CN207552837U - Dovetail brick - Google Patents

Dovetail brick Download PDF

Info

Publication number
CN207552837U
CN207552837U CN201721705582.9U CN201721705582U CN207552837U CN 207552837 U CN207552837 U CN 207552837U CN 201721705582 U CN201721705582 U CN 201721705582U CN 207552837 U CN207552837 U CN 207552837U
Authority
CN
China
Prior art keywords
dovetail
dovetail groove
brick
dovetails
top side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721705582.9U
Other languages
Chinese (zh)
Inventor
林承勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Martha Building Materials Co Ltd
Original Assignee
Changchun Martha Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Martha Building Materials Co Ltd filed Critical Changchun Martha Building Materials Co Ltd
Priority to CN201721705582.9U priority Critical patent/CN207552837U/en
Application granted granted Critical
Publication of CN207552837U publication Critical patent/CN207552837U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Dovetail brick belongs to brick field.Brick ontology including being in cuboid, brick ontology include top side, bottom side and the first side being looped around successively between top side and bottom side, the second side, third side and the 4th side;First side is provided with the first dovetail groove, and third side is provided with the first dovetails;The second side is provided with the second dovetail groove, and the 4th side is provided with the second dovetails;First dovetails of one brick ontology can be engaged by clamping with the first dovetail groove of another brick ontology;Second dovetails of one brick ontology can be engaged by clamping with the second dovetail groove of another brick ontology.Other dovetail bricks can be connected respectively in the first side of dovetail brick, the second side, third side and the 4th side by the first dovetails, the first dovetail groove, the second dovetails and the second dovetail groove, further reinforce the bonding strength between dovetail brick, compared to only with concrete binding, this kind of mode is more secured, make overall structure more firm, extend usage time, improve safety coefficient.

