CN207512927U - Prefabricated components articulated mounting and prefabricated components - Google Patents

Prefabricated components articulated mounting and prefabricated components Download PDF

Info

Publication number
CN207512927U
CN207512927U CN201721655583.7U CN201721655583U CN207512927U CN 207512927 U CN207512927 U CN 207512927U CN 201721655583 U CN201721655583 U CN 201721655583U CN 207512927 U CN207512927 U CN 207512927U
Authority
CN
China
Prior art keywords
prefabricated components
bolt
slot
articulated mounting
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721655583.7U
Other languages
Chinese (zh)
Inventor
李伟
马云飞
李青山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Technology Co Ltd
Original Assignee
Sany Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Construction Industry Co Ltd filed Critical Sany Construction Industry Co Ltd
Priority to CN201721655583.7U priority Critical patent/CN207512927U/en
Application granted granted Critical
Publication of CN207512927U publication Critical patent/CN207512927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model is related to construction engineering technical field, more particularly to a kind of prefabricated components articulated mounting and prefabricated components.The prefabricated components articulated mounting includes bolt and coaming plate;Bolt includes inserted link and the plug being connect with one end of inserted link;The one end of inserted link far from plug is for being embedded in the first prefabricated components, and for being plugged in the slot being arranged on the second prefabricated components, coaming plate is used to be arranged between the side wall of bolt and the side wall of the slot on the second prefabricated components plug.Prefabricated components articulated mounting provided by the utility model is easy for construction, and structural system is clear, bolt can in slot fine rotation, therefore be more in line with hinged it is assumed that hinged effect is good.And coaming plate can make the uniform force of bolt, so as to extend the service life of prefabricated components articulated mounting, ensure the stability of connecting node.

Description

Prefabricated components articulated mounting and prefabricated components
Technical field
The utility model is related to construction engineering technical field, more particularly to a kind of prefabricated components articulated mounting and prefabricated structure Part.
Background technology
Assembled architecture is built relative to conventional concrete cast in situs formula, undoubtedly a much progress, assembled architecture Prefabricated components can be factory produced, and prefabricated components can carry out Assembling, then the production of prefabricated components can standardize, quality Controllably, efficient quick reduces waste of material, reduces construction site environmental pollution.
In the relevant technologies, the articulated connection of traditional prefabricated components is all in a manner that reserved steel bar is locally cast-in-place, by office Portion is cast-in-place to be considered as articulated connection, and the connection mode work progress is cumbersome.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated components articulated mounting and prefabricated components, to solve the prior art In the cast-in-place modes in part of prefabricated components construct the technical issues of cumbersome.
The utility model provides a kind of prefabricated components articulated mounting, including bolt and coaming plate;Bolt include inserted link and The plug being connect with one end of inserted link;For being embedded in the first prefabricated components, plug is used to insert for the one end of inserted link far from plug It is located in the slot being arranged on the second prefabricated components, coaming plate is used to be arranged on inserting on the side wall and the second prefabricated components of bolt Between the side wall of slot.
Further, prefabricated components articulated mounting further includes bottom plate, and bottom plate is used to be arranged on the bottom wall and second of bolt in advance The bottom wall of slot on component processed and between.
Further, prefabricated components articulated mounting further includes connecting plate, and connecting plate is connect with the one end of inserted link far from plug.
Further, the material of coaming plate is stainless steel or zinc-plating material.
Further, the material of bottom plate is stainless steel or zinc-plating material.
Further, the material of connecting plate is stainless steel or zinc-plating material.
The utility model also provides a kind of prefabricated components, including the first prefabricated components, the second prefabricated components and this practicality The prefabricated components articulated mounting of novel offer;Bolt in prefabricated components articulated mounting is embedded on the first prefabricated components, and second Slot is provided on prefabricated components, bolt is plugged in slot, and coaming plate is arranged between the side wall of bolt and the side wall of slot.
