CN207538475U - A kind of building steel bar hook - Google Patents
A kind of building steel bar hook Download PDFInfo
- Publication number
- CN207538475U CN207538475U CN201721288227.6U CN201721288227U CN207538475U CN 207538475 U CN207538475 U CN 207538475U CN 201721288227 U CN201721288227 U CN 201721288227U CN 207538475 U CN207538475 U CN 207538475U
- Authority
- CN
- China
- Prior art keywords
- spring
- shaft core
- shank
- steel bar
- lower shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of building steel bar hook, including shank, the bill set on the front end of shank, the rear end set on shank handle;The handle includes interior shaft core and outer shaft;The interior shaft core includes coaxially connected upper shaft core and lower shaft core, and the outer diameter of the upper shaft core is less than the outer diameter of the lower shaft core, and the upper shaft core connects the shank, and the lower shaft core stretches into the bottom of the outer shaft;The outer shaft includes the circular cylindrical chamber of the link position positioned at the upper shaft core and the lower shaft core;The handle further includes the first spring and second spring, and first spring is located in the chamber, and against the link position of the upper shaft core and the lower shaft core;The second spring is located at the bottom of the outer shaft, and against the end of the lower shaft core.The utility model proposes building steel bar hook, can also provide positioning while axial buffer can be provided, and buffering can be provided by double-spring structure.
Description
Technical field
The utility model is related to building implement technical field, more particularly to a kind of building steel bar hook.
Background technology
On building sites, it when making building girder steel, needs that reinforcing bar is fixed with fine iron wire, worker generally uses
Professional pliers carries out tying up fixation, time-consuming and laborious when being operated using pliers due to iron wire jewelry, expensive clothing and other valuables, extremely inconvenient.Also just
Because of that the patent document for having notification number to be CN202969959U discloses a kind of steel bar hook, including shank;The front end of shank
Bill is designed with, the rear end of shank is designed with rotational handle.
But steel bar hook disclosed in above-mentioned patent and in the prior art most of steel bar hook, it is drawn to iron wire
When dragging, it is along the length direction of rotational handle.And rotational handle itself can rotate, and can provide and radially buffer, it is impossible to
Axial buffer is provided.
Utility model content
To solve the technical issues of above-mentioned, the utility model proposes a kind of building steel bar hooks, can provide axial buffer, and
And positioning can also be provided while providing buffering by double-spring structure.
To achieve the above object, the utility model provides following technical solution:
A kind of building steel bar hook, including shank, the bill set on the front end of shank, the rear end set on shank handle;
The handle includes interior shaft core and outer shaft;
The interior shaft core includes coaxially connected upper shaft core and lower shaft core, and the outer diameter of the upper shaft core is less than the lower shaft core
Outer diameter, the upper shaft core connects the shank, and the lower shaft core stretches into the bottom of the outer shaft;
The outer shaft includes the circular cylindrical chamber of the link position positioned at the upper shaft core and the lower shaft core;
The handle further includes the first spring and second spring, and first spring is located in the chamber, and against
The link position of the upper shaft core and the lower shaft core;The second spring is located at the bottom of the outer shaft, and against institute
State the end of lower shaft core.
As a kind of embodiment, the outer shaft includes Upper shaft sleeve and Lower shaft sleeve, the Upper shaft sleeve and the lower axle
Set is coaxial and is threadedly coupled between the two;
The chamber and first spring are set in the Upper shaft sleeve;
The second spring is set in the Lower shaft sleeve.
As a kind of embodiment, the radius of first spring is more than the radius of the second spring, and described
The coefficient of elasticity of first spring is more than the coefficient of elasticity of the second spring.
It is coaxial between first spring and the second spring as a kind of embodiment.
As a kind of embodiment, first spring is compression spring.
As a kind of embodiment, the second spring is tension spring.
As a kind of embodiment, the surface of the shank is equipped with the axial screw thread around the shank.
The beneficial effects of the utility model compared with the prior art lie in:
The utility model provides a kind of building steel bar hook, can provide axial buffer, and pass through double-spring structure energy
Positioning can also be provided while buffering is provided.Because the length direction that the first spring and second spring are along handle is arranged on
The inside of handle, so when being pulled to iron wire, the first spring and second spring can provide axial buffer.Here lead to
It crosses two springs to be limited, interior shaft core buffering can not only be provided and is capable of providing interior axis positioning.
Description of the drawings
Fig. 1 is the side view of building steel bar hook that the utility model embodiment provides;
Fig. 2 is the sectional view of building steel bar hook that the utility model embodiment provides.
In figure:1st, bill;2nd, shank;3rd, handle;31st, interior shaft core;311st, upper shaft core;312nd, lower shaft core;32nd, outer shaft;
321st, chamber;322nd, Upper shaft sleeve;323rd, Lower shaft sleeve;34th, the first spring;35th, second spring.
Specific embodiment
Below in conjunction with attached drawing, to the utility model, above-mentioned and other technical characteristic and advantage carry out clearly and completely
Description, it is clear that described embodiment is only the section Example rather than whole embodiments of the utility model.
In one embodiment, it as shown in Figure 1, present embodiments providing a kind of building steel bar hook, including shank 2, sets
Bill 1 in the front end of shank 2, the handle 3 set on the rear end of shank 2.In use, user will hold on the handle 3, bill is used
1, which hooks iron wire, to be pullled.And it is pullled generally along the axial direction of handle 3.In the present embodiment, handle 3 is wrapped
The interior shaft core 31 and outer shaft 32 included is all changed, as shown in Figure 2.It is that interior shaft core 31 includes coaxially connected upper first
Shaft core 311 and lower shaft core 312, the outer diameter of upper shaft core 311 are less than the outer diameter of lower shaft core 312, and upper shaft core 311 connects shank 2, lower axle
Core 312 stretches into the bottom of outer shaft 32;Secondly outer shaft 32 includes the link position positioned at upper shaft core 311 and lower shaft core 312
Circular cylindrical chamber 321;In the present embodiment, also the inside of handle 3 is changed.Specifically, handle 3 further includes first
Spring 34 and second spring 35, the first spring 34 are located in chamber 321, and against the connection of upper shaft core 311 and lower shaft core 312
Position;Second spring 35 is located at the bottom of outer shaft 32, and against the end of lower shaft core 312.
In the present embodiment, the first spring 34 and second spring 35 can provide interior 31 axial buffer of shaft core, and by double
Spring structure can also provide positioning while providing buffering.Because the first spring 34 and second spring 35 are along handle 3
Length direction be arranged on the inside of handle 3, so when being pulled to iron wire, the first spring 34 and second spring 35 can
To provide axial buffer.Here it is limited by two springs, interior shaft core 31 can not only be provided and buffer and be capable of providing
Interior shaft core 31 positions.
In one embodiment, as shown in Figure 2.A kind of building steel bar hook is present embodiments provided, outer shaft 32 includes
Upper shaft sleeve 322 and Lower shaft sleeve 323, Upper shaft sleeve 322 and Lower shaft sleeve 323 are coaxial and are threadedly coupled between the two;Chamber 321 and
One spring 34 is set in Upper shaft sleeve 322;Second spring 35 is set in Lower shaft sleeve 323.
In the present embodiment, outer shaft 32 is subjected to split, is respectively set to Upper shaft sleeve 322 and Lower shaft sleeve 323, can be facilitated
Installation to components such as the first spring 34, second spring 35, interior shaft cores 31.During installation, first second spring 35 is packed into, again by
One spring 34 is packed into, finally by Upper shaft sleeve 322 on Lower shaft sleeve 323.
In one embodiment, the radius of the first spring 34 is more than the radius of second spring 35, and first spring 34
Coefficient of elasticity is more than the coefficient of elasticity of second spring 35.In the present embodiment, because the first spring 34 is closer to shank 2,
The spring that coefficient of elasticity can be taken larger.
In one embodiment, the first spring 34 is compression spring, and second spring 35 is tension spring.In the present embodiment, pass through one
Spring back-pressure, another spring are drawn, and can promote the effect that internal shaft core 31 positions.Especially positioned at 323 bottom of Lower shaft sleeve
Second spring 35 provides pulling force, and the first spring 34 in chamber 321 provides counter-pressure.
In one embodiment, the surface of shank 2 is equipped with the axial screw thread around shank 2.In the present embodiment, it can increase
The degree of roughness on 2 surface of shank.
Particular embodiments described above has carried out into one the purpose of this utility model, technical solution and advantageous effect
The detailed description of step, it should be understood that the foregoing is merely specific embodiment of the utility model, are not used to limit this reality
With novel protection domain.Particularly point out, to those skilled in the art, it is all the spirit and principles of the utility model it
Any modification, equivalent substitution, improvement and etc. that are interior, being done, should be included within the scope of protection of this utility model.
Claims (7)
1. a kind of building steel bar hook, which is characterized in that including shank (2), set on the bill (1) of the front end of shank (2), set on hook
The handle (3) of the rear end of bar (2);
The handle (3) includes interior shaft core (31) and outer shaft (32);
The interior shaft core (31) includes coaxially connected upper shaft core (311) and lower shaft core (312), the upper shaft core (311) it is outer
Diameter is less than the outer diameter of the lower shaft core (312), and the upper shaft core (311) connects the shank (2), and the lower shaft core (312) is stretched
Enter the bottom of the outer shaft (32);
The circular column of link position of the outer shaft (32) including being located at the upper shaft core (311) and the lower shaft core (312)
Shape chamber (321);
The handle (3) further includes the first spring (34) and second spring (35), and first spring (34) is positioned at the chamber
(321) in, and against the upper shaft core (311) and the link position of the lower shaft core (312);Second spring (35) position
In the bottom of the outer shaft (32), and against the end of the lower shaft core (312).
2. building steel bar hook according to claim 1, which is characterized in that the outer shaft (32) includes Upper shaft sleeve (322)
With Lower shaft sleeve (323), the Upper shaft sleeve (322) and the Lower shaft sleeve (323) are coaxial and are threadedly coupled between the two;
The chamber (321) and first spring (34) are in the Upper shaft sleeve (322);
The second spring (35) is in the Lower shaft sleeve (323).
3. building steel bar hook according to claim 2, which is characterized in that the radius of first spring (34) is more than described
The radius of second spring (35), and the coefficient of elasticity of first spring (34) is more than the elasticity system of the second spring (35)
Number.
4. building steel bar hook according to claim 2, which is characterized in that first spring (34) and the second spring
(35) it is coaxial between.
5. the building steel bar hook according to claims 1 or 2 or 3 or 4, which is characterized in that first spring (34) is pressure
Spring.
6. the building steel bar hook according to claims 1 or 2 or 3 or 4, which is characterized in that the second spring (35) is draws
Spring.
7. the building steel bar hook according to claims 1 or 2 or 3 or 4, which is characterized in that the surface of the shank (2) is equipped with
Around the axial screw thread of the shank (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721288227.6U CN207538475U (en) | 2017-10-01 | 2017-10-01 | A kind of building steel bar hook |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721288227.6U CN207538475U (en) | 2017-10-01 | 2017-10-01 | A kind of building steel bar hook |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207538475U true CN207538475U (en) | 2018-06-26 |
Family
ID=62610009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721288227.6U Expired - Fee Related CN207538475U (en) | 2017-10-01 | 2017-10-01 | A kind of building steel bar hook |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207538475U (en) |
-
2017
- 2017-10-01 CN CN201721288227.6U patent/CN207538475U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207538475U (en) | A kind of building steel bar hook | |
CN206774996U (en) | A kind of self-adaptive conductors on quad bundled line lifter | |
CN207484987U (en) | A kind of building steel bar hook with dual bearing structure | |
CN209040658U (en) | Pole guy binding tool | |
CN207526134U (en) | A kind of steel bar hook for construction | |
CN201827177U (en) | Connection device of metal wire | |
CN204661928U (en) | A kind ofly reduce the twizzle twisting with the fingers sunken effect | |
CN209610112U (en) | A kind of connection structure of umbrella stem and upper disk | |
CN206902459U (en) | A kind of security performance it is high hang drawing metal rope | |
CN202664036U (en) | Fishing rod with stronger toughness | |
CN204624839U (en) | Wire coiling machine take-up device | |
CN203506638U (en) | Mop with adjustable pull rod | |
CN206051290U (en) | A kind of crane self-locking suspension hook | |
CN204435893U (en) | The finished product prestressing tendon of band steel ring suspension ring is installed | |
CN206308530U (en) | A kind of wire line hitch | |
CN204435901U (en) | A kind of novel finished product prestressing tendon being provided with suspension ring | |
CN207420048U (en) | A kind of foldable building steel bar hook | |
CN201587078U (en) | Reinforced polypropylene core rod for rubber hoses | |
CN204435905U (en) | A kind of finished product prestressing tendon being provided with suspension ring | |
CN206143514U (en) | Hawser protector for engineering | |
CN207393673U (en) | Novel hollow rivet | |
CN202768608U (en) | Multifunctional sleeve pipe | |
CN205013458U (en) | Precious bracing piece of easy -to -draw | |
CN102771984A (en) | Handbag lifting rope and processing method thereof | |
CN207787368U (en) | A kind of spanner for being bent noise reduction packet exhaust pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 Termination date: 20181001 |