CN207514581U - A kind of more air source long range methane delivery systems - Google Patents

A kind of more air source long range methane delivery systems Download PDF

Info

Publication number
CN207514581U
CN207514581U CN201721465730.4U CN201721465730U CN207514581U CN 207514581 U CN207514581 U CN 207514581U CN 201721465730 U CN201721465730 U CN 201721465730U CN 207514581 U CN207514581 U CN 207514581U
Authority
CN
China
Prior art keywords
biogas
air source
gas
surge tank
booster fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721465730.4U
Other languages
Chinese (zh)
Inventor
乔旭野
李志鹏
乔梦君
尹敏敏
常刘伟
谢雨
曲立德
卢凤娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hennan Tutian New Energy Technology Co Ltd
Original Assignee
Hennan Tutian New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Tutian New Energy Technology Co Ltd filed Critical Hennan Tutian New Energy Technology Co Ltd
Priority to CN201721465730.4U priority Critical patent/CN207514581U/en
Application granted granted Critical
Publication of CN207514581U publication Critical patent/CN207514581U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model discloses a kind of more air source long range methane delivery systems, gas holder including connecting gas source, the gas holder passes sequentially through main biogas booster fan, input terminal pressure transmitter connects biogas surge tank, the biogas surge tank conveys supervisor by biogas and is connected with biogas output surge tank, the biogas output surge tank is connected with gas consuming device, further include the first biogas booster fan of the secondary air source of connection first, the first biogas booster fan passes sequentially through first pressure transmitter and the first biogas delivery branch pipe is connected with the biogas surge tank, first flowmeter is provided between the secondary air source of described first and the first biogas booster fan.The utility model can be used in improving the problem of existing biogas gas consuming device biogas pressure is not up to standard.

Description

A kind of more air source long range methane delivery systems
Technical field
The utility model is related to biogas utilization fields, specifically, refer to a kind of more air source long range methane delivery systems.
Background technology
Biogas be organic substance under anaerobic, a kind of mixed gas generated by the fermentation of microorganism. The main component methane of biogas is a kind of ideal gaseous fuel containing 50%-80% methane (CH4).Its colorless and odorless, with It can burn after appropriate air mixing.Belong to clean regenerative resource.In recent years, since country more payes attention to environmental issue And to the support of biogas industry, biogas industry is rapidly developed.But China's biogas current situation is small scale, and distribution is opposite to divide Dissipate, the biogas produced cannot often efficiently use, have it is direct by torch burn burn or directly exhaust, not only waste of energy but also Air is polluted.Some places attempt by neighbouring biogas be transported to one place carry out focus utilization, generated electricity or Boiler of feeding.Due to a lack of corresponding technology, the demand of gas consuming device is often not achieved in methane conveying.
Utility model content
The purpose of this utility model is that:A kind of more air source long range methane delivery systems are provided, it is existing for improving The problem of biogas gas consuming device biogas pressure is not up to standard.
The technical solution adopted in the utility model is as follows:A kind of more air source long range methane delivery systems are led including connection The gas holder of air source, the gas holder pass sequentially through main biogas booster fan, input terminal pressure transmitter connection biogas surge tank, institute The biogas surge tank stated conveys supervisor by biogas and is connected with biogas output surge tank, and biogas output surge tank is with using Gas terminal is connected, and further includes the first biogas booster fan of the first secondary air source of connection, the first biogas booster fan according to It is secondary to be connected by first pressure transmitter and the first biogas delivery branch pipe with the biogas surge tank, the described first secondary gas First flowmeter is provided between source and the first biogas booster fan.
In conclusion by adopting the above-described technical solution, the beneficial effects of the utility model are:
1. the utility model, as gas source, using another air source as secondary air source, utilizes pair by using an air source Air source can be such that the biogas of gas source and secondary air source is realized in biogas surge tank and balance, pass through biogas to gas source methane conveying Output surge tank carries out being output to gas consuming device after supercharging buffering, and the biogas pressure that can make gas consuming device is constant, makes it With more efficient;
2. the utility model, can be by biogas pressure by the way that multiple air sources are sent to gas consuming device by long distance delivery concentration No matter control with gas end gas consumption size or pause gas can ensure that terminal biogas pressure is constant, meet natural pond in setting pressure Gas generator or boiler are required with gas.
Optionally, preferably to realize the utility model, the second biogas booster fan for connecting the second secondary air source is further included, The second biogas booster fan passes sequentially through second pressure transmitter and the second biogas delivery branch pipe is delayed with the biogas It rushes tank to be connected, second flowmeter is provided between the described second secondary air source and the second biogas booster fan.It is logical The secondary air source of setting second is crossed, the second secondary air source and the first secondary air source is made to cooperate, can aid in increase biogas output quantity, energy Enough natural ponds for further increasing gas consuming device when gas consuming device demand is not achieved in gas source and the first secondary air source biogas output quantity Gas exports, and helps that biogas terminal is made to remain constant pressure state.
Optionally, preferably to realize the utility model, between the gas holder and the main biogas booster fan Pipeline on be provided with level meter.By setting level meter, it can facilitate and wind is pressurized with main biogas to the gas holder of biogas gas source Output quantity detection is carried out between machine, and then can easily control the biogas supplement of the first secondary air source or the second secondary air source in real time Amount.
Optionally, preferably to realize the utility model, become in the biogas output surge tank by output end pressure Device is sent to be connected with the gas consuming device.By setting output end pressure transmitter, output gas can be pressurized, into And output gas is made to reach the biogas pressure demand of gas consuming device.
Optionally, preferably to realize the utility model, in the output end pressure transmitter with described with gas end Main meter is provided between end.By setting main meter, it can facilitate and the biogas usage amount of gas consuming device is detected, It is convenient to understand the biogas output pressure of gas consuming device in real time, while billing operation can be facilitated.
Description of the drawings
The utility model will illustrate by example and with reference to the appended drawing, wherein:
Fig. 1 is the utility model overall structure diagram.
Reference numeral:1. gas holder, 1-1. level meters, 2. main biogas booster fans, 3. input terminal pressure transmitters, 4. biogas Surge tank, 4-1. biogas conveying supervisor, 5-1 the first biogas delivery branch pipes, 5-2. the second biogas delivery branch pipes, 5a. first flows Meter, 5b. second flowmeters, 6a. the first biogas booster fans, 6b. the second biogas booster fans, 7a. first pressure transmitters, 7b. second pressure transmitters, 8. output terminal biogas surge tanks, 8-1. output end pressure transmitters, 9. main meters, 10. use gas Terminal, 11. gas sources, 12. first secondary air sources, 13. second secondary air sources.
Specific embodiment
All features or disclosed all methods disclosed in this specification or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
It elaborates with reference to Fig. 1 to the utility model.
The utility model is directed to domestic biogas utilization, and more air source long distance deliveries are uniformly particularly utilized when institute face The problem of facing, the utility model provide a kind of more air source long range methane delivery systems, which includes connection gas source 11 Gas holder 1, the gas holder 1 passes sequentially through main biogas booster fan 2, input terminal pressure transmitter 3 connects biogas surge tank 4, The biogas surge tank 4 conveys supervisor 4-1 by biogas and is connected with biogas output surge tank 8, and biogas output is slow It rushes tank 8 with gas consuming device 10 to be connected, further includes the first biogas booster fan 6a of the first secondary air source 12 of connection, described first Biogas booster fan 6a passes sequentially through first pressure transmitter 7a and the first biogas delivery branch pipe 5-1 and the biogas surge tank 4 are connected, and first flowmeter 5a is provided between the described first secondary air source 12 and the first biogas booster fan 6a.
When there are multiple (2 and more than) biogas air sources a zonule, an air source is selected to do according to on-site actual situations To convey gas source, which undertakes the major part of conveying tolerance, can design the level meter 1-1 on gas holder, main biogas increases Pressure fan, valve, biogas surge tank, main meter 9, input terminal pressure transmitter etc..Biogas is made mainly to be exported by gas source, When the biogas pressure deficiency of gas source output, the first secondary air source is opened, makes the first secondary air source output biogas, makes the first pair at this time The biogas of air source enters biogas surge tank and carries out first time buffering, and by biogas, conveying supervisor is input to output terminal biogas buffering Tank carries out second after buffering, carries out supercharging and be output to gas consuming device.Due to can be by the first secondary air source to gas The biogas of terminal is pressurized, and the biogas output quantity of gas consuming device is made to may remain in pressure constant state.Multiple air sources are led in realization Long-distance conveying, which is concentrated, is sent to gas consuming device, and can control biogas pressure and set pressure, no matter big with gas end gas consumption Small or pause gas can ensure that terminal biogas pressure is constant, meet the use gas requirement of biogas generator or boiler.
In the utility model, in order to ensure the biogas pressure of gas consuming device, it is preferable that export surge tank in the biogas 8 are connected by output end pressure transmitter 8-1 with the gas consuming device 10.In output, by biogas by exporting side pressure Power transmitter is pressurized, and is made to be transported to the biogas of gas consuming device in constant pressure state, be can help to ensure that biogas Quantitative output, while being wasted to avoid biogas, avoid gas consuming device equipment due to biogas input pressure change and be damaged.
Embodiment 1:
In order to further ensure the biogas pressure of gas consuming device, in the present embodiment, it is preferable that further include the secondary gas of connection second Second biogas the booster fan 6b, the second biogas booster fan 6b in source 13 passes sequentially through second pressure transmitter 7b and Two biogas delivery branch pipe 5-2 are connected with the biogas surge tank 4, in the described second secondary air source 13 and second natural pond Second flowmeter 5b is provided between gas booster fan 6b.It is defeated to biogas surge tank using the second secondary air source and biogas delivery branch pipe The methane quantity entered is supplemented, and when the biogas input quantity deficiency of gas source and the first secondary air source, can pass through the second secondary air source Supplement in real time, may further ensure that the biogas pressure of gas consuming device is constant accordingly.

Claims (5)

1. a kind of more air source long range methane delivery systems include the gas holder (1) of connection gas source (11), it is characterised in that:Institute The gas holder (1) stated passes sequentially through main biogas booster fan (2), input terminal pressure transmitter (3) connection biogas surge tank (4), institute The biogas surge tank (4) stated conveys supervisor (4-1) by biogas and is connected with biogas output surge tank (8), and the biogas is defeated Go out surge tank (8) with gas consuming device (10) to be connected, further include the first biogas booster fan of the secondary air source (12) of connection first (6a), the first biogas booster fan (6a) pass sequentially through first pressure transmitter (7a) and the first biogas delivery branch pipe (5-1) is connected with the biogas surge tank (4), the described first secondary air source (12) and the first biogas booster fan First flowmeter (5a) is provided between (6a).
2. a kind of more air source long range methane delivery systems according to claim 1, it is characterised in that:Further include connection Second biogas booster fan (6b) of second mate's air source (13), the second biogas booster fan (6b) pass sequentially through second pressure Transmitter (7b) and the second biogas delivery branch pipe (5-2) are connected with the biogas surge tank (4), in the described second secondary gas Second flowmeter (5b) is provided between source (13) and the second biogas booster fan (6b).
3. a kind of more air source long range methane delivery systems according to claim 1 or 2, it is characterised in that:Described Level meter (1-1) is provided on pipeline between gas holder (1) and the main biogas booster fan (2).
4. a kind of more air source long range methane delivery systems according to claim 1 or 2, it is characterised in that:Described Biogas output surge tank (8) is connected by output end pressure transmitter (8-1) with the gas consuming device (10).
5. a kind of more air source long range methane delivery systems according to claim 4, it is characterised in that:In the output Main meter (9) is provided between side pressure power transmitter (8-1) and the gas consuming device (10).
CN201721465730.4U 2017-11-06 2017-11-06 A kind of more air source long range methane delivery systems Expired - Fee Related CN207514581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721465730.4U CN207514581U (en) 2017-11-06 2017-11-06 A kind of more air source long range methane delivery systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721465730.4U CN207514581U (en) 2017-11-06 2017-11-06 A kind of more air source long range methane delivery systems

Publications (1)

Publication Number Publication Date
CN207514581U true CN207514581U (en) 2018-06-19

Family

ID=62538013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721465730.4U Expired - Fee Related CN207514581U (en) 2017-11-06 2017-11-06 A kind of more air source long range methane delivery systems

Country Status (1)

Country Link
CN (1) CN207514581U (en)

Similar Documents

Publication Publication Date Title
CN201424957Y (en) Coal bed methane-mixing intake system of ventilation air methane oxidation system
CN112628602A (en) Hydrogen-doped natural gas transportation and separation system and control method thereof
CN207514581U (en) A kind of more air source long range methane delivery systems
CN204117454U (en) A kind of hydropower instructional device
CN203006483U (en) Single efficient continuous delivery pump
CN207877377U (en) It is a kind of to couple energy supplying system based on more air sources of biogas and natural gas
CN204939417U (en) A kind of Marsh gas purifying device
CN202560497U (en) Environment-friendly utilization system of biogas energy of pig farm
CN113346109B (en) Fuel cell hydrogen system for power station and control method
CN205744126U (en) A kind of continuous electricity generation system of gas
CN207621681U (en) A kind of more air source long range biogas conveying automatic control systems
CN202954839U (en) Gas electrical generation system
CN209113513U (en) A kind of sewage plant bad smell circular treatment Zero discharging system
CN203346363U (en) Central gas supply device based on methane and light hydrocarbon mixed air mixture
CN201215252Y (en) Stalk gas supply device
CN205121716U (en) Intercommunication formula marsh gas charge system
CN206469064U (en) The dual gas supply combined supply gas system of natural gas power
CN202452116U (en) Skid-mounted type liquefied natural gas supply device
CN204901349U (en) Naturally, air feed equipment and system are organized to interim bottle of gasification
CN207213643U (en) A kind of gas axial flow blower mixing device
CN205725124U (en) A kind of Dewar flask notifies air exchange system automatically
CN202302745U (en) Natural evaporation type self-operated gas odorization device for cities and towns
CN204026146U (en) A kind of 8 well formula heating isolation integral integrated devices
CN201942552U (en) Aerating device in contact oxidation method
CN202811114U (en) Generator set air distribution system for mixed use of gas with high and low concentration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

CF01 Termination of patent right due to non-payment of annual fee