Further, gap, gap width 2mm-3mm are provided between the side wall of bolt and the side wall of slot.
Further, grouting material is filled between bolt and slot.
The utility model also provides a kind of prefabricated components, including the first prefabricated components, the second prefabricated components and this practicality The prefabricated components articulated mounting of novel offer;The inserted link of bolt in prefabricated components articulated mounting is embedded in the first prefabricated components On, slot is provided on the second prefabricated components, bolt is plugged in slot;Coaming plate is arranged on the side wall of bolt and the side wall of slot Between, bottom plate is arranged between the bottom wall of bolt and the bottom wall of slot;Coaming plate and bottom plate are embedded on the second prefabricated components.
During prefabricated components articulated mounting provided by the utility model is used, the inserted link of bolt is first embedded in first It in prefabricated components, that is, is fixed in the first prefabricated components, is wrapped on the side wall of mold using mold, and by coaming plate, so as to make Second prefabricated components form slot in casting process.It is prefabricated by first when assembled first prefabricated components and the second prefabricated components Component and the second prefabricated part hanging adjustment position, are inserted into slot by bolt, the gap around bolt are carried out again if needed Material filling.The assembly process is convenient and efficient, and so as to make installation time saving and energy saving, speed of application is fast;It is fast and accurate for positioning, so as to make Installation accuracy is high;Material filling only is carried out to the gap around bolt, then can greatly reduce material filling dosage, so as to save construction cost.
In addition, fine rotation can be achieved in plug in slot, so as to which the connection at prefabricated components connecting node be made more to meet It is hinged to be preferably hinged effect it is assumed that having.Moreover, coaming plate can make the uniform force of bolt, so as to extend prefabricated components hinge The service life of connection device ensures the stability of connecting node.
Description of the drawings
The attached drawing for forming the part of the utility model is used to provide a further understanding of the present invention, this practicality is new The illustrative embodiments and their description of type do not form the improper restriction to the utility model for explaining the utility model. In attached drawing:
The attached drawing for forming the part of the utility model is used to provide a further understanding of the present invention, this practicality is new The illustrative embodiments and their description of type do not form the improper restriction to the utility model for explaining the utility model. In attached drawing:
Fig. 1 is the vertical view according to the prefabricated components articulated mounting of the utility model first embodiment;
Fig. 2 is the A-A sectional views of prefabricated components articulated mounting shown in FIG. 1;
Fig. 3 is the vertical view according to the prefabricated components articulated mounting of the utility model second embodiment;
Fig. 4 is the B-B sectional views of prefabricated components articulated mounting shown in Fig. 3;
Fig. 5 is the vertical view according to the prefabricated components articulated mounting of the utility model 3rd embodiment;
Fig. 6 is the C-C sectional views of prefabricated components articulated mounting shown in fig. 5;
Fig. 7 is the structure diagram according to the prefabricated components of the utility model embodiment.
In figure:01- bolts;02- slots;03- coaming plates;04- bottom plates;05- connecting plates;The first reinforced bars of 06-; The second reinforced bars of 07-;08- third reinforced bars;The first protrusions of 09-;The second protrusions of 10-;11- third protrusions;011- is inserted Bar;012- plugs;100- prefabricated components articulated mountings;The first prefabricated components of 110-;The second prefabricated components of 120-.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the utility model can To be combined with each other.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integrally Connection;Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can above-mentioned art be understood with concrete condition Concrete meaning of the language in the utility model.
Fig. 1 is according to a structure diagram of the prefabricated components articulated mounting of the utility model first embodiment, and Fig. 2 is Another structure diagram of prefabricated components articulated mounting shown in FIG. 1, Fig. 3 are according to the prefabricated of the utility model second embodiment One structure diagram of component articulated mounting, Fig. 4 are another structure diagrams of prefabricated components articulated mounting shown in Fig. 3, Fig. 5 is according to a structure diagram of the prefabricated components articulated mounting of the utility model 3rd embodiment, and Fig. 6 is shown in Fig. 5 Prefabricated components articulated mounting another structure diagram.
