CN207552463U - A kind of zinc-plated production system of electric power tower - Google Patents
A kind of zinc-plated production system of electric power tower Download PDFInfo
- Publication number
- CN207552463U CN207552463U CN201721558904.1U CN201721558904U CN207552463U CN 207552463 U CN207552463 U CN 207552463U CN 201721558904 U CN201721558904 U CN 201721558904U CN 207552463 U CN207552463 U CN 207552463U
- Authority
- CN
- China
- Prior art keywords
- unit
- zinc
- conveyer belt
- plated
- discharge end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to a kind of zinc-plated production systems of electric power tower,Including pickling unit,The discharge end of the pickling unit is connected with washing the feed end of unit,The discharge end of the washing unit is connected with the feed end of drying unit,The discharge end of the drying unit is connected with the feed end of zinc-plated unit,The feed end that the discharge end of the zinc-plated unit hangs baking room with leaching is connected,Above-mentioned pickling unit can effectively clear up away the impurity such as the iron rust on angle steel,Angle steel after overpickling,The remaining acid solution on angle steel surface can be removed using unit is washed,And quickly the moisture evaporation on angle steel surface can be gone out using drying unit,And then it imports in zinc-plated unit,So as to implement the zinc-plated operation of diagonal steel,While the system can be ensured that the galvanizing quality of prefabricated zinc-plated component to steel tower,Improve the production efficiency to prefabricated zinc-plated component,It is suitable for the electric system construction needs of reality.
Description
Technical field
The utility model is related to electrical equipment technical fields, and in particular to a kind of zinc-plated production system of electric power tower.
Background technology
The steel tower of power transmission line erection is mostly assembled by galvanized angle iron, since steel tower is exposed in the external world, steel tower
Antirust is particularly important, and the steel tower of corrosion has an immense impact on to the structural stability of its own, therefore is simply sprayed on angle bar
The use demand of steel tower reality can not be adapted to by applying antirust paint, be in the prior art to receive typically using prefabricated zinc-plated component
The installation of steel tower, since the prefabricated zinc-plated component amount that steel tower needs is larger, it is therefore desirable to provide and a kind of improve zinc-plated efficiency
Production system.
Utility model content
The purpose of this utility model is:There is provided a kind of electric power tower zinc-plated production system, it can be ensured that the prefabricated plating to steel tower
While the galvanizing quality of zinc component, the production efficiency to prefabricated zinc-plated component is improved, to adapt to the electric system construction of reality
It needs.
To achieve the above object, the technical solution adopted in the utility model is:
A kind of zinc-plated production system of electric power tower, including pickling unit, discharge end and the washing unit of the pickling unit
Feed end linking, it is described washing unit discharge end be connected with the feed end of drying unit, the discharge end of the drying unit
It is connected with the feed end of zinc-plated unit, the discharge end of the zinc-plated unit is connected with the feed end of leaching extension baking room, the pickling
Unit includes pickling tube, and first conveyer belt is provided in the pickling tube, and the first conveyer belt zone face is horizontal and positioned at pickling
Below the liquid level of pond, the washing unit includes the second conveyer belt being connected with first conveyer belt discharge end, second conveyer belt
Top be provided with water spray plate, the drying unit includes the third conveyer belt being connected with the second conveyer belt discharging end, described the
Hot bellows are provided with above three conveyer belts, the air outlet of the hot bellows is directed toward zone face on third conveyer belt, the zinc-plated list
Member includes galvanized bath, is provided with the 4th conveyer belt in the galvanized bath, the 4th conveyer belt is located at third conveyer belt discharging end
Arranged beneath.
Compared with prior art, the technique effect that the utility model has is:Above-mentioned pickling unit can be effectively by angle steel
On the impurity such as iron rust clear up away, the angle steel after overpickling can be by the remaining acid solution on angle steel surface using unit is washed
It removes, and quickly the moisture evaporation on angle steel surface can be gone out using drying unit, and then import in zinc-plated unit, so as to real
The zinc-plated operation of diagonal steel is applied, while which can be ensured that the galvanizing quality of prefabricated zinc-plated component to steel tower, is improved to pre-
The production efficiency of zinc-plated component is made, is suitable for the electric system construction needs of reality.
Description of the drawings
Fig. 1 is the flow chart of the zinc-plated production system of electric power tower;
Fig. 2 is the structure diagram of the zinc-plated production system of electric power tower.
Specific embodiment
With reference to shown in Fig. 1 and Fig. 2, the further details of explanation to the utility model:
A kind of zinc-plated production system of electric power tower, including pickling unit 10, the discharge end of the pickling unit 10 and washing
The feed end linking of unit 20, the discharge end of the washing unit 20 are connected with the feed end of drying unit 30, and the drying is single
The discharge end of member 30 be connected with the feed end of zinc-plated unit 40, the discharge end of the zinc-plated unit 40 with drench extension baking room 50 into
Expect end linking, the pickling unit 10 includes pickling tube 11, is provided with first conveyer belt 12 in the pickling tube 11, and described first
12 zone face of conveyer belt is horizontal and below 11 liquid level of pickling tube, and the washing unit 20 includes and 12 discharge end of first conveyer belt
Second conveyer belt 21 of linking, the top of second conveyer belt 21 are provided with water spray plate 22, the drying unit 30 include with
The third conveyer belt 31 of second conveyer belt, 21 discharge end linking, the top of the third conveyer belt 31 is provided with hot bellows 32, institute
The air outlet for stating hot bellows 32 is directed toward zone face on third conveyer belt 31, and the zinc-plated unit 40 includes galvanized bath 41, described zinc-plated
The 4th conveyer belt 42 is provided in pond 41, the 4th conveyer belt 42 is located at 31 discharge end arranged beneath of third conveyer belt;
With reference to shown in Fig. 1 and Fig. 2, above-mentioned first conveyer belt 12 can be quickly by angle steel Surface Fe by first conveyer belt 12
Rust and impurity dissolving, to ensure the cleaning on angle steel surface, and can be by angle steel table using the second conveyer belt 21 and water spray plate 22
The remaining acid solution in face is cleaned out, and can quickly be steamed the moisture on angle steel surface using third conveyer belt 31 and hot bellows 32
It sends out, imports in galvanized bath 41, to realize the zinc-plated operation of diagonal steel, after zinc-plated, transported angle steel by manipulator
Baking room 50 is hung to leaching to dry, and then forms finished product, which can effectively improve the production efficiency of the prefabricated galvanized part to steel tower.
As the preferred embodiment of the utility model, with reference to shown in Fig. 2, the water spray plate 22 is arranged on supporting rack 23, institute
It states and is provided with collecting box 24 outside the second conveyer belt 21, the collecting box 24 is connect with elevating mechanism, and the water spray plate 22 is arranged on
In collecting box 24;
Above-mentioned elevating mechanism driving collecting box 24 moves up and down, can be by the waste water of collection to realize the collection to waste water
It deacidifies and except miscellaneous operation, waste water is recycled with realizing.
The elevating mechanism includes being arranged on cylinder 25 on supporting rack 23, the piston rod of the cylinder 25 straight down and
It is connect with collecting box 24, the bottom of the collecting box 24 is provided with inclined plate 241;
Above-mentioned inclined plate 241, which can facilitate, exports acid solution to sewage treatment unit, and deacidify to sewage and clean behaviour
Make, waste water is recycled with realizing.
To ensure the drying efficiency of diagonal steel, the lower section of the third conveyer belt 31 is provided with hot wind jet pipe 33, the heat
By pipeline connection, the wind turbine 34 is arranged at the air outlet of combustion furnace 35 air outlet of wind jet pipe 33 and wind turbine 34, described
Combustion furnace 35 is arranged in thermal-insulating body 36, and the third conveyer belt 31, which is located at the case mouth of thermal-insulating body 36, to be arranged;
The high temperature dry air that above-mentioned combustion furnace 35 generates is introduced to hot wind jet pipe 33 and hot bellows 32 by wind turbine 34
It is interior, so as to which quickly the water evaporation on angle steel surface is gone out, to ensure the drying on angle steel surface.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and
And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that by containing in the equivalent requirements of the claims is fallen
All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (4)
1. a kind of zinc-plated production system of electric power tower, it is characterised in that:Including pickling unit(10), the pickling unit(10)'s
Discharge end and washing unit(20)Feed end linking, the washing unit(20)Discharge end and drying unit(30)Charging
End linking, the drying unit(30)Discharge end and zinc-plated unit(40)Feed end linking, the zinc-plated unit(40)'s
Discharge end hangs baking room with leaching(50)Feed end linking, the pickling unit(10)Including pickling tube(11), the pickling tube
(11)Inside it is provided with first conveyer belt(12), the first conveyer belt(12)Zone face is horizontal and positioned at pickling tube(11)Liquid level under
Side, the washing unit(20)Including with first conveyer belt(12)Second conveyer belt of discharge end linking(21), described second is defeated
Send band(21)Top be provided with water spray plate(22), the drying unit(30)Including with the second conveyer belt(21)Discharge end is connected
Third conveyer belt(31), the third conveyer belt(31)Top be provided with hot bellows(32), the hot bellows(32)Go out
It is directed toward third conveyer belt in air port(31)Upper zone face, the zinc-plated unit(40)Including galvanized bath(41), the galvanized bath(41)It is interior
It is provided with the 4th conveyer belt(42), the 4th conveyer belt(42)Positioned at third conveyer belt(31)Discharge end arranged beneath.
2. the zinc-plated production system of electric power tower according to claim 1, it is characterised in that:The water spray plate(22)It is arranged on
Supporting rack(23)On, second conveyer belt(21)It is provided with collecting box outside(24), the collecting box(24)Connect with elevating mechanism
It connects, the water spray plate(22)It is arranged on collecting box(24)It is interior.
3. the zinc-plated production system of electric power tower according to claim 2, it is characterised in that:The elevating mechanism includes setting
In supporting rack(23)On cylinder(25), the cylinder(25)Piston rod straight down and and collecting box(24)Connection, it is described
Collecting box(24)Bottom be provided with inclined plate(241).
4. the zinc-plated production system of electric power tower according to claim 1, it is characterised in that:The third conveyer belt(31)'s
Lower section is provided with hot wind jet pipe(33), the hot wind jet pipe(33)With wind turbine(34)Air outlet pass through pipeline connection, the wind
Machine(34)It is arranged on combustion furnace(35)Air outlet at, the combustion furnace(35)It is arranged on thermal-insulating body(36)It is interior, the third
Conveyer belt(31)Positioned at thermal-insulating body(36)Case mouth at arrange.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721558904.1U CN207552463U (en) | 2017-11-21 | 2017-11-21 | A kind of zinc-plated production system of electric power tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721558904.1U CN207552463U (en) | 2017-11-21 | 2017-11-21 | A kind of zinc-plated production system of electric power tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207552463U true CN207552463U (en) | 2018-06-29 |
Family
ID=62679480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721558904.1U Expired - Fee Related CN207552463U (en) | 2017-11-21 | 2017-11-21 | A kind of zinc-plated production system of electric power tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207552463U (en) |
-
2017
- 2017-11-21 CN CN201721558904.1U patent/CN207552463U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203990994U (en) | A kind of steel component surface anticorrosion coating spraying system | |
CN205667937U (en) | Hydraulic support structural member painting line | |
CN107557708A (en) | A kind of closed loop galvanization production line and control method | |
CN207452224U (en) | Closed loop galvanization production line | |
CN203768462U (en) | Closed acid mist recycling device | |
CN204727956U (en) | With the steel band alkali spraying and cleaning apparatus of functions/drying | |
CN103643246A (en) | Hot-dip galvanizing production line pretreatment acid mist sealing, collecting and treating system | |
CN107363034A (en) | A kind of silico briquette cleaning drying device | |
CN111534776A (en) | Energy-saving environment-friendly hot galvanizing production system | |
CN205436122U (en) | Electrophoresis application is silane spraying mechanism for equipment | |
CN202808953U (en) | Steel pipe surface acid-washing treating device | |
CN102758238A (en) | Large electrophoresis apparatus and electrophoresis technology thereof | |
CN207552463U (en) | A kind of zinc-plated production system of electric power tower | |
CN103834942B (en) | Multifunction surface processing pond and its hair blackening liquid | |
CN203700530U (en) | Closed-collection treatment system for pretreatment acid mist of hot-dip galvanizing production line | |
CN105457793A (en) | Silane spraying mechanism for electrophoretic coating equipment | |
CN205393114U (en) | Level pipe falling film evaporation ware belt cleaning device | |
CN205966307U (en) | Super fog recovery unit that sprays paint among painting process | |
CN201952442U (en) | Gas purification tower | |
CN106222594A (en) | A kind of galvanization production line | |
CN208829820U (en) | A kind of vortex spinning roller cleaning device | |
CN109628970A (en) | A kind of zinc-plated processing technique of fastener | |
CN102978643A (en) | Online rod pickling device | |
CN202968697U (en) | Steel cylinder suspending jig for automatic spraying line and automatic spraying line | |
CN110328083B (en) | Fastener dacromet production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 Termination date: 20211121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |