CN207555899U - A kind of central air-conditioning regulating system based on neural network prediction - Google Patents

A kind of central air-conditioning regulating system based on neural network prediction Download PDF

Info

Publication number
CN207555899U
CN207555899U CN201721598700.0U CN201721598700U CN207555899U CN 207555899 U CN207555899 U CN 207555899U CN 201721598700 U CN201721598700 U CN 201721598700U CN 207555899 U CN207555899 U CN 207555899U
Authority
CN
China
Prior art keywords
neural network
air
controller
network prediction
central controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721598700.0U
Other languages
Chinese (zh)
Inventor
王桓
曾生辉
王高飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ludes Environmental Technology Co ltd
Original Assignee
Zhongshan Lotusair Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Lotusair Co Ltd filed Critical Zhongshan Lotusair Co Ltd
Priority to CN201721598700.0U priority Critical patent/CN207555899U/en
Application granted granted Critical
Publication of CN207555899U publication Critical patent/CN207555899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses a kind of central air-conditioning regulating systems based on neural network prediction, including central controller, central controller is internally provided with nerve network controller and neural network prediction device, the input terminal of central controller is connected with power supply module, wind pressure detector and temperature sensor, the output terminal of central controller is connected with frequency converter and pressure fan, frequency converter is connected with air-conditioner set, air-conditioner set is connected with pressure fan, pressure fan is connected with wind pipe, and wind pressure detector and temperature sensor are arranged on wind pipe;The wind pressure situation of each air outlet of the wind pipe of wind pressure detector detection pressure fan is collected by central controller, and temperature sensor is in the collected indoor temperature of each air outlet institute and air outlet temperature information, prediction is trained in conjunction with nerve network controller and neural network prediction device, quickly obtain prediction result and feed back to central controller, it realizes dynamic regulation, has many advantages, such as that stability is good, fast response time.

