CN207569408U - A kind of construction bridge compound pipeline complex pipeline - Google Patents

A kind of construction bridge compound pipeline complex pipeline Download PDF

Info

Publication number
CN207569408U
CN207569408U CN201721317114.4U CN201721317114U CN207569408U CN 207569408 U CN207569408 U CN 207569408U CN 201721317114 U CN201721317114 U CN 201721317114U CN 207569408 U CN207569408 U CN 207569408U
Authority
CN
China
Prior art keywords
pipeline
fixture block
strut
connecting rod
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721317114.4U
Other languages
Chinese (zh)
Inventor
陈婉珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721317114.4U priority Critical patent/CN207569408U/en
Application granted granted Critical
Publication of CN207569408U publication Critical patent/CN207569408U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a kind of construction bridge compound pipeline complex pipelines, including pipeline, the right part of the pipeline is equipped with the first card slot in both sides up and down, the second card slot is equipped at left and right sides of the inner cavity of first card slot, on the left part of the pipeline support plate is mounted on to both sides, the inside of the strut is equipped with groove, fixed plate is installed on the outside of the inner cavity of the groove, the interior survey of the fixed plate is equipped with scroll spring, head rod is installed on the inside of the scroll spring, the inside of the head rod is equipped with the second connecting rod, the first strut is installed at the top of second connecting rod, button is installed on the right side of the third connecting rod.The construction bridge compound pipeline complex pipeline, which is worked as, to be needed, swing the first strut, second baffle is made to be detached with connecting shaft, second fixture block is withdrawn by the pressure of extension spring, so as to which the first fixture block is rebounded by the torsion of scroll spring, so as to accomplish the sealing splicing for pipeline, without with welding, when dismounting, also can be very convenient.

Description

A kind of construction bridge compound pipeline complex pipeline
Technical field
The utility model is related to bridge technical field of construction, specially a kind of construction bridge compound pipeline complex pipeline.
Background technology
Concrete duct fabrication cycle is long, and dead weight is larger, and wear-resisting property is poor, and the limited length of single pipeline, needs more Section concrete duct is spliced, and interface sealing performance does not with great difficulty leak, and pipe of cement such usage time long afterwards Road inner wall is rough, easily grows algae and deposition, causes to block, service life is short.Plastic pipe structure is light, but it cannot Corrosion-and high-temp-resistant can not endure the erosion and erosion of swiftly flowing strongly corrosion liquid, old using easily occurring for a long time Phenomena such as change, cracking or dusting, cracking can also cause line clogging, and service life is shorter, and the hidden danger brought is more.Metallic conduit Inner wall smooth, heat resistant and wear resistant damage, but cause to block pipeline using the also substances such as inevitable siltation algae for a long time, increase stream Logical resistance, and metallic conduit length is also limited, needs for pipe ends to be welded together to form the conveyance conduit of long range, work Journey amount is larger, cost it is higher for example application No. is 201520478679.5 utility model patent, although he change for a long time Phenomena such as using easy aging, cracking or dusting, but the sealing splicing for each pipeline of bridge compound pipeline complex pipeline is had ignored, The welding that the splicing of pipeline uses substantially in the prior art, when dismounting, are very inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of construction bridge compound pipeline complex pipeline, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides following technical solution:A kind of construction bridge compound pipeline complex pipeline, including pipe Road, both sides are equipped with the first card slot to the right part of the pipeline up and down, and second is equipped at left and right sides of the inner cavity of first card slot Card slot, is mounted on support plate on the left part of the pipeline to both sides, and the inside of the strut is equipped with groove, the inner cavity of the groove Outside is equipped with fixed plate, and the interior survey of the fixed plate is equipped with scroll spring, and the is equipped on the inside of the scroll spring One connecting rod, the inside of the head rod are equipped with the second connecting rod, and is equipped at the top of second connecting rod One strut, the first fixture block is equipped at the top of first strut, and the inner cavity of first fixture block is equipped with second in both sides up and down Baffle, the second baffle are connected by extension spring with the first fixture block, and the second baffle passes through the second fixture block and first gear Plate is connected, and second fixture block runs through the first fixture block, and third connecting rod is equipped on the right side of first fixture block, and the third connects Extension bar runs through the first fixture block, and the third connecting rod is connected by connecting shaft with tapered pole, the right side of the third connecting rod Button is installed.
Preferably, shaft is installed on the right side of first fixture block, the shaft is connected by the 4th connecting rod with link, The both sides up and down of the pipeline are mounted on the second strut, and third strut is equipped on the right side of second strut.
Preferably, it is mounted on rubber ring at left and right sides of the pipeline.
Preferably, the outer wall installation rubber sleeve of the button.
Preferably, first fixture block is equipped with rubber pad.
Compared with prior art, the beneficial effects of the utility model are:The construction bridge compound pipeline complex pipeline, which is worked as, to be needed, and swings first Strut rotates the second connecting rod, so as to rotate head rod, so as to make the clamping phase of the first fixture block and the first card slot Even, accomplish that two pipelines fit closely, and scroll spring can move button down by torsion, button press, so as to make Connecting shaft moves down, and tapered pole is driven to move down, so as to make tapered pole to extruding second baffle at left and right sides of both sides, when not It when needing the pipeline, knobs up outward, second baffle is made to be detached with connecting shaft, the pressure that the second fixture block passes through extension spring It withdraws, is rebounded by the torsion of scroll spring so as to the first fixture block, so as to accomplish the sealing splicing for pipeline, without with weldering It connects, when dismounting also can be very convenient.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the left side structure schematic diagram of the utility model;
Fig. 3 is the first fixture block internal structure schematic diagram of the utility model;
Fig. 4 is the hanging ring structure schematic diagram of the utility model.
In figure:1st, pipeline, the 2, second strut, the 3, first fixture block, the 4, first strut, the 5, second card slot, the 6, first card slot, 7, Rubber ring, 8, support plate, 9, button, the 10, the 4th connecting rod, 11, head rod, 12, scroll spring, 13, fixed plate, 14, Two connecting rods, 15, groove, 16, tapered pole, 17, connecting shaft, 18, link, 19, third connecting rod, 20, shaft, 21, first gear Plate, the 22, second fixture block, 23, extension spring, 24, second baffle, 25, third strut, 26, rubber sleeve, 27, rubber pad.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction bridge compound pipeline complex pipeline, including pipeline 1, both sides are equipped with the first card slot 6 to the right part of pipeline 1 up and down, and the second card slot 5 is equipped at left and right sides of the inner cavity of the first card slot 6, Support plate 8 is mounted on to both sides on the left part of pipeline 1, the inside of strut 8 is equipped with groove 15, is equipped on the outside of the inner cavity of groove 15 Fixed plate 13, the interior survey of fixed plate 13 are equipped with scroll spring 12, and the coefficient of elasticity of scroll spring 12 is 20N/CM, scrollwork The inside of spring 12 is equipped with head rod 11, and the inside of head rod 11 is equipped with the second connecting rod 14, and second connects The top of extension bar 14 is equipped with the first strut 4, and the top of the first strut 4 is equipped with the first fixture block 3, by between two pipelines 1 It is connected, is connected by the first fixture block 3 with the clamping of the first card slot 6, by the torsion of scroll spring 12, so as to make two pipelines 1 It fits closely, both sides are equipped with second baffle 24 up and down for the inner cavity of the first fixture block 3, and second baffle 24 passes through extension spring 23 and the One fixture block 3 is connected, and the coefficient of elasticity of extension spring 23 is 5N/CM, and second baffle 24 passes through the second fixture block 22 and first baffle 21 It is connected, the second fixture block 22 runs through the first fixture block 3, and the right side of the first fixture block 3 is equipped with third connecting rod 19, and third connecting rod 19 is passed through The first fixture block 3 is worn, third connecting rod 19 is connected by connecting shaft 17 with tapered pole 16, the right side installation of third connecting rod 19 There is button 9, when the first fixture block 3 and the clamping engagement of the first card slot 6, button press 9 moves down button 9, so as to make connection Axis 17 moves down, and tapered pole 16 is driven to move down, so as to which tapered pole 16 be made to squeeze second baffle 24, so as to make second baffle 24 casees both sides movements, so as to which the second fixture block 22 be made to be engaged by clamping with the second card slot 5, the right side of the first fixture block 3 is equipped with shaft 20, Shaft 20 is connected by the 4th connecting rod 10 with link 18, and the both sides up and down of pipeline 1 are mounted on the second strut 2, the second strut 2 right side is equipped with third strut 25, is hung on the second strut 2 by link 18, so as to which the first fixture block 3 be made to accomplish to fix, pipe The left and right sides in road 1 is mounted on rubber ring 7, the outer wall installation rubber sleeve 26 of button 9, and the first fixture block 3 is equipped with rubber pad 27。
When the pipeline are needed to make, two pipelines 1 are spliced together, the first strut 4 is swung, rotates the second connecting rod 14, So as to rotate head rod 11, so as to which the first fixture block 3 and the clamping of the first card slot 6 be made to be connected, accomplish that two pipelines 1 are tight Closely connected conjunction, and scroll spring 12 can by torsion, button press 9 moves down button 9, so as to make connecting shaft 17 to Lower movement drives tapered pole 16 to move down, and so as to make tapered pole 16 to extruding second baffle 24 at left and right sides of both sides, and draws Stretching spring 23 can be under pressure, and so as to make 24 casees both sides movements of second baffle, it is close with second baffle 24 to be expressed to connecting shaft 17 Fitting, accomplishes to make button that can pop up because of the pressure of extension spring 23, so as to which the second fixture block 22 be made with the second card slot 5 to block Connect cooperation, accomplish that the first fixture block 3 will not pop up, when not needing to the pipeline, knob up 9 outward, make second baffle 24 with Connecting shaft 17 detaches, and the second fixture block 22 is withdrawn by the pressure of extension spring 23, so as to which the first fixture block 3 passes through scroll spring 12 Torsion rebound, accomplish pipeline detach.
In the description of the present invention, it is to be appreciated that term " coaxial ", " bottom ", " one end ", " top ", " in Portion ", " other end ", " on ", " side ", " top ", " interior ", " forepart ", " center ", the orientation of the instructions such as " both ends " or position close Be for based on orientation shown in the drawings or position relationship, be for only for ease of description the utility model and simplify description rather than Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore cannot It is construed as a limitation of the present invention.
In the utility model unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu It is fixed ", the terms such as " being screwed on " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral; Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, it can be with It is the interaction relationship of connection inside two elements or two elements, unless otherwise restricted clearly, for this field For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction bridge compound pipeline complex pipeline, including pipeline (1), it is characterised in that:Both sides are equal up and down for the right part of the pipeline (1) Equipped with the first card slot (6), the second card slot (5) is equipped at left and right sides of the inner cavity of first card slot (6), the pipeline (1) Support plate (8) is mounted on to both sides on left part, the inside of the support plate (8) is equipped with groove (15), the inner cavity of the groove (15) Outside is equipped with fixed plate (13), and scroll spring (12), the scroll spring (12) are equipped on the inside of the fixed plate (13) Inside head rod (11) is installed, the second connecting rod (14) is installed on the inside of the head rod (11), it is described First strut (4) at the top of the second connecting rod (14) is installed, the first fixture block (3) is installed at the top of first strut (4), The inner cavity of first fixture block (3) is equipped with second baffle (24) in both sides up and down, and the second baffle (24) passes through extension spring (23) it is connected with the first fixture block (3), the second baffle (24) is connected by the second fixture block (22) with first baffle (21), described Second fixture block (22) is equipped with third connecting rod (19) on the right side of the first fixture block (3), first fixture block (3), and described Three connecting rods (19) are connected through the first fixture block (3), the third connecting rod (19) by connecting shaft (17) with tapered pole (16), Button (9) is installed on the right side of the third connecting rod (19).
2. a kind of construction bridge compound pipeline complex pipeline according to claim 1, it is characterised in that:The right side of first fixture block (3) Side is equipped with shaft (20), and the shaft (20) is connected by the 4th connecting rod (10) with link (18), the pipeline (1) it is upper Lower both sides are mounted on the second strut (2), and third strut (25) is equipped on the right side of second strut (2).
3. a kind of construction bridge compound pipeline complex pipeline according to claim 1, it is characterised in that:The left and right two of the pipeline (1) Side is mounted on rubber ring (7).
4. a kind of construction bridge compound pipeline complex pipeline according to claim 1, it is characterised in that:The outer wall peace of the button (9) Equipped with rubber sleeve (26).
5. a kind of construction bridge compound pipeline complex pipeline according to claim 1, it is characterised in that:First fixture block (3) installation There is rubber pad (27).
CN201721317114.4U 2017-10-13 2017-10-13 A kind of construction bridge compound pipeline complex pipeline Expired - Fee Related CN207569408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721317114.4U CN207569408U (en) 2017-10-13 2017-10-13 A kind of construction bridge compound pipeline complex pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721317114.4U CN207569408U (en) 2017-10-13 2017-10-13 A kind of construction bridge compound pipeline complex pipeline

Publications (1)

Publication Number Publication Date
CN207569408U true CN207569408U (en) 2018-07-03

Family

ID=62695210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721317114.4U Expired - Fee Related CN207569408U (en) 2017-10-13 2017-10-13 A kind of construction bridge compound pipeline complex pipeline

Country Status (1)

Country Link
CN (1) CN207569408U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195470A (en) * 2019-06-17 2019-09-03 范拓 Building element connection structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195470A (en) * 2019-06-17 2019-09-03 范拓 Building element connection structure
CN110195470B (en) * 2019-06-17 2020-11-03 浙江皓睿建设有限公司 Building element connection structure

Similar Documents

Publication Publication Date Title
CN207569408U (en) A kind of construction bridge compound pipeline complex pipeline
CN109519620A (en) A kind of flange arrangement that caliber can easily be accommodated and install
CN205745740U (en) A kind of conduit coupling of good airproof performance
CN105570590A (en) Pipe connector capable of serving as three-way pipe connector and four-way pipe connector
CN203082411U (en) Different diameter connecting piece
CN203202474U (en) Corrugation-clamping type end face seal pipe joint
CN202466787U (en) Inspection well
CN203836170U (en) Oil leakage detecting device for oil seal of horizontal speed reducer
CN202746832U (en) Universal compensating nipple for pipeline connecting
CN211449918U (en) Glass fiber reinforced plastic composite pipeline
CN208687053U (en) A kind of heat distribution pipeline valve being easily installed
CN202791063U (en) Connecting structure of joint for corrugated pipes
CN207454936U (en) A kind of dual side seal loose joint pipe fitting of portable full-bore
CN206738789U (en) A kind of freeze proof antifouling type CPVC tee pipe fittings
CN207906643U (en) A kind of reducing coupling of stainless steel tube
CN209196308U (en) A kind of throttling spigot-and-socket HDPE winding reinforcing pipe being exclusively used in sewage discharge
CN204176037U (en) faucet assembly
CN204187153U (en) A kind of PE composite water pipe
CN205978956U (en) Butt clamp formula sight glass
CN208442440U (en) Serve as a contrast tetrafluoro swelling red sandstone fixed structure
CN218961969U (en) Filter element assembly of water purifier
CN219345758U (en) High vibration-resistant metal joint
CN208816089U (en) A kind of production wellhead raw oil heater
CN214579221U (en) High-pressure valve suitable for oil field gathering pipeline
CN217441004U (en) Antibacterial wear-resistant composite PE pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

Termination date: 20181013

CF01 Termination of patent right due to non-payment of annual fee