As shown in Figures 1 to 6, the utility model provides a kind of prefabricated components articulated mounting, and the utility model provides a kind of Prefabricated components articulated mounting, bolt 01 and coaming plate 03;Bolt 01 includes inserted link 011 and connect with one end of inserted link 011 Plug 012;For being embedded in the first prefabricated components, plug 012 sets for being plugged in for the one end of inserted link 011 far from plug 012 It puts in the slot 02 on the second prefabricated components, coaming plate 03 is used to be arranged on inserting on the side wall and the second prefabricated components of bolt 01 Between the side wall of slot 02.
It should be noted that the side wall of bolt 01 refers to that the side wall of plug 012 and the inserted link 011 of bolt are located at second in advance The side wall of 02 part of slot on component processed.
Wherein, the material of bolt 01 can be a variety of, such as:The metals such as steel, iron, preferably using with high intensity etc. The galvanizing production or other new materials of grade, high antirust grade, this material can improve the intensity of plug, can extend slotting The service life of head, so as to reduce the maintenance cost at prefabricated components connecting node.
There are many structure types of bolt 01, such as:The plug 012 of bolt 01 is consistent with the sectional dimension of inserted link 011, That is, bolt 01 is in straight panel, straight panel is inserted into the slot of the second prefabricated components.For another example:The plug 012 of bolt 01 includes multiple points and inserts Head.
Again as depicted in figs. 1 and 2, plug 012 is cylindrical, and the extension side of the axis direction of plug 012 and inserted link 011 To vertical, plug 012 and the formation "-" type of inserted link 011, that is, the plug 012 of bolt 01 is cylinder, and inserted link 011 is connected to plug On 012 side wall.This 01 easy processing simple in structure of bolt.
Again as shown in Figure 3 and Figure 4, plug 012 is in strip, and is vertically arranged with inserted link 011, plug 012 and 011 shape of inserted link Into T fonts.This latch structure is simple, easy processing, and it is firm that card is set.
Again as shown in Figure 5 and Figure 6, plug 012 includes the link block for being connected to 011 both sides of inserted link, and plug forms Y with inserted link Font.Link block parallelogram is connected to the head of inserted link, and making bolt 01, the structure can make card set reliable jail in Y-shaped Gu.
The shape that the shape of coaming plate 03 should be located in the slot on the second prefabricated components with bolt is mutually agreed with, i.e. plug 012 And inserted link 011 is located at the shape of the part of slot 02.
The material of coaming plate 03 can be a variety of, such as:Steel, iron, stainless steel or zinc-plating material etc., preferably using tool There are the galvanizing production or other new materials of high grade, high antirust grade, this material can improve the strong of coaming plate 03 Degree, so as to the maintenance cost being further reduced at prefabricated components connecting node.
During articulated mounting provided in this embodiment is used, the inserted link of bolt 01 is first embedded in the first prefabricated components In, that is, it is fixed in the first prefabricated components, is wrapped on the side wall of mold using mold, and by coaming plate, it is second prefabricated so as to make Component forms slot 02 in casting process.When assembled first prefabricated components and the second prefabricated components, by the first prefabricated components with Second prefabricated part hanging adjusts position, and bolt 01 is inserted into slot 02, and the gap around bolt 01 is carried out again if needed Material filling.The assembly process is convenient and efficient, and so as to make installation time saving and energy saving, speed of application is fast;It is fast and accurate for positioning, so as to make Installation accuracy is high;Material filling only is carried out to the gap around bolt, then can greatly reduce material filling dosage, so as to save construction cost.
In addition, fine rotation can be achieved in plug 012 in slot 02, so as to make the connection at prefabricated components connecting node more Meet hinged it is assumed that with effect is preferably hinged.
Moreover, coaming plate 03 can make the uniform force of bolt 01, so as to extend the service life of prefabricated components articulated mounting, Ensure the stability of connecting node.
As shown in Figures 1 to 6, on above-described embodiment basis, further, prefabricated components articulated mounting further includes bottom Plate 04, bottom plate 04 be used for be arranged on the slot 02 on the bottom wall and the second prefabricated components of bolt 01 bottom wall and between.
Wherein, the bottom wall of bolt refers to that the bottom wall of the plug of bolt and the inserted link of bolt are located on the second prefabricated components The bottom wall of socket portion.
The material of bottom plate 04 can be a variety of, such as:Steel, iron, stainless steel or zinc-plating material etc., preferably using tool There are the galvanizing production or other new materials of high grade, high antirust grade, this material can improve the strong of bottom plate 04 Degree, so as to the maintenance cost being further reduced at prefabricated components connecting node.
In the present embodiment, bottom plate 04 can further make the uniform force of bolt, so as to extend the service life of bolt 01, And then extend the service life of prefabricated components articulated mounting, it ensures the stability of connecting node, further reduces maintenance cost.
As shown in Figures 1 to 6, on above-described embodiment basis, further, prefabricated components articulated mounting further includes company Fishplate bar 05, connecting plate 05 are connect with the one end of inserted link 011 far from plug 012.
Wherein, the material of connecting plate 05 can be a variety of, such as:Steel, iron, stainless steel or zinc-plating material etc., preferably It is to use galvanizing production or other new materials with high grade, high antirust grade, this material being capable of the company of raising The intensity of fishplate bar 05, so as to the maintenance cost being further reduced at prefabricated components connecting node.
Connecting plate 05 can improve the cohesive force of inserted link and the first prefabricated components, make connection more secured.
As shown in Figures 1 to 6, on above-described embodiment basis, further, prefabricated components articulated mounting further includes One reinforced bar 06, the first reinforced bar 06 are connect with side of the coaming plate 03 far from plug 012, and the first reinforced bar 06 is in coaming plate 03 Angle is set;First reinforced bar 06 is used to be embedded in the second prefabricated components.
Wherein, the structure type of the first reinforced bar 06 can be a variety of, such as:First reinforced bar 06 for straight-bar, curved bar or Person's special-shaped bar;Existing object such as peg, pin or axis etc. are either used, at this point, the first reinforced bar 06 is far from coaming plate 03 One end be provided with the first protrusion 09, the cross sectional dimensions of the first protrusion 09 is more than the cross sectional dimensions of the first reinforced bar 06, the The shape of one protrusion 09 can be spherical shape, column etc., and the first protrusion 09 can improve the bonding of 03 and first prefabricated components of coaming plate Power connects coaming plate 03 more solid and reliable.
First reinforced bar 06 can also directly use anchor bar, such as straight reinforcing bar or U-shaped steel muscle etc., the intensity of reinforcing bar The length of high anchor bar is calculated according to design and is determined.
First reinforced bar 06 will with 03 angled setting of coaming plate, such as acute angle, right angle or obtuse angle, when coaming plate 03 be cambered surface When, the section of the first reinforced bar 06 and the tie point of coaming plate 03 is angled.Then the first reinforced bar 06 to far from coaming plate 03 direction The first prefabricated components 110 are put in, the first reinforced bar 06 is firmly inserted into prefabricated components as root, this is considerably improved The cohesive force of coaming plate 03.
As shown in Figures 1 to 6, on above-described embodiment basis, further, prefabricated components articulated mounting further includes Two reinforced bars 07, the second reinforced bar 07 are connect with side of the bottom plate 04 far from inserted link 011.
