CN207568878U - A kind of Sewage Disposal produces pump house pipeline - Google Patents

A kind of Sewage Disposal produces pump house pipeline Download PDF

Info

Publication number
CN207568878U
CN207568878U CN201721646414.7U CN201721646414U CN207568878U CN 207568878 U CN207568878 U CN 207568878U CN 201721646414 U CN201721646414 U CN 201721646414U CN 207568878 U CN207568878 U CN 207568878U
Authority
CN
China
Prior art keywords
pipeline
gate valve
water
sewage disposal
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721646414.7U
Other languages
Chinese (zh)
Inventor
梁福和
杨振
杨杰
张念凯
尹浩
魏广金
王凯
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721646414.7U priority Critical patent/CN207568878U/en
Application granted granted Critical
Publication of CN207568878U publication Critical patent/CN207568878U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of Sewage Disposals to produce pump house pipeline, including main pipeline (1), the extremely fire prevention grouting station pipeline (2) connected with main pipeline (1), to coal preparation plant's pipeline (3), to downhole water supply pipeline (4), it is characterized in that, it further includes to ground water lines (5), the ground water lines (5) are in parallel including two branch pipelines for being connected with high powered water pump (51) connected with main pipeline (1), and the branch pipeline that two connected with main pipeline (1) are connected with small-power water pump (52) is in parallel, the outlet of four branch pipelines is combined into be linked in sequence afterwards all the way non-return valve (53) and gate valve (54), gate valve (54) downstream tandem connection output channel (55).The utility model has the advantage of:Sewage Disposal production pump house pipeline is additionally arranged to the pipeline of ground water, alleviates the pressure of ground water, cost efficiency significantly.

Description

A kind of Sewage Disposal produces pump house pipeline
Technical field
The utility model is related to sewage disposal system pipeline fields, are more particularly to a kind of Sewage Disposal production pump house pipe Road.
Background technology
Sewage Disposal is responsible for handling mine water and sanitary sewage.Mine water is that discharge capacity is most in coal production process Waste water, mine water raw water are handled in Sewage Disposal through a series for the treatment of process, handle water up to standard in production pump house through reuse Water pump is sent to each by pipeline and uses water spot reuse.At present, wastewater flow rate up to standard is larger, and with water spot in addition to be used for coal preparation plant's coal washing, Except down-hole fireproof grouting station fire extinguishing, underground are supplied water, other purposes are can be also used for, do not need to the ground using tap water such as Use water.Ground, generally using tap water, is caused big with water pressure with water, and cost is excessively high, and water resource waste is serious, but sprinkling truck, The undrinkable water such as sanitary water are without using tap water.Water up to standard will such as be handled and be used for more than multiple use, then be badly in need of meeting The output pipe of the water up to standard of a variety of output whereabouts.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of Sewage Disposals to produce pump house pipeline, passes through The pipeline will handle mine water up to standard for various uses, not need to the ground water using tap water such as, such as sprinkling truck is defended The undrinkable water such as life water.
The utility model is to solve above-mentioned technical problem by the following technical programs:
A kind of Sewage Disposal produces pump house pipeline, and what is connected including main pipeline (1), with main pipeline (1) is in the milk to preventing fires Stand pipeline (2), to coal preparation plant's pipeline (3), to downhole water supply pipeline (4) and to ground water lines (5), ground water lines (5) two including being connected with main pipeline (1) are connected with high powered water pump (51) branch pipeline it is in parallel and with main pipeline (1) The branch pipeline that two of connection are connected with small-power water pump (52) is in parallel, and the outlet of four branch pipelines is combined into be linked in sequence afterwards all the way Non-return valve (53) and gate valve (54), gate valve (54) downstream tandem connection output channel (55).
It is connected in the branch pipeline of high powered water pump (51) and is disposed with gate valve (511), high powered water pump (51), check Valve (512) and gate valve (513);Described be connected in the branch pipeline of small-power water pump (52) is disposed with gate valve (521), small work( Rate water pump (52), non-return valve (522) and gate valve (523).
High powered water pump (51) is the water pump of 37kW.
Small-power water pump (52) is the water pump of 4kW.
It is in the milk on station pipeline (2) to fire prevention and is sequentially set with gate valve (21), water pump (22), non-return valve (23) and gate valve successively (24), gate valve (24) downstream tandem connection output channel (25).
Include two branch pipelines for being connected with gate valve (31) parallel connections, the water outlet of two branch pipelines to coal preparation plant's pipeline (3) The water pump (32) that is linked in sequence afterwards all the way, gate valve (33), pipeline (34) and gate valve (35) are combined into, the connection of gate valve (35) downstream tandem is defeated Go out pipeline (36).
Gate valve (41), pipeline (42), non-return valve (43) and gate valve are sequentially set on to downhole water supply pipeline (4) successively (44), gate valve (44) downstream tandem connection output channel (45), and between the pipeline (34) and the output channel (45) It is connected by pipeline (340).
The utility model has the following advantages compared with prior art:Sewage Disposal produces pump house pipeline and is used added to ground The pipeline of water alleviates the pressure of ground water significantly, is not needing to using tap water, such as the non-drink of sprinkling truck, sanitary water In the case of with water, it can be used and handle mine water up to standard, cost efficiency;And it is supplied in pipeline to coal preparation plant, ground water, underground The failure of any pipeline or maintenance, have no effect on the operation of entire water supply pipe in the pipeline in water direction;It supplies water underground Pipeline do not need to using water pump, to convey using the method for siphon using the principle of height pressure difference;To ground water pipe Realize the automatic opening of water pump with being automatically closed in road.
Description of the drawings
Fig. 1 is the Sewage Disposal production pump house pipeline schematic diagram of the utility model.
Specific embodiment
Elaborate below to the embodiment of the utility model, the present embodiment using technical solutions of the utility model before It puts and is implemented, give detailed embodiment and specific operating process, but the scope of protection of the utility model is unlimited In following embodiments.
Referring to Fig. 1, a kind of Sewage Disposal production pump house pipeline is filled including main pipeline 1, the extremely fire prevention connected with main pipeline 1 Slurry station pipeline 2, to coal preparation plant's pipeline 3, to downhole water supply pipeline 4 and to ground water lines 5, ground water lines 5 include with Two branch pipelines for being connected with high-power (37kW) water pump 51 that main pipeline 1 connects are in parallel and connected with main pipeline 1 two The branch pipeline for being connected with small-power (4kW) water pump 52 is in parallel, and the outlet of four branch pipelines is combined into the non-return valve that is linked in sequence afterwards all the way 53 and gate valve 54,54 downstream tandem of gate valve connection output channel 55;It is connected in the branch pipeline of high powered water pump 51 and sets gradually There are gate valve 511, high powered water pump 51, non-return valve 512 and gate valve 513;It is described be connected in the branch pipeline of small-power water pump 52 according to It is secondary to be provided with gate valve 521, small-power water pump 52, non-return valve 522 and gate valve 523.It is in the milk on the pipeline 2 of station to fire prevention and sequentially sets successively It is equipped with gate valve 21, water pump 22, non-return valve 23 and gate valve 24,24 downstream tandem of gate valve connection output channel 25;To coal preparation plant's pipeline 3 It is in parallel including two branch pipelines for being connected with gate valve 31, the water outlets of two branch pipelines be combined into the water pump 32 that is linked in sequence afterwards all the way, Gate valve 33, pipeline 34 and gate valve 35,35 downstream tandem of gate valve connection output channel 36;On to downhole water supply pipeline 4 successively sequentially It is provided with gate valve 41, pipeline 42, non-return valve 43 and gate valve 44,44 downstream tandem of gate valve connection output channel 45, and pipeline 34 It is connected between output channel 45 by pipeline 340.
It handles after water up to standard enters main pipeline 1, opens gate valve 21 and gate valve 24, be powered for water pump 22, water passes sequentially through Gate valve 21, water pump 22, non-return valve 23 and gate valve 24, into output channel 25, until fire prevention grouting station pipeline 2, wherein non-return valve 23 It can prevent in water adverse current to water pump 22, to protect water pump 22.
The gate valve 31 in two any branch pipelines being connected in the branch pipeline of gate valve 31 in parallel is opened, another is in charge of Then road for water pump 32 can be powered as spare duct when there is circuit failure, open gate valve 33 and gate valve 35, water leads to successively Cross gate valve 31, water pump 32, gate valve 33 and pipeline 34;Then can output channel 36 be entered by gate valve 35, until coal preparation plant's pipeline 3; Also can directly output channel 45 be entered from pipeline 340, directly into downhole water supply pipeline 4.
It opens gate valve 41 and gate valve 44, water passes sequentially through gate valve 41, pipeline 42, non-return valve 43 and gate valve 44;Then can lead to Piping 340 to gate valve 35 enters output channel 36, until coal preparation plant's pipeline 3;Output channel 45 is can also pass through, is supplied directly into underground Water lines 4.It is mutual indepedent and interrelated to coal preparation plant's pipeline 3 and to downhole water supply pipeline 4, when any bar pipeline breaks down When, do not influence the operation of the two.And it does not need to, using water pump, utilize the principle of height pressure difference on to downhole water supply pipeline 4 Water can be delivered to downhole water supply pipeline 4 using the method for siphon.
Gate valve 511 and gate valve 513 on any bar in the branch pipeline of two high powered water pumps 51 in parallel are opened, it is in parallel Gate valve 521 and gate valve 523 and gate valve 53 in the branch pipeline of two small-power water pumps 52 on any bar, water are supplied when to ground In the case of water saturated, small-power (4KW) water pump 52 starts automatically, while high-power (37KW) water pump 51 is automatically closed, water according to It is secondary by gate valve 521, small-power water pump 52, non-return valve 522 and gate valve 523, subsequently into non-return valve 53, gate valve 54 and efferent duct Road 55, until ground water lines 5;When surface water supply demand is larger, small-power (4KW) water pump 52 is automatically closed, high-power (37KW) water pump 51 automatically turns on, and water passes sequentially through gate valve 511, small-power water pump 51, non-return valve 512 and gate valve 513, Ran Houjin Enter non-return valve 53, gate valve 54 and output channel 55, until ground water lines 5.Therefore, electricity consumption has not only been saved, but also has protected pipe Road avoids damaging caused by pump power is excessive pipeline.
It is individual to fire prevention grouting station pipeline.And the coal preparation plant that arrives, ground water, underground supply water pipeline pass through shut-off valve Partition, it is not only mutual indepedent but also interrelated, and be provided with spare duct, so, until coal preparation plant, ground water, underground The failure of any pipeline or maintenance, have no effect on the operation of entire water supply pipe in the pipeline of water supply direction.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (8)

1. a kind of Sewage Disposal produces pump house pipeline, which is characterized in that connected including main pipeline (1), with main pipeline (1) to Fire prevention grouting station pipeline (2), to coal preparation plant's pipeline (3), to downhole water supply pipeline (4) and to ground with water lines (5), describedly Face water lines (5) are in parallel including two branch pipelines for being connected with high powered water pump (51) connected with main pipeline (1), Yi Jiyu Two branch pipelines for being connected with small-power water pump (52) of main pipeline (1) connection are in parallel, and the outlet of four branch pipelines is combined into all the way After be linked in sequence non-return valve (53) and gate valve (54), gate valve (54) downstream tandem connection output channel (55).
2. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that described to be connected with high-power water It pumps and is disposed with gate valve (511), high powered water pump (51), non-return valve (512) and gate valve (513) in the branch pipeline of (51).
3. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that described to be connected with small-power water It pumps and is disposed with gate valve (521), small-power water pump (52), non-return valve (522) and gate valve (523) in the branch pipeline of (52).
4. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that the high powered water pump (51) Water pump for 37kW.
5. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that the small-power water pump (52) Water pump for 4kW.
6. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that described to fire prevention grouting station pipe Gate valve (21), water pump (22), non-return valve (23) and gate valve (24), gate valve (24) downstream tandem are sequentially set on road (2) successively Connect output channel (25).
7. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that described to coal preparation plant's pipeline (3) in parallel including two branch pipelines for being connected with gate valve (31), the water outlet of two branch pipelines is combined into the water that is linked in sequence afterwards all the way Pump (32), gate valve (33), pipeline (34) and gate valve (35), gate valve (35) downstream tandem connection output channel (36).
8. Sewage Disposal according to claim 1 produces pump house pipeline, which is characterized in that described to downhole water supply pipeline (4) gate valve (41), pipeline (42), non-return valve (43) and gate valve (44) are sequentially set on successively, gate valve (44) downstream tandem connects Output channel (45) is connect, and is connected between the pipeline (34) and the output channel (45) by pipeline (340).
CN201721646414.7U 2017-11-30 2017-11-30 A kind of Sewage Disposal produces pump house pipeline Expired - Fee Related CN207568878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721646414.7U CN207568878U (en) 2017-11-30 2017-11-30 A kind of Sewage Disposal produces pump house pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721646414.7U CN207568878U (en) 2017-11-30 2017-11-30 A kind of Sewage Disposal produces pump house pipeline

Publications (1)

Publication Number Publication Date
CN207568878U true CN207568878U (en) 2018-07-03

Family

ID=62689576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721646414.7U Expired - Fee Related CN207568878U (en) 2017-11-30 2017-11-30 A kind of Sewage Disposal produces pump house pipeline

Country Status (1)

Country Link
CN (1) CN207568878U (en)

Similar Documents

Publication Publication Date Title
CN201568076U (en) Drilling hole sealing device in highly gassy mine
CN201152429Y (en) High pressure water current flow concentrating or dividing device
CN202469479U (en) Safety low-concentration gas transporting system
CN109381830B (en) Ultra-long highway tunnel partition water supply fire-fighting system and water supply fire-fighting method
CN104791610A (en) Skid-mounted type automatic draining device used for evacuation and liquid separation
CN202418740U (en) Improved water seal system for torch gas
CN112412526B (en) Coal mine gas and fire disaster co-treatment system and use method thereof
CN207568878U (en) A kind of Sewage Disposal produces pump house pipeline
CN205918455U (en) Hydrophobic recovery system device of steam power plant
CN103382852A (en) Underground flood damage emergency water draining rescue system and method
CN206296280U (en) A kind of flushing line system for preventing Waste Water Treatment drug feeding pipeline from blocking
CN202156775U (en) Resin transfer device
CN205299081U (en) Recovery system of gas gathering station unloading natural gas
CN104930348A (en) High-low pressure switching and venting skid-mounted device based on large cluster well set
CN108954006A (en) A kind of Sewage Disposal production pump house pipeline
CN204647862U (en) A kind of automatic draining device of skid-mounted emptying liquid-separation
CN209384316U (en) A kind of desulfurization municipal water supply system
CN211057931U (en) Tunnel fire control water supply double-supply system
CN208990117U (en) A kind of pumping plant Novel firefighting water system
CN201671840U (en) Device for extracting underground liquid
CN208202002U (en) A kind of novel flood-proof device
CN206860225U (en) A kind of mineral long reach automatic pressure-reducing device
CN207262413U (en) A kind of feed water system of boiler
CN204785563U (en) It prizes dress device to switch and empty based on big cluster well high -low pressure
CN205557765U (en) Water tank siphon destructor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

Termination date: 20201130