CN207527136U - Municipal supplying drainage channel fixing device - Google Patents
Municipal supplying drainage channel fixing device Download PDFInfo
- Publication number
- CN207527136U CN207527136U CN201721664068.5U CN201721664068U CN207527136U CN 207527136 U CN207527136 U CN 207527136U CN 201721664068 U CN201721664068 U CN 201721664068U CN 207527136 U CN207527136 U CN 207527136U
- Authority
- CN
- China
- Prior art keywords
- lower plate
- leading screw
- fixedly mounted
- arc panel
- horizontal axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
Municipal supplying drainage channel fixing device, including pedestal, vertical screw shell is fixedly mounted in pedestal top, leading screw is equipped in screw shell, leading screw and screw shell thread fitting, the upper end of leading screw is equipped with branch sleeve, leading screw is flexibly connected with branch sleeve bearing, arc lower plate is fixedly mounted in the upper end of branch sleeve, arc lower plate top is equipped with upper arc panel, arc lower plate is oppositely arranged with upper arc panel, arc lower plate and the right end of upper arc panel are articulated and connected, lateral latch is fixedly mounted in arc lower plate and the left end of upper arc panel, locking plate top surface opens up first through hole, two first through hole center lines are coaxial, the right side of branch sleeve is equipped with horizontal axis, the left end of horizontal axis is flexibly connected with branch sleeve side bearing.The utility model helps staff that can first fix water supply line, then proceeds by the adjusting of duct height, realizes mostly with abutting joint work accurate between water supply line.
Description
Technical field
The utility model belongs to pipeline prop technical field, and specifically a kind of municipal water supply and sewerage pipeline fixes dress
It puts.
Background technology
With the development of society, people's majority uses the central water supply of Running-water Company now, supply tap water needs to spread
If a large amount of water supply line, water supply line needs the stent using pipeline support, and traditional support height is certain, it is impossible to adjust high
Degree, also there is a prop that can adjust height at present, but these stent majorities are needed first to adjust after height in installing pipe
Road, Pipe installing cannot continue to adjust after the completion, because adjusting such prop needs the lower section of pipe laying position,
The top of pipeline is difficult to be continued to adjust to prop.
Utility model content
The utility model provides a kind of municipal supplying drainage channel fixing device, the defects of to solve in the prior art.
The utility model is achieved by the following technical programs:
Municipal supplying drainage channel fixing device, including pedestal, vertical screw shell, thread bush is fixedly mounted in pedestal top
Leading screw, leading screw and screw shell thread fitting are equipped in cylinder, the upper end of leading screw is equipped with branch sleeve, leading screw and branch sleeve bearing
Flexible connection, the upper end of branch sleeve are fixedly mounted arc lower plate, and arc lower plate top is equipped with upper arc panel, arc lower plate with it is upper
Arc panel is oppositely arranged, and arc lower plate and the right end of upper arc panel are articulated and connected, and arc lower plate and the left end of upper arc panel are solid
The lateral latch of Dingan County's dress, locking plate top surface open up first through hole, and two first through hole center lines are coaxial, the right side of branch sleeve
Side is equipped with horizontal axis, and the left end of horizontal axis is flexibly connected with branch sleeve side bearing, and the first bevel gear, leading screw are fixedly mounted on horizontal axis
The second bevel gear of upper fixed suit, the first bevel gear engage cooperation with the second bevel gear, and upper arc panel upper right passes through stent
Regulating sleeve is fixedly mounted, adjusting rod is equipped in regulating sleeve, adjusting rod can slidably reciprocate along regulating sleeve length direction, adjust
Be equipped with connecting rod between the lower end of bar and horizontal axis right end, the upper and lower ends of connecting rod respectively with the right end of the lower end of adjusting rod and horizontal axis it
Between connected by Hooks coupling universal coupling.
Municipal administration supplying drainage channel fixing device as described above, the arc lower plate are fixed with upper arc panel medial surface
Anti-skid rubber cushion is installed.
Municipal administration supplying drainage channel fixing device as described above, the upper side of the adjusting rod open up the second through-hole.
Municipal administration supplying drainage channel fixing device as described above, by several uniform between the pedestal and screw shell
The brace of distribution is fixedly connected.
The utility model has the advantages that:The utility model helps staff that can first fix water supply line, then proceedes to
The adjusting of duct height is carried out, realizes that staff can be in pipeline mostly with abutting joint work accurate between water supply line
Top the height of the utility model is adjusted, operate enhanced convenience and safety, the utility model be simple in structure and secured.
When carrying out the installation of water supply line using the utility model, water supply line is clamped by arc lower plate and upper arc panel first,
Then two latch are fixed by bolt, water supply line is fastened, then rotate adjusting rod using tool, adjusting rod is ten thousand
Horizontal axis rotation is driven under the gearing of shaft coupling and connecting rod, horizontal axis is in the mating reaction of the first bevel gear and the second bevel gear
Lower drive leading screw rotation, can be with height of the adjusting screw in screw shell under the effect of the thread fitting of leading screw and screw shell
Degree, so as to adjust the height of water supply line.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is
Some embodiments of the utility model, for those of ordinary skill in the art, in the premise of not making the creative labor property
Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of the utility model;Fig. 2 is the usage state diagram of the utility model.
Reference numeral:7 latch of arc panel on 1 pedestal, 2 screw shell, 3 leading screw, 4 branch sleeve, 5 arc lower plate 6
8 first through hole, 9 horizontal axis, 10 first 14 adjusting rod of bevel gear 11 second bevel gear, 12 stent, 13 regulating sleeve, 15 connecting rod
16 Hooks coupling universal coupling, 17 18 second through-hole of anti-skid rubber cushion, 19 brace.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model
Example, those of ordinary skill in the art's all other embodiments obtained without creative efforts, belongs to
The range of the utility model protection.
Municipal supplying drainage channel fixing device, as shown in the figure, including pedestal 1, vertical screw thread is fixedly mounted in 1 top of pedestal
Sleeve 2, screw shell 2 is interior to be equipped with leading screw 3, leading screw 3 and 2 thread fitting of screw shell, and the upper end of leading screw 3 is equipped with branch sleeve 4,
Leading screw 3 is flexibly connected with 4 bearing of branch sleeve, and arc lower plate 5 is fixedly mounted in the upper end of branch sleeve 4, and 5 top of arc lower plate is set
There is upper arc panel 6, arc lower plate 5 is oppositely arranged with upper arc panel 6, and arc lower plate 5 and the right end of upper arc panel 6 are articulated and connected,
The left end of arc lower plate 5 and upper arc panel 6 is fixedly mounted lateral latch 7, and 7 top surface of latch opens up first through hole 8, and two
A 8 center line of first through hole is coaxial, and the right side of branch sleeve 4 is equipped with horizontal axis 9, left end and the 4 side bearing of branch sleeve of horizontal axis 9
It is flexibly connected, the first bevel gear 10 is fixedly mounted on horizontal axis 9, the second bevel gear 11 of suit, the first bevel gear 10 are fixed on leading screw 3
Cooperation is engaged with the second bevel gear 11, regulating sleeve 13, regulating sleeve is fixedly mounted by stent 12 in upper 6 upper right of arc panel
Adjusting rod 14 is equipped in 13, adjusting rod 14 can slidably reciprocate along 13 length direction of regulating sleeve, lower end and the horizontal axis 9 of adjusting rod 14
Connecting rod 15 is equipped between right end, the upper and lower ends of connecting rod 15 between the right end of the lower end of adjusting rod 14 and horizontal axis 9 respectively with passing through
Hooks coupling universal coupling 16 connects.The utility model helps staff that can first fix water supply line, then proceeds by pipeline height
The adjusting of degree realizes that, mostly with abutting joint work accurate between water supply line, staff can carry out on the top of pipeline
The height of the utility model is adjusted, enhanced convenience is operated and safety, the utility model is simple in structure and secured.Use this practicality
During the installation of novel carry out water supply line, water supply line is clamped by arc lower plate 5 and upper arc panel 6 first, is then passed through
Bolt fixes two latch 7, and water supply line is fastened, and then rotates adjusting rod 14 using tool, adjusting rod 14 is universal
Shaft coupling 16 under the gearing of connecting rod 15 with driving horizontal axis 9 to rotate, and horizontal axis 9 is in the first bevel gear 10 and the second bevel gear 11
Leading screw 3 is driven to rotate under mating reaction, it, can be with adjusting screw 3 in spiral shell under the effect of the thread fitting of leading screw 3 and screw shell 2
Height in line sleeve 2, so as to adjust the height of water supply line.
Specifically, anti-skid rubber cushion is fixedly mounted with upper 6 medial surface of arc panel in the arc lower plate 5 described in the present embodiment
17.Anti-skid rubber cushion 17 can increase the frictional force between water supply line and the utility model, ensure the stabilization of water supply line installation.
Specifically, the upper side of the adjusting rod 14 described in the present embodiment opens up the second through-hole 18.Staff is being adjusted
It during the height of the utility model, can be inserted into the second through-hole 18 using rod-shaped tool, be rotated and adjusted using lever principle
Bar 14, it is more light during the height of the utility model which adjust staff.
Further, it is solid by several equally distributed braces 19 between the pedestal 1 described in the present embodiment and screw shell 2
Fixed connection.Brace 19 can improve the stability that screw shell 2 is installed on 1 top of pedestal, improve the reliability of the utility model.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:
It still can modify to the technical solution recorded in foregoing embodiments or which part technical characteristic is carried out etc.
With replacement;And these modifications or replacement, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The spirit and scope of scheme.
Claims (4)
1. municipal supplying drainage channel fixing device, it is characterised in that:Including pedestal(1), pedestal(1)Top is fixedly mounted vertical
Screw shell(2), screw shell(2)It is interior to be equipped with leading screw(3), leading screw(3)With screw shell(2)Thread fitting, leading screw(3)It is upper
End is equipped with branch sleeve(4), leading screw(3)With branch sleeve(4)Bearing is flexibly connected, branch sleeve(4)Upper end be fixedly mounted
Arc lower plate(5), arc lower plate(5)Top is equipped with upper arc panel(6), arc lower plate(5)With upper arc panel(6)It is oppositely arranged,
Arc lower plate(5)With upper arc panel(6)Right end articulated connection, arc lower plate(5)With upper arc panel(6)The fixed peace of left end
Fill lateral latch(7), latch(7)Top surface opens up first through hole(8), two first through hole(8)Center line is coaxial, connection
Sleeve(4)Right side be equipped with horizontal axis(9), horizontal axis(9)Left end and branch sleeve(4)Side bearing flexible connection, horizontal axis(9)On
The first bevel gear is fixedly mounted(10), leading screw(3)The second bevel gear of upper fixed suit(11), the first bevel gear(10)With the second umbrella
Gear(11)Engagement cooperation, upper arc panel(6)Upper right passes through stent(12)Regulating sleeve is fixedly mounted(13), regulating sleeve
(13)It is interior to be equipped with adjusting rod(14), adjusting rod(14)It can be along regulating sleeve(13)Length direction slidably reciprocates, adjusting rod(14)'s
Lower end and horizontal axis(9)Connecting rod is equipped between right end(15), connecting rod(15)Upper and lower ends respectively with adjusting rod(14)Lower end and
Horizontal axis(9)Right end between pass through Hooks coupling universal coupling(16)Connection.
2. municipal administration supplying drainage channel fixing device according to claim 1, it is characterised in that:The arc lower plate(5)
With upper arc panel(6)Anti-skid rubber cushion is fixedly mounted in medial surface(17).
3. municipal administration supplying drainage channel fixing device according to claim 1, it is characterised in that:The adjusting rod(14)'s
Upper side opens up the second through-hole(18).
4. municipal administration supplying drainage channel fixing device according to claim 1, it is characterised in that:The pedestal(1)With spiral shell
Line sleeve(2)Between pass through several equally distributed braces(19)It is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721664068.5U CN207527136U (en) | 2017-12-04 | 2017-12-04 | Municipal supplying drainage channel fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721664068.5U CN207527136U (en) | 2017-12-04 | 2017-12-04 | Municipal supplying drainage channel fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207527136U true CN207527136U (en) | 2018-06-22 |
Family
ID=62577387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721664068.5U Expired - Fee Related CN207527136U (en) | 2017-12-04 | 2017-12-04 | Municipal supplying drainage channel fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207527136U (en) |
-
2017
- 2017-12-04 CN CN201721664068.5U patent/CN207527136U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203092062U (en) | Auxiliary supporting device for pipeline welding | |
CN207527136U (en) | Municipal supplying drainage channel fixing device | |
CN211010173U (en) | Fixing device for coal mine ventilation pipe fitting | |
CN206682431U (en) | A kind of fixed support for adopting pipe used in mine | |
CN210141014U (en) | Reinforced supporting structure for constructional engineering | |
CN212656230U (en) | Film drum type vibrator for concrete curing | |
CN210536195U (en) | Novel adjustable cable bridge | |
CN212319145U (en) | Natural gas line protective structure | |
CN212839737U (en) | Adjustable base device matched with pipeline construction machinery for use | |
CN205350649U (en) | Coupling mechanism is used in installation of pipeline connection ends | |
CN210622854U (en) | Reinforced tunnel suspension post | |
CN209294597U (en) | A kind of municipal administration supplying drainage pipeline connecting structure | |
CN208830254U (en) | A kind of cantilever form for inclined-plane | |
CN215212414U (en) | Concrete floating device | |
CN218441042U (en) | Hydraulic engineering pipe connection alignment device | |
CN219451580U (en) | Outer wall protection supporting structure | |
CN204913514U (en) | Terrace grinds quick -witted handrail | |
CN216590274U (en) | Pipeline fixing device is used in municipal administration plumbing construction | |
CN112695778B (en) | Accurate positioner with adjustable road bed bank protection | |
CN222392340U (en) | External reinforcing structure of drain pipe | |
CN215668892U (en) | Semi-filling and semi-digging road section construction auxiliary device | |
CN215772464U (en) | Electric power conveying pile convenient to angle regulation | |
CN216078594U (en) | Pre-buried structure of building engineering water and electricity installation pipeline | |
CN206233631U (en) | A kind of architectural engineering support meanss | |
CN218911683U (en) | Embedded part for water supply and drainage pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180622 Termination date: 20191204 |
|
CF01 | Termination of patent right due to non-payment of annual fee |