CN207567842U - 一种输电铁塔地脚螺栓损坏补强结构 - Google Patents

一种输电铁塔地脚螺栓损坏补强结构 Download PDF

Info

Publication number
CN207567842U
CN207567842U CN201721734968.2U CN201721734968U CN207567842U CN 207567842 U CN207567842 U CN 207567842U CN 201721734968 U CN201721734968 U CN 201721734968U CN 207567842 U CN207567842 U CN 207567842U
Authority
CN
China
Prior art keywords
foundation
bolt
original place
new
foot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721734968.2U
Other languages
English (en)
Inventor
杨昌富
王勇
代志强
黎智
赵健
邓凤淋
张鹏
华建坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Electric Power Engineering Co Ltd
Original Assignee
Guizhou electric power design institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou electric power design institute filed Critical Guizhou electric power design institute
Priority to CN201721734968.2U priority Critical patent/CN207567842U/zh
Application granted granted Critical
Publication of CN207567842U publication Critical patent/CN207567842U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种输电铁塔地脚螺栓损坏补强结构,包括预埋有损坏的原地脚螺栓的塔基础,其中原地脚螺栓为4颗,并呈方形的布置在塔基础上端面,在塔基础上端面原地脚螺栓构成的方形外对称设置有4颗新地脚螺栓,其中4颗原地脚螺栓和4颗新地脚螺栓与位于塔基础上的同一新塔脚板连接,本实用新型采用增设辅助锚固新地脚螺栓,用来弥补原地脚螺栓锚固不足,可有效以解决重新浇筑存在的工期长,成本高等问题。

Description

一种输电铁塔地脚螺栓损坏补强结构
技术领域
本实用新型涉及一种输电铁塔地脚螺栓损坏补强结构,属于塔基础技术领域。
背景技术
在安龙变~兴义变220kV线路π接入香书塘变工程中,铁塔组立完成后,申请人检查发现21号塔基础中的四颗地脚螺栓出露部分有一颗断裂,造成塔脚板只有三颗地脚螺栓与之连接。如按常规错开基础并重新开挖四个新基础的处理方式,需重新浇筑53.62方混凝土,增加基础钢筋3.68吨,增加地脚螺栓1.2吨,不仅工期较长,影响正常投运,而且大约需增加投资20万元左右才能完成。
实用新型内容
本实用新型要解决的技术问题是:提供一种输电铁塔地脚螺栓损坏补强结构,以解决现有技术存在的工期长,成本高等问题。
本实用新型的技术方案是:一种输电铁塔地脚螺栓损坏补强结构,包括预埋有损坏的原地脚螺栓的塔基础,其中原地脚螺栓为4颗,并呈方形的布置在塔基础上端面,在塔基础上端面原地脚螺栓构成的方形外对称设置有4颗新地脚螺栓,其中4颗原地脚螺栓和4颗新地脚螺栓与位于塔基础上的同一新塔脚板连接。
4颗新地脚螺栓分别对称布置在原地脚螺栓构成的方形的每一条边的中垂线上。
原地脚螺栓的损坏颗数为1、2、3或4颗。
本实用新型的有益效果是:本实用新型采用增设辅助锚固新地脚螺栓,用来弥补原地脚螺栓锚固不足。新增设的辅助锚固螺栓设置在原来基础主柱内,并锚固在柱里,使得新老地脚螺栓能同时受力,使得新增地脚螺栓能弥补原地脚螺栓强度不足。
由于本实用新型为不拆塔加固,不需爆破原基础及重新浇筑基础,不移动塔位,减少了工期,且安全可靠。据申请人测算,采用本实用新型方案只需增加地脚螺栓0.3吨,增加新塔脚板重量0.68吨,增加细石混凝土0.30方,大约只需增加投资1万元左右。
本实用新型方案通过两年的运行,经住了覆冰、大风等恶劣天气的考验,加固后的基础稳定运行、加固过程人员配置少,同时缩短施工工期,施工成本却大幅降低,运行维护同常规基础一致,经济效益和社会效益较好。
本实用新型适宜在塔基础地脚螺栓因损坏,以及老工程线路改造中,个别铁塔基础强度满足新铁塔基础作用力、但原铁塔基础地脚螺栓强度不满足的地方应用。
附图说明
图1为本实用新型的结构示意图;
图2为塔基础的传统结构示意图;
图中:1、塔基础,2、原地脚螺栓,3、原塔脚板,4、新地脚螺栓,5、新塔脚板。
具体实施方式
下面结合附图及具体的实施例对实用新型进行进一步介绍:
如图2为现有塔基础的结构示意图,其上的原地脚螺栓2部分已损坏,此时塔基础1的强度尚满足要求,但原地脚螺栓2的强度已不满足要求。为了避免重新开挖浇筑新基础导致的生产成本较高,以及工期较长影响正常投运等问题。如图1所示,在现有塔基础1上的原地脚螺栓2构成的方形外对称钻4个孔,并安装4颗新地脚螺栓4(在安装前先拆除原塔脚板3),其中4颗原地脚螺栓2和4颗新地脚螺栓4与位于塔基础1上的同一新塔脚板5连接,以使得两者能共同受力,使得新地脚螺栓4能弥补原地脚螺栓2强度不足。
为了提高受力效果,4颗新地脚螺栓4分别对称布置在原地脚螺栓2构成的方形的每一条边的中垂线上。
所述4颗新地脚螺栓4与4颗原地脚螺栓2采用相同型号的螺栓。
以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施只局限于这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型的保护范围。

Claims (3)

1.一种输电铁塔地脚螺栓损坏补强结构,包括预埋有损坏的原地脚螺栓(2)的塔基础(1),其中原地脚螺栓(2)为4颗,并呈方形的布置在塔基础(1)上端面,其特征在于:在塔基础(1)上端面原地脚螺栓(2)构成的方形外对称设置有4颗新地脚螺栓(4),其中4颗原地脚螺栓(2)和4颗新地脚螺栓(4)与位于塔基础(1)上的同一新塔脚板(5)连接。
2.根据权利要求1所述的输电铁塔地脚螺栓损坏补强结构,其特征在于:4颗新地脚螺栓(4)分别对称布置在原地脚螺栓(2)构成的方形的每一条边的中垂线上。
3.根据权利要求1所述的输电铁塔地脚螺栓损坏补强结构,其特征在于,其特征在于:原地脚螺栓(2)的损坏颗数为1、2、3或4颗。
CN201721734968.2U 2017-12-13 2017-12-13 一种输电铁塔地脚螺栓损坏补强结构 Active CN207567842U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721734968.2U CN207567842U (zh) 2017-12-13 2017-12-13 一种输电铁塔地脚螺栓损坏补强结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721734968.2U CN207567842U (zh) 2017-12-13 2017-12-13 一种输电铁塔地脚螺栓损坏补强结构

Publications (1)

Publication Number Publication Date
CN207567842U true CN207567842U (zh) 2018-07-03

Family

ID=62688106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721734968.2U Active CN207567842U (zh) 2017-12-13 2017-12-13 一种输电铁塔地脚螺栓损坏补强结构

Country Status (1)

Country Link
CN (1) CN207567842U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951689A (zh) * 2018-08-28 2018-12-07 国网山东省电力公司电力科学研究院 一种输电塔地脚螺栓的辅助补强装置及补强方法
CN110616733A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种输电铁塔基础及构件的整体加固装置及方法
CN110616734A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种改扩塔脚板式输电铁塔基础加固结构及加固方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951689A (zh) * 2018-08-28 2018-12-07 国网山东省电力公司电力科学研究院 一种输电塔地脚螺栓的辅助补强装置及补强方法
CN108951689B (zh) * 2018-08-28 2023-04-18 国网山东省电力公司电力科学研究院 一种输电塔地脚螺栓的辅助补强装置及补强方法
CN110616733A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种输电铁塔基础及构件的整体加固装置及方法
CN110616734A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种改扩塔脚板式输电铁塔基础加固结构及加固方法

Similar Documents

Publication Publication Date Title
CN207567842U (zh) 一种输电铁塔地脚螺栓损坏补强结构
CN203296175U (zh) 矩形钢管柱装配式柱脚
CN105926775A (zh) 新型钢管混凝土梁柱节点
CN206554254U (zh) 一种门式刚架轻型房屋钢结构的铰接柱脚结构
CN206784392U (zh) 深基坑装配式组合钢结构水平内支撑体系
CN205934703U (zh) 一种用于现浇桥梁的高阻尼隔震橡胶支座安装结构
CN107630460A (zh) 一种新型的钢结构铰接柱脚节点
CN207846457U (zh) 装配式竖向构件与基础的延性连接构造
CN213596822U (zh) 一种钢筋混凝土箱涵加固装置
CN207526643U (zh) 一种用于风电机组混合塔架的预制混凝土塔段
CN202595758U (zh) 一种架空输电线路用斜柱桩基础结构
CN210002942U (zh) 一种老建筑砖柱的改造结构
CN206986918U (zh) 一种用于风机锚栓基础灌浆的非对称模板
CN206090852U (zh) 预制装配式建筑用支撑构件
CN207452828U (zh) 一种预浇筑装配式堤坝防护混凝土坝层
CN106939586B (zh) 一种混凝土面板堆石坝的面板结构
CN206267169U (zh) 一种分片式预应力锚板
CN202055602U (zh) 输电线路多功能应急铁塔基础
CN213173789U (zh) 一种房屋建筑施工中的地基结构
CN208650083U (zh) 一种装配式矩形独立基础
CN208857835U (zh) 一种输电塔地脚螺栓的辅助补强装置
CN206308705U (zh) 一种混凝土装配式基础
CN208167780U (zh) 一种地脚螺栓安装装置
CN207846656U (zh) 一种装配式竖向构件与基础的强连接构造
CN206513378U (zh) 一种隧道仰拱及填充端头整体式钢模模板

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Building A6, Defu center, No. 357, qianlingshan Road, high tech Zone, Guiyang City, Guizhou Province 550002

Patentee after: POWERCHINA GUIZHOU ELECTRIC POWER DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 550001 56 Zunyi Road, Nanming District, Guiyang City, Guizhou Province

Patentee before: GUIZHOU ELECTRIC POWER DESIGN INSTITUTE