Description

Dovetail brick
Technical field
The utility model is related to brick field, in particular to dovetail brick.
Background technology
Building block is mainly realized by concrete and is bonded.But this kind of mode there are it is following the shortcomings that:
1st, the position between brick needs artificial control arrangement, and technology requirement is high, and block is engaged in throughout the year so being typically necessary Brick and the high staff of technology complete.Personnel are limited, and technology is irregular to reduce construction efficiency indirectly.
2nd, using concrete bonding between brick, according to concrete composition difference, service life is limited.
Utility model content
The purpose of this utility model is to provide dovetail brick, the quickening connection that efficiency is reinforced simultaneously between dovetail brick of laying bricks is strong Degree makes overall structure more firm.
The utility model is realized in this way:
A kind of dovetail brick, the brick ontology including being in cuboid, brick ontology include top side, bottom side and are looped around top side successively The first side, the second side, third side and the 4th side between bottom side;The setting of first side is parallel to the extension of top side direction and both ends Perforative first dovetail groove, the setting of third side are parallel to the first dovetails of top side direction extension;The second side is provided with vertically In the extension of top side direction and perforative second dovetail groove in both ends, the 4th side is provided perpendicular to the second dovetail of top side direction extension Block;
First dovetails of one brick ontology can be engaged by clamping with the first dovetail groove of another brick ontology;One brick sheet Second dovetails of body can be engaged by clamping with the second dovetail groove of another brick ontology.
First dovetail groove and the first dovetails are along the direction extension for being parallel to top side;Second dovetail groove and the second dovetails Extend along perpendicular to the direction of top side.
" dovetail groove " in " the first dovetail groove " and " the second dovetail groove " refers to:The cutting perpendicular to top side of first dovetail groove Face is in dovetail shaped, and the section for being parallel to top side of the second dovetail groove is in dovetail shaped, and the opening width of dovetail groove is from opening Gradually increase inwardly;" dovetails " in " the first dovetails " and " the second dovetails " refer to:First dovetails perpendicular to The section of top side is in dovetail shaped, and the sections for being parallel to top side of the second dovetails is in dovetail shaped, and the width of dovetails is from root Portion gradually increases to end.
First dovetails of one dovetail brick can be caught in the first swallow of another dovetail brick along the direction for being parallel to top side Stern notch, but the first dovetails can not be taken out from perpendicular to the direction of top side;Second dovetails of one dovetail brick being capable of edge It is caught in the second dovetail groove of another dovetail brick perpendicular to the direction of top side, but cannot be from the direction of top side is parallel to by second Dovetails are taken out out of second dovetail groove.So as to play company in the first side of dovetail brick, the second side, third side and the 4th side The effect connect.
During practical splicing, one piece of dovetail brick is first arranged, the first dovetails edge of one piece of dovetail brick is then parallel to top side Direction be aligned and be caught in the first dovetail groove of the block dovetail brick;The first dovetail groove edge of one piece of dovetail brick is parallel to top side again Direction and the first dovetail block alignment of the block dovetail brick be caught in;Then by the second dovetails of one piece of dovetail brick along perpendicular to top The direction of side is aligned with the second dovetail groove of the dovetail brick and is caught in, finally by the second dovetail groove of one piece of dovetail brick along perpendicular to top The direction of side is aligned with the second dovetail brick of the dovetail brick and is caught in.Complete the first side of the dovetail brick, the second side, third side and 4th side is installed by dovetail brick.Four pieces of dovetail bricks are mutually restrained with the block dovetail brick, further reinforce connection.
Set the first dovetails, the first dovetail groove, the second dovetails and the second dovetail groove that can utilize concrete bonding The preceding relative position strictly accurately determined between each dovetail brick, accelerates the speed laid bricks, to provide construction efficiency;It is filling After concrete, connection can be further reinforced only with concrete bonding, the first dovetails and the second dovetails compared to existing, Integrally-built integrated connection intensity and stability are improved, safety coefficient is provided.
Optionally, the first dovetail groove and the second dovetail groove set ball respectively, ball part protrude from the first dovetail groove and The side wall of second dovetail groove.
Optionally, the first dovetail groove and the second dovetail groove are respectively arranged with mounting groove, the mounting groove in the first dovetail groove Extending direction is parallel to the direction that the first dovetail groove is limited, and the extending direction of the mounting groove in the second dovetail groove is parallel to second The direction that dovetail groove is limited;One end closing setting of mounting groove, the other end of mounting groove open setting, and the opening of mounting groove is set The one end put removably is connected with fixture block.
Optionally, one end retraction setting towards the second side of the first dovetails forms the first guide end, is led positioned at first Part third side between end and the second side forms the first guide surface;One end towards bottom side of second dovetails is retracted setting The second guide end is formed, the part bottom side between the second guide end and bottom side forms the second guide surface.
