CN207553387U - A kind of waterproof construction of hyperboloid curtain wall - Google Patents

A kind of waterproof construction of hyperboloid curtain wall Download PDF

Info

Publication number
CN207553387U
CN207553387U CN201721674529.7U CN201721674529U CN207553387U CN 207553387 U CN207553387 U CN 207553387U CN 201721674529 U CN201721674529 U CN 201721674529U CN 207553387 U CN207553387 U CN 207553387U
Authority
CN
China
Prior art keywords
panel unit
connecting portion
curtain wall
card slot
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721674529.7U
Other languages
Chinese (zh)
Inventor
许文潇
黄炫
张霜
曾明理
文睿
苏冲
曾圣龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HUASEN ARCHITECTURE AND ENGINEERING DESIGNING CONSULTANTS Co Ltd
Original Assignee
SHENZHEN HUASEN ARCHITECTURE AND ENGINEERING DESIGNING CONSULTANTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN HUASEN ARCHITECTURE AND ENGINEERING DESIGNING CONSULTANTS Co Ltd filed Critical SHENZHEN HUASEN ARCHITECTURE AND ENGINEERING DESIGNING CONSULTANTS Co Ltd
Priority to CN201721674529.7U priority Critical patent/CN207553387U/en
Application granted granted Critical
Publication of CN207553387U publication Critical patent/CN207553387U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of waterproof construction of hyperboloid curtain wall, including the first waterproof layer towards indoor setting and the second waterproof layer towards outdoor setting, first waterproof layer includes thermal insulation material and several first panel units affixed with thermal insulation material, second waterproof layer includes several second panel units, several splicing components and several connectors, there is fixed space between second panel unit and first panel unit, each splicing component is respectively positioned in fixed space, and it is connected between two pieces of adjacent second panel units by each splicing component, several connectors are respectively positioned in fixed space, and two adjacent second panel units are affixed by connector and first panel unit.The waterproof construction for the hyperboloid curtain wall that the utility model embodiment provides, by setting the first waterproof layer and the second waterproof layer, extraneous most of moisture is obstructed using the second waterproof layer, so that substantially no water or a small amount of water are entered in the first waterproof layer, the water resistance of hyperboloid curtain wall is effectively ensured.