Description

A kind of central air-conditioning regulating system based on neural network prediction
Technical field
The utility model is related to a kind of central air-conditioning, particularly a kind of central air-conditioning based on neural network prediction adjusts system System.
Background technology
Central air-conditioning is a huge and complicated system, mainly includes air conditioner cold-heat source system, cooling water and freezing Water system, control system etc., since system thermal capacity is big, the reasons such as inertia is big and ventilation shaft is longer so that whole system is deposited It is a kind of multivariable between very big hysteresis quality, air conditioning energy consumption and each influence factor, close coupling, serious non-linear Relationship, have very strong dynamic, current central air-conditioning mostly use conventional method(Such as CPC control becomes static pressure control System, total air volume control etc.)It is influenced, but these methods are all based on theoretical foundation to carry out caused by system hysteresis quality to overcome It adjusts, there are larger limitation, for the central air conditioner system with nonlinear characteristic, in stability and response speed On be all difficult to reach preferable performance indicator.
Invention content
For overcome the deficiencies in the prior art, a kind of dynamic regulation of the utility model offer, stability are good, fast response time Based on neural network prediction energy-saving central air-conditioning.
Technical solution is used by the utility model solves its technical problem:
A kind of central air-conditioning regulating system based on neural network prediction, including central controller, the central controller Be internally provided with nerve network controller and neural network prediction device, the input terminal of the central controller is connected with power supply mould Block, wind pressure detector and temperature sensor, the output terminal of the central controller are connected with frequency converter and pressure fan, the frequency conversion Device is connected with air-conditioner set, and the air-conditioner set is connected with the pressure fan, and the pressure fan is connected with wind pipe, described Wind pressure detector and the temperature sensor are arranged on the wind pipe.
The wind pressure detector and temperature sensor are arranged at the air outlet of the wind pipe.
The nerve network controller is BP neural network controller.
The neural network prediction device is Elman neural network prediction devices.
The model DS18B20 of the temperature sensor.
Chip signal in the central controller is S3C2416.
The beneficial effects of the utility model are:The utility model collects the detection air-supply of wind pressure detector by central controller The wind pressure situation and temperature sensor of each air outlet of the wind pipe of machine are in the collected Indoor Temperature of each air outlet institute Degree and air outlet temperature information, are trained prediction in conjunction with nerve network controller and neural network prediction device, quickly obtain Prediction result simultaneously feeds back to central controller, realizes dynamic regulation, has many advantages, such as that stability is good, fast response time.
Description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the nerve network controller of the utility model and neural network prediction device fundamental diagram.
Specific embodiment
With reference to Fig. 1, Fig. 2, a kind of central air-conditioning regulating system based on neural network prediction, including central controller, institute The model S3C2416 of the main control chip in central controller is stated, the central controller is internally provided with neural network control Device and neural network prediction device processed, in the present embodiment, the nerve network controller be BP neural network controller, the god It is Elman neural network prediction devices through neural network forecast device, by the way that the BP neural network controller and Elman neural networks is pre- It surveys device to be combined, can realize that the information acquired to the central controller carries out fast prediction;The central controller Input terminal is connected with power supply module, wind pressure detector and temperature sensor, and the power supply module provides work electricity for whole system Source, the model DS18B20 of the temperature sensor;The output terminal of the central controller is connected with frequency converter and pressure fan, The frequency converter is connected with air-conditioner set, and the air-conditioner set is connected with the pressure fan, and the pressure fan is connected with outlet air Pipeline, the wind pressure detector and temperature sensor are arranged at the air outlet of the wind pipe, can be improved accessed Data reliability;Each air outlet of the wind pipe of wind pressure detector detection pressure fan is collected by central controller Wind pressure situation and temperature sensor in the collected indoor temperature of each air outlet institute and air outlet temperature information, in conjunction with Nerve network controller and neural network prediction device are trained prediction, quickly obtain prediction result and feed back to central control Device realizes dynamic regulation, has many advantages, such as that stability is good, fast response time.
The operation principle of the utility model is as follows:
With reference to Fig. 1, Fig. 2, wherein, TOFor the set temperature of air-conditioning, TcFor wind duct temperature;TsFor total temperature difference;P is wind Road static pressure, the wind duct temperature TO, total temperature difference TsIt is adopted with air duct static pressure p by the wind pressure detector and temperature sensor Collection obtains;T is that the control of the nerve network controller exports, for controlling controlled device(Temperature, wind pressure etc.)With the god Through neural network forecast device;TcmFor output temperature;TpThe predicted temperature predicted by the neural network prediction device;It is described defeated Go out the error amount of temperature and predicted temperature;For the output temperature and set temperature error amount;Residual quantity is exported in order to control, It is combined for the neural network prediction deviceThe value of the two and output temperature Tcm, it is trained obtained by prediction;Institute It states neural network prediction device and nerve network controller and the control finally obtained is exported into residual quantityIt is transferred to the center control Device, the central controller adjusts the frequency converter according to actual demand, so as to change the refrigerating capacity of the air-conditioner set;And lead to The rotating speed of the pressure fan is overregulated to control the air output of wind pipe, finally realizes dynamic regulation.
Above embodiment cannot limit the protection domain of the invention, and the personnel of professional skill field are not departing from In the case of the invention general idea, the impartial modification and variation done still fall within the range that the invention is covered Within.

Claims (6)

1. a kind of central air-conditioning regulating system based on neural network prediction, including central controller, it is characterised in that in described Centre controller is internally provided with nerve network controller and neural network prediction device, the input terminal connection of the central controller There are power supply module, wind pressure detector and temperature sensor, the output terminal of the central controller is connected with frequency converter and pressure fan, The frequency converter is connected with air-conditioner set, and the air-conditioner set is connected with the pressure fan, and the pressure fan is connected with outlet air Pipeline, the wind pressure detector and the temperature sensor are arranged on the wind pipe.
2. the central air-conditioning regulating system according to claim 1 based on neural network prediction, it is characterised in that the wind Pressure detector and temperature sensor are arranged at the air outlet of the wind pipe.
3. the central air-conditioning regulating system according to claim 1 based on neural network prediction, it is characterised in that the god It is BP neural network controller through network controller.
4. the central air-conditioning regulating system according to claim 1 based on neural network prediction, it is characterised in that the god It is Elman neural network prediction devices through neural network forecast device.
5. the central air-conditioning regulating system according to claim 1 based on neural network prediction, it is characterised in that the temperature Spend the model DS18B20 of sensor.
6. the central air-conditioning regulating system according to claim 1 based on neural network prediction, it is characterised in that in described It is S3C2416 to entreat the chip signal in controller.
CN201721598700.0U 2017-11-27 2017-11-27 A kind of central air-conditioning regulating system based on neural network prediction Active CN207555899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721598700.0U CN207555899U (en) 2017-11-27 2017-11-27 A kind of central air-conditioning regulating system based on neural network prediction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721598700.0U CN207555899U (en) 2017-11-27 2017-11-27 A kind of central air-conditioning regulating system based on neural network prediction

