CN207525766U - A kind of construction of hydro project drainage arrangement - Google Patents

A kind of construction of hydro project drainage arrangement Download PDF

Info

Publication number
CN207525766U
CN207525766U CN201721338697.9U CN201721338697U CN207525766U CN 207525766 U CN207525766 U CN 207525766U CN 201721338697 U CN201721338697 U CN 201721338697U CN 207525766 U CN207525766 U CN 207525766U
Authority
CN
China
Prior art keywords
hole
connecting tube
fixed plate
water pump
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721338697.9U
Other languages
Chinese (zh)
Inventor
陈长德
练春红
周宗润
罗顺达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hengding Construction Engineering Co Ltd
Original Assignee
Fujian Hengding Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hengding Construction Engineering Co Ltd filed Critical Fujian Hengding Construction Engineering Co Ltd
Priority to CN201721338697.9U priority Critical patent/CN207525766U/en
Application granted granted Critical
Publication of CN207525766U publication Critical patent/CN207525766U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction of hydro project drainage arrangements, including the first fixed plate, first through hole is offered at the axle center of the first fixation plate surface, the bottom of first fixed plate is fixedly connected with the second fixed plate, and the second through-hole is offered at the axle center of the second fixed plate surface bottom portion;The first through hole is internally provided with the first connecting tube.The utility model is by setting the first fixed plate and the second fixed plate, achieve the effect that drainage arrangement is made to keep afloat, pass through water pump, achieve the effect that water pumping, pass through fixed block and third through-hole, water pump is facilitated to be pumped, also achieve the effect that contaminant filter simultaneously, by electric telescopic rod, achieve the effect that drive head rod movement, while also achieve the effect that drive fixed block movement, facilitate and discharge the water of bottom, effectively water can be discharged, and be less prone to the situation that centrifugal water pump is fallen, it is convenient for people to use.

Description

A kind of construction of hydro project drainage arrangement
Technical field
The utility model is related to hydrotechnics field, specially a kind of construction of hydro project drainage arrangement.
Background technology
Hydraulic engineering is in the construction process, it is often necessary to draining is carried out to the water in foundation pit, to prevent ponding to applying Work impacts, and when to drainage of foundation pit operation, the mode of generally use is that centrifugal water pump is connected drainpipe, then uses rope Centrifugal water pump is tied down, the water surface that centrifugal water pump is placed on to foundation pit carries out draining, but this method is not simply failed to water effectively Discharge, and it is easy to appear the situation that centrifugal water pump is fallen, thus it is proposed that a kind of construction of hydro project drainage arrangement.
Utility model content
The purpose of this utility model is to provide a kind of construction of hydro project drainage arrangements, and having effectively to arrange water Go out, and be less prone to the advantages of centrifugal water pump is fallen, solving effectively to discharge water, and is susceptible to centrifugal water pump The problem of falling.
To achieve the above object, the utility model provides following technical solution:A kind of construction of hydro project drainage arrangement, Including the first fixed plate, first through hole, the bottom of first fixed plate are offered at the axle center of the first fixation plate surface The second fixed plate is fixedly connected with, the second through-hole is offered at the axle center of the second fixed plate surface bottom portion;
The first through hole is internally provided with the first connecting tube, and the bottom of first fixed plate is provided with water pump, institute The water outlet for stating water pump is connected with the first connecting tube, and the water inlet of the water pump is communicated with telescoping tube, and the telescoping tube is far from water One end of pump water inlet mouth is communicated with the second connecting tube, and the bottom of second connecting tube is fixedly connected with fixed block, the fixation The surface of block offers third through-hole, and the third through-hole is connected by pipeline with the second connecting tube, second connecting tube two The bottom of side is communicated with third connecting tube, and the described one end of third connecting tube far from the second connecting tube is connected with third through-hole, The both sides of the first fixed plate bottom open up fluted, and the inside of the groove is fixedly connected with electric telescopic rod, described The bottom of electric telescopic rod is fixedly connected with head rod, and one end of the head rod is fixed with the second connecting tube to be connected It connects.
Preferably, the both sides of first connecting tube have been fixedly connected with link block, and the link block is far from the first connection One end of pipe is fixedly connected with the inner wall of first through hole.
Preferably, the both sides of the water pump have been fixedly connected with the second connecting rod, and second connecting rod is far from water pump One end is fixedly connected with the first fixed plate.
Preferably, the both sides of the second fixed plate surface bottom portion offer the 4th be used cooperatively with head rod Through-hole, the fourth hole are connected with the second through-hole.
Preferably, the surface of first connecting tube is arranged with sealing ring, the sealing ring far from the first connecting tube one Side is fixedly connected with the inner wall of first through hole.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model reaches the effect that drainage arrangement is made to keep afloat by setting the first fixed plate and the second fixed plate Fruit by water pump, achievees the effect that water pumping, by fixed block and third through-hole, water pump is facilitated to be pumped, while also reaches pair The effect of contaminant filter by electric telescopic rod, achievees the effect that drive head rod movement, while also reach drive and fix The effect of block movement, facilitates and discharges the water of bottom, can effectively discharge water, and be less prone to the shape that centrifugal water pump is fallen Condition, it is convenient for people to use.
2nd, the utility model reaches to the fixed effect of the first connecting tube by link block, the first connecting tube is avoided to occur The situation fallen, while drainage arrangement is also avoided to be in the presence of not running, by the second connecting rod, reach to water pump supporter Effect, water pump is avoided to be in the presence of falling, by sealing ring, achievees the effect that seal first through hole, is avoided first solid Not floating occur in fixed board and the second fixed plate, and by head rod, electric telescopic rod are facilitated to drive the second connection Pipe moves, and the second connecting tube is avoided irremovable situation occur, by telescoping tube, fixed block is facilitated to be moved, avoided Be in the presence of after movement can not draining, by fourth hole, head rod is facilitated to be moved, head rod is avoided to go out Existing irremovable situation.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the bottom view of the second fixed plate of the utility model structure.
In figure:1 first fixed plate, 2 first through hole, 3 second fixed plates, 4 second through-holes, 5 first connecting tubes, 6 water pumps, 7 Telescoping tube, 8 second connecting tubes, 9 fixed blocks, 10 third through-holes, 11 third connecting tubes, 12 grooves, 13 electric telescopic rods, 14 first Connecting rod, 15 link blocks, 16 second connecting rods, 17 fourth holes, 18 sealing rings.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, a kind of construction of hydro project drainage arrangement, including the first fixed plate 1,1 He of the first fixed plate The material of second fixed plate 3 may be configured as cystosepiment, facilitates and suspends, and is offered at the axle center on 1 surface of the first fixed plate One through-hole 2, the bottom of the first fixed plate 1 are fixedly connected with the second fixed plate 3, and the both sides of 3 surface bottom portion of the second fixed plate are opened Equipped with the fourth hole 17 being used cooperatively with head rod 14, by fourth hole 17, head rod 14 is facilitated to be moved It is dynamic, head rod 14 is avoided irremovable situation occur, fourth hole 17 is connected with the second through-hole 4,3 table of the second fixed plate The second through-hole 4 is offered at the axle center of face bottom;
