CN207553578U - A kind of safe connection equipment of steel pipe scaffold easy to disassemble - Google Patents
A kind of safe connection equipment of steel pipe scaffold easy to disassemble Download PDFInfo
- Publication number
- CN207553578U CN207553578U CN201721410172.1U CN201721410172U CN207553578U CN 207553578 U CN207553578 U CN 207553578U CN 201721410172 U CN201721410172 U CN 201721410172U CN 207553578 U CN207553578 U CN 207553578U
- Authority
- CN
- China
- Prior art keywords
- upright bar
- safety
- steel pipe
- connection equipment
- main upright
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of safe connection equipment of steel pipe scaffold easy to disassemble, it includes the longitudinally disposed upright bar of several rows and horizontally disposed cross bar and longitudinally disposed scissor down tube and main upright bar, bridging and upright bar joint homogeneously connect, upright bar and cross bar joint homogeneously connect, the cube component of the generally steel of formation one, it is connected with main upright bar respectively in the cube component four corners, at least two safety connectors are respectively equipped in each main upright bar, steel wire rope is set on safety connector, main upright bar opposite each other and adjacent is even integral by steel wire rope.It is simple, convenient, fast that the utility model can realize that peace is torn open, it can be used repeatedly, but also it improves work efficiency, accelerate the progress of construction and the cost that economizes on resources, it is flexible that scaffold dismounting is also achieved simultaneously, is connected firmly, can be repeatedly used, construction cost can be reduced, can also reduce security risk.
Description
Technical field
The utility model is related to a kind of devices, are filled more particularly to a kind of secure connection of steel pipe scaffold easy to disassemble
It puts, is mainly used for suspension safety belt to realize scaffold building, remove, belongs to building auxiliary material technical field.
Background technology
The scaffold support system used in industry at present is set up mode and is generally:Unwrapping wire --- vertical upright bar --- is horizontal
Bar-bridging-installation top cylinder-installation form-reinforcing.In concrete engineering application example, since Construction Schedule is fast,
Scaffold operator's safety belt fixing process is not in place, it will causes major safety risks, traditional fixing means is peace
Full band is fixed on cross bar, but there are following defects for such conventional construction method:Cross bar or upright bar dismounting during setting up, are pacified
Full band fixation is insecure, and there are larger security risks.
Therefore, it is economic and practical, easy to operate, safe and reliable that one kind need to be developed, the one kind that can be repeatedly used is convenient for tearing open
The safe connection equipment of dress steel pipe scaffold is the key point for solving above-mentioned technical problem.
Invention content
To solve the above-mentioned problems of the prior art and defect, this insecure problem is fixed temporarily for tradition, originally
Utility model is subject to this easy to disassemble and innovation, it is desirable to provide one kind can not only realize that peace tears simple, convenient, fast, energy open
It is used repeatedly, while working efficiency can also be improved, accelerate construction progress, economize on resources and cost, it can regularization processing
The safe connection equipment of such a steel pipe scaffold easy to disassemble.
In order to solve the above problem and reach above-mentioned purpose of utility model, a kind of steel pipe feet hand easy to disassemble of the utility model
The safe connection equipment of frame is realized by using following design structure and using following technical solution:
A kind of safe connection equipment of steel pipe scaffold easy to disassemble, it includes the longitudinally disposed upright bar of several rows and level
The cross bar of setting and longitudinally disposed scissor down tube and main upright bar, wherein, the bridging and upright bar joint are homogeneous
It connects, the upright bar and cross bar joint homogeneously connect, the cube component of the generally steel of formation one, in this cube
Body component four corners are connected with main upright bar respectively, and at least two safety connectors, secure connection are respectively equipped in each main upright bar
Steel wire rope on part is set, main upright bar opposite each other and adjacent is even integral by steel wire rope.
Another preferred technical solution above-mentioned as the utility model, the cross bar of each row and upright bar are equipped with
At least five row.
As the above-mentioned optimal technical scheme of the utility model, the safety connector is in integrally " Ω " shape of middle part hollow out
Structure, safety connector one end of " Ω " shape structure are equipped with the upper fixing element of conjoined structure, and the other end is equipped under conjoined structure
Fixing piece.
