CN207553157U - A kind of road surface inspection well construction walling crib is fixed and height adjuster - Google Patents
A kind of road surface inspection well construction walling crib is fixed and height adjuster Download PDFInfo
- Publication number
- CN207553157U CN207553157U CN201721275326.0U CN201721275326U CN207553157U CN 207553157 U CN207553157 U CN 207553157U CN 201721275326 U CN201721275326 U CN 201721275326U CN 207553157 U CN207553157 U CN 207553157U
- Authority
- CN
- China
- Prior art keywords
- walling crib
- fixed
- road surface
- crossbeam
- height adjuster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Check that well construction walling crib is fixed and height adjuster the utility model is related to a kind of road surface, including supporting rack, crossbeam, adjustment mechanism and fixed mechanism, support frame as described above is set to the both ends of the crossbeam, for the fixation of the crossbeam, the adjustment mechanism is set to the middle part of the crossbeam, the fixed mechanism is connected on the adjustment mechanism, and for removably connecting walling crib, the adjustment mechanism is used to adjust the height of the walling crib.By being directly fixed, adjusting to walling crib, adjustment is more convenient.
Description
Technical field
The utility model is related to inspection shaft construction field, especially a kind of road surface checks that well construction walling crib is fixed and height is adjusted
Engagement positions.
Background technology
Inspection shaft be the power supply for Urban Underground infrastructure, feedwater, draining, blowdown, communication, cable television, gas pipe,
The repairs such as public lighting circuit, it is easy for installation and setting.Be generally located at pipeline intersection, turning, caliber or gradient change, with
And locate at a certain distance on straight line pipeline section, it is easy for inspecting periodically auxiliary construction.
During construction there is fixed and accurate height-regulating and be not easy in the walling crib of inspection shaft, the quality of walling crib directly influences
The flatness on road surface, influences road quality after the completion of construction.Existing such as Chinese patent CN200910230438, height have opened a kind of road
Road inspection shaft concrete one-piece casting construction method and construction harness, by adjusting the height of both ends opinion adjustment walling crib, are adjusted
It is relatively complicated to have suffered journey.
Invention content
There is fixed and accurate height-regulating during in order to solve the problems, such as walling crib construction in the prior art to be not easy,
The utility model provides a kind of road surface and checks that well construction walling crib is fixed and height adjuster, by using directly adjustment well
The height of circle, adjustment process is simple, easy to adjust.
The scheme that the utility model solves the use of its technical problem is as follows:The device includes supporting rack, crossbeam, adjustment mechanism
And fixed mechanism, support frame as described above setting to the both ends of the crossbeam, for the fixation of the crossbeam, the adjustment mechanism setting
To the middle part of the crossbeam, the fixed mechanism is connected on the adjustment mechanism, for removably connecting walling crib, the tune
Complete machine structure is used to adjust the height of the walling crib.
The utility model solves the further technical solution of its technical problem:The fixed mechanism includes fixing piece, institute
It states on the annular groove that fixing piece is stuck in the walling crib.
The utility model solves the further technical solution of its technical problem:The adjustment mechanism includes adjusting rod and tune
Handle is saved, the crossbeam is equipped with adjustment hole, and the adjusting rod passes through the adjustment hole, and the adjusting rod lower end is connected to institute
It states on fixing piece, the upper end of the adjusting rod is connected to the regulation handle.
The utility model solves the further technical solution of its technical problem:The adjusting rod be threaded rod, the tune
Knothole is threaded hole, and the fixing piece is equipped with tapped through hole, the lower end connection screw thread through-hole of threaded rod.
The utility model solves the alternative technical solution of its technical problem:It is uniformly set on the adjusting rod several
Card slot, the adjustment mechanism have further included card, and the card is adjusted for being caught in the card slot by card slot.
The utility model solves the further technical solution of its technical problem:The fixing piece includes main part and stretches
Portion, what the pars contractilis can stretch is connected on the main part.