First through hole 2 is internally provided with the first connecting tube 5, and the surface of the first connecting tube 5 is arranged with sealing ring 18, passes through Sealing ring 18 achievees the effect that seal first through hole 2, and the first fixed plate 1 and the second fixed plate 3 is avoided to occur what can not be floated Situation, side of the sealing ring 18 far from the first connecting tube 5 are fixedly connected with the inner wall of first through hole 2, the both sides of the first connecting tube 5 Link block 15 has been fixedly connected with, by link block 15, has reached to 5 fixed effect of the first connecting tube, avoids the first connecting tube 5 It is in the presence of falling, while drainage arrangement is also avoided to be in the presence of not running, link block 15 is far from the first connecting tube 5 One end is fixedly connected with the inner wall of first through hole 2, and the bottom of the first fixed plate 1 is provided with water pump 6, and the both sides of water pump 6 are fixed The second connecting rod 16 is connected with, by the second connecting rod 16, achievees the effect that support water pump 6, water pump 6 is avoided to occur what is fallen Situation, the one end of the second connecting rod 16 far from water pump 6 are fixedly connected with the first fixed plate 1, and the water outlet of water pump 6 is connect with first Pipe 5 connects, and the water inlet of water pump 6 is communicated with telescoping tube 7, by telescoping tube 7, fixed block 9 is facilitated to be moved, is avoided in movement Be in the presence of afterwards can not draining, the one end of telescoping tube 7 far from 6 water inlet of water pump is communicated with the second connecting tube 8, the second connecting tube 8 bottom is fixedly connected with fixed block 9, and the surface of fixed block 9 offers third through-hole 10, and the quantity of third through-hole 10 is several It is a, and diameter is smaller, and impurity is avoided to enter in fixed block 9, causes line clogging, third through-hole 10 is connect by pipeline with second Pipe 8 connects, and the bottom of 8 both sides of the second connecting tube is communicated with third connecting tube 11, by third connecting tube 11, can increase draining Efficiency, the one end of third connecting tube 11 far from the second connecting tube 8 connects with third through-hole 10, the two of 1 bottom of the first fixed plate Side opens up fluted 12, and the inside of groove 12 is fixedly connected with electric telescopic rod 13, and the bottom of electric telescopic rod 13, which is fixed, to be connected Head rod 14 is connected to, by head rod 14, facilitates electric telescopic rod 13 that the second connecting tube 8 is driven to move, avoids the There is irremovable situation in two connecting tubes 8, and one end of head rod 14 is fixedly connected with the second connecting tube 8, passes through setting First fixed plate 1 and the second fixed plate 3, achieve the effect that drainage arrangement is made to keep afloat, and by water pump 6, reach the effect of water pumping Fruit by fixed block 9 and third through-hole 10, facilitates water pump 6 to be pumped, while also achievees the effect that contaminant filter, passes through Electric telescopic rod 13 achievees the effect that head rod 14 is driven to move, while also achievees the effect that fixed block 9 is driven to move, Facilitate and discharge the water of bottom, effectively water can be discharged, and be less prone to the situation that centrifugal water pump is fallen, be convenient for people to It uses.
In use, drainage arrangement is placed in foundation pit, drainage arrangement is made by the first fixed plate 1 and the second fixed plate 3 It is suspended on the water surface, is moved the water to flow into fixed block 9 by the third through-hole 10 on fixed block 9, water pump 6 is run, and is connected by first Take over 5 discharges water, and the first fixed plate 1 and the second fixed plate 3 are moved with water level, electronic when water level reaches bottom Telescopic rod 13 drives head rod 14 to move, while the second connecting tube 8 is also driven to move, and the second connecting tube 8 passes through pipeline band Dynamic fixed block 9 moves, and the water of bottom is discharged.
In summary:The construction of hydro project drainage arrangement is connected by the first fixed plate 1, the second fixed plate 3, first Take over 5, the cooperation of water pump 6, telescoping tube 7, the second connecting tube 8, fixed block 9, third through-hole 10 and electric telescopic rod 13, solve Effectively water can not be discharged, and be susceptible to the problem of centrifugal water pump is fallen.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction of hydro project drainage arrangement, including the first fixed plate(1), it is characterised in that:First fixed plate (1)First through hole is offered at the axle center on surface(2), first fixed plate(1)Bottom be fixedly connected with the second fixed plate (3), second fixed plate(3)The second through-hole is offered at the axle center of surface bottom portion(4);
The first through hole(2)Be internally provided with the first connecting tube(5), first fixed plate(1)Bottom be provided with water Pump(6), the water pump(6)Water outlet and the first connecting tube(5)Connection, the water pump(6)Water inlet be communicated with telescoping tube (7), the telescoping tube(7)Far from water pump(6)One end of water inlet is communicated with the second connecting tube(8), second connecting tube(8) Bottom be fixedly connected with fixed block(9), the fixed block(9)Surface offer third through-hole(10), the third through-hole (10)Pass through pipeline and the second connecting tube(8)Connection, second connecting tube(8)The bottom of both sides is communicated with third connecting tube (11), the third connecting tube(11)Far from the second connecting tube(8)One end and third through-hole(10)Connection, described first fixes Plate(1)The both sides of bottom open up fluted(12), the groove(12)Inside be fixedly connected with electric telescopic rod(13), institute State electric telescopic rod(13)Bottom be fixedly connected with head rod(14), the head rod(14)One end and second Connecting tube(8)It is fixedly connected.
2. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:First connecting tube (5)Both sides be fixedly connected with link block(15), the link block(15)Far from the first connecting tube(5)One end and first logical Hole(2)Inner wall be fixedly connected.
3. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:The water pump(6)'s Both sides have been fixedly connected with the second connecting rod(16), second connecting rod(16)Far from water pump(6)One end with first fix Plate(1)It is fixedly connected.
4. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:Second fixed plate (3)The both sides of surface bottom portion offer and head rod(14)The fourth hole being used cooperatively(17), the fourth hole (17)With the second through-hole(4)Connection.
5. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:First connecting tube (5)Surface be arranged with sealing ring(18), the sealing ring(18)Far from the first connecting tube(5)Side and first through hole(2) Inner wall be fixedly connected.
CN201721338697.9U 2017-10-18 2017-10-18 A kind of construction of hydro project drainage arrangement Expired - Fee Related CN207525766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721338697.9U CN207525766U (en) 2017-10-18 2017-10-18 A kind of construction of hydro project drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721338697.9U CN207525766U (en) 2017-10-18 2017-10-18 A kind of construction of hydro project drainage arrangement

Publications (1)

Publication Number Publication Date
CN207525766U true CN207525766U (en) 2018-06-22

Family

ID=62569365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721338697.9U Expired - Fee Related CN207525766U (en) 2017-10-18 2017-10-18 A kind of construction of hydro project drainage arrangement

Country Status (1)

Country Link
CN (1) CN207525766U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622248A (en) * 2020-05-27 2020-09-04 安徽伟基基础工程有限公司 Drainage device is used in construction site foundation pit construction
CN114558365A (en) * 2022-02-22 2022-05-31 钟艳艳 Foundation ditch drainage following drain pump filter head

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622248A (en) * 2020-05-27 2020-09-04 安徽伟基基础工程有限公司 Drainage device is used in construction site foundation pit construction
CN114558365A (en) * 2022-02-22 2022-05-31 钟艳艳 Foundation ditch drainage following drain pump filter head
CN114558365B (en) * 2022-02-22 2024-01-05 中交广州航道局有限公司 Foundation pit drainage following type drainage pump filter head

Similar Documents

Publication Publication Date Title
CN207525766U (en) A kind of construction of hydro project drainage arrangement
CN206688294U (en) A kind of defoaming device of gas well bubble row's hydrops
CN208940461U (en) A kind of stereo ecological plant walls of composite plant
CN113123975A (en) Submersible pump
CN207417598U (en) A kind of flotation fuel-discharging device of oil tank
CN112064570B (en) Hydraulic engineering is with energy-efficient drainage pumping station
CN207478056U (en) Scraping and sucking machine
CN207505623U (en) A kind of water conservancy irrigation pipeline with filtering function
CN207153190U (en) A kind of sedimentation basin with self-priming cleaning pool wall device
CN206753551U (en) A kind of hydraulic cylinder type water drainage gas production device
CN206722059U (en) A kind of monoblock type sewage lifter of anti-return
CN206935929U (en) Medicinal material cleaning and dewatering device
CN205340342U (en) Oil extraction filter
CN206366236U (en) A kind of environment protection-type oil purifier
CN209975668U (en) Novel retaining wall for hydraulic engineering
CN209348197U (en) The filter press being dehydrated for biochemical sludge without heat depth
CN208534866U (en) Pneumatic water pump and big flow precipitation system
CN207307351U (en) A kind of filter
CN206014530U (en) Floating ring current oil receiver hydraulic-driven mud scraper is combined the unit
CN206829340U (en) A kind of monoblock type sewage lifter
CN109293042A (en) A kind of building energy conservation rainwater-collecting equipment
CN207295748U (en) A kind of well-points dewatering device of construction of hydro project
CN205391851U (en) Automatic excellent automatic pressure filter of performance
CN216549689U (en) High-efficient river course ecological remediation device
CN220725031U (en) Hydrophobic device capable of cleaning floaters

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20181018