Description

A kind of waterproof construction of hyperboloid curtain wall
Technical field
The utility model is related to building structure technology field more particularly to a kind of waterproof constructions of hyperboloid curtain wall.
Background technology
Since the moulding of building needs, many landmarks all employ arc Curtain Wall or bi-curved curtain wall System, these architectural images have broken the limitation of cartesian coordinate system, impart building kinesthesia and ambiguity, have strongly Visual impact and expressive force.However, the hyperboloid Curtain Wall Design of Most current is more difficult, and the only conduct in design Decorative exterior wall uses, and is mainly single layer designs therefore, barely satisfactory so as to cause the waterproof effect of curtain wall.
Utility model content
In view of the above-mentioned problems in the prior art, the purpose of this utility model is to provide a kind of hyperboloid curtain walls Waterproof construction can effectively improve the water resistance of curtain wall.
To achieve the above object, the utility model embodiment provides following technical solution:
The utility model provides a kind of waterproof construction of hyperboloid curtain wall, including the first waterproof layer towards indoor setting And the second waterproof layer towards outdoor setting, if first waterproof layer includes thermal insulation material and affixed with the thermal insulation material Dry first panel unit, second waterproof layer include several second panel units, several splicing components and several connectors, institute Stating has fixed space between second panel unit and the first panel unit, each splicing component is respectively positioned on the fixation In space, and connected between adjacent two pieces of second panel units by each splicing component, several connections Part is respectively positioned in the fixed space, and the adjacent two second panel units pass through the connector and first face Plate unit is affixed.
Wherein, the surface of each piece of first panel unit is curved surface, adjacent two pieces of first panel units Between be seamlessly connected.
Wherein, the surface of each piece of second panel unit is curved surface.
As an alternative embodiment, in the embodiment of the utility model, each splicing component includes the One secondary frame and the second secondary frame, the described first secondary frame are fixedly connected on adjacent one of second panel unit, and described the Second mate's frame is fixedly connected on the second panel unit of adjacent another piece, and the connector is set on the described first secondary frame and described Between second secondary frame, for connecting the described first secondary frame and the second secondary frame.
As an alternative embodiment, in the embodiment of the utility model, adjacent two pieces of second panels There are splicing seams, the connector includes first connecting portion, second connecting portion and third connecting portion, and described first connects between unit Socket part is fixedly connected with the described first secondary frame, the second connecting portion be connected to the first connecting portion and third connecting portion it Between, the third connecting portion is set towards the splicing seams, and the third connecting portion is fixedly connected with the described second secondary frame, institute It states third connecting portion and includes shielding surface, the shielding surface is directed at the splicing seams setting.
As an alternative embodiment, in the embodiment of the utility model, the second connecting portion is described in First panel unit is set, and the second connecting portion is fixed in the first panel unit.
As an alternative embodiment, in the embodiment of the utility model, the described first secondary frame is towards described the It is provided with the first card slot/or the first fastener on one end of one connecting portion, corresponding first card slot in the first connecting portion/ Or first fastener be provided with the first fastener/or the first card slot, first fastener/or the first card slot are connected together in described first Card slot/or the first fastener;
The second secondary frame is described towards being provided with the second card slot/or the second fastener on one end of the third connecting portion Corresponding second card slot/or the second fastener are provided with the second fastener/or the second card slot, second button on third connecting portion Part/or the second card slot are connected together in second card slot/or the second fastener.
Wherein, several deep floors are additionally provided in the fixed space, several deep floors are with described second Panel unit is affixed.
Wherein, the described first secondary frame is approximate figure of three structure, including first part, second part and Part III, institute It states second part to be connected between the first part and Part III, the first part is added by the first fastener with described Strong floor is affixed, and the second part is fixed in adjacent one of second panel unit, the Part III direction Connector setting, and the first splice is provided on the Part III is provided with described the on first splice One card slot/or the first fastener.
Wherein, the described second secondary frame is approximate figure of three structure, including Part IV, Part V and Part VI, institute It states Part V to be connected between the Part IV and Part VI, the Part IV is added by the second fastener with described Strong floor is affixed, and the Part V is fixed in the second panel unit of adjacent another piece, and the Part VI is towards institute Connector setting is stated, and the second splice is provided on the Part VI, described second is provided on second splice Card slot/or the second fastener.
Further, first splice includes the first stitching section and the second stitching section, first stitching section and institute It states Part III to be fixedly connected, second stitching section is set towards the first connecting portion, and is set on second stitching section It is equipped with first card slot;
Second splice includes third stitching section and the 4th stitching section, the third stitching section and the Part VI It is fixedly connected, the 4th stitching section is set towards the third connecting portion, and described second is provided on the 4th stitching section Card slot.
Further, first connects between the second part and adjacent one of second panel unit Seam is provided with the first seal assembly in first connecting sewing;
Between the Part V and the adjacent another piece second panel unit have the second connecting sewing, described second The second seal assembly is provided in connecting sewing;
Wherein, first seal assembly and the second seal assembly include structure glue and foam rods.
As an alternative embodiment, in the embodiment of the utility model, first fastener and described first The first waterproof gasket cement is equipped between card slot, the second waterproof gasket cement is equipped between second fastener and second card slot.
As an alternative embodiment, in the embodiment of the utility model, positioned at the bottom of the hyperboloid curtain wall The second panel unit in portion includes stitching section, fixed part and rake, described in adjacent thereto another piece in the stitching section Second panel unit spliced, the fixed part set towards the first panel unit and are fixed in the first panel unit, The rake is connected between the stitching section and the fixed part, and the rake is from the fixed part to the inclination Portion tilts predetermined angle setting, and water dropping openings is provided on the side that the rake is connect with the stitching section.
Further, the waterproof construction of the hyperboloid curtain wall further includes header tank, and the header tank is set on described drip Below mouthful, for collecting the water oozed via the water dropping openings.
Wherein, the predetermined angle is 0~10 °.
Preferably, the predetermined angle is 3 °.
As an alternative embodiment, in the embodiment of the utility model, the first panel unit and described Second panel unit is aluminium sheet, and the thickness of the second panel unit is more than the thickness of the first panel unit.
As an alternative embodiment, in the embodiment of the utility model, the thermal insulation material is mineral wool, silicon Hydrochlorate thermal insulation material or ceramic thermal insulation material, the thickness of the thermal insulation material are greater than or equal to 30mm.
As an alternative embodiment, in the embodiment of the utility model, the waterproof knot of the hyperboloid curtain wall Structure further includes fixation kit, and the fixation kit includes the first fixing piece and the second fixing piece, and first fixing piece is embedded in In the thermal insulation material, and the first panel unit and the thermal insulation material are fixed in the both ends of first fixing piece respectively, One end of second fixing piece is fixedly connected on the first panel unit, and the other end of second fixing piece is from the guarantor It stretches out in adiabator, and is fixed on the thermal insulation material towards on the indoor side.
Wherein, first fixing piece is Zinc-coated angle steel, and second fixing piece is steel angle hitch.
Compared with prior art, the utility model embodiment has the advantages that:
The waterproof construction for a kind of hyperboloid curtain wall that the utility model embodiment provides, by setting towards indoor first Waterproof layer and the second waterproof layer towards outdoor, and so that there is fixed space between the second waterproof layer and the first waterproof layer, from And first can be obstructed extraneous most of moisture using the second waterproof layer, so that basic no or a small amount of water It enters in the first waterproof layer, effectively ensures the water resistance of hyperboloid curtain wall.
In addition, by the way that thermal insulation material and first panel unit is set to form the first waterproof layer, so that hyperboloid curtain wall With heat insulation function, so that hyperboloid curtain wall can be used as functional wall, the practicability of hyperboloid curtain wall is effectively improved.
To sum up, a kind of waterproof construction of hyperboloid curtain wall provided by the utility model, by setting first panel list Member and thermal insulation material form the first waterproof layer, and second panel unit forms the second waterproof layer so that the hyperboloid curtain wall is bilayer Structure, not only waterproof effect is preferable, and highly practical.
Description of the drawings
In order to illustrate more clearly of the technical scheme in the embodiment of the utility model, will make below to required in embodiment Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings Other attached drawings.
Fig. 1 is a kind of schematic diagram of the waterproof construction for hyperboloid curtain wall that the utility model embodiment provides;
Fig. 2 is partial enlarged view at the A of Fig. 1;
Fig. 3 is the structure diagram of the first secondary frame in Fig. 1;
Fig. 4 is the structure diagram of the connector in Fig. 1;
Fig. 5 is the B partial enlarged views in Fig. 1.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that described embodiment is only the reality of the utility model part of the embodiment rather than whole Apply example.Based on the embodiment in the utility model, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the utility model, term " on ", " under ", "left", "right", "front", "rear", " top ", " bottom ", " interior ", " outer ", " in ", " vertical ", " level ", " transverse direction ", the orientation of the instructions such as " longitudinal direction " or position relationship be based on orientation shown in the drawings or Position relationship.These terms are not intended to limit indicated primarily to preferably describe the utility model and embodiment Device, element or component must have and particular orientation or constructed and operated with particular orientation.
Also, above-mentioned part term is other than it can be used to indicate that orientation or position relationship, it is also possible to for representing it His meaning, such as term " on " also be likely used for representing certain relations of dependence or connection relation in some cases.For ability For the those of ordinary skill of domain, concrete meaning of these terms in the utility model can be understood as the case may be.
In addition, term " installation ", " setting ", " being equipped with ", " connection ", " connected " should be interpreted broadly.It is for example, it may be solid Fixed connection, is detachably connected or monolithic construction;Can be mechanical connection or electrical connection;It can be directly connected, either The connections of two inside between device, element or component are indirectly connected or are by intermediary.For this field For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
In addition, term " first ", " second " etc. are mainly used for distinguishing different devices, element or component (specifically Type and construction may it is identical may also be different), be not intended to show or imply meaning showing device, element or component Relative importance and quantity.Unless otherwise indicated, the meaning of " multiple " is two or more.
It is described in detail below with reference to attached drawing.
It is the waterproof construction of a kind of hyperboloid curtain wall that the utility model embodiment provides also referring to Fig. 1 to Fig. 4 Schematic diagram.A kind of waterproof construction 100 for hyperboloid curtain wall that the utility model embodiment provides includes the towards indoor setting One waterproof layer 10 and the second waterproof layer 20 towards outdoor setting, and second waterproof layer 20 is set with the first waterproof layer 10 interval It puts.First waterproof layer 10 includes thermal insulation material 11 and several first panel units 12 affixed with thermal insulation material 11.This second Waterproof layer 20 include several second panel units 21, several splicing components and several connectors 24, the second panel unit 21 with There is fixed space 101, each splicing component is respectively positioned in the fixed space 101, and adjacent between first panel unit It is linked together between two pieces of second panel units 21 by each splicing component.Several connectors 24 are respectively positioned on this In fixed space 101, and adjacent two pieces of second panel units 21 are solid by the connector 24 and the first panel unit 12 It connects.
Double-deck design method is set as using by hyperboloid curtain wall so that hyperboloid curtain wall makes not only as decorative wall With, additionally it is possible to it is used as functional wall, effectively improves the practicability of hyperboloid curtain wall.In addition, using double-deck design, Neng Gouli External water is effectively stopped with second waterproof layer 20, so as to effectively improve the water resistance of the hyperboloid curtain wall.
In the present embodiment, which refers to towards indoor setting, the thermal insulation material of first waterproof layer 10 11 are located at interior, and connect with indoor metope.The first panel unit 12 is connected to the thermal insulation material 11 far from indoor wall The one end in face, to play certain protective effect to the thermal insulation material 11.Preferably, which can be mineral wool, silicon Hydrochlorate thermal insulation material 11 or ceramic thermal insulation material 11 etc..The thickness of the thermal insulation material 11 is greater than or equal to 30mm, good to have Heat insulation effect.It is understood that in other embodiments, the thickness of the thermal insulation material 11 can also be required according to practice of construction Setting.
Further, it is seamlessly connected between two pieces of adjacent first panel units 12, that is to say, that in splicing, should use up Amount closely to splice between two pieces of adjacent first panel units 12, that is, between two pieces of adjacent first panel units 12 not It will appear splicing seams or be utilized in the mode of packing sealing between splicing seams, to cause adjacent two pieces of first panel units It can closely be connected between 12, and then water is effectively prevent to enter from the stitching portion of adjacent two pieces of first panel units 12, it is ensured that is double The water resistance of curved surface curtain wall.That is, several pieces of first panel units 12 are spliced into the seamless panel unit of a monoblock, And the first panel unit 12 can be aluminium sheet, so that it is guaranteed that water can not enter at the first panel unit 12, it is ensured that this first The good water resistance of waterproof layer.
Specifically, which is curved surface aluminium sheet, that is, the surface of the first panel unit 12 is Curved surface.Preferably, it is seamless spliced between two pieces of adjacent first panel units 12 in order to reduce production cost and ensure, It, can be by the curvature of each piece of first panel unit 12 of calculated in advance (that is, surface undulation when producing the first panel unit 12 Degree), then determine quantity that is that formwork is needed to customize and not needing to the first panel unit 12 that formwork customizes.Wherein, this is needed The first panel unit 12 that formwork customizes is wanted to refer to the first panel list in construction, additional designs mold being needed to be customized Member;The first panel unit 12 without formwork customization refers in construction, can be used currently existing mold carry out it is molding First panel unit.In this way, in splicing, two pieces of first panel units 12 similar in curvature can be spliced one It rises, so as to ensure the splicing compactness between two pieces of first panel units 12.
Further, the waterproof construction 100 of the hyperboloid curtain wall further includes fixation kit, and it is solid which includes first Determine 31 and second fixing piece 32 of part, the first fixing piece 31 is embedded in thermal insulation material 11, and the both ends difference of the first fixing piece 31 Fix the first panel unit 12 and thermal insulation material 11.One end of second fixing piece 32 is fixedly connected on first panel unit 12, the other end self-thermal insulation material 11 of second fixing piece 32 is interior to be stretched out, and be fixed on thermal insulation material 11 towards indoor side On.Specifically, which can be Zinc-coated angle steel, which can be steel angle hitch.First fixing piece 31 For thermal insulation material 11 and first panel unit 12 to be fixed, to realize consolidating for first panel unit 12 and thermal insulation material 11 Fixed connection.Second fixing piece 32 is for thermal insulation material 11 and indoor metope to be fixed, so as to fulfill thermal insulation material 11 With being fixedly connected for indoor metope.
In the present embodiment, there are splicing seams 210, that is, adjacent two pieces between two pieces of adjacent second panel units 21 There is gap between second panel unit 21.Specifically, which can be 5~20mm.Preferably, which is 12mm.It is understood that in other embodiments, which can also be 5mm, 10mm, 15mm, 18mm or 20mm Deng.
For traditional hyperboloid curtain wall in order to improve waterproof effect, generally use adopts two pieces of adjacent second panel units 21 With the mode of seamless connection, this connection mode is not only difficult to realize (because of two pieces of adjacent second panel units 21 in technique Curvature it is different and can not ensure to be seamlessly connected completely), and waterproof effect is unsatisfactory.And the utility model embodiment uses It sets two pieces of adjacent second panel units 21 that there is the design of splicing seams, two pieces of adjacent second panel lists can not only be convenient for The connection of member 21, while the splicing seams 210 are utilized, even if there is water to enter in the splicing seams 210, the splicing component can also be passed through And connector 24 realizes waterproof, therefore waterproof effect is ideal.
Further, since the second panel unit 21 is towards outdoor design, which mainly makees Exterior wall for curtain wall uses, and the thickness of the second panel unit 21 is more than the thickness of the first panel unit 12, with good Good intensity and wind-proof performance.Specifically, which is also aluminium sheet, and the thickness of the second panel unit 21 More than the thickness of the first panel unit 12.Preferably, the thickness of the second panel unit 21 can be the first panel unit 12 Twice or more.For example, when the thickness of first panel unit 12 is 1.5mm, the thickness of the second panel unit 21 can be 3.0mm either 3.5mm etc..
Further, which is also curved surface aluminium sheet, that is, the surface of the second panel unit 21 Also it is curved surface.In order to reduce the production cost of the second panel unit 21, when producing the second panel unit 21, can be used with The identical production method of the first panel unit, that is, before manufacture, the curvature of each piece of second panel unit 21 of calculated in advance (that is, surface undulation degree), you can determine what is needed the quantity of the second panel unit 21 of formwork customization and customized without formwork The quantity of second panel unit 21.
Further, since the second panel unit 21 is towards outdoor setting, in order to strengthen the second panel unit 21 Structural strength, be additionally provided with several deep floors 102 in the fixed space 101, several deep floors 102 are and second panel Unit 21 is fixedly connected.Preferably, which can be aluminium sheet, and several deep floors 102 by bolt or The mode of screw and the second panel unit 21 are affixed, so that it is guaranteed that the company of the deep floor 102 and the second panel unit 21 Connect tightness.
In the present embodiment, which includes the first secondary secondary frame 23 of frame 22 and second, which, which fixes, connects Adjacent one of second panel unit 21 is connected to, which is fixedly connected on another piece of adjacent second panel list Member 21, which is set between the first secondary secondary frame 23 of frame 22 and second, secondary for connecting the first secondary frame 22 and second Frame 23.Specifically, which is frame structure of aluminum alloy, the first secondary secondary frame of frame 22 and second 23 are respectively used to be fixedly connected with two pieces of adjacent second panel units 21, to realize the spelling of two pieces of adjacent second panel units 21 It connects.
Further, which includes first connecting portion 24a, second connecting portion 24b and third connecting portion 24c, should First connecting portion 24a is fixedly connected with the first secondary frame 22, and second connecting portion 24b is connected to first connecting portion 24a and third Between connecting portion 24c, which is set towards the splicing seams, and third connecting portion 24c is fixed with the second secondary frame 23 Connection, third connecting portion 24c include shielding surface 241, which is directed at the splicing seams 210 and sets.Specifically, the company Fitting 24 is used to implement being fixedly connected between the first secondary secondary frame 23 of frame 22, second and the first panel unit 12, so as to real Being fixedly connected between existing second panel unit 21 and first panel unit 12.Aluminium alloy pendant can be used in the connector 24, should First connecting portion 24a may extend to be fixedly connected with the first secondary frame 22, and third connecting portion 24c may extend to and second pair Frame 23 is fixedly connected.
In a manner that the shielding surface 241 of setting third connecting portion 24c is directed at the splicing seams 210 setting, when the external world Water into fashionable, can block most water using the shielding surface 241, be fixed so as to reduce water into this via the splicing seams 210 Probability in space 101.It that is, can be as first of waterproof defence line, the first panel unit 12 by the use of the shielding surface 241 Second waterproof defence line can be used as, when extraneous water out of splicing seams 210L into fashionable, will be most by the shielding surface 241 Water is blocked, and least a portion of water is penetrated into the fixed space 101 of second panel unit 21 and first panel unit 12, at this point, Since the first panel unit 12 is aluminium sheet, there is good water resistance, therefore, the water of the part can not be from first panel list Member 12 is penetrated into thermal insulation material 11, so as to ensure the height water proofing property of curtain wall.
Further, being fixedly connected in order to ensure second connecting portion 24b and the first panel unit 12, this second connects Socket part 24b is set towards the first panel unit 12, and second connecting portion 24b is fixed in the first panel unit 12, so as to Realize the purpose for connecting second panel unit 21 and first panel unit 12.Specifically, second connecting portion 24b can lead to It crosses galvanized steel plain sheet and screw to be fixedly connected with first panel unit 12, and in order to ensure second connecting portion 24b and galvanized steel plain sheet Connection reliability, prevent the situation that screw or galvanized steel plain sheet are slided or loosened, which is serrated surface.
In the present embodiment, which is approximate figure of three structure, including first part 22a, second part 22b and Part III 22c, second part 22b are connected between first part 22a and Part III 22c, this first Point 22a is fixedly connected by the first fastener with above-mentioned deep floor 102, second part 22b be fixed in it is adjacent wherein One piece of second panel unit 21, Part III 22c are set towards the connector 24, and is provided on Part III 22c Be provided with the first fastener on one card slot or Part III 22c, on first connecting portion 24a corresponding first card slot or First fastener is provided with the first fastener or the first card slot, which is connected together in first card slot or first card Slot is connected together in first fastener.Specifically, second part 22b is the first secondary frame 22 towards first connecting portion 24a Part, be provided with the first splice on second part 22b, first card slot be provided on first splice or should First fastener is provided on first splice.
Using the connection mode of card slot and fastener, the mounting between the secondary frame 22 of the connector 24 and first can be realized.
Further, which includes the first stitching section 221 and the second stitching section 222, first stitching section 221 It is fixedly connected with Part III 22c, which is set towards first connecting portion 24a, and second splicing The first card slot 222a is provided in portion 222, first card slot 222a is corresponded on first connecting portion 24a and is provided with the first fastener 243, which is sticked in first card slot 222a.And in order to ensure first fastener 243 firmly engages always In first card slot 222a and the waterproof effect between the two is ensured, between first fastener, 243 and first card slot 222a Equipped with the first waterproof gasket cement 243a.That is, when first fastener 243 is sticked in first card slot 222a, it can The first waterproof gasket cement 243a is set between first fastener, 243 and first card slot 222a, so as to fulfill first anti-using this While first fastener 243 and the first card slot 222a are bonded together by watertight sealing 243a, also using first waterproof sealing The water entered in first card slot 222a via the splicing seams 210 is blocked in the first card slot by the good water resistance of glue 243a In 222a, and then reduce the probability that water enters in the fixed space 101.It, can also be it is understood that in other embodiments First fastener 243 on first stitching section 221 is set, first card slot 222a is then correspondingly arranged on first connecting portion 24a.
Further, in order to further improve the waterproof effect of the hyperboloid curtain wall, second part 22b with it is adjacent One of second panel unit 21 between there is the first connecting sewing (not indicating), it is close to be provided with first in first connecting sewing Sealing assembly 211.Preferably, first seal assembly 211 include structure glue and foam rods, using the structure glue can realize this second It is bonding between part 22b and second panel unit 21, while can effectively improve second part 22b and using the foam rods The connection waterproof effect of two panel units 21.
Similarly, which is also approximate figure of three structure, the structure of the second secondary frame 23 and the first secondary frame 22 Structure it is identical, therefore, the above-mentioned structure about the first secondary frame 22 can be found in for the structure description of the second secondary frame 23 and describe, Which is not described herein again.
That is, it is provided between second secondary second card slot of frame 23 and the second fastener 244 of third connecting portion 24c Second waterproof gasket cement 243b, the second waterproof gasket cement 243b are identical with the first waterproof gasket cement 243a.
That is, when splicing seams 210 of the external water between two pieces of adjacent second panel units 21 enter When, most water is blocked via the shielding surface 241 of the connector 24 first, part water enters to the first secondary frame 22 and first In the second card slot in the first card slot 222a between connecting portion 24a and between the second secondary frame 23 and third connecting portion 24c, quilt The first waterproof gasket cement 243a and the second waterproof gasket cement 243b is blocked in outer;It is at this point, a small amount of or basic without water entrance It, also can be by even if there is a small amount of water to enter in fixed space 101 between the second panel unit 21 and first panel unit 12 The first panel unit 12 is blocked in the fixed space 101, and the waterproof so as to fundamentally solve the hyperboloid curtain wall is asked Topic.
Also referring to Fig. 1, Fig. 3 and Fig. 5, in the present embodiment, the second panel positioned at the bottom of the hyperboloid curtain wall Unit 21 includes stitching section 21a, fixed part 21b and rake 21c, another piece of second panel adjacent thereto stitching section 21a Unit 21 splices, and fixed part 21b sets towards the first panel unit and is fixed in the first panel unit 12, the rake 21c is connected between stitching section 21a and fixed part 21b, and rake 21c is from fixed part 21b to rake 21c Tilt predetermined angle setting.Specifically, fixed part 21b can pass through angle bar either zinc-plated corner brace and the first panel unit 12 It is fixedly connected, and the junction of fixed part 21b and first panel unit 12 is provided with fluid sealant 212, so as to improve While the being completely embedded property of fixed part 21b and first panel unit 12, additionally it is possible to prevent water from fixed part 21b and the The junction of one panel unit 12 enters, and effectively improves the waterproof effect of the hyperboloid curtain wall.
Further, water dropping openings 213 is provided on the side that rake 21c is connect with stitching section 21a.Specifically, The water dropping openings 213 is set on rake 21c at outdoor position, which enters the fixed space for oozing out Water in 101, water to be prevented to be gathered in the fixed space 101.
Specifically, it is fallen into water dropping openings 213 via rake 21c for the ease of water, rake 21c is from the fixed part The inclined predetermined angles of 21b are 0~10 °.Preferably, which can be 3 °, that is, the predetermined angle is from the fixed part 21b is inclined to outdoor direction.It is understood that the predetermined angle can also be 0 °, 1 °, 2 °, 4 °, 5 °, 6 °, 7 °, 8 °, 9 ° Or 10 ° etc..
Further, the waterproof construction of the hyperboloid curtain wall further includes header tank, which is set on the water dropping openings 213 Lower section, for collecting the water oozed via the water dropping openings 213.
Using the design for setting header tank below water dropping openings 213, it can prevent water from directly dropping to ground from water dropping openings 213 Face or other positions, while also can the water of collection be subjected to secondary use, energy conservation and environmental protection.
The waterproof construction for a kind of hyperboloid curtain wall that the utility model embodiment provides, by setting towards indoor first Waterproof layer and the second waterproof layer towards outdoor, and so that there is fixed space between the second waterproof layer and the first waterproof layer, from And first can be obstructed extraneous most of moisture using the second waterproof layer, so that basic no or a small amount of water It enters in the first waterproof layer, effectively ensures the water resistance of hyperboloid curtain wall.
In addition, by the way that thermal insulation material and first panel unit is set to form the first waterproof layer, so that hyperboloid curtain wall With heat insulation function, so that hyperboloid curtain wall can be used as functional wall, the practicability of hyperboloid curtain wall is effectively improved.
To sum up, a kind of waterproof construction of hyperboloid curtain wall provided by the utility model, by setting first panel list Member and thermal insulation material form the first waterproof layer, and second panel unit forms the second waterproof layer so that the hyperboloid curtain wall is bilayer Structure, not only waterproof effect is preferable, and highly practical.
The waterproof construction of hyperboloid curtain wall a kind of disclosed in the utility model embodiment is described in detail above, this It applies specific case in text to be expounded the principle and embodiment of the utility model, the explanation of above example is It is used to help understand the method and its core concept of the utility model;Meanwhile for those of ordinary skill in the art, according to this The thought of utility model, there will be changes in specific embodiments and applications, in conclusion the content of the present specification It should not be construed as a limitation of the present invention.

Claims (10)

1. a kind of waterproof construction of hyperboloid curtain wall, which is characterized in that including the first waterproof layer and direction towards indoor setting Second waterproof layer of outdoor setting, first waterproof layer include thermal insulation material and affixed with the thermal insulation material several first Panel unit, second waterproof layer include several second panel units, several splicing components and several connectors, described second There is fixed space, each splicing component is respectively positioned on the fixed space between panel unit and the first panel unit It is connected between two pieces of interior and adjacent second panel units by each splicing component, several connectors are equal In the fixed space, and the adjacent two second panel units pass through the connector and the first panel list Member is affixed.
2. the waterproof construction of hyperboloid curtain wall according to claim 1, which is characterized in that each splicing component includes First secondary frame and the second secondary frame, the described first secondary frame is fixedly connected on adjacent one of second panel unit, described Second secondary frame is fixedly connected on the second panel unit of adjacent another piece, and the connector is set on the described first secondary frame and institute Between stating the second secondary frame, for connecting the described first secondary frame and the second secondary frame.
3. the waterproof construction of hyperboloid curtain wall according to claim 2, which is characterized in that two pieces of adjacent second faces Between plate unit have splicing seams, the connector include first connecting portion, second connecting portion and third connecting portion, described first Connecting portion is fixedly connected with the described first secondary frame, the second connecting portion be connected to the first connecting portion and third connecting portion it Between, the third connecting portion is set towards the splicing seams, and the third connecting portion is fixedly connected with the described second secondary frame, institute It states third connecting portion and includes shielding surface, the shielding surface is directed at the splicing seams setting.
4. the waterproof construction of hyperboloid curtain wall according to claim 3, which is characterized in that the second connecting portion is towards institute The setting of first panel unit is stated, and the second connecting portion is fixed in the first panel unit.
5. the waterproof construction of hyperboloid curtain wall according to claim 3 or 4, which is characterized in that the described first secondary frame direction The first card slot/or the first fastener are provided on one end of the first connecting portion, corresponding described in the first connecting portion One card slot/or the first fastener are provided with the first fastener/or the first card slot, first fastener/or the first card slot be connected together in First card slot/or the first fastener;
The second secondary frame is towards being provided with the second card slot/or the second fastener, the third on one end of the third connecting portion Corresponding second card slot/or the second fastener are provided with the second fastener/or the second card slot on connecting portion, and second fastener/ Or second card slot be connected together in second card slot/or the second fastener.
6. the waterproof construction of hyperboloid curtain wall according to claim 4, which is characterized in that first fastener and described the The first waterproof gasket cement is equipped between one card slot, the second waterproof sealing is equipped between second fastener and second card slot Glue.
7. the waterproof construction of hyperboloid curtain wall according to claim 1, which is characterized in that positioned at the hyperboloid curtain wall The second panel unit of bottom includes stitching section, fixed part and rake, the stitching section another piece of institute adjacent thereto Second panel unit spliced is stated, the fixed part sets towards the first panel unit and is fixed in the first panel list Member, the rake are connected between the stitching section and the fixed part, and the rake is from the fixed part to described Rake tilts predetermined angle setting, and water dropping openings is provided on the side that the rake is connect with the stitching section.
8. the waterproof construction of hyperboloid curtain wall according to claim 1, which is characterized in that the first panel unit and institute It is aluminium sheet to state second panel unit, and the thickness of the second panel unit is more than the thickness of the first panel unit.
9. the waterproof construction of hyperboloid curtain wall according to any one of claims 1 to 4, which is characterized in that the thermal insulating material Expect for mineral wool, silicate heat-protective coatings or ceramic thermal insulation material, the thickness of the thermal insulation material is greater than or equal to 30mm.
10. the waterproof construction of hyperboloid curtain wall according to claim 1, which is characterized in that the hyperboloid curtain wall is prevented Water-bound further includes fixation kit, and the fixation kit includes the first fixing piece and the second fixing piece, and first fixing piece buries In the thermal insulation material, and the first panel unit and the thermal insulating material are fixed in the both ends of first fixing piece respectively Material, one end of second fixing piece are fixedly connected on the first panel unit, and the other end of second fixing piece is from institute It states in thermal insulation material and stretches out, and be fixed on the thermal insulation material towards on the indoor side.
CN201721674529.7U 2017-12-05 2017-12-05 A kind of waterproof construction of hyperboloid curtain wall Active CN207553387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721674529.7U CN207553387U (en) 2017-12-05 2017-12-05 A kind of waterproof construction of hyperboloid curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721674529.7U CN207553387U (en) 2017-12-05 2017-12-05 A kind of waterproof construction of hyperboloid curtain wall

Publications (1)

Publication Number Publication Date
CN207553387U true CN207553387U (en) 2018-06-29

Family

ID=62664808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721674529.7U Active CN207553387U (en) 2017-12-05 2017-12-05 A kind of waterproof construction of hyperboloid curtain wall

Country Status (1)

Country Link
CN (1) CN207553387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795046A (en) * 2017-12-05 2018-03-13 深圳华森建筑与工程设计顾问有限公司 The waterproof construction of hyperboloid curtain wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795046A (en) * 2017-12-05 2018-03-13 深圳华森建筑与工程设计顾问有限公司 The waterproof construction of hyperboloid curtain wall
CN107795046B (en) * 2017-12-05 2023-11-21 深圳华森建筑与工程设计顾问有限公司 Waterproof structure of hyperboloid curtain wall

Similar Documents

Publication Publication Date Title
CN107882184B (en) Assembled type exterior wall system construction method thereof
KR101709253B1 (en) Double combination type finish panel and wall structure using the same
CN207553387U (en) A kind of waterproof construction of hyperboloid curtain wall
KR101655725B1 (en) Special roof and Method of constructing special roof
KR102144119B1 (en) Waterproof Connector for Polycarbonate Panels
CN107795046A (en) The waterproof construction of hyperboloid curtain wall
CN209413009U (en) A kind of assembling type outer wall interlayer fireproof blocking construction
CN210067132U (en) Connection node structure between main boards of assembly type building wall
CN207553388U (en) A kind of hyperboloid curtain wall with two level waterproof construction
JP2006009564A (en) Building panel and heat insulating wall using the same
CN207296228U (en) Heat insulating decorative board
CN206205161U (en) A kind of integral type waterproof construction
CN205421554U (en) Side fascia and girder steel connected node of steel construction house
KR20150002707U (en) Joining members for connecting external finish materials improved heat-blocking ability and connecting structure of external finish materials using the same
CN210316198U (en) Outer-hanging wallboard piece structure
CN203200963U (en) L-shaped connecting structure of light wall board
CN208056372U (en) A kind of precast concrete wall panel system and its precast concrete wall panel
CN206591694U (en) Aluminum plate unit formula curtain wall
CN206737318U (en) A kind of external wall thermal insulation/decoration integration board and the heat insulation decoration integrated plate for external corner
CN205976012U (en) Waterproof board and use thereof
CN206070813U (en) A kind of paper honeycomb composite plate partition wall
CN205557915U (en) Prefabricated corner and wallboard integrated structure of light partition wall
CN105178472B (en) The sandwich heat-insulating wall structure of EPS modules
CN110130598A (en) A kind of no jointing insulating wall body decoration plate, light body structure and its construction method
CN210134564U (en) Plug-in type metal sandwich panel curtain wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant