CN207514484U - A kind of closure saddle - Google Patents
A kind of closure saddle Download PDFInfo
- Publication number
- CN207514484U CN207514484U CN201721482592.0U CN201721482592U CN207514484U CN 207514484 U CN207514484 U CN 207514484U CN 201721482592 U CN201721482592 U CN 201721482592U CN 207514484 U CN207514484 U CN 207514484U
- Authority
- CN
- China
- Prior art keywords
- plate
- saddle
- copper post
- prefabricated plate
- saddle plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a kind of closure saddle, including saddle plate and prefabricated plate;The prefabricated plate is equipped with interior mesoporous, internal face is equipped with sheet groove, prefabricated plate is in sheet groove, prefabricated plate is equipped with cloth silk slot, cloth silk slot is equipped with the resistance wire for melting prefabricated plate, it is set on prefabricated plate there are two the copper post for being docked with electro-fusion welding machine, resistance wire one end is connect with a copper post, and the resistance wire other end is connect with another copper post;The saddle plate lateral wall is equipped with passes through saddle plate with the one-to-one protection pipe of copper post, copper post, and copper post at one end is in corresponding protection pipe.The beneficial effects of the utility model are:It is rational in infrastructure, can closure reparation quickly be carried out to impaired PE pipes, PE pipes need not stop the supple of gas or steam in repair process, and reparation operation is relatively simple, and repairing effect is good.
Description
Technical field
The utility model belongs to fuel gas transmission technical field more particularly to a kind of closure saddle.
Background technology
PE modeling pipes(PE is managed), it has been widely used in present production, life.The classification of PE pipes is various, and function is each
It is different, industrially there is a kind of purposes of relatively mainstream to be used as gas transmission, pipeline road etc., it is natural to convey such as to commonly use PE pipes at present
Gas.In use, PE pipes can because hitting, shaking, aging when factors due to surface is caused deeper cut, slight crack or broken occur
Damage, at this time with regard to being replaced, but replace when, air delivering pipeline is needed locally to stop the supple of gas or steam, and replacement process take it is longer, always
For it is more time-consuming and to gas transmission work can have some impact on.
Utility model content
The utility model be in order to overcome deficiency of the prior art, provide it is a kind of rational in infrastructure, can be quickly to impaired
PE pipes carry out closure reparation, PE pipes need not stop the supple of gas or steam in repair process, and it is relatively simple to repair operation, and the closure that repairing effect is good
Saddle.
To achieve these goals, the utility model uses following technical scheme:
A kind of closure saddle, including
Saddle plate, the column tube being arranged on saddle plate and the prefabricated plate being connect with saddle plate, the saddle plate have to manage with PE
The internal face that road lateral wall is affixed;
The prefabricated plate is equipped with interior mesoporous, and internal face is equipped with sheet groove, and prefabricated plate is in sheet groove, prefabricated
Thin plate is equipped with cloth silk slot, and cloth silk slot is equipped with for the resistance wire that melts prefabricated plate, sets that there are two be used on prefabricated plate
The copper post docked with electro-fusion welding machine, resistance wire one end are connect with a copper post, and the resistance wire other end is connect with another copper post;
The saddle plate lateral wall is equipped with passes through saddle plate with the one-to-one protection pipe of copper post, copper post, and copper post at one end exists
In corresponding protection pipe.
Preferably, the saddle plate lateral wall is equipped with column tube, saddle plate is equipped with outer mesoporous, and column tube one end connects with outer mesoporous
Logical, the column tube other end is equipped with closing cap, and rubber block is equipped in column tube, and rubber block is equipped with head slot, and head slot is equipped with pre- envelope screw,
Pre- envelope screw includes sequentially connected tail head, stud section and tip, and tail head is cylindrical and is stuck in a slot, and tail head and column tube are same
Axis arranges that tail head is equipped with driver flutes.
Preferably, the closing cap is threadedly coupled with column tube, rubber block is arranged on closing cap.
Preferably, being set on the saddle plate, there are two the pressing aid items for being in flat column, and two pressing aid item parallel arrangements, two are helped
Press strip office is in the opposite sides of saddle plate.
The beneficial effects of the utility model are:It is rational in infrastructure, can closure reparation quickly be carried out to impaired PE pipes, repaired
PE pipes need not stop the supple of gas or steam in journey, and reparation operation is relatively simple, and repairing effect is good.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the partial structural diagram of the utility model;
Fig. 3 is the structure diagram at the utility model saddle plate and prefabricated plate;
Fig. 4 is the structure diagram of the utility model prefabricated plate;
Fig. 5 is the structure diagram at the utility model rubber block and pre- envelope screw.
In figure:Saddle plate 1, outer mesoporous 1a, protection pipe 11, prefabricated plate 2, interior mesoporous 2a, cloth silk slot 21, copper post 3, column tube 4,
Closing cap 41, rubber block 51, pre- envelope screw 52, tail head 521, stud section 522, tip 523, pressing aid item 6.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and detailed description.
In embodiment as shown in Figures 1 to 5, a kind of closure saddle, including
Saddle plate 1 and the prefabricated plate 2 being connect with saddle plate, the saddle plate have the inner wall for being affixed with PE pipeline lateral walls
Face;
The prefabricated plate is equipped with interior mesoporous 2a, and internal face is equipped with sheet groove, and prefabricated plate is in sheet groove, in advance
Sheeting is equipped with cloth silk slot 21, and cloth silk slot is equipped with for the resistance wire that melts prefabricated plate, set on prefabricated plate there are two
For the copper post 3 docked with electro-fusion welding machine, resistance wire one end is connect with a copper post, and the resistance wire other end connects with another copper post
It connects;
The saddle plate lateral wall is equipped with protection pipe 11 one-to-one with copper post, and copper post passes through saddle plate, copper post at one end
In corresponding protection pipe.Saddle plate and prefabricated plate are made of PE materials.
The saddle plate lateral wall is equipped with column tube 4, and saddle plate is equipped with outer mesoporous 1a, and column tube one end is connected with outer mesoporous, column
The pipe other end is equipped with closing cap 41, and rubber block 51 is equipped in column tube, and rubber block is equipped with head slot, and head slot is equipped with pre- envelope screw
52, the pre- screw that seals includes sequentially connected tail head 521, stud section 522 and tip 523, and tail head is cylindrical and is stuck in a slot,
Tail head and column tube are coaxially arranged, and tail head is equipped with driver flutes.
The closing cap is threadedly coupled with column tube, and rubber block is arranged on closing cap.Closing cap can be opened, in observation
Portion's situation or to being filled in column tube, with strengthen repair, leak preventing effect.
It is set on the saddle plate there are two the pressing aid item 6 for being in flat column, two pressing aid items are arranged in parallel, two pressing aid offices
In the opposite sides of saddle plate.When saddle plate is with PE pipe weldings, needing saddle plate being pressed on PE pipes, saddle plate itself is in irregular shape,
It is unfavorable for external agency it is carried out to stablize pressurization(Saddle plate curved surface is more, is unfavorable for exerting a force), and pressing aid item is good compression position
It puts.
When needing to carry out PE pipes to repair, pre- envelope screw can be first removed, by the tip of pre- envelope screw against the impaired portion of PE pipes
Pre- envelope screw is screwed in the impaired place of PE pipes with screwdriver, so as to realize pre- envelope by position.It then can be by saddle plate together with prefabricated plate
It covers together on PE pipes(The tail head of pre- envelope screw enters a slot, since head slot is provided on rubber block, so rubber block
It can adaptively deform, be not in the situation for tail head being caused to cannot be introduced into a slot when not perfectly aligned), rubber block compresses pre-
Screw is sealed, internal face is attached on PE pipes.Then two copper post connections can be connect with electro-fusion welding machine, electro-fusion welding machine work, resistance
It is heated at silk so that prefabricated plate melting, the part saddle plate melting close to prefabricated plate, the part PE pipes close to prefabricated plate are molten
Melt, at the same time can pressurize to saddle plate, saddle plate is made tightly to touch PE pipes, so as to which PE pipes can realize welding with saddle plate.In this way,
Pre- envelope and sealing welding twice repair process are realized, the impaired place of PE pipes again can not outwardly gas leakage after can ensureing reparation.
Claims (4)
1. a kind of closure saddle, it is characterized in that, including
Saddle plate and the prefabricated plate being connect with saddle plate, the saddle plate have the internal face for being affixed with PE pipeline lateral walls;
The prefabricated plate is equipped with interior mesoporous, and internal face is equipped with sheet groove, and prefabricated plate is in sheet groove, prefabricated plate
It is equipped with cloth silk slot, cloth silk slot is equipped with for the resistance wire that melts prefabricated plate, sets that there are two be used for and electricity on prefabricated plate
The copper post of fusing soldering welder docking, resistance wire one end are connect with a copper post, and the resistance wire other end is connect with another copper post;
The saddle plate lateral wall is equipped with passes through saddle plate with the one-to-one protection pipe of copper post, copper post, and copper post at one end is in correspondence
Protection pipe in.
2. a kind of closure saddle according to claim 1, it is characterized in that, the saddle plate lateral wall is equipped with column tube, on saddle plate
Equipped with outer mesoporous, column tube one end is connected with outer mesoporous, and the column tube other end is equipped with closing cap, and rubber block, rubber block are equipped in column tube
Head slot is equipped with, head slot is equipped with pre- envelope screw, and the pre- screw that seals includes sequentially connected tail head, stud section and tip, and tail head is in
Cylindric and be stuck in a slot, tail head and column tube are coaxially arranged, and tail head is equipped with driver flutes.
3. a kind of closure saddle according to claim 2, it is characterized in that, the closing cap is threadedly coupled with column tube, rubber block
It is arranged on closing cap.
4. a kind of closure saddle according to claims 1 or 2 or 3, it is characterized in that, set that there are two in flat column on the saddle plate
Pressing aid item, two pressing aid items parallel arrangement, two pressing aid offices are in the opposite sides of saddle plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721482592.0U CN207514484U (en) | 2017-11-09 | 2017-11-09 | A kind of closure saddle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721482592.0U CN207514484U (en) | 2017-11-09 | 2017-11-09 | A kind of closure saddle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207514484U true CN207514484U (en) | 2018-06-19 |
Family
ID=62536758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721482592.0U Active CN207514484U (en) | 2017-11-09 | 2017-11-09 | A kind of closure saddle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207514484U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109630802A (en) * | 2018-10-31 | 2019-04-16 | 河南中拓石油工程技术股份有限公司 | A kind of sealing element and monitoring technique is sealed for pipeline branch pipe aperture after repairing |
-
2017
- 2017-11-09 CN CN201721482592.0U patent/CN207514484U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109630802A (en) * | 2018-10-31 | 2019-04-16 | 河南中拓石油工程技术股份有限公司 | A kind of sealing element and monitoring technique is sealed for pipeline branch pipe aperture after repairing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207514484U (en) | A kind of closure saddle | |
CN206297791U (en) | A kind of powder sack-filling device | |
CN203356945U (en) | Threaded steel tube high-pressure weld joint butt joint device | |
CN204201367U (en) | A kind of small-bore pipeline on-line production send blocking device | |
CN206407191U (en) | A kind of polysulfide sealant vacuum binder accessory system | |
CN216466300U (en) | Energy-saving PE pipe welding jig for hydraulic engineering | |
CN201128233Y (en) | Heat-sealing welding mould | |
CN209925862U (en) | Quick repair equipment of pipeline for mine | |
CN207239632U (en) | A kind of full-automatic frame disassembly machine of solar photovoltaic assembly aluminium | |
CN204387549U (en) | A kind of assembling pipe joint | |
CN205968089U (en) | Vacuum assembly quality | |
CN203131296U (en) | Multiple sealing pipe fitting capable of observing butt fusion effect | |
CN207271736U (en) | Blowing pipeline device | |
CN208855601U (en) | A kind of soft air bag of reinforced imitation body | |
CN102435090A (en) | Method for repairing tube plate of shell and tube graphite heat exchanger | |
CN206530788U (en) | Jointing | |
CN201420931Y (en) | Pipeline plugging device for sealing micro leak point at weal seam of pipeline | |
CN203671047U (en) | HDPE blue water supply pipe | |
CN206373029U (en) | A kind of plunger-type resorption glue dispensing valve | |
CN204254124U (en) | Electric melting pipe fittings | |
CN203994712U (en) | The fixing tip of tack for a kind of Plastic Welding | |
CN205118491U (en) | Double -deck horn mouth air conditioner connecting pipe | |
CN203893087U (en) | Lamp cap structure of LED fluorescent tube | |
CN201068391Y (en) | Refrigerant filling and sealing device | |
CN204800140U (en) | Portable battery terminal cap electrokinetic remediation machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 315414 No. 71, West Road, Hemudu Town, Yuyao City, Ningbo City, Zhejiang Province Patentee after: Ningbo Yuhua Industrial Co.,Ltd. Address before: 315414 No. 71, West Road, Hemudu Town, Yuyao City, Ningbo City, Zhejiang Province Patentee before: NINGBO YUHUA ELECTRIC APPLIANCE Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |