CN207513120U - A kind of construction plaster trowel - Google Patents

A kind of construction plaster trowel Download PDF

Info

Publication number
CN207513120U
CN207513120U CN201721596553.3U CN201721596553U CN207513120U CN 207513120 U CN207513120 U CN 207513120U CN 201721596553 U CN201721596553 U CN 201721596553U CN 207513120 U CN207513120 U CN 207513120U
Authority
CN
China
Prior art keywords
scraper plate
storage
deashing
column
outer scraper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721596553.3U
Other languages
Chinese (zh)
Inventor
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721596553.3U priority Critical patent/CN207513120U/en
Application granted granted Critical
Publication of CN207513120U publication Critical patent/CN207513120U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of construction plaster trowels, and including outer scraper plate, the outer scraper plate upper end is equipped with handle, and the outer scraper plate bottom surface is provided with the grey hole of storage;The outer scraper plate uses hollow structure, is equipped with lifter plate by restoring spring inside the outer scraper plate, the lifter plate upper end is equipped with compression bar, and the compression bar is pierced by the outer scraper plate;The lifter plate lower end is provided with deashing column, and the deashing column is corresponding with the grey hole of the storage, and the deashing column is stretched into inside the grey hole of the storage.Advantageous effect is:During plastering, the extra ash erased, which enters inside the grey hole of storage, to be stored, and can prevent that influence smearing effect can be accumulated;After plastering, lower moulded rod overcomes the elasticity of returning spring, elongates returning spring, so as to deashing column be driven to remove the ash stored up inside grey hole by lifter plate, prevents ash from influencing the performance of device in the grey hole building up inside hardening of storage.

Description

A kind of construction plaster trowel
Technical field
The utility model is related to architectural furniture technical fields, and in particular to a kind of construction plaster trowel.
Background technology
Plaster trowel is the tool being commonly used in construction, is mainly used for the floating on cement wall surface or ground.According to Effect plaster trowel is divided into troweling sliding surface and smears rough surface, and the plaster trowel of troweling sliding surface is mostly irony, and the plaster trowel for smearing rough surface is more It is wooden.
Applicants have discovered that at least there are following technical problems in the prior art:Currently used for smearing the wooden plastering of rough surface Knife can be damaged by reasons such as water loggings, influence smearing effect;Plaster trowel baseplane is depended merely on simultaneously and carries out erasing for ash, easily Because the accumulation of ash causes to damage to plane, smearing effect is influenced.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of construction plaster trowel, with solution It can be certainly damaged by reasons such as water loggings currently used for smearing the wooden plaster trowel of rough surface in the prior art, influence smearing effect;Together When depend merely on plaster trowel baseplane carry out for ash erasing, easily because ash accumulation plane is caused to damage, influence smooth out effect The technical problems such as fruit.Preferred technical solution, can be right when being plastered in many technical solutions provided by the utility model The extra ash erased is stored, and prevents ash accumulation from influencing smearing effect;It is simple and convenient convenient for removing the ash of storage, no Influence the technique effects such as the long-time service of device, elaboration as detailed below.
To achieve the above object, the utility model provides following technical scheme:
A kind of construction plaster trowel provided by the utility model, including outer scraper plate, the outer scraper plate upper end is equipped with Handle, the outer scraper plate bottom surface are provided with the grey hole of storage;The outer scraper plate uses hollow structure, passes through recovery inside the outer scraper plate Spring is equipped with lifter plate, and the lifter plate upper end is equipped with compression bar, and the compression bar is pierced by the outer scraper plate;Under the lifter plate End is provided with deashing column, and the deashing column is corresponding with the grey hole of the storage, and the deashing column is stretched into inside the grey hole of the storage.
Using a kind of above-mentioned construction plaster trowel, when device is in unused state, the recovery spring is utilized Elastic force pulls the lifter plate, and the deashing column is driven to rise, and the deashing post part is made to be detached from the grey hole of the storage, at this time The grey hole of storage can be used in the storage of ash there are cavity, and during use device, cement surface is carried out by the outer scraper plate bottom Plastering, the extra ash erased, which enters inside the grey hole of the storage, to be stored, when the ash storage inside the grey hole of the storage is a certain amount of, Ash inside the grey hole of storage squeezes the deashing column, overcomes the elastic force of the returning spring, makes described in the lifter plate drive Deashing column rises, and convenient for the grey more ashes of hole storage of the storage, can prevent ash accumulation from influencing smearing effect;After plastering, The compression bar is pushed, the elastic force for restoring spring is overcome, makes the lifter plate that the deashing column be driven to decline, so as to release The ash inside the grey hole of storage is stated, prevents ash from influencing the using effect of device in the grey hole building up inside hardening of the storage.
Preferably, the outer scraper plate, the handle, the lifter plate and the deashing column are made of plastics.
Preferably, the grey hole of storage uses hexagonal structure, and the grey hole of the storage is interspersed at the outer scraper plate bottom Face.
Preferably, the external dimensions of the lifter plate is equal with the external dimensions of the outer scraper plate and is matched using gap It closes.
Preferably, the outer scraper plate inner wall is provided with sliding slot, be provided with sliding block on the outside of the lifter plate, the sliding block with The sliding slot is slidably matched.
Preferably, the outer end of the compression bar uses T font structures.
Preferably, the external dimensions of the deashing column is equal with the inside dimension in the grey hole of the storage, and matched using gap It closes.
Preferably, the length dimension of the deashing column is equal with the depth dimensions in the grey hole of the storage.
Advantageous effect is:When the 1st, plastering, the extra ash erased is stored into described store up inside grey hole, can be prevented Influence smearing effect can be accumulated;
2nd, after plastering, the compression bar is pushed, overcomes the elasticity of the returning spring, elongate the returning spring, So as to the deashing column be driven to remove the ash inside the grey hole of the storage by the lifter plate, ash is prevented in the grey hole of the storage The performance of device is hardened and is influenced in portion's accumulation.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the dimensional structure diagram of the utility model;
Fig. 2 is the bottom view of the utility model;
Fig. 3 is the internal structure schematic diagram of the utility model;
Fig. 4 is the lifter plate dimensional structure diagram of the utility model;
Fig. 5 is the close-up schematic view of the utility model.
The reference numerals are as follows:
1st, outer scraper plate;101st, sliding slot;2nd, handle;3rd, compression bar;4th, grey hole is stored up;5th, lifter plate;501st, sliding block;6th, restore bullet Spring;7th, deashing column.
Specific embodiment
It, below will be to the technology of the utility model to make the purpose of this utility model, technical solution and advantage clearer Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Obtained all other embodiment is put, belongs to the range that the utility model is protected.
Referring to shown in Fig. 1-Fig. 5, the utility model provides a kind of construction plaster trowel, including outer scraper plate 1, scrapes outside 1 upper end of plate is equipped with handle 2, and outer 1 bottom surface of scraper plate is provided with the grey hole 4 of storage;Outer scraper plate 1 uses hollow structure, and outer 1 inside of scraper plate is logical Over recovery spring 6 is equipped with lifter plate 5, and 5 upper end of lifter plate is equipped with compression bar 3, and compression bar 3 is pierced by outer scraper plate 1;5 lower end of lifter plate Deashing column 7 is provided with, deashing column 7 is corresponding with the grey hole 4 of storage, and deashing column 7 is stretched into inside the grey hole 4 of storage.
As optional embodiment, outer scraper plate 1, handle 2, lifter plate 5 and deashing column 7 are made of plastics, and device is whole Weight is light, durable;
The grey hole 4 of storage is stored up grey hole 4 and is interspersed in outer 1 bottom surface of scraper plate using hexagonal structure, and setting in this way can increase The quantity in the grey hole 4 of storage, so as to improve the amount of storage of ash;
The external dimensions of lifter plate 5 is equal with the external dimensions of outer scraper plate 1 and is gap-matched, and is easy to implement lifter plate 5 in outer 1 inside lifting carriage of scraper plate;
Outer 1 inner wall of scraper plate is provided with sliding slot 101, and 5 outside of lifter plate is provided with sliding block 501, and sliding block 501 is slided with sliding slot 101 Dynamic cooperation, can play lifter plate 5 guiding role, and auxiliary realizes lifter plate 5 in outer 1 inside lifting carriage of scraper plate;
The outer end of compression bar 3 uses T font structures, in this way, convenient for lower moulded rod 3;
The external dimensions of deashing column 7 is equal with the inside dimension in the grey hole 4 of storage, and is gap-matched, and can play sealing Effect prevents ash from entering inside outer scraper plate 1, while it is clean that deashing column 7 is contributed to remove the ash stored up inside grey hole 4;
The length dimension of deashing column 7 is equal with the depth dimensions in the grey hole 4 of storage, in this way, can ensure that deashing column 7 will store up Ash inside grey hole 4 is removed clean.
Using the above structure, when device is in unused state, using the elastic force for restoring spring 6, lifter plate 5 is pulled, and Deashing column 7 is driven to rise, deashing column 7 is made to be partially disengaged the grey hole 4 of storage, storing up grey hole 4 at this time, there are cavitys, can be used in depositing for ash Storage during use device, plasters to cement surface by outer 1 bottom of scraper plate, and the extra ash erased, which enters grey 4 inside of hole of storage, to carry out Storage when the ash storage inside the grey hole 4 of storage is a certain amount of, stores up the ash inside grey hole 4 and squeezes deashing column 7, overcome returning spring Elastic force makes lifter plate 5 that deashing column 7 be driven to rise, and stores more ashes convenient for the grey hole 4 of storage, can prevent ash accumulation from influencing to smooth out Effect;After plastering, lower moulded rod 3 overcomes the elastic force for restoring spring 6, makes lifter plate 5 that deashing column 7 be driven to decline, so as to push away Go out the ash inside the grey hole 4 of storage, prevent ash from influencing the using effect of device in grey 4 building up inside of the hole hardening of storage.
The above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, in the technical scope that any one skilled in the art discloses in the utility model, variation can be readily occurred in Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power Subject to the protection domain of profit requirement.

Claims (8)

1. a kind of construction plaster trowel, including outer scraper plate(1), it is characterised in that:The outer scraper plate(1)Upper end is equipped with handle Hand(2), the outer scraper plate(1)Bottom surface is provided with the grey hole of storage(4);The outer scraper plate(1)Using hollow structure, the outer scraper plate (1)Inside is by restoring spring(6)Lifter plate is installed(5), the lifter plate(5)Upper end is equipped with compression bar(3), the compression bar (3)It is pierced by the outer scraper plate(1);The lifter plate(5)Lower end is provided with deashing column(7), the deashing column(7)With the storage ash Hole(4)It is corresponding, and the deashing column(7)Stretch into the grey hole of the storage(4)It is internal.
2. a kind of construction plaster trowel according to claim 1, it is characterised in that:The outer scraper plate(1), the handle (2), the lifter plate(5)With the deashing column(7)It is made of plastics.
3. a kind of construction plaster trowel according to claim 1, it is characterised in that:The grey hole of storage(4)Using six sides Shape structure, and the grey hole of the storage(4)It is interspersed in the outer scraper plate(1)Bottom surface.
4. a kind of construction plaster trowel according to claim 1, it is characterised in that:The lifter plate(5)External ruler The very little and outer scraper plate(1)External dimensions it is equal and be gap-matched.
5. a kind of construction plaster trowel according to claim 1, it is characterised in that:The outer scraper plate(1)Inner wall is set There is sliding slot(101), the lifter plate(5)Outside is provided with sliding block(501), the sliding block(501)With the sliding slot(101)It slides Cooperation.
6. a kind of construction plaster trowel according to claim 1, it is characterised in that:The compression bar(3)Outer end adopt With T font structures.
7. a kind of construction plaster trowel according to claim 1, it is characterised in that:The deashing column(7)External ruler It is very little to store up grey hole with described(4)Inside dimension it is equal, and be gap-matched.
8. a kind of construction plaster trowel according to claim 1, it is characterised in that:The deashing column(7)Length ruler It is very little to store up grey hole with described(4)Depth dimensions it is equal.
CN201721596553.3U 2017-11-26 2017-11-26 A kind of construction plaster trowel Expired - Fee Related CN207513120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721596553.3U CN207513120U (en) 2017-11-26 2017-11-26 A kind of construction plaster trowel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721596553.3U CN207513120U (en) 2017-11-26 2017-11-26 A kind of construction plaster trowel

Publications (1)

Publication Number Publication Date
CN207513120U true CN207513120U (en) 2018-06-19

Family

ID=62541234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721596553.3U Expired - Fee Related CN207513120U (en) 2017-11-26 2017-11-26 A kind of construction plaster trowel

Country Status (1)

Country Link
CN (1) CN207513120U (en)

Similar Documents

Publication Publication Date Title
CN204983391U (en) Exempt from to tear open precast concrete beam mold board
CN210459895U (en) Plastering device for building construction
CN204826614U (en) Exempt from to tear open precast concrete wall form
CN207513120U (en) A kind of construction plaster trowel
CN215977109U (en) Ecological water conservancy bank protection device based on hydraulic engineering
CN203222911U (en) Novel building curtain wall
CN215889251U (en) Wall surface treatment is with scraping thick stick
CN203080877U (en) Brick wall rebar punching device
CN217630621U (en) Convenient to use's assembled building wallboard fixing device
CN203029162U (en) Cleaning besom
CN212453532U (en) Floor tile laying raw material leveling device for indoor building
CN205369345U (en) Novel energy -conserving formula bull -dozer
CN219057089U (en) Galvanized tile transportation protection device
CN211258062U (en) Subway construction sound insulation wall
CN214615274U (en) Leveling device for construction wall panel
CN220284849U (en) Ecological restoration soil and water conservation mechanism
CN205171938U (en) Buckle formula floor with waterproof construction
CN203947863U (en) Precast member for reinforcing bar concrete compound wall
CN204983129U (en) Pipeline cleaner
CN204510748U (en) A kind of claying knife of adjustable handle
CN110541543B (en) Scraper device for building and using method thereof
CN219965949U (en) Green and environment-friendly construction dust screen for construction site
CN219411673U (en) Wall plastering device
CN204357356U (en) Drilling rod thread washer
CN204163350U (en) A kind of cement trowelling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20181126