CN207521269U - Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus - Google Patents

Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus Download PDF

Info

Publication number
CN207521269U
CN207521269U CN201721212542.0U CN201721212542U CN207521269U CN 207521269 U CN207521269 U CN 207521269U CN 201721212542 U CN201721212542 U CN 201721212542U CN 207521269 U CN207521269 U CN 207521269U
Authority
CN
China
Prior art keywords
area
heating zone
feed inlet
discharge port
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721212542.0U
Other languages
Chinese (zh)
Inventor
周健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao 55 Intelligent Technology Co Ltd
Original Assignee
Qingdao 55 Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao 55 Intelligent Technology Co Ltd filed Critical Qingdao 55 Intelligent Technology Co Ltd
Priority to CN201721212542.0U priority Critical patent/CN207521269U/en
Application granted granted Critical
Publication of CN207521269U publication Critical patent/CN207521269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus, is related to the technical field of spraying equipment.The discharge port in the workpiece feeding area of full-automatic titanium pole plate spray sintering assembly line is connect with the feed inlet in Surface Treatment with Plasma area, the discharge port in Surface Treatment with Plasma area is connect with the feed inlet in low-temperature prewarming area, the discharge port in low-temperature prewarming area is connect with spraying area feed inlet, the discharge port of spraying area and the feed inlet of heating zone connect, the discharge port of heating zone is connect with the feed inlet in high temperature sintering area, the discharge port in high temperature sintering area and the feed inlet of cooling area connect, and the discharge port of cooling area is connect with the feed inlet of workpiece discharging area.It solves in the prior art, by the way of hand spray, the technical issues of spray efficiency is low.The utility model sets feeding area, Surface Treatment with Plasma area, low-temperature prewarming area, spraying area, heating zone, high temperature sintering area, cooling area and discharging area on transmission line body, and spray efficiency is high.

Description

Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus
Technical field
The utility model is related to the technical field of spraying equipment, more particularly, to a kind of full-automatic titanium pole plate spray sintering stream Waterline and automation spray painting apparatus.
Background technology
Coated titanium electrode is mainly used in chlorine industry, chloric acid salt industrial, hypochlorite industry and the life of perchlorate Production, electrolysis manufacturing copper foil, persulfate electrolysis, electrolysis organic synthesis, electroextraction metal, the production of catalyst for electrolytic silver, Electrolytic oxidation recycles mercury, electrolysis water, and chlorine dioxide is produced, Hospital Sewage Treatment, electroplating industry, and domestic water and food are used The disinfection of tool, the processing of power plant cooling circulating water, electrolysis produce acid ion alkali ion water, steel plate chromium plating plating palladium it is gold-plated plating Ruthenium, desalination by electrodialysis seawater.Therefore, the application field of coated titanium electrode be related to chemical industry, metallurgy, water process, environmental protection, plating, It is electrolysed organic synthesis and other electrolysis industries.
It is above-mentioned in the prior art, to titanium pole plate carry out spray process during, since the processing conditions in workshop has Limit usually using spray gun spraying, manually sprays and artificial brush sprays three kinds of modes, using spray gun spraying, due to spray gun The bad positioning in position, the spraying position of spray gun is made easily to deviate the position of workpiece, masking liquid is caused to waste, also to the environment of surrounding It pollutes;By the way of manually spraying, the position of spray gun can be positioned, but need position of the special messenger to spray gun It exercises supervision, cost of labor is caused to increase, operating efficiency is low;By the way of manually brushing, it cannot be guaranteed due to manually brushing The external coating of workpiece is uniform, and the aberration for causing product is big, and quality is unstable, and manual operation efficiency is low, can also be to spraying The health of worker causes very big harm.
Utility model content
The purpose of this utility model is to provide a kind of full-automatic titanium pole plate spray sintering assembly line, to solve the prior art Present in, during the spray process of titanium pole plate, since processing conditions is limited, the spray of product by the way of hand spray It is poor to apply effect, causes to process the technical issues of operating efficiency is low, titanium pole plate spraying effect is poor.
The utility model also provides a kind of automation spray painting apparatus, to solve in the prior art, the processing operation of titanium pole plate The technical issues of efficiency is low.
A kind of full-automatic titanium pole plate spray sintering assembly line provided by the utility model, including workpiece feeding area, plasma It is surface-treated area, low-temperature prewarming area, spraying area, heating zone, high temperature sintering area, cooling area and workpiece discharging area;
The workpiece feeding area, Surface Treatment with Plasma area, low-temperature prewarming area, spraying area, heating zone, high temperature sintering area, Cooling area and workpiece discharging area are distributed on transmission line body;The discharge port in the workpiece feeding area and Surface Treatment with Plasma area Feed inlet connection, the discharge port in the Surface Treatment with Plasma area is connect with the feed inlet in the low-temperature prewarming area, described low The discharge port of warm preheating zone is connect with the spraying area feed inlet, the feed inlet of the discharge port of the spraying area and the heating zone Connection, the discharge port of the heating zone connect with the feed inlet in the high temperature sintering area, the discharge port in the high temperature sintering area and The feed inlet connection of the cooling area, the discharge port of the cooling area are connect with the feed inlet of the workpiece discharging area.
Further, the workpiece feeding area, Surface Treatment with Plasma area, low-temperature prewarming area, spraying area, heating zone, height Warm sintering zone, cooling area and workpiece discharging area form the assembly line of ring seal on transmission line body.
Further, the spraying area includes flush coater, and the flush coater is arranged on transmission line body, and the flush coater is adopted It is sprayed with electrostatic rotating cup.
Further, the flush coater includes flush coater housing, overhead chain conveyer one, reciprocating engine, bottom collection cover, air draft Pipeline, discharging of waste liquid pipeline and PLC controller;
One end of the overhead chain conveyer one is connect with one end in the flush coater housing, the overhead chain conveyer one it is another One end is stretched out the other end of the flush coater housing and is connect with the other end of the flush coater housing;The reciprocating engine is connected to In the flush coater housing, it is connect with the flush coater housing cavity;The bottom collection cover is connected to the flush coater housing The bottom of inner cavity, the exhaust duct are connect with one end of the bottom collection cover, the discharging of waste liquid pipeline and the bottom The other end connection of collecting hood;The overhead chain conveyer one, reciprocating engine and the electrical connection of PLC controllers.
Further, be connected with manipulator and spray gun on the flush coater, the manipulator and spray gun respectively with the PLC Controller is electrically connected.
Further, the heating zone includes the first heating area, the second heating zone, third heating zone and the 4th heating zone;
The discharge port of the spraying area is connect with the feed inlet in the first heating area, the discharge port in the first heating area It is connect with the feed inlet of second heating zone, the discharge port of second heating zone and the feed inlet of the third heating zone connect It connects, the discharge port of the third heating zone is connect with the feed inlet of the 4th heating zone, the discharge port of the 4th heating zone It is connect with the feed inlet in the high temperature sintering area;The first heating area, the second heating zone, third heating zone and the 4th heating zone Heating temperature gradually rise.
Further, the first heating area, the second heating zone, third heating zone and the 4th heating zone use electric kiln Heating.
Further, the high temperature sintering area includes electric kiln;
The electric kiln include housing, overhead chain conveyer two, supporting beam, mullite furnace internal-lining, quartz electrothermal tube heater, Discharge duct, wind turbine and insulating layer;
One end of the supporting beam is connected to one end of the hull outside, and the overhead chain conveyer two is connected to the branch The other end of beam is supportted, and is arranged on the upper part of the housing position;The mullite furnace internal-lining is connected in the housing, the stone English electric tube heater is connected to the side wall of the mullite furnace internal-lining;The discharge duct is connected to the one of the case inside End, the wind turbine are connected to the other end of the case inside, and the insulating layer is connected to the outside of the mullite furnace internal-lining Wall.
Further, the Surface Treatment with Plasma area uses Surface Treatment with Plasma machine.
The utility model also provides a kind of automation spray painting apparatus, and the equipment installation full-automatic titanium pole plate spraying is burnt Tie assembly line.
A kind of full-automatic titanium pole plate spray sintering assembly line provided by the utility model, by the workpiece feeding area, etc. from Sublist surface treatment area, low-temperature prewarming area, spraying area, heating zone, high temperature sintering area, cooling area and workpiece discharging area are distributed in one On transmission line body, workpiece is made continual can be run on transmission line body, and transmission line body uses the side of automatic running Formula without manpower intervention, makes workpiece carry out spraying operation automatically, operating efficiency is high, saves manpower;It only needs using a people Work feeding avoids artificial multiple transporting work pieces in the prior art, the scuffing caused by workpiece surface;Spraying area is directly set On transmission line body, and enclosed mode is used, do not need to hand spray operation, operate more safe, workpiece Spraying effect it is more uniform, effectively raise the utilization rate of masking liquid, save raw material;Workpiece uses in whole process High temperature low temperature transition effectively reduces temperature difference thermal shock caused by workpiece surface, reduces thermal losses, improve the energy Utilization rate.
The utility model also provides a kind of automation spray painting apparatus, which installs above-mentioned full-automatic titanium pole plate spray sintering Assembly line, the spraying effect of titanium pole plate is good, spraying operation is efficient.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the schematic diagram of full-automatic titanium pole plate spray sintering assembly line that the utility model embodiment provides;
Fig. 2 is the structure diagram of flush coater that the utility model embodiment provides;
Fig. 3 is the structure diagram of electric kiln that the utility model embodiment provides;
Fig. 4 is the flow chart of full-automatic titanium pole plate spray sintering assembly line that the utility model embodiment provides;
Fig. 5 is the flow chart of spraying process that the utility model embodiment provides.
Icon:11- workpiece feedings area;12- Surface Treatment with Plasma area;13- low-temperature prewarmings area;14- spraying areas; 15- heating zones;16- high temperature sinterings area;17- cooling areas;18- workpiece discharging area;141- flush coater housings;142- is hung Conveyer one;143- reciprocating engines;144- bottom collection covers;145- exhaust ducts;146- discharging of waste liquid pipelines;151- One heating zone;The second heating zones of 152-;153- third heating zones;The 4th heating zones of 154-;161- housings;162- is hung Conveyer two;163- supporting beams;164- mullite furnace internal-linings;165- quartz electrothermal tube heaters;166- discharge ducts; 167- wind turbines;168- insulating layers.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected range.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.In addition, term " the One ", " second ", " third " are only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integrally Connection;Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can above-mentioned art be understood with concrete condition Concrete meaning of the language in the utility model.
Fig. 1 is the schematic diagram of full-automatic titanium pole plate spray sintering assembly line that the utility model embodiment provides;Fig. 2 is this The structure diagram for the flush coater that utility model embodiment provides;Fig. 3 is the knot of electric kiln that the utility model embodiment provides Structure schematic diagram;Fig. 4 is the flow chart of full-automatic titanium pole plate spray sintering assembly line that the utility model embodiment provides;Fig. 5 is The flow chart for the spraying process that the utility model embodiment provides.
As shown in Figures 1 to 3, a kind of full-automatic titanium pole plate spray sintering assembly line provided by the utility model, including workpiece Feeding area 11, Surface Treatment with Plasma area 12, low-temperature prewarming area 13, spraying area 14, heating zone 15, high temperature sintering area 16, cooling Area 17 and workpiece discharging area 18;
The workpiece feeding area 11, Surface Treatment with Plasma area 12, low-temperature prewarming area 13, spraying area 14, heating zone 15, height Warm sintering zone 16, cooling area 17 and workpiece discharging area 18 are sequentially distributed on transmission line body;11 left end of workpiece feeding area Discharge port is connect with the feed inlet of 12 right end of Surface Treatment with Plasma area, the discharge port of 12 left end of Surface Treatment with Plasma area It is connect with the feed inlet of 13 right end of low-temperature prewarming area, discharge port and the spraying area of 13 left end of low-temperature prewarming area 14 right end feed inlets connect, and the discharge port of 14 left end of spraying area is connect with the feed inlet of 15 lower end of heating zone, described The discharge port of 15 upper end of heating zone is connect with the feed inlet of 16 left end of high temperature sintering area, 16 right end of high temperature sintering area Discharge port connect with the feed inlet of 17 upper end of cooling area, the discharge port of 17 lower end of cooling area under the workpiece Expect the feed inlet connection of 18 right end of area;The discharge port of 18 left end of workpiece discharging area is connect with the feeding mouth of logistics transport box.
In one embodiment of the utility model, it is only necessary to which an operating personnel stand under workpiece feeding area 11 and workpiece Expect area 18 between standing area, start transmission line body after, workpiece is placed sequentially on transmission line body by operating personnel, make workpiece by It is conveyed one by one according to certain distance, workpiece first passes through Surface Treatment with Plasma area 12 and is surface-treated, using low-temperature prewarming area 13 carry out low-temperature prewarmings, and after preheating, workpiece is delivered to spraying area 14 by transmission line body, the spraying area 14 to workpiece from Dynamic to carry out spraying operation, after spraying, workpiece is delivered to heating zone 15 and carries out heating operation, workpiece to workpiece by transmission line body It is sintered after heating into high temperature sintering area 16, after sintering, workpiece is delivered to cooling area 17 by transmission line body, treats workpiece Temperature be down to certain temperature after, workpiece is delivered to workpiece discharging area 18 by transmission line body, and operating personnel, which remove workpiece, puts Enter logistics transport box.Logistics transport box is protected product surface application, is reduced into greatest extent using transhipment carrying trolley conveying Damage probability of the product in transportational process.
Entire paint finishing only needs an operating personnel to stand in standing area, it will be able to the spraying operation of workpiece is completed, Cost of labor is greatly saved;Since the masking liquid of titanium pole plate has very strong corrosivity and noxious material is volatile, the system is significantly The severe work situation of operating personnel is improved, and reduces environmental pollution;The overall surface coating of workpiece is more uniform, production Product qualification rate can reach more than 98%;The line speed of whole system is fast, can continual work in 24 hours, yield is big, Manually-operated 6-10 times can be reached.
Further, the transmission line body uses chain conveying wire body.
The chain conveying wire body is using driving structure conveying in suspension type, and bearing capacity is big, and conveying is stablized, heat-resisting ability By force, it is ensured that product position in entire coating process is fixed with respect to pipeline, center of gravity and mount point in same vertical plane, in addition to Other directions of gravity do not stress, and ensure the planarization of finished appearance.
Further, the Surface Treatment with Plasma area 12 uses Surface Treatment with Plasma machine.
Surface cleaning processing carries out workpiece using Surface Treatment with Plasma machine, Surface Treatment with Plasma machine carries out workpiece During surface treatment, the superficial layer of material is acted only on, does not influence original performance of workpiece;Surface Treatment with Plasma machine operation side Just, air pollution is not generated, is also generated without waste liquid, waste residue, it is energy saving, reduce cost;Titanium plate surface passes through plasma table After the processing of surface treatment machine, the adhesive force on its surface is significantly increased, conducive to subsequent spraying process, ensure that the reliable of quality Property and persistence, in addition, can prolong the service life by spray coated workpiece, antiwear property is not plasma treated mistake 20 times or more.In order to realize the better spraying effect in titanium plate surface, by experiment repeatedly, workpiece carries out in advance before spraying Heat can make masking liquid it is dry and hard faster, spraying evenly, apply liquid measure more save, therefore, workpiece use above-mentioned plasma treatment Machine processing after, the surface temperature of workpiece is preheated using Full-automatic temp-control equipment, preheating temperature range can 50 DEG C- Between 160 DEG C, best temperature value is 100 DEG C.
As shown in fig. 1, further, the workpiece feeding area 11, Surface Treatment with Plasma area 12, low-temperature prewarming area 13rd, spraying area 14, heating zone 15, high temperature sintering area 16, cooling area 17 and workpiece discharging area 18 form annular on transmission line body The assembly line of closing.Using the structure of annular enclosed type, the continual operation of entire transmission line body can be made, actual use In the process, above-mentioned transmission line body can also be arranged to linear wire body, two lines body uses two operating personnel, a behaviour Make personnel to stand in the standing area of the left end of two lines body, pan feeding is carried out at the same time to two lines body, another operating personnel stand In the standing area of the right end of two lines body, discharging is carried out at the same time to two lines body, is designed in this way so that adjacent two lines body enters Material and discharging reduce the error rate of inlet/outlet in same direction.
As shown in Figure 1, further, the spraying area 14 includes flush coater, and the flush coater is arranged on transmission line body, Flush coater is sprayed using electrostatic rotating cup, can be reduced masking liquid loss 30% using the spraying of electrostatic rotating cup, be greatly reduced and be produced into This.
As shown in Fig. 2, further, the flush coater includes flush coater housing 141, overhead chain conveyer 1, reciprocating engine 143rd, bottom collection cover 144, exhaust duct 145, discharging of waste liquid pipeline 146 and PLC controller;
The lower end of the overhead chain conveyer 1 is fixed with bottom end in the flush coater housing 141 using bolt, nut to be connected Connect, the upper end of the overhead chain conveyer 1 stretch out the upper end of the flush coater housing 141 and with the flush coater housing 141 Upper end connection;The reciprocating engine 143 is connected in the flush coater housing 141, is connected with 141 inner cavity of flush coater housing It connects;The bottom collection cover 144 is connected to the bottom of 141 inner cavity of flush coater housing, the exhaust duct 145 and the bottom The lower end right end connection of portion's collecting hood 144, the lower end left end of the discharging of waste liquid pipeline 146 and the bottom collection cover 144 connect It connects;The overhead chain conveyer 1, reciprocating engine 143 and PLC controller electrical connection, the PLC controller are connected to the spray It applies in casing body 141.Manipulator and spray gun are connected on the flush coater, manipulator and spray gun are electrically connected respectively with PLC controller It connects, the position of workpiece is moved using PLC controller control machinery hand, spray gun is controlled to workpiece using PLC controller Surface carries out spraying operation.
Further, the heating zone 15 includes the first heating area 151, the second heating zone 152,153 and of third heating zone 4th heating zone 154;
The discharge port of 14 left end of spraying area is connect with the feed inlet of 151 lower end of the first heating area, and described first The discharge port of 151 upper end of heating zone is connect with the feed inlet of 152 lower end of the second heating zone, on second heating zone 152 The discharge port at end is connect with the feed inlet of 153 lower end of third heating zone, the discharge port of 153 upper end of third heating zone with The feed inlet connection of 4th heating zone, 154 lower end, discharge port and the high temperature sintering of 154 upper end of the 4th heating zone The feed inlet connection of 16 left end of area;The first heating area 151, the second heating zone 152, third heating zone 153 and the 4th heat up The heating temperature in area 154 gradually rises;The first heating area 151, the second heating zone 152, third heating zone 153 and the 4th liter Warm area 154 is using electrical kiln stove heat, and the temperature in the first heating area 151 is 200 DEG C, and the temperature of the second heating zone 152 is 300 DEG C, the temperature of third heating zone 153 is 400 DEG C, and the temperature of the 4th heating zone 154 is 500 DEG C.
As shown in figure 3, further, the high temperature sintering area 16 includes electric kiln;
The electric kiln includes housing 161, overhead chain conveyer 2 162, supporting beam 163, mullite furnace internal-lining 164, quartz Electric tube heater 165, discharge duct 166 and wind turbine 167;
The lower end of the supporting beam 163 is connected to the right end in 161 outside of housing, and the overhead chain conveyer 2 162 connects The upper end of the supporting beam 163 is connected on, and is arranged on 161 upper position of housing;The mullite furnace internal-lining 164 connects In the housing 161, the quartz electrothermal tube heater 165 is connected to the side wall of the mullite furnace internal-lining 164, the stone English electric tube heater 165 is using the quartzy electric tube heater of quartz;The discharge duct 166 is connected in the housing 161 The upper end of side, the wind turbine 167 are connected to the lower end of 161 inside of housing.
Further, the electric kiln further includes insulating layer 168;
The insulating layer 168 is connected to the lateral wall of the mullite furnace internal-lining 164.The electric kiln is made using electrical heating For heat source, it is aided with heat circulating system, ensures the uniform controllable of temperature, transmission line body reduces electric kiln using being circular layout Thermal losses, the inner wall of electric kiln increases the service life of electric kiln using high-temperature resistant anti-corrosive material.
A whole set of paint finishing uses intelligence control system, and PLC controller is connected on transmission line body, and PLC controller connects Display screen is connected to, the painting of Surface Treatment with Plasma machine, the electric kiln of workpiece heat, flush coater can be controlled by way of touch screen The a series of activities instructions such as liquid quantitatively conveys, the accurate spraying of flush coater, spray so as to fulfill the fully-automatic intelligent of titanium pole plate.
The full-automatic titanium pole plate spray sintering assembly line of the utility model, overall structure are designed using ring seal, rationally It is whole only to need an artificial loading using place, it reduces in process and manually carries influence of the factor to product surface;Spray Part is applied with masking liquid contact material using resistant material, spraying area enclosed construction, isolation personnel equipment with it is poisonous and harmful The contact of material reduces production safety and environmental risk;Precisely orientation application is realized, while using essence by Moving process control Really metering electrostatic rotating cup spraying, ensure that the utilization rate of masking liquid, the pollution to environment, very big journey is reduced while reducing cost The quality for improving product painting of degree;Electric kiln uses high-temperature region low-temperature space Transition Design, reduces the temperature difference caused by workpiece Thermal shock, while reduce thermal losses, improve the utilization rate of the energy.
As shown in Figures 4 and 5, a kind of operational method of full-automatic titanium pole plate spray sintering assembly line, includes the following steps:
(I) feeding
Start transmission line body, operating personnel pile up workpiece on transmission line body in a certain order, utilize pipeline Body carries out feeding;
(II) Surface Treatment with Plasma
Using plasma surface finishing machine to workpiece surface carry out cleaning treatment, plasma surface finishing machine for wait from Sub- surface treating machine;
(III) workpiece low-temperature prewarming
It opens electric kiln and low-temperature prewarming processing operation is carried out to the surface of workpiece;
(IV) sprays
It opens flush coater and spraying operation is carried out to the surface of workpiece;
(V) workpiece high temperature preheating
It opens electric kiln to be heated at high temperature the surface of workpiece, heats the surface of workpiece;
(VI) workpiece high temperature sintering
It opens electric kiln and operation is sintered to the surface of workpiece, for temperature at 500 DEG C, sintering time continues 10min;
(VII) workpiece cools down
By the way of air-cooled, cooled down using fan to the surface of workpiece;
(VIII) blanking
It after workpiece surface cools down, is exported along transmission line body, after discharging, operating personnel remove workpiece, carry out work Part is transported.
Further, in (III) the workpiece low-temperature prewarming step, the temperature range of heating surfaces of work pieces 200 DEG C- Between 500 DEG C.Electric kiln is heated using 4th area, the warming temperature in the first heating area is 200 DEG C, the heating of the second heating zone Temperature is 300 DEG C, and the warming temperature of third heating zone is 400 DEG C, and the warming temperature of the 4th heating zone is 500 DEG C, reaches 500 DEG C Afterwards, into high temperature sintering.
Further, in (IV) spraying process, include the following steps:Feed flow, quantitative conveying workpieces, workpiece are fixed Position, spraying and exhaust.
Intelligent control is used using electrostatic rotating cup flush coater, the paint finishing of electrostatic rotating cup flush coater in spraying, comprising Masking liquid quantifies transport subsystem and accurate directional spray subsystem:
Masking liquid quantifies transport subsystem:Precisely errorless quantitative conveying masking liquid is to realize that accurately coating quality is very Important guarantee condition, even more control cost it is basic, due to spraying titanium pole plate masking liquid have strong acid strong corrosive, masking liquid is quantitative Transport subsystem quantitatively conveys peristaltic pump using acidproof corrosion resistant special high-accuracy, and high-precision quantitative conveying peristaltic pump has such as Lower advantage:It is manufactured using specialty alloy materials, and makes product more durable by material modification, met the strong fluid of acid-base property and be situated between Matter, it is acidproof, it is corrosion-resistant, improve service life;Using advanced calibration mode so that liquid separation amount is more accurate, precisely quantitatively may be used It controls in 0.1ml/min, to reduce cost and ensureing that quality provides guarantee;Sensing device can be connected outside and realize behaviour with control device The full automation of work.
Accurate directional spray subsystem:By control system to the control algolithm of conveying mechanism, system can be realized to production Product spraying position is accurately positioned, and in Spray Application using electrostatic rotating cup paint finishing, automatic electrostatic rotating cup application is sprayed with tradition It applies to compare and has the following advantages:It is good to the atomizing effect of masking liquid, the appearance of film can be significantly improved;It is high to the utilization rate of masking liquid, Since titanium pole plate masking liquid is very expensive, masking liquid can be saved using the spraying of electrostatic rotating cup, reduces pollution;Film is uniform, strong adhesive force, Stable quality;Improve working condition.In view of the masking liquid of titanium pole plate has strong corrosive, the rotation cup of electrostatic rotating cup flush coater uses The specific alloy material being able to bear strong corrosion.
Further, in (V) the workpiece high temperature preheating step, the temperature range of heating surfaces of work pieces 50 DEG C- Between 160 DEG C.
The operational method of full-automatic titanium pole plate spray sintering assembly line, reaches whole system using intelligence control system Workpiece preheating temperature precisely, masking liquid conveying quantitative accurate, directional spray it is accurate, sintering temperature and time are accurate, avoid artificial The uncontrollability of operation realizes and improves coating quality, reduce material consumption, save human cost, improve working conditions and subtract The R & D design purpose of few environmental pollution.
The utility model also provides a kind of automation spray painting apparatus, and the equipment installation full-automatic titanium pole plate spraying is burnt Tie assembly line.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of full-automatic titanium pole plate spray sintering assembly line, which is characterized in that including workpiece feeding area (11), plasma surface Treatment region (12), low-temperature prewarming area (13), spraying area (14), heating zone (15), high temperature sintering area (16), cooling area (17) and work Part discharging area (18);
The workpiece feeding area (11), Surface Treatment with Plasma area (12), low-temperature prewarming area (13), spraying area (14), heating zone (15), high temperature sintering area (16), cooling area (17) and workpiece discharging area (18) are distributed on transmission line body;The workpiece feeding The discharge port in area (11) is connect with the feed inlet of Surface Treatment with Plasma area (12), and Surface Treatment with Plasma area (12) go out Material mouth is connect with the feed inlet of the low-temperature prewarming area (13), discharge port and the spraying area of the low-temperature prewarming area (13) (14) feed inlet connects, and the discharge port of the spraying area (14) is connect with the feed inlet of the heating zone (15), the heating zone (15) discharge port is connect with the feed inlet of the high temperature sintering area (16), the discharge port of the high temperature sintering area (16) with it is described The feed inlet connection of cooling area (17), the discharge port of the cooling area (17) and the feed inlet of the workpiece discharging area (18) connect It connects.
2. full-automatic titanium pole plate spray sintering assembly line according to claim 1, which is characterized in that the workpiece feeding area (11), Surface Treatment with Plasma area (12), low-temperature prewarming area (13), spraying area (14), heating zone (15), high temperature sintering area (16), cooling area (17) and workpiece discharging area (18) form the assembly line of ring seal on transmission line body.
3. full-automatic titanium pole plate spray sintering assembly line according to claim 1, which is characterized in that the spraying area (14) Including flush coater, the flush coater is arranged on transmission line body, and the flush coater is sprayed using electrostatic rotating cup.
4. full-automatic titanium pole plate spray sintering assembly line according to claim 3, which is characterized in that the flush coater includes Flush coater housing (141), overhead chain conveyer one (142), reciprocating engine (143), bottom collection cover (144), exhaust duct (145), Discharging of waste liquid pipeline (146) and PLC controller;
One end of the overhead chain conveyer one (142) is connect with the interior one end of the flush coater housing (141), the overhead chain conveyer The other end of one (142) stretch out the other end of the flush coater housing (141) and with the other end of the flush coater housing (141) Connection;The reciprocating engine (143) is connected in the flush coater housing (141), is connected with flush coater housing (141) inner cavity It connects;The bottom collection cover (144) is connected to the bottom of flush coater housing (141) inner cavity, the exhaust duct (145) with One end connection of the bottom collection cover (144), the discharging of waste liquid pipeline (146) are another with the bottom collection cover (144) One end connects;The overhead chain conveyer one (142), reciprocating engine (143) and PLC controller electrical connection.
5. full-automatic titanium pole plate spray sintering assembly line according to claim 4, which is characterized in that connect on the flush coater Manipulator and spray gun are connected to, the manipulator and spray gun are electrically connected respectively with the PLC controller.
6. full-automatic titanium pole plate spray sintering assembly line according to claim 1, which is characterized in that the heating zone (15) Including the first heating area (151), the second heating zone (152), third heating zone (153) and the 4th heating zone (154);
The discharge port of the spraying area (14) is connect with the feed inlet of the first heating area (151), the first heating area (151) discharge port is connect with the feed inlet of second heating zone (152), the discharge port of second heating zone (152) with The feed inlet connection of the third heating zone (153), discharge port and the 4th heating zone of the third heating zone (153) (154) feed inlet connection, the discharge port of the 4th heating zone (154) and the feed inlet of the high temperature sintering area (16) connect It connects;The first heating area (151), the heating of the second heating zone (152), third heating zone (153) and the 4th heating zone (154) Temperature gradually rises.
7. full-automatic titanium pole plate spray sintering assembly line according to claim 6, which is characterized in that the first heating area (151), the second heating zone (152), third heating zone (153) and the 4th heating zone (154) use electrical kiln stove heat.
8. full-automatic titanium pole plate spray sintering assembly line according to claim 1, which is characterized in that the high temperature sintering area (16) including electric kiln;
The electric kiln include housing (161), overhead chain conveyer two (162), supporting beam (163), mullite furnace internal-lining (164), Quartz electrothermal tube heater (165), discharge duct (166), wind turbine (167) and insulating layer (168);
One end of the supporting beam (163) is connected to one end on the outside of the housing (161), the overhead chain conveyer two (162) The other end of the supporting beam (163) is connected to, and is arranged on the housing (161) upper position;The mullite furnace internal-lining (164) it is connected in the housing (161), the quartz electrothermal tube heater (165) is connected to the mullite furnace internal-lining (164) side wall;The discharge duct (166) is connected to one end on the inside of the housing (161), wind turbine (167) connection The other end on the inside of the housing (161), the insulating layer (168) are connected to the outside of the mullite furnace internal-lining (164) Wall.
9. full-automatic titanium pole plate spray sintering assembly line according to claim 1, which is characterized in that the plasma surface Treatment region (12) is using Surface Treatment with Plasma machine.
10. a kind of automation spray painting apparatus, which is characterized in that equipment installation is complete as claimed in any one of claims 1-9 wherein Automatic titanium pole plate spray sintering assembly line.
CN201721212542.0U 2017-09-21 2017-09-21 Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus Expired - Fee Related CN207521269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721212542.0U CN207521269U (en) 2017-09-21 2017-09-21 Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721212542.0U CN207521269U (en) 2017-09-21 2017-09-21 Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus

Publications (1)

Publication Number Publication Date
CN207521269U true CN207521269U (en) 2018-06-22

Family

ID=62570049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721212542.0U Expired - Fee Related CN207521269U (en) 2017-09-21 2017-09-21 Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus

Country Status (1)

Country Link
CN (1) CN207521269U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107442385A (en) * 2017-09-21 2017-12-08 青岛五五智能科技有限公司 Full-automatic titanium pole plate spray sintering streamline and its operational method
CN111151398A (en) * 2020-04-01 2020-05-15 缙云松弛自动化科技有限公司 Ring type basic equipment of paint spray booth

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107442385A (en) * 2017-09-21 2017-12-08 青岛五五智能科技有限公司 Full-automatic titanium pole plate spray sintering streamline and its operational method
CN111151398A (en) * 2020-04-01 2020-05-15 缙云松弛自动化科技有限公司 Ring type basic equipment of paint spray booth

Similar Documents

Publication Publication Date Title
CN207521269U (en) Full-automatic titanium pole plate spray sintering assembly line and automation spray painting apparatus
CN203768462U (en) Closed acid mist recycling device
CN112281101A (en) Full-automatic hot-dip galvanizing production line and production process
CN105880102A (en) Dacromet treatment production line for bridge threaded connecting pieces
CN206509149U (en) A kind of wheel hub paint line
CN107442385A (en) Full-automatic titanium pole plate spray sintering streamline and its operational method
CN210304933U (en) Graphite boat cleaning equipment
CN207463516U (en) A kind of polycrystalline cast ingot crucible automatic spray apparatus
CN109402700A (en) A kind of improved Waste Acid From Hua Cheng Foil manufacturing process
CN208390328U (en) A kind of Industrial Steels pipe surface paint spraying apparatus
CN204939544U (en) Ventilation guard box assembly
CN201497337U (en) Horizontal type steam blueing furnace
CN106544718A (en) A kind of automatization's electroplating assembly line
CN206486614U (en) A kind of equipment by formula differential arc oxidation composite board
CN215713211U (en) Steel pipe sprays quenching system
CN112122039A (en) Automatic production line for magnetic steel spraying
CN207043740U (en) Voltage regulation batch meter machining production line
CN209260175U (en) A kind of thermal cycle galvanizing system
CN214736155U (en) Full-automatic cleaning production line for electrogalvanizing of precise slender steel pipe
CN204849039U (en) Tractor part processing system
CN103962029A (en) Paste mixing machine with water-cooling system
CN204074466U (en) For electrostatic powder spraying workpiece automation pre-processing device
CN113186475A (en) Hot-dip coating equipment with heat preservation function
CN202591020U (en) Full-automatic coating production line
CN219385324U (en) Horizontal rotary spraying tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20210921