The utility model solves the further technical solution of its technical problem:Support frame as described above is stretching structure, is used for
Adjust horizontal depth of beam.
The utility model solves the further technical solution of its technical problem:Support frame as described above includes supporting rod, handle
And collet, the supporting rod are threaded rod, the supporting rod and the crossbeam thread fitting.
The utility model solves the further technical solution of its technical problem:The crossbeam is equipped with surveyors' staff.
The utility model solves the further technical solution of its technical problem:There are two the crossbeams, two horizontal strokes
Beam is connected by connecting rod, forms mouth word structure.
By using above-mentioned technical proposal, the utility model achieves following advantageous effect:By directly being carried out to walling crib
Fixed, adjustment, adjustment are more convenient.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is a kind of structure diagram of the utility model;
Fig. 2 is the enlarged drawing at A in Fig. 1;
Specific reference numeral is as follows in figure:
1st, supporting rack;11st, handle;12nd, supporting rod;13rd, collet;2nd, crossbeam;21st, adjustment hole;22nd, scale;3rd, machine is adjusted
Structure;31st, adjusting rod;32nd, regulation handle;4th, fixed mechanism;41st, fixing piece;411st, pars contractilis;412nd, main part;5th, walling crib;
51st, annular groove.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and
The component of the utility model embodiment shown can be configured to arrange and design with a variety of different.
Therefore, requirement is not intended to limit to the detailed description of the embodiment of the utility model provided in the accompanying drawings below
The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model
Embodiment, those of ordinary skill in the art's all other embodiments obtained without creative efforts, all
Belong to the range of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need to that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship be based on orientation shown in the drawings or position relationship or
The utility model product using when the orientation usually put or position relationship, be for only for ease of description the utility model and letter
Change description rather than instruction or imply signified device or element must have specific orientation, with specific azimuth configuration and
Operation, therefore it is not intended that limitation to the utility model.In addition, term " first ", " second ", " third " etc. are only used for area
Divide description, and it is not intended that instruction or hint relative importance.
In addition, the terms such as term " level ", " vertical " are not offered as requiring component abswolute level or pendency, but can be slightly
Low dip.It is not to represent that the structure has been had to if " level " only refers to that its direction is more horizontal with respect to for " vertical "
It is complete horizontal, but can be slightly tilted.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected,
Or it is integrally connected;Can be mechanical connection or electrical connection;It can be directly connected, intermediary can also be passed through
It is indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, it can be managed with concrete condition
Solve concrete meaning of the above-mentioned term in the utility model.
A kind of road surface inspection well construction walling crib 5 is fixed and height adjuster, and shown in refer to the attached drawing 1-2, which includes
Supporting rack 1, crossbeam 2, adjustment mechanism 3 and fixed mechanism 4, the setting of support frame as described above 1 is to the both ends of the crossbeam 2, for described
The fixation of crossbeam 2, the setting of adjustment mechanism 3 to the middle part of the crossbeam 2, the fixed mechanism 4 are connected to the adjustment machine
On structure 3, for removably connecting walling crib 5, the adjustment mechanism 3 is used to adjust the height of the walling crib 5.
Walling crib 5 is connected by the fixed mechanism 4, the height of the walling crib 5 is directly adjusted by the adjustment mechanism 3,
Using more convenient, adjustment is more accurate.
It in order to facilitate fixation, is not required to additionally process connecting hole in walling crib 5, the walling crib 5 can be directly connected to, make
For preferred embodiment, the fixed mechanism 4 includes fixing piece 41, and the fixing piece 41 is stuck in the annular groove 51 in the walling crib 5
On.
Further, the adjustment mechanism 3 includes adjusting rod 31 and regulation handle 32, and the crossbeam 2 is equipped with adjustment hole
21, the adjusting rod 31 passes through the adjustment hole 21, and 31 lower end of the adjusting rod is connected on the fixing piece 41, the tune
The upper end of pole 31 is connected to the regulation handle 32.By adjusting handle, the height of walling crib 5 is adjusted.
Preferably, adjusting rod 31 and crossbeam 2 pass through the horizontal depth of beam of threaded adjusting using thread fitting.It is described
Adjusting rod 31 is threaded rod, and the adjustment hole 21 is threaded hole, and the fixing piece 41 is equipped with tapped through hole, the lower end of threaded rod
Connection screw thread through-hole.
Certainly, it can be adjusted in a manner that card slot and card are clasped in this way, but this adjust is not connect
Continuous.Several card slots are uniformly set on the adjusting rod 31, and the adjustment mechanism 3 has further included card, and the card is used for
It is caught in the card slot, is adjusted by card slot.
When the crossbeam only there are one when, preferably, the fixing piece 41 include main part 412 and pars contractilis
411, what the pars contractilis 411 can stretch is connected on the main part 412.Fixing piece 41 needs during use in this way
The center of the annular groove 51 of walling crib 5 is passed through, ensures both sides balance.Preferably, the pars contractilis 411 is equipped with one section of circle
Arc, increase clamping area, ensures balance.
In order to try out in different use environments, ensureing also can be practical well in Uneven road.Preferably, institute
Supporting rack 1 is stated as stretching structure, for adjusting the height of crossbeam 2.
Preferably, support frame as described above 1 includes supporting rod 12, handle 11 and collet 13, and the supporting rod 12 is spiral shell
Rasp bar, the supporting rod 12 and the crossbeam 2 carry out thread fitting.Other modes can certainly be used to realize that supporting rod 12 can
It adjusts, this will not be repeated here.
The height of walling crib 5 is measured for convenience, the crossbeam is equipped with surveyors' staff 22.The scale 22 is preferred
It is fixed on the corresponding crossbeam in 5 outer of walling crib.
Preferably, there are two the crossbeams, two crossbeams are connected by connecting rod, form mouth word structure.
Such structure, it is more stable.
The above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to
In this, in the technical scope that any one skilled in the art discloses in the utility model, variation can be readily occurred in
Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power
Subject to the protection domain of profit requirement.
Claims (10)
1. a kind of road surface inspection well construction walling crib is fixed and height adjuster, which is characterized in that including supporting rack, crossbeam, tune
Complete machine structure and fixed mechanism, support frame as described above setting to the both ends of the crossbeam, for the fixation of the crossbeam, the adjustment machine
Structure is set to the middle part of the crossbeam, and the fixed mechanism is connected on the adjustment mechanism, for removably connecting walling crib,
The adjustment mechanism is used to adjust the height of the walling crib.
2. inspection well construction walling crib in road surface according to claim 1 is fixed and height adjuster, which is characterized in that described
Fixed mechanism includes fixing piece, and fixing piece is stuck on the annular groove in the walling crib.
3. inspection well construction walling crib in road surface according to claim 2 is fixed and height adjuster, which is characterized in that described
Adjustment mechanism includes adjusting rod and regulation handle, and the crossbeam is equipped with adjustment hole, and the adjusting rod passes through the adjustment hole, and
The adjusting rod lower end is connected on the fixing piece, and the upper end of the adjusting rod is connected to the regulation handle.
4. inspection well construction walling crib in road surface according to claim 3 is fixed and height adjuster, which is characterized in that described
Adjusting rod is threaded rod, and the adjustment hole is threaded hole, and the fixing piece is equipped with tapped through hole, the lower end connection spiral shell of threaded rod
Line through-hole.
5. inspection well construction walling crib in road surface according to claim 3 is fixed and height adjuster, which is characterized in that described
Several card slots are uniformly set on adjusting rod, and the adjustment mechanism has further included card, and the card is used to be caught in the card slot
It is interior, it is adjusted by card slot.
6. inspection well construction walling crib in road surface according to claim 4 or 5 is fixed and height adjuster, which is characterized in that
The fixing piece includes main part and pars contractilis, and what the pars contractilis can stretch is connected on the main part.
7. inspection well construction walling crib in road surface according to claim 1 is fixed and height adjuster, which is characterized in that described
Supporting rack is stretching structure, for adjusting horizontal depth of beam.
8. inspection well construction walling crib in road surface according to claim 7 is fixed and height adjuster, which is characterized in that described
Supporting rack includes supporting rod, handle and collet, and the supporting rod is threaded rod, the supporting rod and the crossbeam thread fitting.
9. inspection well construction walling crib in road surface according to claim 1 is fixed and height adjuster, which is characterized in that described
Crossbeam is equipped with surveyors' staff.
10. inspection well construction walling crib in road surface according to claim 1 is fixed and height adjuster, which is characterized in that institute
It states there are two crossbeams, two crossbeams are connected by connecting rod, form mouth word structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721275326.0U CN207553157U (en) | 2017-09-29 | 2017-09-29 | A kind of road surface inspection well construction walling crib is fixed and height adjuster |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721275326.0U CN207553157U (en) | 2017-09-29 | 2017-09-29 | A kind of road surface inspection well construction walling crib is fixed and height adjuster |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207553157U true CN207553157U (en) | 2018-06-29 |
Family
ID=62676956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721275326.0U Active CN207553157U (en) | 2017-09-29 | 2017-09-29 | A kind of road surface inspection well construction walling crib is fixed and height adjuster |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207553157U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984232A (en) * | 2019-11-28 | 2020-04-10 | 上海二十冶建设有限公司 | Well lid lifting device and method for asphalt pavement of municipal road |
-
2017
- 2017-09-29 CN CN201721275326.0U patent/CN207553157U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984232A (en) * | 2019-11-28 | 2020-04-10 | 上海二十冶建设有限公司 | Well lid lifting device and method for asphalt pavement of municipal road |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207553157U (en) | A kind of road surface inspection well construction walling crib is fixed and height adjuster | |
CN209587579U (en) | A kind of adjustment structure for height of leveling instrument | |
CN206503380U (en) | A kind of support frame for building | |
CN204854716U (en) | Levelling staff support | |
CN209459649U (en) | A kind of level triangular support bracket of hydrological monitoring | |
CN111044107A (en) | Bright channel reducing pendulum rod current surveying appearance of using | |
CN108612915A (en) | A kind of tube support arrangement based on beam support | |
CN209117030U (en) | GPS-RTK and prism arrangement centering rod | |
CN104061916B (en) | Instrument of surveying and mapping bracing frame | |
CN205174389U (en) | Positioner that installation of waste incinerator rocking arm, detection were acted as go -between with benchmark | |
CN207959047U (en) | A kind of municipal works safety height-limiting bar facilitating adjusting | |
CN204718561U (en) | Portable electric pole gradient measurement instrument | |
CN204434827U (en) | The novel means for correcting of a kind of guiding hook for spinning frame | |
CN208858301U (en) | A kind of traffic engineering road drilling machine | |
CN206263932U (en) | A kind of universal position level chi of spherical tank support column center line | |
CN102620749B (en) | A kind of calibrated mount of centering rod | |
CN207452723U (en) | A kind of Coping Construction temporary support device | |
CN204007620U (en) | Instrument of surveying and mapping bracing frame | |
CN216615566U (en) | Intelligent guide sign for creating tourist writings | |
CN209468508U (en) | A kind of cathode copper refining electrolyzing cell pay off rack | |
CN212567363U (en) | Level fixing device | |
CN206132173U (en) | Crystallizer liquid -level probe of adjustable length | |
CN212925196U (en) | Simple device for correcting parallelism of roller system of foil generation machine in copper foil production process | |
CN103308605B (en) | The multidirectional adjustable support consumed in a kind of low frequency mechanical spectrometer is measured | |
CN208284141U (en) | A kind of road construction Sign Board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |