CN207517211U - A kind of advanced process control actual training device - Google Patents

A kind of advanced process control actual training device Download PDF

Info

Publication number
CN207517211U
CN207517211U CN201721061838.7U CN201721061838U CN207517211U CN 207517211 U CN207517211 U CN 207517211U CN 201721061838 U CN201721061838 U CN 201721061838U CN 207517211 U CN207517211 U CN 207517211U
Authority
CN
China
Prior art keywords
pipelines
water pump
water
tank
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721061838.7U
Other languages
Chinese (zh)
Inventor
徐旭
张志军
刘志
黄磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Longzhou Industrial Equipment Ltd By Share Ltd
Original Assignee
Tianjin Longzhou Industrial Equipment Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Longzhou Industrial Equipment Ltd By Share Ltd filed Critical Tianjin Longzhou Industrial Equipment Ltd By Share Ltd
Priority to CN201721061838.7U priority Critical patent/CN207517211U/en
Application granted granted Critical
Publication of CN207517211U publication Critical patent/CN207517211U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrically Operated Instructional Devices (AREA)

Abstract

The utility model discloses a kind of advanced process control actual training devices, including frame, water tank, water pipe line, upper water box, lower header, heating tank and electrical mesh plate, the water tank is bolted on base of frame, and its both sides is furnished with pump outlet, and it is furnished with level detection sensor in the bottom of storage tank, the water pipe line includes water pump A pipelines and water pump B pipelines, and water pump A pipelines and water pump B pipelines are separately mounted to the front and back of water tank, and pass through water pipe line and water tank.The advanced process control actual training device carries out instruction control using the control electric appliances element being fixed on inside electrical mesh plate to whole device, so as to control the operating process of water pump A pipelines and water pump B pipelines;By the unified assembling of frequency converter, PLC and man-machine interface on real training mesh plate, the structure for making training platform is simple, volume-diminished, weight saving, and with certain technology content, unfailing performance enhancing.

Description

A kind of advanced process control actual training device
Technical field
The utility model is related to process control real training technical field, specially a kind of advanced process control actual training device.
Background technology
Level process real training control system is intended to attach most importance to each institution of higher learning's automatic technology specialization process control subject, It automatic process control system principle, designs and develops and combines together with parameter tuning etc. content, as Automation Specialty core The teaching platform of course, teaching and student for process control technology design and develop centered on Practical Training Teaching-Platform, actively New teaching pattern is innovated and explored, is conducive to further improving for teaching level.
Utility model content
To achieve the above object, the utility model provides following technical solution:A kind of advanced process control actual training device, packet Frame, water tank, water pipe line, upper water box, lower header, heating tank and electrical mesh plate are included, the water tank is consolidated by bolt Base of frame is scheduled on, and its both sides is furnished with level detection sensor, the water pipe equipped with pump outlet, and in the bottom of storage tank Pipeline includes water pump A pipelines and water pump B pipelines, and water pump A pipelines and water pump B pipelines are separately mounted to front and the back of the body of water tank Face, and pass through pump outlet and be connected with water pump A pipelines, water pump B pipelines, wherein water pump A pipelines are distinguished water pump A by three It is communicated to the conduit pipeline of upper water box, lower header and heating tank and electromagnetic flowmeter, pressure gauge, electrical ball valve, ball valve switch group Into the water pump B pipelines include two groups of pipelines and control ball valve, and water pump B is respectively communicated with upper water by one group of pipeline by three Case, the conduit pipeline of lower header and heating tank and turbine flowmeter, pressure gauge composition, another group of pipeline are connected to by conduit pipeline In water pump A pipelines, control ball valve is mounted on the intersection of two groups of pipelines in water pump B pipelines, the upper water box and lower header difference Mounted on the middle part of frame left and top, and it is equipped with liquid level sensor inside it, the heating tank is placed in frame Right side middle and upper part point, and one layer of collet is enclosed with outside it.
As a kind of preferred technical solution of the utility model, the electrical mesh plate is fixed on frame left plate surface, And required electric elements are installed inside electrical mesh plate covered with waterproof bulkhead in electrical mesh plate surface.
As a kind of preferred technical solution of the utility model, the water pump A and water pump B can work independently, also can be simultaneously Work.
As a kind of preferred technical solution of the utility model, the frame is built using industrial aluminum profile, and its bottom Equipped with Moving caster and support lower margin.
As a kind of preferred technical solution of the utility model, the upper water box and lower header are welded using 304 stainless steels It is connected in cylinder.
Compared with prior art, the beneficial effects of the utility model are:The advanced process control actual training device, uses fixation Control electric appliances element inside electrical mesh plate carries out instruction control to whole device, so as to control water pump A pipelines With the operating process of water pump B pipelines, since water pump A and water pump B can be worked at the same time, it can also separate and work, then water pump A is managed Road and water pump B pipelines can also realize same operating mode, and water pump can will be inside water tank when water pump A pipelines work independently Water by being heated in pipeline transportation to heating tank, then transport upper water box and lower header be for use, make in transportational process Pressure flow monitoring is carried out with devices such as electromagnetic flowmeter, pressure gauges, and flow is adjusted by electrical ball valve, ball valve switch again Pressure simulates the process of advanced real training;It is similar to water pump A pipeline processes when similarly water pump B pipelines work independently, and unlike Water pump B pipelines have two pipelines, and one can be no different with the water pump A pipeline courses of work, and another connection is in water pump A pipelines Among, the operating state of complex pipeline can be simulated, and arbitrarily switched using ball-cock device;Practical Training Teaching-Platform is realized high Degree is integrated;Pressure, flow, liquid level and temperature sensor in controlled device and transmitter are installed concentratedly, various manually-operated gates, The regulating mechanisms such as solenoid valve and electrical ball valve concentration is assemblied in controlled device, by the unified assembling of frequency converter, PLC and man-machine interface On real training mesh plate, the structure for making training platform is simple, volume-diminished, weight saving, and with certain technology content, can By performance enhancement.
Description of the drawings
Fig. 1 is the utility model main structure diagram;
Fig. 2 is the utility model left view structural representation.
In figure:1- frames;2- water tanks;31- water pump A pipelines;311- water pumps A;32- water pump B pipelines;321- control balls Valve;322- water pumps B;4- upper water boxs;5- lower headers;6- heating tanks;The electrical mesh plates of 7-;8- pump outlets;9- water level detectings Sensor;10- electromagnetic flowmeters;11- pressure gauges;12- electrical ball valves;13- ball valve switchs;14- turbine flowmeters;15- liquid levels Sensor;16- collets;17- Moving casters;18- supports lower margin.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
Embodiment:
It please refers to Fig.1 and Fig. 2, the utility model provides a kind of technical solution:A kind of advanced process control actual training device, packet Frame 1, water tank 2, water pipe line, upper water box 4, lower header 5, heating tank 6 and electrical mesh plate 7, the water tank 2 is included to pass through Bolt is fixed on 1 bottom of frame, and its both sides is furnished with level detection sensor equipped with pump outlet 8, and in 2 bottom of water tank 9, the water pipe line includes water pump A pipelines 31 and water pump B pipelines 32, and water pump A pipelines 31 and water pump B pipelines 32 are installed respectively In the front and back of water tank 2, and pass through pump outlet 8 and be connected with water pump A pipelines 31, water pump B pipelines 32, wherein water Water pump A311 is respectively communicated with the conduit pipeline and electromagnetic current of upper water box 4, lower header 5 and heating tank 6 by three by pump A pipelines 31 Gauge 10, pressure gauge 11, electrical ball valve 12, ball valve switch 13 form, and the water pump B pipelines 32 include two groups of pipelines and control Water pump B322 is respectively communicated with the conduit pipeline of upper water box 4, lower header 5 and heating tank 6 by three by ball valve 321, one group of pipeline It is formed with turbine flowmeter 14, pressure gauge 11, another group of pipeline is connected to by conduit pipeline in water pump A pipelines 31, controls ball valve 321 are mounted on the intersection of two groups of pipelines in water pump B pipelines 32, and it is left that the upper water box 4 and lower header 5 are separately mounted to frame 1 The middle part and top of side, and be equipped with liquid level sensor 15 inside it, on the heating tank 6 is placed in the right side of frame 1 Part, and one layer of collet 16 is enclosed with outside it.
The electrical mesh plate 7 is fixed on 1 left side plate surface of frame, and electrical 7 surface of mesh plate covered with waterproof every Plate is equipped with required electric elements inside electrical mesh plate 7;The water pump A311 and water pump B322 can work independently, and also may be used It works at the same time;The frame 1 is built using industrial aluminum profile, and its bottom is equipped with Moving caster 17 and support lower margin 18;It is described Upper water box 4 and lower header 5 use 304 it is stainless steel welded for cylinder.
The advanced process control actual training device, using the control electric appliances element being fixed on inside electrical mesh plate to entire Device carries out instruction control, so as to control the operating process of water pump A pipelines 31 and water pump B pipelines 3, due to water pump A311 It can be worked at the same time with water pump B322, can also separate and work, then water pump A pipelines 31 and water pump B pipelines 32 can also be realized together The operating mode of sample, the water inside water tank 2 can be passed through pipeline transportation to heating by water pump when water pump A pipelines 31 work independently It is heated in tank 6, then transports upper water box 4 and lower header 5 is for use, electromagnetic flowmeter 10, pressure are used in transportational process 11 grade devices of table carry out pressure flow monitoring and flow pressure are adjusted by electrical ball valve 12, ball valve switch 13 again, and simulation is high The process of grade real training;It is similar to water pump A 31 processes of pipeline when similarly water pump B pipelines 32 work independently, and the difference is that water pump B pipes Road 32 has two pipelines, and one can be no different with 31 course of work of water pump A pipelines, and another connection is in water pump A pipelines 31 Among, the operating state of complex pipeline can be simulated, and arbitrarily switched using ball-cock device;Practical Training Teaching-Platform is realized high Degree is integrated;Pressure, flow, liquid level and temperature sensor in controlled device and transmitter are installed concentratedly, various manually-operated gates, The regulating mechanisms such as solenoid valve and electrical ball valve concentration is assemblied in controlled device, by the unified assembling of frequency converter, PLC and man-machine interface On the electrical mesh plate 7 of real training, the structure for making training platform is simple, volume-diminished, weight saving, and contains with certain technology Amount, unfailing performance enhancing.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that by containing in the equivalent requirements of the claims is fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of advanced process control actual training device, including frame (1), water tank (2), water pipe line, upper water box (4), lower water Case (5), heating tank (6) and electrical mesh plate (7), it is characterised in that:The water tank (2) is bolted on frame (1) Bottom, and its both sides is furnished with level detection sensor (9), the water equipped with pump outlet (8), and in water tank (2) bottom Pipe pipeline includes water pump A pipelines (31) and water pump B pipelines (32), and water pump A pipelines (31) and water pump B pipelines (32) are installed respectively Front and back in water tank (2), and pass through pump outlet (8) and be connected with water pump A pipelines (31), water pump B pipelines (32) Logical, wherein water pump A (311) is respectively communicated with upper water box (4), lower header (5) and heating tank by water pump A pipelines (31) by three (6) conduit pipeline and electromagnetic flowmeter (10), pressure gauge (11), electrical ball valve (12), ball valve switch (13) composition, the water Pump B pipelines (32) include two groups of pipelines and control ball valve (321), and water pump B (322) is respectively communicated with by one group of pipeline by three Upper water box (4), the conduit pipeline of lower header (5) and heating tank (6) and turbine flowmeter (14), pressure gauge (11) composition, it is another Group pipeline is connected to by conduit pipeline in water pump A pipelines (31), and control ball valve (321) is two groups in water pump B pipelines (32) The intersection of pipeline, the upper water box (4) and lower header (5) are separately mounted to middle part and top on the left of frame (1), and at it Mounted inside has liquid level sensor (15), and the heating tank (6) is placed in the right side middle and upper part point of frame (1), and outside it It is enclosed with one layer of collet (16).
2. a kind of advanced process control actual training device according to claim 1, it is characterised in that:The electrical mesh plate (7) plate surface on the left of frame (1) is fixed on, and on electrical mesh plate (7) surface covered with waterproof bulkhead, in electrical mesh plate (7) it is internal that required electric elements are installed.
3. a kind of advanced process control actual training device according to claim 1, it is characterised in that:The water pump A (311) and Water pump B (322) can work independently, and also be simultaneously operable.
4. a kind of advanced process control actual training device according to claim 1, it is characterised in that:The frame (1) uses Industrial aluminum profile is built, and its bottom is equipped with Moving caster (17) and support lower margin (18).
5. a kind of advanced process control actual training device according to claim 1, it is characterised in that:The upper water box (4) and Lower header (5) use 304 it is stainless steel welded for cylinder.
CN201721061838.7U 2017-08-23 2017-08-23 A kind of advanced process control actual training device Expired - Fee Related CN207517211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721061838.7U CN207517211U (en) 2017-08-23 2017-08-23 A kind of advanced process control actual training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721061838.7U CN207517211U (en) 2017-08-23 2017-08-23 A kind of advanced process control actual training device

Publications (1)

Publication Number Publication Date
CN207517211U true CN207517211U (en) 2018-06-19

Family

ID=62532310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721061838.7U Expired - Fee Related CN207517211U (en) 2017-08-23 2017-08-23 A kind of advanced process control actual training device

Country Status (1)

Country Link
CN (1) CN207517211U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109238375A (en) * 2018-11-01 2019-01-18 北京京航计算通讯研究所 Experiment test device for the acquisition of industrial pipeline data
RU194949U1 (en) * 2019-07-19 2020-01-09 Федеральное Государственное Казенное Военное Образовательное Учреждение Высшего Образования "Дальневосточное Высшее Общевойсковое Командное Училище Имени Маршала Советского Союза К.К. Рокоссовского" Министерства Обороны Российской Федерации EDUCATIONAL ACTIVE STAND OF HEATING AND VENTILATION UNIT ОВ-65

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109238375A (en) * 2018-11-01 2019-01-18 北京京航计算通讯研究所 Experiment test device for the acquisition of industrial pipeline data
CN109238375B (en) * 2018-11-01 2021-03-23 北京京航计算通讯研究所 Experimental testing device for industrial pipeline data acquisition
RU194949U1 (en) * 2019-07-19 2020-01-09 Федеральное Государственное Казенное Военное Образовательное Учреждение Высшего Образования "Дальневосточное Высшее Общевойсковое Командное Училище Имени Маршала Советского Союза К.К. Рокоссовского" Министерства Обороны Российской Федерации EDUCATIONAL ACTIVE STAND OF HEATING AND VENTILATION UNIT ОВ-65

Similar Documents

Publication Publication Date Title
CN207517211U (en) A kind of advanced process control actual training device
CN202946125U (en) Visual test device for collection assistance by carrying liquid on rockshaft
CN102288736B (en) Circulating pipe network water quality integrative simulation test system with visible pipe sections
CN100410139C (en) Sea thermocline imitation system for test of underwater delivery means
CN202853120U (en) Circular type heat pump machine set constant temperature water supplement device
CN206410984U (en) A kind of salt spray test salting liquid automatically configures device
CN102297932B (en) Water quality comprehensive simulation test system with replacement pipe sections for circulating pipe network
CN206021753U (en) A kind of process control device
Zhenga et al. A coupled immersed boundary method for simulating multiphase flows
CN205402675U (en) Small -size boiler water supplement structure
CN201427874Y (en) Experimental simulation device for circulating cooling water
CN206379106U (en) One kind three holds high water tank control experimental teaching unit
CN116703072A (en) Comprehensive water quantity-water quality scheduling method for river bank connected river network area
CN207499039U (en) PLC water supply and energy saving systems
CN203773861U (en) Process control monitoring training device
CN203688405U (en) Device for simulating leaching of slope soil
CN203406006U (en) Chemical process automation comprehensive training device
CN206515039U (en) A kind of undercurrent of coupling about surface water and ground water exchanges self-loopa experimental rig
CN101976046B (en) Method for simulating dynamic characteristic of controlled object and measuring and transducing process
CN201993303U (en) Improved corrosion test equipment for acid-resistant gases
CN103853201A (en) Device for simulating climate warming to adjust pH value of water body
CN204087549U (en) Process measurement and control integrated practice system
CN106096147A (en) Fetch water before ecological dispatching method for reservoir and reservoir dam the determination method of position
CN203733002U (en) Device for adjusting water body pH (Potential of Hydrogen) by simulating climate warming
CN209034271U (en) A kind of material-stirring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20190823

CF01 Termination of patent right due to non-payment of annual fee