As the above-mentioned preferred technical solution of the utility model, the total quantity of the safety connector is set as two, and two
A safety connector respectively activity or be fixedly installed on scaffold four corners each main upright bar both sides, the secure connection of both sides
Part is opposite each other, is formed symmetrical.
The further preferred technical solution above-mentioned as the utility model, fixed part are fixed on the upper of main upright bar
Side outer wall;The lower fixing piece is fixed on the downside outer wall of main upright bar.
The further step preferred technical solution above-mentioned as the utility model, described two safety connectors, which are respectively welded, to be set
It is placed in the both sides upper end region of each main upright bar of scaffold four corners.
The technical solution still further preferably above-mentioned as the utility model, the steel wire rope are by lockset lantern ring, rope
Folder and safety collar are formed, wherein, the lockset lantern ring is located at the front end of steel wire rope, and the rope clamp is equipped with rope fastening holder, safety
Ring passes through rope clamp.
The technical solution again still further preferably above-mentioned as the utility model, on a steel cord installation are hung with safety
Band, safety belt one end are secured to connect across steel wire rope, and the total quantity of the steel wire rope is set as five, five steel wire ropes
Diameter is 6~8cm.
Above-mentioned as the utility model adds further preferred technical solution, the upright bar, cross bar and bridging again again
And main upright bar is round steel pipe.
Generated advantageous effect is the utility model compared with prior art:This practicality new design structure is simple, dismounting
Scaffold is flexible, is connected firmly, and can repeatedly use, you can reduces construction cost, can also reduce security risk.
Description of the drawings
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the partial enlargement structural representation of A positions shown in Fig. 1;
Fig. 3 is the partial enlargement structural representation of B positions shown in Fig. 1;
Fig. 4 is the partial enlargement structural representation of C positions shown in Fig. 1;
Fig. 5 is the structure diagram of the utility model steel wire rope (5) component;
Wherein, figure label:1-upright bar, 2-cross bar, 3-main upright bar, 4-safety connector, 41-upper fixing element,
42-lower fixing piece, 5-steel wire rope, 51-lockset lantern ring, 52-rope clamp, 53-safety collar, 6-safety belt.
Specific embodiment
In order to be easy to understand technical means, creative features, achievable purpose and effectiveness of the utility model, under
Make further detailed description to the technical solution of the utility model with reference to attached drawing and specific embodiment in face.
If Figure of description 1 is to a kind of safe connection equipment of steel pipe scaffold easy to disassemble shown in fig. 5, if it includes
The longitudinally disposed upright bar 1 of dry row and horizontally disposed cross bar 2 and longitudinally disposed scissor down tube and main upright bar 3, wherein,
Bridging and 1 joint of upright bar homogeneously connect, and upright bar 1 and 2 joint of cross bar homogeneously connect, and form a generally steel
Cube component, be connected with main upright bar 3 respectively in the cube component four corners, be respectively equipped at least in each main upright bar 3
Two safety connectors 4 set steel wire rope 5 on safety connector 4, by steel wire rope 5 main upright bar 3 opposite each other and adjacent
Company is integral.
Further, the cross bar 2 of each row and upright bar 1 are equipped at least five row.
Further, whole " Ω " shape structure in middle part hollow out of safety connector 4, the safety connector of " Ω " shape structure
4 one end are equipped with the upper fixing element 41 of conjoined structure, and the other end is equipped with the lower fixing piece 42 of conjoined structure.
Specifically, the total quantity of safety connector 4 is set as two, two safety connectors 4 are movable or fixed respectively
The both sides of each main upright bar 3 of scaffold four corners are set to, the safety connector 4 of both sides is opposite each other, is formed symmetrical.
More specifically, upper fixing element 41 is fixed on the upper side outer wall of main upright bar 3;Lower fixing piece 42 is fixed on main upright bar 3
Downside outer wall.
Further, two safety connectors 4 are respectively welded on the both sides for each main upright bar 3 for being set to scaffold four corners
End regions.
Further, steel wire rope 5 is made of lockset lantern ring 51, rope clamp 52 and safety collar 53, wherein, the lockset lantern ring
51 are located at the front end of steel wire rope 5, and the rope clamp 52 is equipped with rope fastening holder 521, and safety collar 53 passes through rope clamp 52.
Specifically, installation is hung with safety belt 6 on steel wire rope 5,6 one end of safety belt passes through 5 company of being secured to of steel wire rope
It connects, the total quantity of steel wire rope 5 is set as five, and the diameter of five steel wire ropes 5 is 6~8cm.
Further, upright bar 1, cross bar 2 and bridging and main upright bar 3 are round steel pipes.
Described in synthesis, more specifically embodiment is the utility model:
Step 1;According to layout design, it would be desirable to which the frame-type building poured is uniformly divided into several construction sections, and pour institute
There are shear wall and the ground of construction section bottom, the lower concrete after pouring is U-shaped, and steel reinforcement cage is installed above shear wall.
Step 2;After lower concrete air-dries, above-mentioned traveling centering has been set up on the first construction section, it is specific
It is as follows to set up process:
First:Standpipe is established to set up a little:On the bottom plate of pouring molding, inwardly indicated along both sides shear wall parallel
Set up line in the upright bar of shear wall 300-500mm, then according to the distance of construction section indicate with standpipe set up line intersect hang down
Straight horizontal line, it is setting up a little for standpipe that horizontal line sets up line intersection with upright bar;
Second:Determine upright bar part 1 set up position after, until entire frame-type building complete construction.
Step 3;Shear wall and the concrete of top surface are poured, and maintenance of sprinkling water is until age of concrete maintenance;Concrete
Using watering maintenance until filling out age of concrete maintenance after the completion of pouring.
Step 4;Form removal, shear wall formwork are removed according to same condition pressure testing part situation, and roof plate template is in age
It is removed after reaching.
Step 5;Scaffold is migrated, after template is removed completely, scaffold building or is removed to certain altitude, along building
It builds weldering one in object corner upright bar to pick up the ears, the steel cable of a diameter of 6cm is fixed on the safety connector 4 on the outside of building corner upright bar
On, steel cable tenses, rope card is fixed, and after the completion of work, after the completion of outrigger is removed or set up, steel wire rope 5 recycles, and pile is neat.
Finally, it should be noted that specific embodiment of the present utility model has been made specifically above in conjunction with attached drawing
It is bright, but the utility model is not limited to above-mentioned embodiment, the knowledge model that one skilled in the relevant art has
In enclosing, many variations can also be made to it.
Claims (9)
1. a kind of safe connection equipment of steel pipe scaffold easy to disassemble, it includes the longitudinally disposed upright bar (1) of several rows and water
The cross bar (2) and longitudinally disposed bridging of flat setting and main upright bar (3), it is characterised in that:The bridging and upright bar (1)
Joint homogeneously connects, and the upright bar (1) and cross bar (2) joint homogeneously connect, and the generally steel of formation one is stood
Cube component is connected with main upright bar (3) in the cube component four corners, is respectively equipped at least on each main upright bar (3) respectively
Two safety connectors (4), setting steel wire rope (5) on safety connector (4), by steel wire rope (5) opposite each other and adjacent
Main upright bar (3) even be integral.
2. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 1, it is characterised in that:It is described
The cross bar (2) of each row and upright bar (1) are equipped at least five row.
3. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 1, it is characterised in that:It is described
Safety connector (4) is in integrally " Ω " shape structure of middle part hollow out, and safety connector (4) one end of " Ω " shape structure is equipped with disjunctor
The upper fixing element (41) of structure, the other end are equipped with the lower fixing piece (42) of conjoined structure.
4. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 3, it is characterised in that:It is described
The total quantity of safety connector (4) is set as two, and two safety connectors (4) are movable respectively or are fixedly installed on scaffold
The both sides of each main upright bar (3) of four corners, the safety connector (4) of both sides is opposite each other, is formed symmetrical.
5. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 4, it is characterised in that:It is described
Upper fixing element (41) is fixed on the upper side outer wall of main upright bar (3);The lower fixing piece (42) is fixed on the downside of main upright bar (3)
Face outer wall.
6. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 4, it is characterised in that:It is described
The both sides upper end region for each main upright bar (3) for being set to scaffold four corners is respectively welded in two safety connectors (4).
7. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 1, it is characterised in that:It is described
Steel wire rope (5) is made of lockset lantern ring (51), rope clamp (52) and safety collar (53), wherein, the lockset lantern ring (51) is located at
The front end of steel wire rope (5), the rope clamp (52) are equipped with rope fastening holder (521), and safety collar (53) is across rope clamp (52).
8. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 7, it is characterised in that:In steel
Installation is hung with safety belt (6) in cord (5), and safety belt (6) one end is secured to connect across steel wire rope (5), the steel wire
The total quantity of rope (5) is set as five, and the diameter of five steel wire ropes (5) is 6~8cm.
9. a kind of safe connection equipment of steel pipe scaffold easy to disassemble according to claim 1, it is characterised in that:It is described
Upright bar (1), cross bar (2) and bridging and main upright bar (3) are round steel pipes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721410172.1U CN207553578U (en) | 2017-10-27 | 2017-10-27 | A kind of safe connection equipment of steel pipe scaffold easy to disassemble |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721410172.1U CN207553578U (en) | 2017-10-27 | 2017-10-27 | A kind of safe connection equipment of steel pipe scaffold easy to disassemble |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207553578U true CN207553578U (en) | 2018-06-29 |
Family
ID=62674004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721410172.1U Expired - Fee Related CN207553578U (en) | 2017-10-27 | 2017-10-27 | A kind of safe connection equipment of steel pipe scaffold easy to disassemble |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207553578U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110230391A (en) * | 2019-06-13 | 2019-09-13 | 杜希田 | Scaffold is used in a kind of construction of high-altitude |
-
2017
- 2017-10-27 CN CN201721410172.1U patent/CN207553578U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110230391A (en) * | 2019-06-13 | 2019-09-13 | 杜希田 | Scaffold is used in a kind of construction of high-altitude |
CN110230391B (en) * | 2019-06-13 | 2021-09-10 | 天津九为实业有限公司 | Scaffold for high-altitude construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501837U (en) | Steel case roof beam becomes bridge welding simple platform | |
CN104975719A (en) | Novel material distribution device and floor concrete casting construction method of novel material distribution device | |
CN207553578U (en) | A kind of safe connection equipment of steel pipe scaffold easy to disassemble | |
CN204375432U (en) | Spent fuel dry-type storage project underwater operation platform device for hoisting | |
CN207314833U (en) | A kind of construction Novel scissors blade square column shuttering fastening member | |
CN209368686U (en) | A kind of wet seam mortar leakage prevention of precast beam quickly pacifies demoulding system | |
CN103758045B (en) | Box girder wet joint formwork construction method under space limitation condition | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN203097253U (en) | Elevator shaft triangular support type formwork platform | |
CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN207920126U (en) | A kind of Construction of Steel Structure safety rope fixing device | |
CN106245615A (en) | A kind of block assembly auxiliary mould | |
CN104612166B (en) | The combination supporting device of a kind of supporting hole wall and method for protecting support | |
CN104847090B (en) | A kind of small cross-sectional size ventilation shaft construction method | |
CN209523123U (en) | A kind of working job platform | |
CN112761079A (en) | Quick installation device of wet joint suspended formwork bottom plate | |
CN205973582U (en) | Simple and easy hoisting accessory of cable cover plate | |
CN206971735U (en) | Basic platform for cantilevered structure formwork | |
CN103790109B (en) | Light automatic multi-function bridge inspection frame | |
CN207018000U (en) | The vertical breakage borehole wall repaiies multiplexed platform | |
CN205400074U (en) | Simple and easy concrete lifting bucket device | |
CN206735623U (en) | Framework of steel reinforcement hanging apparatus | |
CN205990768U (en) | A kind of glomeration building prefabricated construction wall piece wears muscle instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 Termination date: 20201027 |
|
CF01 | Termination of patent right due to non-payment of annual fee |