Wherein, the structure type of the second reinforced bar 07 can be a variety of, such as:Second reinforced bar 07 for straight-bar, curved bar or Person's special-shaped bar;Existing object such as peg, pin or axis etc. are either used, at this point, the second reinforced bar 07 is far from bottom plate 04 one end is provided with the second protrusion 10, and the cross sectional dimensions of the second protrusion 10 is more than the cross sectional dimensions of the second reinforced bar 07, The shape of second protrusion 10 can be spherical shape, column etc., and the second protrusion 10 can improve the viscous of 04 and second prefabricated components of bottom plate Power is tied, makes bottom plate connection more solid and reliable.
Second reinforced bar 07 can also directly use anchor bar, such as straight reinforcing bar or U-shaped steel muscle etc., just into intensity The length of high anchor bar is calculated according to design and is determined.
Second reinforced bar 07 will with 04 angled setting of bottom plate, such as acute angle, right angle or obtuse angle, when bottom plate 04 be cambered surface When, the second reinforced bar 07 and bottom plate 04 and the section of the tie point of the second reinforced bar 07 are angled.Then the second reinforced bar 07 is to remote The second prefabricated components are stretched into direction from bottom plate 04, and the second reinforced bar 07 is firmly inserted into prefabricated components as root, this It has been considerably improved the cohesive force of bottom plate 04.
As shown in Figures 1 to 6, on above-described embodiment basis, further, prefabricated components articulated mounting further includes Three reinforced bars 08, third reinforced bar 08 are connect with side of 05 plate of connecting plate far from inserted link, and with the angled setting of connecting plate.
Wherein, the structure type of third reinforced bar 08 can be a variety of, such as:Third reinforced bar 08 for straight-bar, curved bar or Person's special-shaped bar;Existing object such as peg, pin or axis etc. are either used, at this point, third reinforced bar 08 is far from connection One end of plate 05 is provided with third protrusion 11, and the cross sectional dimensions of third protrusion 11 is more than the cross section ruler of third reinforced bar 08 Very little, the shape of third protrusion 11 can be spherical shape, column etc., and third protrusion 11 can improve 05 and first prefabricated components of connecting plate Cohesive force, the connection for making connecting plate is more solid and reliable.
Third reinforced bar 08 can also directly use anchor bar, such as straight reinforcing bar or U-shaped steel muscle etc., just into intensity The length of high anchor bar is calculated according to design and is determined.
Third reinforced bar 08 will with 05 angled setting of connecting plate, such as acute angle, right angle or obtuse angle, when connecting plate 05 is During cambered surface, third reinforced bar 08 and connecting plate 05 and the section of the tie point of the second reinforced bar 07 are angled.Then third reinforced bar 08 stretches into the first prefabricated components to the direction far from connecting plate 05, and third reinforced bar 08 is firmly inserted into prefabricated as root In component, this has been considerably improved the cohesive force of connecting plate 05.
It should be noted that the first reinforced bar 06, the second reinforced bar 07 and third reinforced bar 08 may be used it is different Structure type preferably using identical structure type, can facilitate processing industryization to manufacture with unified specification in this way.
Fig. 7 is the structure diagram according to the prefabricated components of the utility model embodiment.As shown in Fig. 7, the utility model A kind of prefabricated components are also provided, including the first prefabricated components 110, the second prefabricated components 120 and provided by the utility model pre- Component articulated mounting 100 processed, the bolt 01 in prefabricated components articulated mounting are embedded on the first prefabricated components 110, and second is prefabricated Slot 02 is provided on component 120, bolt 01 is plugged in slot 02, and coaming plate 03 is arranged on the side wall of bolt 01 and slot 02 Between side wall.
Wherein, slot 02 can be arranged directly on the second prefabricated components 120, can also be a link block, link block Upper setting slot 02, link block are connect with the second prefabricated components 120.
The structure type of slot 02 can be determined according to the structure type of bolt 01.
First prefabricated components 110 can be multiple, and the second prefabricated components 120 can be multiple, first prefabricated components 110 connect with second prefabricated components 120.
It should be noted that when multiple first prefabricated components, multiple second prefabricated components is needed to be sequentially connected, Ke Yi Bolt 01 and slot 02 are respectively provided on first prefabricated components and the second prefabricated component, so as to so that the first prefabricated component, one A second prefabricated components, first prefabricated components, second prefabricated components ... are sequentially connected.
When producing prefabricated components provided in this embodiment, bolt 01 is determined according to specific project and stress checking computations Size and the size that is reserved in outside the first prefabricated components 110, then bolt 01 is placed on to the precalculated position of die station, then First prefabricated components are poured;The mold consistent with 02 geomery of slot is placed on to the designated position of die station, by coaming plate The side wall of mold is wrapped in, then the second prefabricated components are poured.
When prefabricated components provided in this embodiment is used to carry out splicing assembling, by the first prefabricated components 110, (connection is prefabricated Component) lifting and position adjustment it is in place after installation temporary support;Then the second prefabricated components 120 (prefabricated components to be connected) are hung After the completion of the adjustment of position, bolt 01 is inserted into slot 02 for dress;If it is desired, the side wall of the side wall and slot 02 to bolt 01 Between fill grouting material;After node reaches design strength, temporary support is removed, installation is complete.
Wherein, when needing to fill grouting material between the side wall of bolt 01 and the side wall of slot 02, grouting material is using non- Shrinkage material, the product hierarchy for the material that grouting material uses are not less than the product hierarchy of the material of the first prefabricated components, so as to Ensure the intensity at connecting node.
Prefabricated components provided in this embodiment can avoid numerous and diverse positioning device, and assembled process is simple, so as to improve Speed of application.Since a large amount of grouting materials need not be poured at the connecting node of the first prefabricated components 110 and the second prefabricated components 120, Construction cost can be then saved, and makes the protection cost of finished product low.
As shown in Figure 1, Figure 7 shows, on above-described embodiment basis, further, slot 02 is included mutually through perforation First opening and the second opening, for being arranged on the upper wall of the second prefabricated components, second is open to be arranged on the first opening The side wall of second prefabricated components;Plug 012 can pass through the first opening, and inserted link 011 passes through the second opening.
In the present embodiment, the first opening mutually runs through with the second opening, and first is open to be arranged on the second prefabricated components 120 upper wall, the second opening is for being arranged on the side walls of the second prefabricated components 120, then bolt 01 is from the second prefabricated components 120 Upper surface be passed into slot 02, inserted link 011 is stretched out by the second opening, and the size of plug is more than the size of inserted link, first Opening is adapted with the geomery of plug, and the second opening is adapted with the geomery of inserted link 011, then is inserted when bolt 01 is inserted into After slot 02, the connecting portion of plug 012 and inserted link 011 is stuck in the second opening of slot 02, so that bolt 01 and slot 02 Connection more stablize, when prefabricated components are horizontal positioned, plug can be avoided to be detached from by slot 02, further improve the reliable of connection Property, further facilitate the installation of prefabricated component.
During the first prefabricated components and the second prefabricated components are installed, the gap between bolt and slot needs basis to set Requirement, construction technology, factory process precision etc. are counted to determine.
For example, as shown in fig. 7, gap, gap width 2mm- are provided between the side wall of bolt and the side wall of slot 02 3mm, such as:Any value in the sections such as 2mm, 2.5mm or 3mm.
In the present embodiment, when installation accuracy precision is higher, the gap between the side wall of bolt and the side wall of slot 02 can To reach 2mm-3mm, it can further save process to avoid grouting material is re-injected and simplify work progress at this time.
