CN207571278U - A kind of power supply test connector and its system - Google Patents
A kind of power supply test connector and its system Download PDFInfo
- Publication number
- CN207571278U CN207571278U CN201720801888.8U CN201720801888U CN207571278U CN 207571278 U CN207571278 U CN 207571278U CN 201720801888 U CN201720801888 U CN 201720801888U CN 207571278 U CN207571278 U CN 207571278U
- Authority
- CN
- China
- Prior art keywords
- power supply
- interface
- test
- oscillograph
- capacitance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
A kind of power supply test connector and its system, belong to power supply test technical field.The utility model power supply test connector includes power interface, oscillograph connecting interface, electronic load interface and signal processing circuit;The power interface is sequentially connected signal processing circuit, oscillograph connecting interface, electronic load interface.The utility model power detecting system includes above-mentioned power supply test connector, power supply to be measured, electronic load, oscillograph, test platform;The power supply test connector connects the power supply to be measured, the electronic load, the oscillograph respectively, and the electronic load and the oscillograph connect the test platform respectively.The utility model connects tested power supply with test equipment, simple to operate, saves the time, will not more destroy tested power supply.
Description
Technical field
The utility model power supply test technical field more particularly to a kind of power supply test connector and its system.
Background technology
Power supply is the device that power is provided to electronic equipment, also referred to as power supply unit.Computer power supply is mounted to host
Closing individual components in case, its effect are that alternating current is converted to 5V, 12V, -12V, 3.3V by switching mode power supply transformer
Etc. steady dc voltages, so that mainboard in mainframe box, hard disk and other all parts use.
Whether size, electric current and the voltage of power are stablized, and will directly affect computer operation performance and used life.
It can be seen that the quality of a power supply is most important for a product, so the test for power supply is also very important.
Under normal circumstances, when testing power supply, the output loading to power supply is needed, this just needs the connection simulation in the output of power supply negative
The test equipment of load, such as electronic load, but the output terminal of power supply is all standard interface, and has a variety of different voltage outputs,
It needs to connect electronic load respectively, and these standard interfaces are not suitable for each electronic load, these standard interfaces can not thus
Directly it is connect with electronic load.
To solve the above-mentioned problems, there are two types of schemes at present:A kind of is the standard interface for removing power output end, will be exported
Signal wire be connected to electronic load.But standard interface is removed in test, if being loaded on after the completion of test so that standard
Interface repeated disassembled and assembled has not only been lost standard interface, has also destroyed power supply;Even if the standard interface removed is not loaded on, tearing open
Also power supply is destroyed during removing so that power supply normally or can not be used effectively.Another kind is by the standard of power output end
Interface is connected on corresponding interface, then from welding signal line on corresponding interface, is then connected to electronic load.But this
Sample according to different electronic loads, needs to select corresponding interface every time, and welding operation is repeated, and both wastes time, and
Welding operation damages to test man's body, and will appear problem of faulty soldering in the welding process then to the validity of test
It impacts.
Application for a patent for invention CN105137364A discloses a kind of automatization test system of Switching Power Supply, specifically discloses
The system includes Switching Power Supply, circuit board under test, oscillograph, electronic load instrument and a test circuit, wherein, the Switching Power Supply
By cable and the electronic load instrument on lateral circuit plate is treated, the Switching Power Supply is connect with the oscillograph, the switch
Power supply is by cable and the electronic load instrument, and the electronic load instrument is connect by gpib interface with oscillograph, described to show
Wave device is connect by gpib interface with the test computer.The patent application when being only to power supply test the communication of each instrument and equipment connect
Mouthful uncurrent problem gives realizes that one or more instrument is listened, said, the scheme of control function using gpib interface, but for because
The port connectivity problem that power interface exports different voltages and corresponds to when different electronic loads are attached test does not propose effectively
Solution.Equally, application for a patent for invention CN103792498A does not also propose solution for existing issue.
Utility model content
The utility model is in view of the problems of the existing technology, it is proposed that it is a kind of by tested power supply and test equipment (including
Electronic load, oscillograph etc.) the power supply test connector that connects and its system.
When doing power supply test, the utility model is merely with a power supply test connector by tested power supply and test equipment
It connects, without removing standard interface or connecting the additional operation that is inefficient, destroying power supply such as corresponding interface and welding signal line,
With regard to easy, efficient, reliability is high power supply test can be carried out.
The utility model technical scheme is that:
A kind of power supply test connector, including power interface, oscillograph connecting interface, electronic load interface and signal
Processing circuit;The power interface is sequentially connected signal processing circuit, oscillograph connecting interface, electronic load interface.
Preferably, the oscillograph connecting interface, the electronic load interface, signal processing circuit three composition
Branch is tested, a power interface is connected with a plurality of test branch.
Preferably, a plurality of test branch is the test branch with different output voltages.
Preferably, the power interface is and the matched standard interface of power output end to be measured.
Preferably, the signal processing circuit includes filtering sub-circuit.
Preferably, the filtering sub-circuit includes the first capacitance and the second capacitance;First capacitance, second electricity
Appearance is both parallel between the power interface and the oscillograph connecting interface.
Preferably, the capacitance of first capacitance is ten times of the capacitance of second capacitance.
Preferably, first capacitance, second capacitance are electrolytic capacitor.
A kind of power detecting system, including above-mentioned power supply test connector, power supply to be measured, electronic load, oscillograph, test
Platform;The power supply test connector connects the power supply to be measured, the electronic load, the oscillograph, the electronics respectively
Load and the oscillograph connect the test platform respectively.
Preferably, the test platform is respectively between the electronic load, the oscillograph through general purpose interface bus
Communication connection.
The utility model has the advantages that:
A kind of power supply test connector of the utility model and its system, will be by an interface unit by tested power supply and survey
Examination equipment connects, and neither damages tested power supply, and do not need to increase operation bidirectional to match the versatility of each interface,
So that power supply test is more convenient, efficient, reliability is high.
Description of the drawings
Fig. 1 is a kind of structure diagram of power supply test connector of the utility model;
Fig. 2 is a kind of functional block diagram of power detecting system of the utility model.
Specific embodiment
It is specific embodiment of the utility model and with reference to attached drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these embodiments.
A kind of power supply test connector of the utility model include power interface, oscillograph connecting interface, electronic load interface,
And signal processing circuit.The power interface is sequentially connected signal processing circuit, oscillograph connecting interface, electronic load and connects
Mouthful.
The power interface with tested power output end for being connected, above it will be appreciated that tested power output end is all one at present
A little standard interfaces, the power interface are matching standard interface.For computer power supply, AC power is through opening
It closes power transformer and is converted to the steady dc voltages such as 5V, 12V, -12V and 3.3V, the power interface is electromechanical with calculating thus
When source output terminal is connected, the output DC voltage electron load of power supply test connector.
The oscillograph connecting interface can be connect for being connect with oscillograph by probe with oscillograph.
The device that the electronic load interface is used to load with simulation electronic is connect, and is connected with each other by conducting wire.
In order to improve the accuracy for measuring power supply voltage signal, letter is set between the power interface and oscillograph interface
Number processing circuit so that power interface exports steady, reliable voltage value, in order to oscillograph carried out according to the voltage value it is effective
Detection, analysis.
The power interface is exported often has rough situations such as burr to the voltage of oscillograph interface, described thus
Signal processing circuit includes filtering sub-circuit.Further, the filtering sub-circuit includes the first capacitance and the second capacitance.Described
One capacitance, second capacitance are both parallel between the power interface and the oscillograph connecting interface.Wherein, it is described
First capacitance or second capacitance are electrolytic capacitor.According to the output characteristics of computer power supply, the capacitance of first capacitance
Value is ten times of second capacitance, as the capacitance when the first capacitance of tell be 10 μ f when, the capacitance of second capacitance
It is worth for 0.1 μ f.
The power supply test connector can be set and a plurality of be connect by the oscillograph according to the difference of electric power output voltage
Mouth, the electronic load interface, the signal processing circuit three form test branch.The power supply test connector is suitable for more
During the power supply of a standard interface, a power interface can be set on the power supply test connector.If power interface has multiple
And it is mutually not general, multiple power interfaces can be set on power supply test connector, and be set inside power supply test connector
Interface standard conversion circuit;Or multiple power interfaces connect external interface standard handovers before power supply test connector is connected
Circuit.The quantity of the unlimited power interface herein, the quantity of the unlimited test branch.
Fig. 1 shows a kind of example of power supply test connector of the utility model.There are one power supply test connector tools
Power interface J1, five test branches.Every test branch includes a signal processing circuit, an oscillograph connecting interface
J2, J3, J4, J5, J6, electronic load interface J7, J8, J9, J10, a J11.The signal processing circuit is sequentially connected described
Oscillograph connecting interface J2, J3, J4, J5, J6 and electronic load interface J7, J8, J9, J10, J11.Each signal processing circuit packet
Include first capacitance C1, C3, C5, C7, C9 being both connected in parallel between power interface and oscillograph interface, the second capacitance
C2、C4、C6、C8、C10。
Wherein, the first test branch includes the first capacitance C1, the second capacitance C2, oscillograph connecting interface J2, electronic load
Interface J7, the output test voltage of the first test branch is 12V.Second test branch includes the first capacitance C3, the second electricity
Hold C4, oscillograph connecting interface J3, electronic load interface J8, the output test voltage of the first test branch is 5V.Third
It tests branch and includes the first capacitance C5, the second capacitance C6, oscillograph connecting interface J4, electronic load interface J9, described first surveys
The output test voltage for trying branch is 5V.4th test branch includes the first capacitance C7, the second capacitance C8, oscillograph connecting interface
J5, electronic load interface J10, the output test voltage of the first test branch is 3.3V.The 5th test branch includes
First capacitance C9, the second capacitance C10, oscillograph connecting interface J6, electronic load interface J11, described first tests the defeated of branch
Go out test voltage for -12V.Test branch in the power supply test connector of Fig. 1 includes the test branch of different output voltages,
The above-mentioned five test branches shown are general branch, can increase and decrease branch as needed, can be arranged as required to a plurality of output electricity
Press identical test branch or the different test branch of output voltage.
By taking the first test branch as an example, connection mode is that both the first capacitance C1, described second capacitance C2 are mutually simultaneously
Connection, and the power interface J1 both ends are connected in parallel on, and be connected in parallel on the oscillograph connecting interface J2 both ends;The oscillograph connection
The both ends of interface J2 respectively connect 12V connecting pins and the ground terminal of the electronic load J7.Specifically, the power interface J1 draws
Two contact pins gone out, are voltage signal on one side, are ground signalling on one side, can directly be correspondingly connected with the signal and ground of probe, are come
It is corresponding in turn to connection oscillograph connecting interface and electronic load interface.
Fig. 2 shows a kind of power detection system of the utility model, including above-mentioned power supply test connector, electricity to be measured
Source, electronic load, oscillograph, test platform.The power supply test connector connects the power supply to be measured, the Electronic Negative respectively
It carries, the oscillograph, the electronic load and the oscillograph connect the test platform respectively.
After previous oscillograph detection, after adjusting detection parameters manually, a variety of tests are carried out, such as efficiency test, ripple
Test, dynamic response test, voltage overshoot and undershoot test, power on power-off sequential test, output voltage and input voltage it is steady
Qualitative test, short-circuit protection test, overcurrent protection test, overvoltage protection test and under-voltage protection test etc..For example, ripple is surveyed
Examination after test platform is built, is needed repeatedly to adjust manually and be tested under programmable DC electronic load progress different loads, drawn every time
It is required for capturing the waveform on oscillograph manually during load;Then, report test data and test waveform being copied in computer
In;Finally, it then goes to judge whether test result meets testing standard.Each single item test is both needed to carry out this action, and test process is numerous
It is trivial, inefficiency.For this purpose, the power detection system is on the basis of using above-mentioned power supply test connector, it is flat based on test
Platform realizes automatic detection.
During in order to avoid automatic detection each instrument communication interface it is inconsistent caused by it is inconvenient prompt the problem of, it is described
Test platform communicates to connect between the electronic load, the oscillograph through general purpose interface bus respectively.
The test platform can be the PC machine or test cloud platform for being equipped with test software.
Before specific test, the system operation procedures are as follows:
Step 1, power output end to be measured are directly connect with the power interface on power supply test connector;
Step 2, the oscillograph connecting interface of power supply test connector are connect by probe with oscillograph;
Step 3 according to test request, sets every branch to connect the load current of electronic load;
Step 4 tests the voltage or electric current of every branch on oscillograph.
The control of the test parameter of above-mentioned steps three, four realizes that final testing result is also flat in test by test platform
Reflect on platform, handle, analysis, recording.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Described specific embodiment can be done various modifications or additions or using similar by belonging to those skilled in the art
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Claims (8)
1. a kind of power supply test connector, which is characterized in that power interface, oscillograph including being used to connect computer power supply connect
Connection interface, electronic load interface and signal processing circuit;The power interface is sequentially connected signal processing circuit, oscillograph
Connecting interface, electronic load interface;The signal processing circuit includes filtering sub-circuit;The filtering sub-circuit includes the first electricity
Hold and the second capacitance;First capacitance, second capacitance are both parallel to the power interface and the oscillograph connects
Between connection interface.
2. a kind of power supply test connector according to claim 1, which is characterized in that the oscillograph connecting interface, institute
Electronic load interface, signal processing circuit three composition test branch are stated, a power interface is connected with a plurality of test branch
Road.
3. a kind of power supply test connector according to claim 2, which is characterized in that a plurality of test branch is with difference
The test branch of output voltage.
4. a kind of power supply test connector according to claim 1, which is characterized in that the power interface be and electricity to be measured
The matched standard interface of source output terminal.
5. a kind of power supply test connector according to claim 1, which is characterized in that the capacitance of first capacitance is
Ten times of the capacitance of second capacitance.
6. a kind of power supply test connector according to claim 1, which is characterized in that first capacitance, described second
Capacitance is electrolytic capacitor.
7. a kind of power detecting system, which is characterized in that the power supply test connector including one of the claims 1-6 is treated
Survey power supply, electronic load, oscillograph, test platform;The power supply test connector connects the power supply to be measured, the electricity respectively
Son load, the oscillograph, the electronic load and the oscillograph connect the test platform respectively.
8. a kind of power detecting system according to claim 7, which is characterized in that the test platform respectively with the electricity
It is communicated to connect between son load, the oscillograph through general purpose interface bus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720801888.8U CN207571278U (en) | 2017-07-04 | 2017-07-04 | A kind of power supply test connector and its system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720801888.8U CN207571278U (en) | 2017-07-04 | 2017-07-04 | A kind of power supply test connector and its system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207571278U true CN207571278U (en) | 2018-07-03 |
Family
ID=62696964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720801888.8U Expired - Fee Related CN207571278U (en) | 2017-07-04 | 2017-07-04 | A kind of power supply test connector and its system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207571278U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111175668A (en) * | 2019-12-23 | 2020-05-19 | 贵州航天计量测试技术研究所 | Switching device for connecting power module test system with test tool |
CN113589041A (en) * | 2021-06-22 | 2021-11-02 | 苏州浪潮智能科技有限公司 | Interface power supply signal test fixture, integrity test system and integrity test method |
-
2017
- 2017-07-04 CN CN201720801888.8U patent/CN207571278U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111175668A (en) * | 2019-12-23 | 2020-05-19 | 贵州航天计量测试技术研究所 | Switching device for connecting power module test system with test tool |
CN111175668B (en) * | 2019-12-23 | 2022-08-23 | 贵州航天计量测试技术研究所 | Switching device for connecting power module test system with test tool |
CN113589041A (en) * | 2021-06-22 | 2021-11-02 | 苏州浪潮智能科技有限公司 | Interface power supply signal test fixture, integrity test system and integrity test method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207352137U (en) | A kind of adaptor power supplies Auto-Test System | |
CN207571278U (en) | A kind of power supply test connector and its system | |
US8217674B2 (en) | Systems and methods to test integrated circuits | |
CN103747408A (en) | Audio performance test system and method | |
CN104678158A (en) | High-voltage power-on display device of electric automobile | |
CN207595296U (en) | A kind of integrated test system | |
CN108732490B (en) | Full-automatic unmanned aging test and life test system for microwave solid-state power amplifier | |
CN202649371U (en) | Cable automatic detection device | |
CN101122620A (en) | Power supply line | |
CN116742432B (en) | Interface universality adapting method and system for realizing cable assembly based on negative feedback | |
CN101957436B (en) | Power supply quality tester of IT (Information Technology) server equipment and test method | |
CN212229131U (en) | Direct current system test device | |
CN105626501B (en) | A kind of electric submersible pump working-condition monitoring system failure diagnostic apparatus | |
CN2864702Y (en) | Electric field property testing device for electric precipitator | |
CN204595074U (en) | High-voltage power-on display device of electric automobile | |
CN204964642U (en) | Automatic test platform's test system | |
CN102331530A (en) | Signal testing method | |
CN215219049U (en) | UPS circuit board card detection device | |
CN101833028B (en) | Device convenient for testing output voltage of power supply | |
TW201913120A (en) | Automated cable testing apparatus and adapter thereof | |
TWM434214U (en) | Equipment for testing short protecting performance | |
CN203012500U (en) | Controller test system | |
CN207473049U (en) | A kind of fault test set of electronic product integrated circuit | |
CN203520072U (en) | Signal converter assembly detection device | |
CN202330629U (en) | Tester for electric power security tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180703 Termination date: 20190704 |
|
CF01 | Termination of patent right due to non-payment of annual fee |