Publications (1)

Publication Number Publication Date
CN207555899U true CN207555899U (en) 2018-06-29

Family

ID=62680996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721598700.0U Active CN207555899U (en) 2017-11-27 2017-11-27 A kind of central air-conditioning regulating system based on neural network prediction

Country Status (1)

Country Link
CN (1) CN207555899U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107655160A (en) * 2017-11-27 2018-02-02 中山路得斯空调有限公司 A kind of central air-conditioning regulating system based on neural network prediction
CN113217448A (en) * 2021-06-01 2021-08-06 广东鑫钻节能科技股份有限公司 Energy-saving control system for air blower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107655160A (en) * 2017-11-27 2018-02-02 中山路得斯空调有限公司 A kind of central air-conditioning regulating system based on neural network prediction
CN113217448A (en) * 2021-06-01 2021-08-06 广东鑫钻节能科技股份有限公司 Energy-saving control system for air blower
CN113217448B (en) * 2021-06-01 2021-12-24 广东鑫钻节能科技股份有限公司 Energy-saving control system for air blower

Similar Documents

Publication Publication Date Title
CN101881498B (en) Multiple connected air conditioning system and control method thereof
CN102012077B (en) Energy-saving control system and control method of central air conditioning freezing station
CN202119050U (en) Self-adaptive energy-saving control system of air conditioner of computer room
CN104315673B (en) Fuzzy control system and method for central air conditioner
CN201368558Y (en) Air supply control system for data equipment cabinet
CN204902662U (en) Adaptive cooling tower fan controller
CN106545930A (en) A kind of energy-efficient central air conditioner room and power-economizing method
CN107655160B (en) Central air conditioning governing system based on neural network prediction
CN105091209B (en) A kind of control system and method based on Air-conditioning Load Prediction
CN103062861A (en) Energy-saving method and system for central air conditioner
CN101957046A (en) Base station/machine room intelligent air-conditioner power-saving control system
CN205372921U (en) Adaptive variable blast volume air conditioner air supply fan speed controller
CN104121666A (en) Hourly frequency conversion air supplying system and control method for central air conditioning ventilation system
CN205156669U (en) Energy -conserving cooling tower system
CN103822303B (en) A kind of accurate adjustable air conditioning system of energy-conservation many variable working condition gamut and control method thereof
Ou et al. Model-based optimization strategy for a liquid desiccant cooling and dehumidification system
CN207555899U (en) A kind of central air-conditioning regulating system based on neural network prediction
CN205316605U (en) Warm intelligent control economizer who leads to central air conditioning
CN105546768A (en) Energy-saving method and system of central air conditioner
CN101893851A (en) Indoor temperature fuzzy control system and method thereof
CN217109938U (en) Air conditioner energy efficiency analysis and adjustment system
CN206648205U (en) A kind of central air conditioner system
CN105605748B (en) A kind of air-conditioning system geomantic omen joint debugging control method and system
CN202254089U (en) Natural ventilation air inlet and air exhaust device with functions of air guide and heat recovery
CN204329256U (en) Fuzzy control system for central air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528400 4th floor, building 1, Daling Industrial Zone, Torch Development Zone, Zhongshan City, Guangdong Province

Patentee after: Guangdong ludes Environmental Technology Co.,Ltd.

Address before: 528400 4th floor, building 1, Daling Industrial Zone, Torch Development Zone, Zhongshan City, Guangdong Province

Patentee before: ZHONGSHAN LOTUSAIR Co.,Ltd.

CP01 Change in the name or title of a patent holder