CN207515915U - A kind of high temperature instrument thermometric instrument - Google Patents
A kind of high temperature instrument thermometric instrument Download PDFInfo
- Publication number
- CN207515915U CN207515915U CN201721682492.2U CN201721682492U CN207515915U CN 207515915 U CN207515915 U CN 207515915U CN 201721682492 U CN201721682492 U CN 201721682492U CN 207515915 U CN207515915 U CN 207515915U
- Authority
- CN
- China
- Prior art keywords
- cold house
- instrument
- water
- cooling chamber
- high temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of high temperature instrument thermometric instruments, including right cold house and left cold house, the inside of the right cold house is equipped with water cooling tube, and the bottom righthand side of water cooling tube is connected with water outlet, left end inside the right cold house is equipped with the first water pump, and right cooling chamber is connected on the left of right cold house, the upper end of the right cooling chamber is provided with water hole, and cooling chamber is connected with above water hole, the lower-left end of the upper cooling chamber is provided with left cooling chamber, and the right end of left cooling chamber is mounted with instrument room, the inside of the instrument room is equipped with gauge outfit, and Chuan Jie areas are provided with below instrument room, sealed wall is fixed on the outside of the Chuan Jie areas, right end inside the left cold house is equipped with the second water pump.The high temperature instrument is provided with thermometric instrument about centrosymmetric right cold house of instrument room and left cold house so that water, which can pass through inside the two, to cool down, and can carry out dual cooling by right cold house and left cold house, the effective effect for improving cooling.
Description
Technical field
The utility model is related to thermometric instrument engineering device technique field, specially a kind of high temperature instrument thermometric instrument.
Background technology
Thermometric instrument uses modular construction scheme, simple in structure, easy to operate, cost-effective, suitable for plastics, food
The industries such as product, package packing machine, are also applied for the system for needing to carry out multistage curve program lifting/lowering temperature control, and thermometric instrument is many
A branch in more instrument, common thermometric instrument have thermometer, moisture recorder, temperature converter etc., specific as high
Warm instrument thermometric instrument.
When thermometric instrument in the market uses under the continuous action of high temperature, the damage or survey of gauge outfit, pointer can be caused
It measures result and generates larger error, and larger energy can be lost in drop, temperature control and there is waste money for general thermometric instrument
The problem of source, for this purpose, it is proposed that it is a kind of can high temperature-proof, energy-saving temperature control high temperature instrument thermometric instrument.
Utility model content
The purpose of this utility model is to provide a kind of high temperature instrument thermometric instrument, to solve to carry in above-mentioned background technology
When the thermometric instrument that goes out uses under the continuous action of high temperature, can cause gauge outfit, the damage of pointer or measurement result generate compared with
Big error, and general thermometric instrument can be lost larger energy in drop, temperature control and there are problems that waste of resource.
To achieve the above object, the utility model provides following technical solution:A kind of high temperature instrument thermometric instrument, including
Right cold house and left cold house, the inside of the right cold house is equipped with water cooling tube, and the bottom righthand side of water cooling tube is connected with water outlet, described
Left end inside right cold house is equipped with the first water pump, and right cooling chamber is connected on the left of right cold house, the right cooling chamber it is upper
End is provided with water hole, and cooling chamber is connected with above water hole, and the lower-left end of the upper cooling chamber is provided with left cooling chamber, and
The right end of left cooling chamber is mounted with instrument room, and the inside of the instrument room is equipped with gauge outfit, and be provided with below instrument room
Chuan Jie areas, are fixed with sealed wall on the outside of the Chuan Jie areas, and the right end inside the left cold house is equipped with the second water pump, and left cold
Room is located at the left side of left cooling chamber, and the lower end of the left cold house is connected with water inlet, and recirculated water is mounted on the outside of water inlet
Area.
Preferably, the right cold house is identical with left cold house's shape, and central symmetry of the two about instrument room.
Preferably, the length of the water cooling tube is more than the length of instrument room, and 25 that its bore is Chuan Jie areas bore
/ mono-.
Preferably, the water hole is provided with 3, and to equidistantly distribute between it.
Preferably, the left cooling chamber forms connectivity structure, and it is logical by left cold house and the second water pump with cycle pool
Water hole and upper cooling chamber form connectivity structure with right cooling chamber.
Preferably, the center at the center and Chuan Jie areas in the cycle pool coincides, and its width is Chuan Jie areas diameter
Twice.
Compared with prior art, the beneficial effects of the utility model are:The high temperature instrument with thermometric instrument be provided with about
Centrosymmetric right cold house of instrument room and left cold house so that water, which can pass through inside the two, to cool down, and by right cold house and
Left cold house can carry out dual cooling, the effective effect for improving cooling, and it is provided with length more than the length of instrument room
Water cooling tube can be very good to carry out cooling processing to the water flowed through by curved long tortuous water cooling tube, well to right cold house and
Left cold house carries out temperature control, and right cold house and left cold house is allowed to keep low temperature, and so as to achieve the purpose that cool down to whole device, and it is set
Have between 3 for the water hole equidistantly distributed, can be very good by water hole by right cooling chamber and left cooling chamber and upper cooling chamber
Connection so that flow can be recycled by upper cooling chamber, so as to allow the more uniform of water flowing, keep the one of temperature
It causes, effectively prevents localized hyperthermia from being damaged to the part of instrument, and it is provided with left cold house and the second water pump is formed
The left cooling chamber of connectivity structure and cycle pool pass through water inlet quilt by the water in the work cycle pool of the second water pump
Extraction is flowed into left cooling chamber, then the work by the first water pump so that left cooling is indoor by left cold indoor water cooling tube
Water is flowed into through water hole in upper cooling chamber, is then flowed into again in right cooling chamber, is finally followed by right cold indoor water cooling tube inflow
In ring pool so that water can be recycled, and reach energy-efficient effect, and it is provided with the center phase at center and Chuan Jie areas
The cycle pool of coincidence allows cycle pool that can pacify while being used by Chuan Jie areas to gauge internal device
Load connects, and prevents from cooling down temperature measuring device, so as to influence the effect of measurement.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model instrument room and meter head structure schematic diagram;
Fig. 3 is the utility model Chuan Jie areas and water inlet structure schematic diagram.
In figure:1st, right cold house, 2, water cooling tube, 3, water outlet, the 4, first water pump, 5, right cooling chamber, 6, water hole, 7, upper cooling
Room, 8, left cooling chamber, 9, instrument room, 10, gauge outfit, 11, Chuan Jie areas, 12, sealed wall, 13, left cold house, the 14, second water pump,
15th, water inlet, 16, cycle pool.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of high temperature instrument thermometric instrument, including the right side
Cold house 1, water cooling tube 2, water outlet 3, the first water pump 4, right cooling chamber 5, water hole 6, upper cooling chamber 7, left cooling chamber 8, instrument room 9,
Gauge outfit 10, Chuan Jie areas 11, sealed wall 12, left cold house 13, the second water pump 14, water inlet 15, cycle pool 16, right cold house 1
Inside is equipped with water cooling tube 2, and the bottom righthand side of water cooling tube 2 is connected with water outlet 3, and right cold house 1 is identical with left 13 shape of cold house, and
Central symmetry of the two about instrument room 9 so that water, which can pass through inside the two, to cool down, and cold by right cold house 1 and a left side
Room 13 can carry out dual cooling, and the effective effect for improving cooling, the length of water cooling tube 2 is more than the length of instrument room 9, and its
Bore is 1st/25th of 11 bore of Chuan Jie areas, by curved long tortuous water cooling tube 2 can be very good to the water flowed through into
Row cooling is handled, and carries out temperature control to right cold house 1 and left cold house 13 well, and right cold house 1 and left cold house 13 is allowed to keep low temperature, so as to
Achieve the purpose that cool down to whole device, the left end inside right cold house 1 is equipped with the first water pump 4, and the left side connection of right cold house 1
There is right cooling chamber 5, the upper end of right cooling chamber 5 is provided with water hole 6, and the top in water hole 6 is connected with cooling chamber 7, and water hole 6 is set
There are 3, and to equidistantly distribute between it, can be very good by water hole 6 by right cooling chamber 5 and left cooling chamber 8 and upper cooling
Room 7 connects so that flow can be recycled by upper cooling chamber 7, so as to allow water flowing more uniformly, keep temperature
Unanimously, effectively prevent localized hyperthermia from being damaged to the part of instrument, the lower-left end of upper cooling chamber 7 is provided with left cooling chamber 8,
And the right end of left cooling chamber 8 is mounted with instrument room 9, left cooling chamber 8 passes through left 13 and second water pump 14 of cold house and cycle pool 16
Connectivity structure is formed, and it forms connectivity structure by water hole 6 and upper cooling chamber 7 with right cooling chamber 5, passes through the second water pump 14
Work causes the water in cycle pool 16 to be extracted by water inlet 15, and left cooling is flowed by the water cooling tube 2 in left cold house 13
In room 8, then the work by the first water pump so that the water in left cooling chamber 8 is flowed into through water hole 6 in upper cooling chamber 7, Ran Houzai
It flows into right cooling chamber 5, is finally flowed into cycle pool 16 by the water cooling tube 2 in right cold house 1 so that water can be recycled
It uses, reaches energy-efficient effect, the inside of instrument room 9 is equipped with gauge outfit 10, and the lower section of instrument room 9 is provided with Chuan Jie areas
The outside in 11, Chuan Jie areas 11 is fixed with sealed wall 12, and the right end inside left cold house 13 is equipped with the second water pump 14, and left cold house 13
Positioned at the left side of left cooling chamber 8, the lower end of left cold house 13 is connected with water inlet 15, and the outside of water inlet 15 is mounted with recirculated water
Area 16, the center for recycling the center and Chuan Jie areas 11 in pool 16 coincide, and twice that its width is 11 diameter of Chuan Jie areas, allow and follow
Ring pool 16 can carry out installation connection to gauge internal device by Chuan Jie areas 11, prevent to survey while being used
Warm device cooling, so as to influence the effect of measurement.
Operation principle:It, first can be by Chuan Jie areas 11 to gauge internal for this kind of high temperature instrument thermometric instrument
Device carries out installation connection, prevents from cooling down temperature measuring device, so as to influence the effect of measurement, passes through the second water pump 14 later
Work causes the water in cycle pool 16 to be extracted by water inlet 15, and left cooling is flowed by the water cooling tube 2 in left cold house 13
In room 8, then the work by the first water pump so that the water in left cooling chamber 8 is flowed into through water hole 6 in upper cooling chamber 7, Ran Houzai
It flows into right cooling chamber 5, is finally flowed into cycle pool 16 by the water cooling tube 2 in right cold house 1 so that water can be recycled
It uses, reaches energy-efficient effect, and can be very good to connect right cooling chamber 5 and left cooling chamber 8 with upper cooling chamber 7 by water hole 6
While logical so that flow can be recycled by upper cooling chamber 7, so as to allow water flowing more uniformly, holding temperature
It is consistent, effectively prevent localized hyperthermia from being damaged to the part of instrument, while can be very by curved long tortuous water cooling tube 2
Good carries out the water flowed through cooling processing, carries out temperature control to right cold house 1 and left cold house 13 well, makes right cold house 1 and a left side cold
Room 13 keeps low temperature, so as to achieve the purpose that cool down to whole device, completes entire high temperature instrument thermometric instrument like this
Use process.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of high temperature instrument thermometric instrument, including right cold house (1) and left cold house (13), it is characterised in that:The right cold house
(1) inside is equipped with water cooling tube (2), and the bottom righthand side of water cooling tube (2) is connected with water outlet (3), and the right cold house (1) is internal
Left end the first water pump (4) is installed, and right cooling chamber (5) is connected on the left of right cold house (1), the right cooling chamber (5)
Upper end is provided with water hole (6), and cooling chamber (7) is connected with above water hole (6), and the lower-left end of the upper cooling chamber (7) is set
Left cooling chamber (8) is equipped with, and the right end of left cooling chamber (8) is mounted with instrument room (9), the inside of the instrument room (9) is equipped with
Gauge outfit (10), and Chuan Jie areas (11) are provided with below instrument room (9), it is fixed with sealed wall on the outside of the Chuan Jie areas (11)
(12), the internal right end of the left cold house (13) is equipped with the second water pump (14), and left cold house (13) positioned at left cooling chamber (8)
Left side, the lower end of the left cold house (13) are connected with water inlet (15), and cycle pool is mounted on the outside of water inlet (15)
(16)。
2. a kind of high temperature instrument thermometric instrument according to claim 1, it is characterised in that:The right cold house (1) and a left side
Cold house (13) shape is identical, and central symmetry of the two about instrument room (9).
3. a kind of high temperature instrument thermometric instrument according to claim 1, it is characterised in that:The length of the water cooling tube (2)
Degree is more than the length of instrument room (9), and 1/25th that its bore is Chuan Jie areas (11) bore.
4. a kind of high temperature instrument thermometric instrument according to claim 1, it is characterised in that:The water hole (6) is provided with 3
It is a, and to equidistantly distribute between it.
5. a kind of high temperature instrument thermometric instrument according to claim 1, it is characterised in that:The left cooling chamber (8) is logical
Guo Zuo cold houses (13) and the second water pump (14) form connectivity structure, and it passes through water hole (6) and upper cooling with cycle pool (16)
Room (7) forms connectivity structure with right cooling chamber (5).
6. a kind of high temperature instrument thermometric instrument according to claim 1, it is characterised in that:Cycle pool (16)
The center at center and Chuan Jie areas (11) coincides, and twice that its width is Chuan Jie areas (11) diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721682492.2U CN207515915U (en) | 2017-12-06 | 2017-12-06 | A kind of high temperature instrument thermometric instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721682492.2U CN207515915U (en) | 2017-12-06 | 2017-12-06 | A kind of high temperature instrument thermometric instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207515915U true CN207515915U (en) | 2018-06-19 |
Family
ID=62543796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721682492.2U Expired - Fee Related CN207515915U (en) | 2017-12-06 | 2017-12-06 | A kind of high temperature instrument thermometric instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207515915U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374580A (en) * | 2019-08-14 | 2019-10-25 | 宏华油气工程技术服务(四川)有限公司 | A kind of instrument cooling device |
-
2017
- 2017-12-06 CN CN201721682492.2U patent/CN207515915U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374580A (en) * | 2019-08-14 | 2019-10-25 | 宏华油气工程技术服务(四川)有限公司 | A kind of instrument cooling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207515915U (en) | A kind of high temperature instrument thermometric instrument | |
CN207828635U (en) | Washing machine and its condensing unit | |
CN106066681A (en) | Cabinet-level computer server cooling system | |
CN204142665U (en) | Recirculated water dirtiness resistance on-line monitoring system | |
CN204924502U (en) | Calorimeter calibrating installation heat transfer constant temperature water tank | |
CN204165287U (en) | Four backhaul condensers | |
CN209580279U (en) | Foamed plastics automatic moulding machine steam chest heat cycles balanced structure | |
CN209015380U (en) | A kind of fluorescence analyser cooling water multistage acoustic-optic alarm | |
CN203932021U (en) | A kind of nitrogen heater | |
CN207951102U (en) | A kind of wet desulphurization absorption tower oxidation air apparatus for eliminating sludge | |
CN204352567U (en) | A kind of reboiler with warning function | |
CN203546231U (en) | Cooling device of polyester chip spinning equipment | |
CN204573581U (en) | A kind of water circulation cooling equipment | |
CN207823062U (en) | Constant temperature water tank structure | |
CN104502570A (en) | Novel alkali aggregate experimental box | |
CN203908022U (en) | Oil storage device for heat conducting oil | |
CN208155114U (en) | A kind of circulating cooling coil pipe in Waste Sulfuric Acid reuse treatment process | |
CN109466005A (en) | Foamed plastics automatic moulding machine steam chest heat cycles balanced structure | |
CN207894480U (en) | A kind of rotary drum liquid level capacity display device | |
CN207272135U (en) | A kind of high pressing mold cold | |
CN209197973U (en) | A kind of pressure sensor base | |
IT201800002920A1 (en) | HEAT PRODUCTION PLANT INCLUDING A HEAT ACCUMULATOR | |
CN106092370A (en) | A kind of temperature sensor for testing tube channel temp | |
CN204240839U (en) | Flush type square chest cooler | |
CN203222471U (en) | Massecuite cooling water recycling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180619 Termination date: 20191206 |
|
CF01 | Termination of patent right due to non-payment of annual fee |