Optionally, one end of the 4th side of direction of the first dovetail groove is provided with the first horn mouth, and the first horn mouth is through the The direction of four sides and bore towards the 4th side gradually increases;One end towards top side of second dovetail groove is provided with the second loudspeaker Mouthful, the second horn mouth gradually increases through the direction of top side and bore towards top side.
Optionally, the bore of the first dovetail groove and the first dovetails perpendicular to the section of top side from positioned at the one of the 4th side It holds and is tapered into positioned at one end of the second side;The section for being parallel to top side of the bore of second dovetail groove and the second dovetails from It is tapered into positioned at one end of top side to one end positioned at bottom side.
Optionally, the top side of brick ontology is arranged at intervals with anti-skid bulge item.
Optionally, anti-skid bulge item is trapezoidal perpendicular to the section of top side, the horizontal stroke for being parallel to top side of anti-skid bulge item Direction to width from far from top side direction to close to top side gradually increases.
Optionally, anti-skid bulge item is covered with respectively anti-skidding dot.
Optionally, anti-skid bulge item sets two, the second dovetail groove and the second dovetails be located at two anti-skid bulge items it Between.
The beneficial effects of the utility model:The dovetail brick that the application provides passes through the first dovetails, the first dovetail groove, second Dovetails and the second dovetail groove can connect other dovetail bricks respectively in the first side of dovetail brick, the second side, third side and the 4th side. On the one hand, it can quickly realize the fixation of relative position between multiple dovetail bricks, accelerate brick-laying processes, improve construction efficiency;Separately The bonding strength between dovetail brick is reinforced on one side, and compared to only with concrete binding, this kind of mode is more secured, makes entirety Structure is more firm, extends usage time, improves safety coefficient.
Description of the drawings
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the vertical view of the first structure of dovetail brick that the utility model embodiment provides;
Fig. 2 is the front view of the first structure of dovetail brick that the utility model embodiment provides;
Fig. 3 is the vertical view of second of structure of dovetail brick that the utility model embodiment provides;
Fig. 4 is the front view of second of structure of dovetail brick that the utility model embodiment provides;
Fig. 5 is the rearview of second of structure of dovetail brick that the utility model embodiment provides.
Icon:100- brick ontologies;110- top sides;120- bottom sides;The first sides of 130-;The first dovetail grooves of 131-;140- second Side;The second dovetail grooves of 141-;150- thirds side;The first dovetails of 151-;The 4th sides of 160-;The second dovetails of 161-;200- is rolled Pearl;210- mounting grooves;220- fixture blocks;The first guide ends of 300-;The first guide surfaces of 310-;The second guide ends of 400-;410- second Guide surface;The first horn mouths of 500-;The second horn mouths of 510-;600- anti-skid bulge items;The anti-skidding dots of 610-.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and The component of the utility model embodiment shown can be configured to arrange and design with a variety of different.
Therefore, requirement is not intended to limit to the detailed description of the embodiment of the utility model provided in the accompanying drawings below The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model Embodiment, those of ordinary skill in the art's all other embodiments obtained without creative efforts, all Belong to the range of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need to that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship be based on orientation shown in the drawings or position relationship or The utility model product using when the orientation usually put or position relationship, be for only for ease of description the utility model and letter Change description rather than instruction or imply signified device or element must have specific orientation, with specific azimuth configuration and Operation, therefore it is not intended that limitation to the utility model.In addition, term " first ", " second ", " third ", " the 4th " etc. It is only used for distinguishing description, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, " connection " can be fixedly connected or detachably Connection is integrally connected;Can be mechanical connection or electrical connection;It can be directly connected, centre can also be passed through Medium is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can specific feelings Condition understands concrete meaning of the above-mentioned term in the utility model.
Specific embodiment, referring to figs. 1 to Fig. 5.
As depicted in figs. 1 and 2, dovetail brick provided in this embodiment, the brick ontology 100 including being in cuboid, brick ontology 100 Including top side 110, bottom side 120 and the first side 130 being looped around successively between top side 110 and bottom side 120, the second side 140, Three sides 150 and the 4th side 160;The setting of first side 130 is parallel to the extension of 110 direction of top side and perforative first dovetail groove in both ends 131, third side 150 sets the first dovetails 151 for being parallel to the extension of 110 direction of top side;The second side 140 is provided perpendicular to 110 direction of top side extends and perforative second dovetail groove 141 in both ends, and the 4th side 160 is provided perpendicular to the extension of 110 direction of top side The second dovetails 161;
First dovetails 151 of one brick ontology 100 can be clamped with the first dovetail groove 131 of another brick ontology 100 Cooperation;Second dovetails 161 of one brick ontology 100 can be clamped with the second dovetail groove 141 of another brick ontology 100 matches It closes.
First dovetail groove 131 and the first dovetails 151 are along the direction extension for being parallel to top side 110;Second dovetail groove 141 Extend with the second dovetails 161 along perpendicular to the direction of top side 110.
" dovetail groove " in " the first dovetail groove 131 " and " the second dovetail groove 141 " refers to:First dovetail groove 131 it is vertical In the section of top side 110 in dovetail shaped, the section for being parallel to top side 110 of the second dovetail groove 141 is in dovetail shaped, and dovetail groove Opening width gradually increase inwardly from opening;" dovetails " in " the first dovetails 151 " and " the second dovetails 161 " Refer to:First dovetails 151 are in dovetail shaped perpendicular to the section of top side 110, and the second dovetails 161 are parallel to top side 110 Section in dovetail shaped, and the width of dovetails gradually increases from root to end.
First dovetails 151 of one dovetail brick can be caught in another dovetail brick along the direction for being parallel to top side 110 First dovetail groove 131, but the first dovetails 151 can not be taken out from perpendicular to the direction of top side 110;The of one dovetail brick Two dovetails 161 can be along the second dovetail groove 141 that another dovetail brick is caught in perpendicular to the direction of top side 110, but cannot The second dovetails 161 are taken out out of second dovetail groove 141 from the direction of top side 110 is parallel to.So as in dovetail brick Connection is played the role of in first side 130, the second side 140,150 and the 4th side 160 of third side.
During practical splicing, one piece of dovetail brick is first arranged, then by the first dovetails 151 of one piece of dovetail brick along being parallel to top The direction of side 110 is aligned with the first dovetail groove 131 of the block dovetail brick and is caught in;Again by the first dovetail groove 131 of one piece of dovetail brick It is aligned and is caught in the first dovetails 151 of the block dovetail brick along the direction for being parallel to top side 110;Then by the of one piece of dovetail brick Two dovetails 161 are caught in along being aligned perpendicular to the direction of top side 110 with the second dovetail groove 141 of the dovetail brick, finally by one piece Second dovetail groove 141 of dovetail brick is caught in along being aligned perpendicular to the direction of top side 110 with the second dovetail brick of the dovetail brick.It completes In the first side 130 of the dovetail brick, the second side 140,150 and the 4th side 160 of third side installation dovetail brick.Four pieces of dovetail bricks are with being somebody's turn to do Block dovetail brick mutually restrains, and further reinforces connection.
Set the first dovetails 151, the first dovetail groove 131, the second dovetails 161 and the second dovetail groove 141 can be in profit With the relative position strictly accurately determined before concrete bonding between each dovetail brick, accelerate the speed laid bricks, applied with providing Work efficiency rate;After fill concrete, compared to existing only with concrete bonding, the first dovetails 151 and the second dovetails 161 Connection can be further reinforced, integrally-built integrated connection intensity and stability is improved, safety coefficient is provided.
As shown in Figure 1, the first dovetail groove 131 and the second dovetail groove 141 set ball 200 respectively, 200 part of ball protrudes In the first dovetail groove 131 and the side wall of the second dovetail groove 141.
Ball 200 is set, can reduce the first dovetails 151 and the first dovetail groove 131 and the second dovetails 161 with Frictional force between second dovetail groove 141 makes the first dovetails 151 more swimmingly be caught in the first dovetail groove 131 and make second Dovetails 161 are more swimmingly caught in the second dovetail groove 141.Accelerate the splicing arrangement speed of dovetail brick, so as to improve whole apply Work speed.
As shown in Figure 1, the first dovetail groove 131 and the second dovetail groove 141 are respectively arranged with mounting groove 210, the first dovetail groove The extending direction of mounting groove 210 in 131 is parallel to the direction that the first dovetail groove 131 is limited, the peace in the second dovetail groove 141 The extending direction of tankage 210 is parallel to the direction that the second dovetail groove 141 is limited;One end closing setting of mounting groove 210, installation The other end of slot 210 opens setting, and one end of the open setting of mounting groove 210 is removably connected with fixture block 220.
Ball 200 is put by the one end open of mounting groove 210, is then sealed using fixture block 220, and ball 200 can be It is rolled around in mounting groove 210, the first dovetails 151 are during the first dovetail groove 131 is caught in, and ball 200 rolls, effectively Reduce the frictional force between the first dovetails 151 and the first dovetail groove 131;Second dovetails 161 are being caught in the second dovetail groove 141 During, ball 200 rolls, and effectively reduces the frictional force between the second dovetails 161 and the second dovetail groove 141.
As shown in Figure 3 and Figure 4, one end retraction setting towards the second side 140 of the first dovetails 151 forms first and is oriented to End 300, the part third side 150 between the first guide end 300 and the second side 140 form the first guide surface 310;Second swallow One end retraction setting towards bottom side 120 of tail block 161 forms the second guide end 400, positioned at the second guide end 400 and bottom side Part bottom side 120 between 120 forms the second guide surface 410.
By the first dovetails 151 of one piece of dovetail brick along being parallel to the of the direction of top side 110 and another piece of dovetail brick During the alignment of one dovetail groove 131 is caught in.First the first guide surface 310 and the first side 130 are offseted, then along the first side 130 Mobile, until the first guide end 300 of the first dovetails 151 and the first dovetail groove 131 are opposite, edge is parallel to the side of top side 110 To mobile first dovetails 151, the first dovetails 151 are caught in the first dovetail groove 131.
By the first dovetail groove 131 of one piece of dovetail brick along being parallel to the first of the direction of top side 110 and the block dovetail brick During the alignment of dovetails 151 is caught in.First the first side 130 for setting the first dovetail groove 131 is offseted with the first guide surface 310, Then move the first dovetail groove 131 along perpendicular to the direction of top side 110 in the first guide surface 310, it is known that the first dovetail groove 131 with When first guide end 300 is opposite, the first dovetail groove 131 is moved along the direction for being parallel to top side 110, realizes the first dovetails 151 With the clamping of the first dovetail groove 131.
By the second dovetails 161 of one piece of dovetail brick along the second swallow perpendicular to the direction of top side 110 and the dovetail brick During the alignment of stern notch 141 is caught in.First the second guide surface 410 is offseted with the second side 140, then the second side 140 along The second dovetails 161 are moved in the direction for being parallel to top side 110, until the second guide end 400 of the second dovetails 161 and the second swallow Stern notch 141 is opposite, and second dovetails 161 are caught in the second dovetail groove 141 along perpendicular to the direction of top side 110.
By the second dovetail groove 141 of one piece of dovetail brick along the second swallow perpendicular to the direction of top side 110 and the dovetail brick During the alignment of tail brick is caught in.First the second side 140 for setting the second dovetail groove 141 is offseted with the second guide surface 410, then It is moved in the second guide surface 410 along the direction for being parallel to top side 110, until the second dovetail groove 141 and the second dovetails 161 Second guide end 400 is opposite, and the second dovetails 161 are caught in the second dovetail groove 141.
First guide surface 310 and the second guide surface 410 are set, plays and divides the first dovetails 151 and the second dovetails 161 The effect of the first dovetail groove 131 and the second dovetail groove 141 Yin Dao be caught in, reduces the first dovetails 151 and the first dovetail groove 131 And second dovetails 161 and the second dovetail groove 141 alignment difficulty, accelerate dovetail brick splicing.
As shown in Figure 1 and Figure 5, one end of the 4th side 160 of direction of the first dovetail groove 131 is provided with the first horn mouth 500, First horn mouth 500 gradually increases through the direction of the 4th side 160 and bore towards the 4th side 160;The court of second dovetail groove 141 One end of top side 110 is provided with the second horn mouth 510, the second horn mouth 510 is through top side 110 and bore towards top side 110 Direction gradually increase.
" the first horn mouth 500 runs through the 4th side 160 " refers to that one end of the 4th side 160 of direction of the first horn mouth 500 is opened Put setting." direction of 500 bore of the first horn mouth towards the 4th side 160 gradually increases " refers to the direction of the first horn mouth 500 The bore of 160 one end of the 4th side is more than the bore that one end is connect with the first dovetail groove 131.
" the second horn mouth 510 runs through top side 110 " refers to that the one end open towards top side 110 after the second loudspeaker is set. " direction of 510 bore of the second horn mouth towards top side 110 gradually increases " refers to one end towards top side 110 after the second loudspeaker Bore be more than the bore of one end connect with the second dovetail groove 141.
Since the bore of the first horn mouth 500 is more than the bore of the first dovetail groove 131, realize the first horn mouth 500 with First dovetails 151 are easier when being aligned, and reduce the difficulty that the first dovetails 151 import the first dovetail groove 131, Neng Goujia The speed of fast dovetail brick splicing, improves construction efficiency.
Similarly, since the bore of the second horn mouth 510 is more than the bore of the second dovetail groove 141, the second horn mouth is being realized 510 are easier when being aligned with the second dovetails 161, reduce the difficulty that the second dovetails 161 import the second dovetail groove 141, It can accelerate the splicing speed of dovetail brick, improve construction efficiency.
As shown in figure 4, the bore of the first dovetail groove 131 and the first dovetails 151 perpendicular to the section of top side 110 from position It is tapered into one end of the 4th side 160 to one end positioned at the second side 140;The bore and the second dovetail of second dovetail groove 141 The section for being parallel to top side 110 of block 161 is tapered into from positioned at one end of top side 110 to positioned at one end of bottom side 120.
It is illustrated by taking the first dovetails 151 and the first dovetail groove 131 as an example, the second dovetails 161 and the second dovetail groove 141, which may be used same principle, deduces.
One end that the bore of first dovetails 151 from the first dovetail groove 131 is big is caught in, gradually to 131 mouthfuls of the first dovetail groove The small one end movement of diameter.It designs in this way, on the one hand can reduce the difficulty that the first dovetails 151 are caught in the first dovetail groove 131, soon Speed realizes the alignment of the first dovetails 151 and the first dovetail groove 131, improves the joint efficiency of two dovetail bricks;On the other hand, It can strengthen between the bonding strength between the first dovetails 151 and the first dovetail groove 131, that is, two dovetail bricks of enhancing Bonding strength, and then make overall structure more firm, improve safety coefficient.
As shown in figure 5, the top side 110 of brick ontology 100 is arranged at intervals with anti-skid bulge item 600.
Using the top side 110 of brick ontology 100 as during walking road surface, the anti-skid bulge item 600 of setting plays anti-skidding work With.
After brick ontology 100 is piled up successively, the anti-skid bulge item 600 of setting can increase the top side 110 of dovetail brick Connection area between concrete, to enhance concrete in the bonding strength of dovetail brick.
As shown in figure 5, anti-skid bulge item 600 is trapezoidal perpendicular to the section of top side 110, anti-skid bulge item 600 is put down Transverse width of the row in top side 110 gradually increases from far from direction of 110 direction of top side to close top side 110.
Using trapezoidal, the area of the outer surface of anti-skid bulge item 600 can be increased, on the one hand, increase friction area, it is another Aspect, increase and the contact area of concrete, improve bonding strength.
As shown in figure 5, anti-skid bulge item 600 is covered with respectively anti-skidding dot 610.
Anti-skidding dot 610 is set, further expands contact area, increasing friction force and bonding strength.
As shown in Figure 1 and Figure 5, anti-skid bulge item 600 sets two, and the second dovetail groove 141 and the second dovetails 161 are located at Between two anti-skid bulge items 600.
On the one hand, the second dovetails 161 and the second dovetail groove 141 are avoided, realize rational deployment;On the other hand, prevent for two 110 stress of top side that sliding raised item 600 can make dovetails evenly, avoids stress unbalance.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of dovetail brick, which is characterized in that the brick ontology including being in cuboid, the brick ontology include top side, bottom side and It is looped around the first side, the second side, third side and the 4th side between top side and bottom side successively;The first side setting is parallel to The top side direction extension and perforative first dovetail groove in both ends, the third side setting are parallel to the top side direction extension The first dovetails;The second side is provided perpendicular to the top side direction extension and perforative second dovetail groove in both ends, institute State the second dovetails that the 4th side is provided perpendicular to the top side direction extension;
First dovetails of one brick ontology can be clamped with first dovetail groove of brick ontology another described Cooperation;Second dovetails of one brick ontology can be clamped with second dovetail groove of brick ontology another described Cooperation.
2. dovetail brick according to claim 1, which is characterized in that first dovetail groove and second dovetail groove difference Ball is set, and the ball part protrudes from the side wall of first dovetail groove and second dovetail groove.
3. dovetail brick according to claim 2, which is characterized in that first dovetail groove and second dovetail groove difference It is provided with mounting groove, the extending direction of the mounting groove in first dovetail groove is parallel to first dovetail groove and is limited Direction, the extending direction of the mounting groove in second dovetail groove is parallel to the side that second dovetail groove is limited To;One end closing setting of the mounting groove, the other end of the mounting groove open setting, the open setting of the mounting groove One end is removably connected with fixture block.
4. dovetail brick according to claim 1, which is characterized in that the one of the direction the second side of first dovetails End retraction setting forms the first guide end, the part third side shape between first guide end and the second side Into the first guide surface;One end retraction setting of the direction bottom side of second dovetails forms the second guide end, positioned at institute The part bottom side stated between the second guide end and the bottom side forms the second guide surface.
5. dovetail brick according to claim 1, which is characterized in that the one of direction the 4th side of first dovetail groove End is provided with the first horn mouth, and first horn mouth is gradual through the direction of the 4th side and bore towards the 4th side Increase;One end of the direction top side of second dovetail groove is provided with the second horn mouth, and second horn mouth runs through institute It states top side and the direction of bore towards the top side gradually increases.
6. dovetail brick according to claim 1, which is characterized in that the bore of first dovetail groove and first dovetail Block is tapered into perpendicular to the section of the top side from positioned at one end of the 4th side to positioned at one end of the second side; The section for being parallel to the top side of the bore of second dovetail groove and second dovetails is from positioned at the one of the top side It holds and is tapered into positioned at one end of the bottom side.
7. dovetail brick according to claim 1, which is characterized in that the top side of the brick ontology is arranged at intervals with anti-skidding Raised item.
8. dovetail brick according to claim 7, which is characterized in that the cutting perpendicular to the top side of the anti-skid bulge item Face is trapezoidal, and the transverse width for being parallel to the top side of the anti-skid bulge item is from the separate top side direction to close to described The direction of top side gradually increases.
9. dovetail brick according to claim 7, which is characterized in that the anti-skid bulge item is covered with respectively anti-skidding dot.
10. dovetail brick according to claim 7, which is characterized in that the anti-skid bulge item sets two, second swallow Stern notch and second dovetails are located between two anti-skid bulge items.
CN201721705582.9U 2017-12-08 2017-12-08 Dovetail brick Active CN207552837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721705582.9U CN207552837U (en) 2017-12-08 2017-12-08 Dovetail brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721705582.9U CN207552837U (en) 2017-12-08 2017-12-08 Dovetail brick

Publications (1)

Publication Number Publication Date
CN207552837U true CN207552837U (en) 2018-06-29

Family

ID=62665460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721705582.9U Active CN207552837U (en) 2017-12-08 2017-12-08 Dovetail brick

Country Status (1)

Country Link
CN (1) CN207552837U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485265A (en) * 2019-08-21 2019-11-22 广州市第二市政工程有限公司 A kind of the pavement prefabricated board and its construction method of full packaged type bridges
CN116065572A (en) * 2022-12-29 2023-05-05 重庆大学 Prefabricated superposed energy underground diaphragm wall and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485265A (en) * 2019-08-21 2019-11-22 广州市第二市政工程有限公司 A kind of the pavement prefabricated board and its construction method of full packaged type bridges
CN116065572A (en) * 2022-12-29 2023-05-05 重庆大学 Prefabricated superposed energy underground diaphragm wall and construction method

Similar Documents

Publication Publication Date Title
CN207552837U (en) Dovetail brick
WO2008064170A3 (en) Devices and methods for forming a closure between fabrics and/or other materials
WO2010051432A3 (en) Retroreflective coating and method for applying a retroreflective coating on a structure
EP2962026B1 (en) Cable suspension clamp
CN102383718A (en) Combined ladder
CN206636050U (en) Antirust H profile steel
CN208088296U (en) A kind of stable soil body from anchor device
CN207699983U (en) A kind of prefabricated runway
CN106400610A (en) Rail plate structure
CN207597349U (en) Hexagonal revetment brick
CN206892121U (en) Sensor framework and wheel speed sensors
CN201783150U (en) Ice-covering-proof pole climber
CN204743654U (en) Rotatory fastener
CN208235429U (en) A kind of hydraulic engineering slope protection support frame
CN206598454U (en) A kind of Platen in Injection Molding Machine
CN207198409U (en) A kind of aerial distribution introduces optical fibre band optical cable
CN206457724U (en) A kind of steel reinforced concrete composite bridge tower structure
CN206346128U (en) A kind of reflective road mark of female
CN208502153U (en) A kind of color ecological decoration panel of coloured glaze
CN207348372U (en) A kind of building floor being conveniently replaceable
CN205529773U (en) Fast pavement way
CN108396741A (en) A kind of stable soil body from anchor device
CN209323714U (en) A kind of panel splicing device for building prefabricated buildings
CN203952187U (en) A kind of compound splicing buoy
CN209804225U (en) Auxiliary fixture for leveling and fixing spray-painting cloth advertisement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant