CN207529420U - A kind of Generation Side electric power ancillary service transaction system - Google Patents
A kind of Generation Side electric power ancillary service transaction system Download PDFInfo
- Publication number
- CN207529420U CN207529420U CN201721651417.XU CN201721651417U CN207529420U CN 207529420 U CN207529420 U CN 207529420U CN 201721651417 U CN201721651417 U CN 201721651417U CN 207529420 U CN207529420 U CN 207529420U
- Authority
- CN
- China
- Prior art keywords
- ancillary service
- block chain
- power
- electric power
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model is related to a kind of Generation Side electric power ancillary service transaction systems, it includes block chain transaction platform, block chain node module and execution unit, wherein, execution unit is arranged and is connect with block chain transaction platform in a distributed manner, block chain transaction platform configuration ground is realized using block chain technology in certain area, is realized between execution unit for the management of electric power ancillary service transaction;Block chain node module configuration ground is for the ancillary service trading processing between block chain transaction platform and each execution unit or between execution unit and preservation.The utility model can change the management mode that the grid dispatching center of current centralization merchandises to electric power ancillary service, the dynamic role in each power plant is given full play to, intelligently top gain mode manages the support services of each power plant using block chain cloud platform.
Description
Technical field
The utility model is related to block chain technical applications, particularly a kind of to realize power generation using block chain technology
Side electric power auxiliary transaction system.
Background technology
Block chain technology is considered as the computer neck after mainframe, PC, internet, movement/social networks
Formula innovation, and the change people other than artificial intelligence and big data that global scientific and technological circle unanimously have an optimistic view of are overturned in the 5th time of domain
The Scientific And Technical means of class future historical progress.Block chain technology is the blank of next-generation cloud computing, is expected to as internet
Thoroughly remodeling human social activity form, and realize the transformation from current information interconnected network to value internet.
It is referred to as within 2016 the block chain first year, traditional financial institution, financial technology enterprise, Internet enterprises are paid close attention to one after another
The development and application of block chain.May in the same year, 25 enterprises including Huawei, Tencent, Jingdone district, safety bank etc. participate in simultaneously
Formally set up financial block chain cooperative alliances, block chain technology is applied to love donation platform by the ant gold clothes under Ali.
The block chain alliance that Ministry of Industry and Information takes the lead is also issued《Chinese block chain technology and application development white paper (2016)》.Block
Chain industry just develops towards the framework similar with cloud computing, passes through the design of standardization so that the entity participated in business can be light
Loose ground is disposed and application, and increasingly focuses on the value-added service that can create more high added value.
At present, expert starts to explore application mode of the block chain technology on electricity transaction, due to China's electric power
Marketing field is later with respect to development abroad, and existing transaction credit system is still that structure in regulatory agency is to be perfectly safe
On the basis of, once and " being perfectly safe " node of centralization goes wrong, it will cause the losses of irreversible catastrophic type.But
For the ancillary service transaction of Power Plant Side in power grid, there is presently no people to consider application block chain technology.
So-called power grid ancillary service refer to for safeguard electric system safe and stable operation, ensure power quality, except just
Normal electrical energy production, conveying, using service that is outer, being provided by electricity power enterprise, enterprises of managing electric wire netting and power consumer, including:Once
Frequency modulation, Automatic Generation Control (AGC), peak regulation, generation schedulecurve, Reactive-power control etc., are examined and are settled accounts in a manner of monthly.Current
The ancillary service transaction platform changed centered on this managed operation mode or grid dispatching center, plannedly from scheduling
The heart is sent to the dispatch command of each power plant, and since instruction has certain delay, even AGC is controlled not yet for some power plant at present,
Many power plant's ancillary services is caused to examine unqualified and imposed a fine.In addition, the fine of annual ancillary service and reward are in each electricity
Shared between factory there is also huge management problems, it is difficult to accomplish it is complete fair and reasonable.
Recently as the rapid development of China's national economy, demand of the people to electric power also sharply increases, peak-valley difference day
Benefit increase.In addition, the rapid development of the power supplys such as wind energy, nuclear energy, the relative reduction self-adjusting ability of power grid accesses on a large scale
Wind turbines even introduce additional random power disturbance, and grid stability is made further to deteriorate.Therefore, China is adjusting at present
Following in unit black starting-up etc. in terms of peak and frequency modulation, assisted hatching notch in terms of these is inevitable with can be again
The further development of raw energy power generation will be increasing.
Utility model content
In order to solve the above-mentioned technical problem, using block chain technology the utility model constructs point-to-point ancillary service and hands over
Easy module can be integrated completely with existing dispatching of power netwoks platform, so as to fulfill automatically point-to-point electric power auxiliary clothes
Business transaction.
For this purpose, the utility model provides a kind of Generation Side electric power ancillary service transaction system, it is flat including the transaction of block chain
Platform, block chain node module and execution unit, wherein, execution unit in certain area in a distributed manner arrangement and with block chain
Transaction platform connects, and each execution unit corresponds to a block chain node module.
Preferably, execution unit is provided in executive device or ancillary service in power plant or outside power plant
External equipment or interruptible load device.
Preferably, power plant be thermal power plant, hydraulic power plant, nuclear power station, gas power station, wind power station,
In photo-voltaic power generation station, biomass power plant, garbage incineration power plant, fuel cell power plant, virtual power station any one or it is several
The combination of kind.
Preferably, executive device is boiler increasing and decreasing load device, steam turbine timing steam gate device, turbine by pass adjusting dress
Put, condensate throttling device, cut be turned up plus or low feeder apparatus in any one or the combination of several of them.
Preferably, ancillary service external equipment is electric boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, accumulation of energy
Any one or the combination of several of them in device.
Preferably, energy storage equipment is any one in electrochemical storage cell, physics energy storage device, kinetic energy energy storage device
Device.
Preferably, electrochemical storage cell is lithium ion battery, plumbic acid, lead carbon, ni-mh, ni-Cd, sodium sulphur, vanadium liquid sulphur, magnesium,
Any one in nickel zinc, zinc air battery.
Preferably, interruptible load device is electric boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, accumulation of energy dress
Any one or the combination of several of them in putting.
Generation Side electric power ancillary service transaction system provided by the utility model can change the power grid tune of current centralization
The management mode that degree center merchandises to electric power ancillary service gives full play to the dynamic role in each power plant, is put down using block chain cloud
Intelligently top gain mode manages the support services of each power plant to platform.This distributed point-to-point electric power auxiliary
Service transacting can accomplish that automatic perform of transaction is arrived account with Transaction Income and fulfilled in real time, and each power plant can be according to itself feelings
Condition formulates the price of sale or purchase ancillary service.Further, since all electric power ancillary service transaction data can not be distorted and
It is stored in a distributed manner in the block chain module of each power plant, it is ensured that data safety and the fairness of transaction.
Description of the drawings
In the attached drawing being not drawn necessarily to scale, identical reference numeral can be similar described in different views
Component.Same reference numerals with different letter suffix can represent the different instances of similar members.Attached drawing generally through
The mode of citing rather than limitation shows various embodiments, and is used for together with specification and claims to disclosed
Embodiment illustrate.In due course, make to be referred to identical reference in all the appended drawings same or similar
Part.Such embodiment is exemplary, and is not intended as the exhaustive or exclusiveness of the present apparatus, system or method
Embodiment.
Fig. 1 show the utility model is related to Generation Side electric power ancillary service transaction system structure diagram;
Fig. 2 shows the utility model is related to Generation Side electric power ancillary service transaction system in block chain transaction platform
Schematic network structure.
Specific embodiment
It is below in conjunction with the accompanying drawings and specific real for those skilled in the art is made to more fully understand the technical solution of the utility model
Mode is applied to elaborate to the utility model.
The utility model is related to a kind of Generation Side electric power ancillary service transaction system, the Generation Side electric power ancillary service
Transaction system is generally used in certain area, in such certain area it is general be equipped in a distributed manner multiple power plants or
Other facilities, these power plants can according to actual conditions and demand selective selling or the different electric power ancillary service of purchase and
Determine corresponding price.The utility model is related to ancillary service transaction system being capable of intelligence using block chain technology combination cloud platform
The ancillary service transaction in each power plant of management of energyization, and cause whole income highest.In addition, this ancillary service transaction
System point-to-point electric power ancillary service transaction can accomplish that the automatic of transaction performs and merchandise between each power plant
Income arrives account and fulfils in real time.
The technical solution of the utility model is described in further detail below by embodiment.
Embodiment 1:
In embodiment 1, specifically, as shown in Figure 1, the Generation Side electric power ancillary service transaction system includes block chain
Transaction platform 1, block chain node module 2 and execution unit 3, wherein, execution unit 3 is arranged simultaneously in a distributed manner in certain area
And connect with block chain transaction platform 1 by communication line, this certain area generally refers to block chain network range, each holds
Row unit 3 corresponds to a block chain node module 2, and block chain node module 2 gives each 3 one unique ID of execution unit,
The node of unique ID namely in certain area or in the range of block chain network.
Wherein, the block chain transaction platform 1 can be integrated in the management control system of grid dispatching center in operation
In, configuration ground is realized using block chain technology in certain area, is realized between block chain transaction platform 1 and execution unit 3
The point-to-point management for electric power ancillary service transaction;Specifically, as a preferred embodiment, 1 energy of block chain transaction platform
The ancillary service enough realized refers to the ancillary service of Generation Side, can be peak regulation, frequency modulation, reactive power/voltage control, black starting-up, mediation
One or several kinds of combinations in the types such as spare, interruptible load, electric energy storage;It is further preferred that the block chain is handed over
The ancillary service transaction that easy platform 1 can be realized can be counterparty's authentication, trading account management, trading rules formulate,
The intelligent contract of transaction, transaction data analysis, transaction results show in any one or the combination of several of them.
The block chain node module 2 corresponds to each execution unit 3, can be integrated in the collection control of each execution unit 3
In system, the automatic point-to-point ancillary service being used to implement to configuration in the case where meeting trading strategies and intelligent treaty conditions is handed over
Easily, configuration ground is between certain area intra block chain transaction platform 1 and each execution unit 3 or between execution unit 3
Point-to-point ancillary service transaction processing and preservation, wherein, for ancillary service transaction processing, above-mentioned block chain node mould
Block 2 can realize that ancillary service sales quotation, purchase quotation, AGC linkages, ancillary service trading strategies are formulated, intelligent contract, bought
Any one or the combination of several of them in vendor identification;For the preservation of ancillary service transaction, refer to the letter of ancillary service transaction
Breath and data are stored in by filling timestamp and with can not distorting in corresponding block chain node module 2.
The execution unit 3 is arranged in a distributed manner in certain area, specifically, execution unit 3 is in power plant
The device of outer setting, for example, execution unit 3 can be the executive device or power plant in generating set in power plant
The ancillary service external equipment of the auxiliary power generation unit operation of interior setting, can also be and be located in certain area power grid outside power plant
Interruptible load device, wherein, the power plant can be thermal power plant in certain area, hydraulic power plant, nuclear power
Stand, gas power station, wind power station, photo-voltaic power generation station, biomass power plant, garbage incineration power plant, fuel cell power plant, void
Send out any one or the combination of several of them in power station.
Preferably, the executive device in the power plant in generating set can be boiler increasing and decreasing load device, steam turbine
Adjust valve gear, turbine by pass regulating device, condensate throttling device, excision it is high plus or low feeder apparatus in any one or
Several combinations;
As another preferred embodiment, in the power plant set ancillary service external equipment can be electric boiler, electric heating pump,
Any one or the combination of several of them in electric compression refigerating machine, electrolytic hydrogen production slot, energy storage equipment, wherein, the energy storage equipment can
To be electrochemical storage cell, such as lithium ion battery, plumbic acid, lead carbon, ni-mh, ni-Cd, sodium sulphur, vanadium liquid sulphur, magnesium, nickel zinc, zinc are empty
Any one or a few in gas accumulator can also be any one dress in physics energy storage device or kinetic energy energy storage device
It puts;
In addition, as another preferred embodiment, the interruptible load device being located at outside the power plant in certain area power grid can
Be located at outside power plant electric boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, any one in energy storage equipment
Or several combination.
The utility model is related to Generation Side electric power ancillary service transaction system at runtime, 1 base of block chain transaction platform
In management and control that block chain technology merchandises to electric power ancillary service by network architecture realization, wherein, as shown in Fig. 2, institute
The network structure of block chain transaction platform 1 stated includes application layer, contract common recognition layer and network data plane;Wherein, application layer knot
The basic constitution element of structure includes registration login, real-name authentication, buyer's registration, seller's registration, aptitude checking, account management, buys
Sell transaction, basis of price adjustment, platform webpage interface and D7000 scheduling system sub-interfaces;Contract common recognition layer structure it is basic
Constitution element includes account center, ancillary service transaction registration, ancillary service prices match, ancillary service transaction realization, common recognition
Mechanism, intelligent contract and payment system;The basic constitution element of network data plane structure includes data block, timestamp, Kazakhstan
Ancillary service flag, point to point network, authentication mechanism, Merkle (Merkel) trees are sold in uncommon hash, asymmetric encryption, 0/1 purchase
Any one or the combination of several of them in single data, key management, public key and private key.
Further, wherein described 0/1 purchase sell ancillary service flag refer to having in block chain data Layer it is a certain
The specifically defined binary digit in position;The binary digit represents seller of the present node as ancillary service using 0;1 represents
Present node is the purchaser of ancillary service;Or the binary digit represents present node as purchaser using 0,1 representative is worked as
Front nodal point is seller;Wherein, the present node is possible to a certain moment as seller, and subsequent time becomes purchaser again.
Below by specific example, introduce and how using above-mentioned Generation Side electric power ancillary service transaction system to carry out auxiliary clothes
The management of business transaction.
In the present embodiment, certain large-scale thermal power machine group passes through block with certain larger wind power plants in certain area
The intelligent contract of chain module realizes point-to-point depth peak regulation ancillary service, the sale of ancillary service with the price of mutual concession
It is just the fired power generating unit with depth peak modulation capacity, purchaser's larger wind power plants;At this point, fired power generating unit passes through peak regulation service
Income is obtained, and wind power station increases the electricity volume of oneself, although transaction by buying the Peak Load of ancillary service
Electricity price is very low, but wind power station obtains additional income by tradable green certificates or emission reduction CO2 the carbon index formed or passes through
The online subsidy of the wind-powered electricity generation in country or place obtains income.
Embodiment 2:
The structure of Generation Side electric power ancillary service transaction system that the present embodiment is related to is substantially the same manner as Example 1, difference
The ancillary service being only that in the present embodiment refers to the peak regulation ancillary service of Generation Side, as the executive device of peak regulation service, both
It can be that general peak regulation is carried out by the boiler increasing and decreasing load device in generating set, can also be taken by the auxiliary in power plant
Be engaged in the electric boiler in external equipment, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, energy storage equipment any one or it is several
The combination of kind carries out the depth peak regulation of power plant.
Embodiment 3:
The structure of Generation Side electric power ancillary service transaction system that the present embodiment is related to is substantially the same manner as Example 1, difference
The frequency modulation ancillary service of Generation Side is refered in particular in the ancillary service being only that in the present embodiment, as the executive device of frequency modulation service, both
Can be by aperture of the aperture of the steam turbine timing steam gate device in regulator generator group or turbine by pass regulating device etc.
Mode is realized, can also pass through condensate throttling device, excision height plus or the low feeder apparatus in generating set in regulating station
Any one or a few combination in carries out fast frequency hopping, can also pass through the ancillary service external equipment in power plant such as electricity
Any one or the combination of several of them in boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, energy storage equipment carries out general
Frequency modulation.
Embodiment 4:
The structure of Generation Side electric power ancillary service transaction system that the present embodiment is related to is substantially the same manner as Example 1, difference
The black starting-up ancillary service of Generation Side, this sale or purchase black starting-up auxiliary are refered in particular in the ancillary service being only that in the present embodiment
The power plant of service is that thermal power plant, gas power station, fuel cell power plant etc. have Fast Starting and ability
Any one or the combination of several of them in power station.
Embodiment 5:
The structure of Generation Side electric power ancillary service transaction system that the present embodiment is related to is substantially the same manner as Example 1, difference
The mediation Reserve Ancillary Service of Generation Side is refered in particular in the ancillary service being only that in the present embodiment, and this sale or purchase mediate spare
The power plant of ancillary service is steam power plant or thermoelectricity flexibility peak regulation depth with main steam bypass and large-scale heat supply network heat exchanger
Reach the thermoelectricity unit of 0 electricity volume, so as to realize the complete thermoelectricity decoupling of short time, i.e., boiler and steam turbine can be one
It fixes time interior recovered part load or generating capacity at full capacity, so as to as providing the stand-by heat ancillary service of qualification for power grid
Power station.
Embodiment 6:
The structure of Generation Side electric power ancillary service transaction system that the present embodiment is related to is substantially the same manner as Example 1, passes through
The accumulator of Generation Side in power grid provides ancillary service, these accumulators may be mounted at thermal power plant, hydraulic power plant,
In nuclear power station, gas power station, wind power station, photo-voltaic power generation station, biomass power plant, garbage incineration power plant, virtual power station
Any one or the combination of several of them.
Certainly, the above is the preferred embodiment of the utility model, it is noted that for the common of the art
For technical staff, under the premise of the utility model principle is not departed from, several improvements and modifications can also be made, these improvement
The scope of protection of the utility model is also considered as with retouching.
Claims (8)
1. a kind of Generation Side electric power ancillary service transaction system, including block chain transaction platform, block chain node module and holds
Row unit, wherein, the execution unit in certain area is arranged and is connect with the block chain transaction platform in a distributed manner,
Each execution unit corresponds to a block chain node module.
2. Generation Side electric power ancillary service transaction system according to claim 1, supplementary features are described to perform list
Member is provided in the executive device ancillary service external equipment in power plant or outside power plant or can interrupt negative
Lotus device.
3. Generation Side electric power ancillary service transaction system according to claim 2, supplementary features are the power plant
It is thermal power plant, hydraulic power plant, nuclear power station, gas power station, wind power station, photo-voltaic power generation station, biomass power plant, rubbish
Rubbish burns any one or the combination of several of them in power station, fuel cell power plant, virtual power station.
4. Generation Side electric power ancillary service transaction system according to claim 3, supplementary features are described to perform dress
To put be boiler increasing and decreasing load device, steam turbine timing steam gate device, turbine by pass regulating device, condensate throttling device, cuts height-regulating
Add or low feeder apparatus in any one or the combination of several of them.
5. Generation Side electric power ancillary service transaction system according to claim 4, supplementary features are the auxiliary clothes
Business external equipment is any one or a few in electric boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, energy storage equipment
Combination.
6. Generation Side electric power ancillary service transaction system according to claim 5, supplementary features are the accumulation of energy dress
It is any one device in electrochemical storage cell, physics energy storage device, kinetic energy energy storage device to put.
7. Generation Side electric power ancillary service transaction system according to claim 6, supplementary features are the electrochemistry
Accumulator is lithium ion battery, appointing in plumbic acid, lead carbon, ni-mh, ni-Cd, sodium sulphur, vanadium liquid sulphur, magnesium, nickel zinc, zinc air battery
Meaning is a kind of.
8. Generation Side electric power ancillary service transaction system according to claim 7, supplementary features are described to interrupt
Load device is any one or a few in electric boiler, electric heating pump, electric compression refigerating machine, electrolytic hydrogen production slot, energy storage equipment
Combination.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721651417.XU CN207529420U (en) | 2017-12-01 | 2017-12-01 | A kind of Generation Side electric power ancillary service transaction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721651417.XU CN207529420U (en) | 2017-12-01 | 2017-12-01 | A kind of Generation Side electric power ancillary service transaction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207529420U true CN207529420U (en) | 2018-06-22 |
Family
ID=62578677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721651417.XU Active CN207529420U (en) | 2017-12-01 | 2017-12-01 | A kind of Generation Side electric power ancillary service transaction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207529420U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107993009A (en) * | 2017-12-01 | 2018-05-04 | 赫普科技发展(北京)有限公司 | A kind of Generation Side electric power assistant service transaction system |
CN109087131A (en) * | 2018-07-18 | 2018-12-25 | 青岛陶知电子科技有限公司 | A kind of garbage classification and reward on total mark system based on block chain framework |
CN110059138A (en) * | 2019-03-12 | 2019-07-26 | 国网辽宁省电力有限公司信息通信分公司 | One kind being based on big data platform data analysis domain architecting method |
CN111342313A (en) * | 2018-12-18 | 2020-06-26 | 赫普科技发展(北京)有限公司 | Block chain intelligent remote control patch board |
-
2017
- 2017-12-01 CN CN201721651417.XU patent/CN207529420U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107993009A (en) * | 2017-12-01 | 2018-05-04 | 赫普科技发展(北京)有限公司 | A kind of Generation Side electric power assistant service transaction system |
CN109087131A (en) * | 2018-07-18 | 2018-12-25 | 青岛陶知电子科技有限公司 | A kind of garbage classification and reward on total mark system based on block chain framework |
CN111342313A (en) * | 2018-12-18 | 2020-06-26 | 赫普科技发展(北京)有限公司 | Block chain intelligent remote control patch board |
CN110059138A (en) * | 2019-03-12 | 2019-07-26 | 国网辽宁省电力有限公司信息通信分公司 | One kind being based on big data platform data analysis domain architecting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107993009A (en) | A kind of Generation Side electric power assistant service transaction system | |
CN207529420U (en) | A kind of Generation Side electric power ancillary service transaction system | |
Hou et al. | How to improve the competiveness of distributed energy resources in China with blockchain technology | |
Ghiassi-Farrokhfal et al. | Optimal design of solar PV farms with storage | |
Gosens et al. | China’s role in the next phase of the energy transition: Contributions to global niche formation in the Concentrated Solar Power sector | |
CN109245091B (en) | Double-layer strategy scheduling method for electricity selling company | |
Kumar et al. | Customer‐oriented energy demand management of grid connected microgrids | |
CN109784554A (en) | A kind of electric system optimal scheduling method based on leader-followers games | |
CN110445125A (en) | A kind of photovoltaic, energy storage and power transmission network coordinated planning method | |
CN115204562B (en) | Multi-energy sharing-based distributed collaborative optimization scheduling method and system for interconnected micro energy networks | |
Lazaroiu et al. | Energy trading optimization of a virtual power plant on electricity market | |
CN111210048A (en) | Energy storage capacity configuration method and device, computer equipment and readable storage medium | |
Charles Rajesh Kumar et al. | Advances and development of wind–solar hybrid renewable energy technologies for energy transition and sustainable future in India | |
Alliance | Energy Storage Industry White Paper 2022 (Summary Version) | |
Song et al. | Distributed Energy Management for Zero‐Carbon Port Microgrid | |
CN113870030A (en) | Multi-microgrid energy transaction mechanism design method based on improved Nash bargaining method | |
Shang et al. | Grid-side energy storage system day-ahead bidding strategy based on two-level decision in spot market | |
Ye et al. | Optimal Scheduling Method of Virtual Power Plant Based on Model Predictive Control | |
Liu et al. | Electricity‐Carbon Joint Trading of Virtual Power Plant with Carbon Capture System | |
Wang et al. | Research on operation strategy optimization method of multi-energy complementary new energy generation system | |
Wang et al. | Robust optimization day-ahead trading strategy for virtual power plant in energy market | |
Zhang et al. | Cooperative operation strategy of electricity-carbon market considering randomness and correlation of electricity-carbon price | |
Ying et al. | Research on Bidding Strategy of Virtual Power Plant Considering Risk Preference | |
Yang et al. | Positive‐Sum Game‐Based Capacity Configuration Planning Method of Solar‐Wind‐Battery System Designed for Black‐Start | |
Ramos et al. | Site selection and economic risks for thermal power plant projects under the new Brazilian regulatory framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180725 Address after: 100176 Beijing Beijing economic and Technological Development Zone, Chuang Chuang thirteen Street 18 building 12, 5 floors 503 rooms. Patentee after: Beijing HEMPEL Electric Power Technology Co., Ltd. Address before: 100176 building 12, 18 Chuang thirteen street, Beijing economic and Technological Development Zone. Patentee before: HEMPEL technology development (Beijing) Co., Ltd. |