with, performs terminal 6.
The operation principle and process for using of the utility model:After the utility model installs, fixed using fixed seat 16 The firmly position of support column outer tube 15, then determine that best camera 1 is believed by adjusting the height of support column outer tube 15 and inner tube 18 Breath acquisition position, finally determines pavement detection sensor suitable location, and installment work is completed;Camera 1 is sensed with pavement detection Device acquires relevant Fast-driving Road Construction condition of construction and is sent to inside road construction construction processing device 14 through signal wire, free way For road construction situation without abnormal, road construction construction processing device 14 stores information into road construction information bank 13 In, then through wireless terminal generator 4 signal being reached into road construction construction management center 11, information is presented on display screen 8, with Just staff goes and finds out what's going in real time, while its information is printed and stayed in shelves and final stored into memory 10 by printer 9, Fast-driving Road Construction condition of construction carries out presentation of information after the processing of operating terminal 7 by information sample platform, is carried out for public's medium 5 It consults;When camera 1 has with the collected Fast-driving Road Construction condition of construction of pavement detection sensor different, signal reaches road and builds Inside facility work processor 14, road construction construction processing device 14 is started to work, and transmits a signal to position indicator 2, and position indicator 2 is true Fixed nearest 6 position of execution terminal, while accident spot signal is sent to by contingency alarm 3 and performs terminal 6, it holds Row terminal 6 starts to act, and saves processing time;Road construction construction processing device 14 transmits signals to road construction and applies simultaneously Work administrative center 11, so that staff takes contingency further step, guidance performs the work of terminal 6, simultaneously Contingency information can be printed and be achieved, to carry out related data query.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Fast-driving Road Construction construction management system, including fixed seat (16), it is characterised in that:The fixed seat (16) Top centre position is provided with support column outer tube (15), is symmetrically arranged at left and right sides of the support column outer tube (15) limited Position hole (20), and support column outer tube (15) is internally provided with accommodating chamber (17), in being internally provided with of the accommodating chamber (17) It manages (18), flexible raised (19) is symmetrically arranged at left and right sides of said inner tube (18), the support column outer tube (15) is remote Side from fixed seat (16) is provided with camera (1), and the side of the camera (1) is provided with position indicator (2), and camera (1) side is provided with road construction construction processing device (14), and side of the position indicator (2) far from camera (1) is provided with Contingency alarm (3), side of the road construction construction processing device (14) far from camera (1) are provided with road construction Construction information library (13), side of the road construction construction information library (13) far from road construction construction processing device (14) are set There is wireless terminal generator (4), signal receiver (12), the signal are provided with below the wireless terminal generator (4) Side of the receiver (12) far from wireless terminal generator (4) is provided with road construction construction management center (11), the road Memory (10) is provided with below the left side of construction administrative center (11), the road construction construction management center (11) Lower section centre position is provided with printer (9), and the lower right-hand side at road construction construction management center (11) is provided with display screen (8), side of the road construction construction management center (11) far from memory (10) is provided with operating terminal (7), the behaviour Make to be provided with public's medium (5) above terminal (7), the operating terminal (7) is far from road construction construction management center (11) Side be provided with perform terminal (6).
2. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The camera (1) it is fixedly connected between support column outer tube (15) and support column outer tube (15) and fixed seat (16) by fixed structure.
3. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The fixed seat (16) be internally provided with holding tank, the internal diameter of the holding tank is identical with the outer diameter size of support column outer tube (15).
4. a kind of Fast-driving Road Construction construction management system according to claim 1 or 3, it is characterised in that:The receiving The inner surface of chamber (17) and holding tank is both provided with sliding sleeve.
5. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:Described two elasticity It is connected between raised (19) by spring, the elastic bumps (19) are fixed between spring by spring mounting seat to be connected It connects.
6. a kind of Fast-driving Road Construction construction management system according to claim 1, it is characterised in that:The fixed seat (16) bolt hole has been symmetrically arranged at left and right sides of bottom, has been bolted to connection between the bolt hole and ground.
CN201721595361.0U 2017-11-25 2017-11-25 A kind of Fast-driving Road Construction construction management system Active CN207571786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721595361.0U CN207571786U (en) 2017-11-25 2017-11-25 A kind of Fast-driving Road Construction construction management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721595361.0U CN207571786U (en) 2017-11-25 2017-11-25 A kind of Fast-driving Road Construction construction management system

Publications (1)

Publication Number Publication Date
CN207571786U true CN207571786U (en) 2018-07-03

Family

ID=62692075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721595361.0U Active CN207571786U (en) 2017-11-25 2017-11-25 A kind of Fast-driving Road Construction construction management system

Country Status (1)

Country Link
CN (1) CN207571786U (en)

Similar Documents

Publication Publication Date Title
CN105257062B (en) Power transmission and transformation shake self-adapting type shaft tower
CN201917812U (en) Iron tower state detecting system based on wireless network technology
CN201638948U (en) Throw-pull earth wire for transmission line
CN107783034A (en) A kind of open side type high voltage isolator condition line monitoring device and method
CN207571786U (en) A kind of Fast-driving Road Construction construction management system
CN205691241U (en) A kind of transformator operating temperature detection device
CN207348572U (en) It is a kind of to position firm transmission line of electricity welding tower
CN105954660A (en) Online insulation monitoring device for high-low voltage equipment
CN211142957U (en) Solar energy building site spray dust removal device utilizing recovered rainwater
CN206074695U (en) A kind of high-voltage capacitor is wirelessly transferred automatic discharging detection means
CN205857881U (en) A kind of railway communication steel tower supervising device
CN110006483B (en) Electric power iron tower
CN206702921U (en) A kind of natural gas vertical filter filter core extracting tool
CN110702161A (en) Device and method for monitoring and positioning dropping of pins of insulators of transmission towers
CN206648609U (en) A kind of road and bridge concrete structure real-time detection apparatus
CN205280778U (en) Draw wire sleeve under telescopic
CN206258547U (en) A kind of remote monitoring electric anti-theft device
CN202059472U (en) Intelligent mobile phone street lamp monitoring system
CN105201755B (en) A kind of identification device of wind-power blade superficial failure
CN204858312U (en) Switch board for distribution system
CN209484521U (en) A kind of crashworthiness type illiciumverum lamp stand
CN207846533U (en) A kind of cell Intelligent rainwater reclaiming system
CN214540109U (en) Soil erosion and water loss and rainfall real-time monitoring device
CN206846313U (en) High consequence data acquisition and analysis system of gas pipeline
CN204027560U (en) Electric transmission pole tower bar monitor system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant