A kind of plastic toy component die for manufacturing being quickly cooled down
Technical field
The utility model is related to toys to make technical field of mold, specially a kind of plastic toy component system being quickly cooled down
Acting mold.
Background technology
Plastic toy is one kind of toy, and the toy for the other materials that compare is more suitable for children's use of child's class.Plastic cement
The big portion of toy raw material is extract from some oils, and most familiar of part PC material are extract from oil,
PC material have one smell of petrol when burning;ABS is extract from coal, and ABS can be in cigarette when burning-out knocks out
Ash shape;POM is extract from natural gas, and POM has one very smelly gas taste when burning down.In plastic toy
Mold is needed when making to carry out molding work to it.
At present, although existing plastic toy mold using when horizontal good effect can be played to molding,
Be to need work of radiating to it after formation, can not be solidified because plastic cement temperature is excessively high, cause mold using when reduce
Working effect influences the situation of its normal use.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of plastic toy component making mould being quickly cooled down
Tool, solve the problems, such as existing plastic mould can not rapid cooling situation.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of plastic cement being quickly cooled down
Toy part die for manufacturing including pedestal, is installed with mold cooler bin, the mold cooler bin at the top of the pedestal
Front and be put into below mouth positioned at it and be fixedly connected with shaft seat, be fixedly connected with shaft on the shaft seat, described turn
The surface activity of axis is socketed with gear door, and the gear door is put into mouth sealed connection, the inside points of the pedestal with mold cooler bin
Aqua storage tank and condensate tank(trap) are not offered, and the condensate tank(trap) is located at the left side of aqua storage tank, and the inside of the condensate tank(trap) is installed with
Condenser, the output terminal of the condenser are communicated with condenser pipe, and the condenser pipe is wrapped in the outside of condensate tank(trap), the pedestal
Right side offer the water filling port being connected with aqua storage tank, the right side that the top of the pedestal is simultaneously located at mold cooler bin is fixed
Water pump is installed, the input terminal of the water pump is communicated with drinking-water pipe, and the water pump output terminal is communicated with water-supply-pipe.
The inner bottom wall of the mold cooler bin is fixedly connected with tubaeform flowing water seat, the tubaeform flowing water seat and aqua storage tank
Between connected by fair current pipe, the inner wall of the mold cooler bin simultaneously be located at tubaeform flowing water seat above is fixedly connected with support
Ring is fixedly connected with filter screen on the inner wall of the support ring, and mold, the mold cooling are placed at the top of the filter screen
The inner roof wall of case is installed with isocon, and the output terminal of the isocon is communicated with fountain head, and the water-supply-pipe is far from water pump
One end through mold cooler bin top and connected with isocon.
Preferably, the front of the gear door is fixedly connected with handle block, and the quantity of the handle block is two, two handles
Block is symmetrical arranged with keeping off the central axes of door.
Preferably, the left side of the pedestal offers the radiating groove being connected with inside condensate tank(trap), the radiating groove
Backstop is fixedly connected on inner wall, the left side of the backstop and the left side of pedestal are located on same vertical plane.
Preferably, the left side of the pedestal and water injection pipe, the water injection pipe are fixedly connected with positioned at the edge of water filling port
Outer surface thread be connected with sealing cover, the inside of the sealing cover is fixedly connected with gasket.
Preferably, the two sides of the water pump have been fixedly connected with securing plate, and bolt is provided in the securing plate, described
The end of thread of bolt is connect through securing plate and with whorl of base.
Preferably, the right side of the mold cooler bin is fixedly connected with supporting rack, and the right side of support frame as described above is fixed
Retainer ring is connected with, the retainer ring is fixedly attached to the outer surface of water-supply-pipe.
(3) advantageous effect
The utility model provides a kind of plastic toy component die for manufacturing being quickly cooled down.Have following
Advantageous effect:
1st, the plastic toy component die for manufacturing being quickly cooled down, it is simple in structure, it is easy to use, condensation can be passed through
Device and condenser pipe heat the water in aqua storage tank, then pumped in isocon by water pump, are finally sprayed by fountain head
Onto mold, mold can be made directly to be contacted with cold water, increase the cooling velocity of mold, improve the effect of its work
Rate, avoid cooling velocity influences the situation of working efficiency more slowly.
2nd, the plastic toy component die for manufacturing being quickly cooled down, then being used cooperatively by support ring and filter screen,
Water is made to be entered in aqua storage tank by tubaeform flowing water seat, the situation that water resource recycles can be played, avoid water waste
The more situation for causing resource loss.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model cross-sectional view of the structure.
Wherein, 1 pedestal, 2 mold cooler bins, 3 shaft seats, 4 shafts, 5 gear doors, 6 aqua storage tanks, 7 condensate tank(trap)s, 8 condensers, 9
Condenser pipe, 10 water filling ports, 11 water pumps, 12 drinking-water pipes, 13 water-supply-pipes, 14 tubaeform flowing water seats, 15 fair current pipes, 16 support rings, 17
Filter screen, 18 isocons, 19 fountain heads, 20 handle blocks, 21 radiating grooves, 22 grades of nets, 23 water injection pipes, 24 sealing covers, 25 gaskets,
26 securing plates, 27 bolts, 28 supporting racks, 29 retainer rings, 30 molds.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
The utility model embodiment provides a kind of plastic toy component die for manufacturing being quickly cooled down, as shown in Figs. 1-2,
Including pedestal 1, the top of pedestal 1 is installed with mold cooler bin 2, and the front of mold cooler bin 2 is simultaneously put into mouth positioned at it
Lower section is fixedly connected with shaft seat 3, and shaft 4 is fixedly connected on shaft seat 3, and the surface activity of shaft 4 is socketed with gear door 5, gear
Door 5 is put into mouth sealed connection with mold cooler bin 2, and the front of gear door 5 is fixedly connected with handle block 20, the number of handle block 20
It is two to measure, and two handle blocks 20 are symmetrical arranged with keeping off the central axes of door 5, and the inside of pedestal 1 offers aqua storage tank 6 and cold respectively
Solidifying slot 7, the left side of pedestal 1 offer the radiating groove 21 being connected with inside condensate tank(trap) 7, fixed on the inner wall of radiating groove 21 to connect
Backstop 22 is connected to, the left side of backstop 22 is located at the left side of pedestal 1 on same vertical plane, and condensate tank(trap) 7 is located at aqua storage tank 6
Left side, the inside of condensate tank(trap) 7 are installed with condenser 8, and condenser 8 will appear heat when work, if heat cannot
It excludes that condenser pipe 9 will be communicated with to the situation that condenser damages, the output terminal of condenser 8 in time, condenser pipe 9 is wrapped in
The outside of condensate tank(trap) 7, the right side of pedestal 1 offer the water filling port 10 being connected with aqua storage tank 6, the left side and position of pedestal 1
Water injection pipe 23 is fixedly connected in the edge of water filling port 10, the outer surface thread of water injection pipe 23 is connected with sealing cover 24, sealing cover
24 inside is fixedly connected with gasket 25, and the top of pedestal 1 is simultaneously installed with water pump positioned at the right side of mold cooler bin 2
11, the two sides of water pump 11 have been fixedly connected with securing plate 26, and bolt 27 is provided in securing plate 26, and the end of thread of bolt 27 passes through
It wears securing plate 26 and is threadedly coupled with pedestal 1, can generate larger vibrations when water pump 11 works, water pump 11 can be caused
It loosens, by the fixation of securing plate 26 and bolt 27, increases the fixed effect of water pump 11, it is made to have given play at work
Better effect, the input terminal of water pump 11 are communicated with drinking-water pipe 12, and 11 output terminal of water pump is communicated with water-supply-pipe 13, mold cooler bin
2 right side is fixedly connected with supporting rack 28, and the right side of supporting rack 28 is fixedly connected with retainer ring 29,29 fixing sleeve of retainer ring
It is connected on the outer surface of water-supply-pipe 13.
The inner bottom wall of mold cooler bin 2 is fixedly connected with tubaeform flowing water seat 14, tubaeform flowing water seat 14 and aqua storage tank 6 it
Between connected by fair current pipe 15, the inner wall of mold cooler bin 2 simultaneously be located at tubaeform flowing water seat 14 top be fixedly connected with support
Ring 16 is fixedly connected with filter screen 17 on the inner wall of support ring 16, and the top of filter screen 17 is placed with mold 30, mold cooler bin
2 inner roof wall is installed with isocon 18, and the output terminal of isocon 18 is communicated with fountain head 19, and water-supply-pipe 13 is far from water pump 11
One end through mold cooler bin 2 top and connected with isocon 18.
In conclusion the plastic toy component die for manufacturing being quickly cooled down, simple in structure, easy to use, Neng Goutong
It crosses condenser 8 and condenser pipe 9 heats the water in aqua storage tank 6, then is pumped in isocon 18 by water pump 11, most pass through afterwards
It crosses fountain head 19 to be sprayed onto on mold 30, mold 30 can be made directly to be contacted with cold water, increase the cooling speed of mold 30
Degree, improves the efficiency of its work, avoid cooling velocity influences the situation of working efficiency more slowly.
Also, being used cooperatively by support ring 16 and filter screen 17 again, makes water be entered by tubaeform flowing water seat 14
In aqua storage tank 6, the situation that water resource recycles can be played, avoids the more situation for causing resource loss of water waste.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.