When prefabricated articulation piece attachment device include bolt 01, coaming plate 03, bottom plate 04, connecting plate 05, the first reinforced bar 06, When the second reinforced bar 07 and third reinforced bar 08, bolt 01, connecting plate 05 and third reinforced bar 08 are first connected (such as Welding) it is fixed together, then be put into the designated position of die station, finally the first prefabricated components 110 are poured, make bolt 01 Part inserted link, connecting plate and third reinforced bar 08 be embedded in the first prefabricated components 110;Coaming plate 03 and bottom plate 04 are connected It connects (such as welding) to fix, the first reinforced bar 06 connect (such as welding) with coaming plate 03, and the second reinforced bar 07 is connect with bottom plate 04 (such as welding);It is put into the designated position of the second prefabricated components 120 again, finally the second prefabricated components 120 are poured, make to enclose Plate 03, bottom plate 04, the first reinforced bar 06 and the second reinforced bar are embedded in the second prefabricated components 120.This processing sequence It is efficient and convenient.
It should be noted that the thickness of coaming plate 03, the thickness of bottom plate 04, connecting plate 05, the first reinforced bar 06, the second reinforcement The bar 07 and respective size of 08 three of third reinforced bar, number and arrangement, the size of bolt 01, inserted link are embedded to the first prefabricated structure The length of part is checked all in accordance with specific project and stress and is determined, to reach intensity requirement, while not waste of materials again.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all in this practicality Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (10)

1. a kind of prefabricated components articulated mounting, which is characterized in that including:Bolt and coaming plate;The bolt include inserted link and The plug being connect with one end of inserted link;
For being embedded in the first prefabricated components, the plug is used to be plugged in setting for the one end of the inserted link far from the plug In slot on the second prefabricated components, the coaming plate is used for the side wall for being arranged on bolt and slot on the second prefabricated components Between side wall.
2. prefabricated components articulated mounting according to claim 1, which is characterized in that further include bottom plate, the bottom plate is used for Be arranged on the bottom wall of the bolt and the bottom wall of the slot on the second prefabricated components and between.
3. prefabricated components articulated mounting according to claim 2, which is characterized in that further include connecting plate, the connecting plate It is connect with the one end of the inserted link far from the plug.
4. prefabricated components articulated mounting according to claim 2, which is characterized in that the material of the coaming plate for stainless steel or Zinc-plating material.
5. prefabricated components articulated mounting according to claim 2, which is characterized in that the material of the bottom plate for stainless steel or Zinc-plating material.
6. prefabricated components articulated mounting according to claim 3, which is characterized in that the material of the connecting plate is stainless steel Or zinc-plating material.
7. a kind of prefabricated components, which is characterized in that including the first prefabricated components, the second prefabricated components and such as claim 1-6 Any one of described in prefabricated components articulated mounting;
Bolt in the prefabricated components articulated mounting is embedded on first prefabricated components, is set on second prefabricated components Slot is equipped with, the bolt is plugged in the slot, and the coaming plate is arranged on the side wall of the bolt and the side of the slot Between wall.
8. prefabricated components according to claim 7, which is characterized in that the side wall of the side wall of the bolt and the slot it Between be provided with gap, the gap width is 2mm-3mm.
9. prefabricated components according to claim 7, which is characterized in that filled with grouting between the bolt and the slot Material.
10. a kind of prefabricated components, which is characterized in that including the first prefabricated components, the second prefabricated components and such as claim 2- Prefabricated components articulated mounting described in any one of 6;
The inserted link of bolt in the prefabricated components articulated mounting is embedded on first prefabricated components, the second prefabricated structure Slot is provided on part, the bolt is plugged in the slot;
The coaming plate is arranged between the side wall of the bolt and the side wall of the slot, and the bottom plate is arranged on the bolt Between the bottom wall of bottom wall and the slot;
The coaming plate and the bottom plate are embedded on second prefabricated components.
CN201721655583.7U 2017-12-01 2017-12-01 Prefabricated components articulated mounting and prefabricated components Active CN207512927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721655583.7U CN207512927U (en) 2017-12-01 2017-12-01 Prefabricated components articulated mounting and prefabricated components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721655583.7U CN207512927U (en) 2017-12-01 2017-12-01 Prefabricated components articulated mounting and prefabricated components

Publications (1)

Publication Number Publication Date
CN207512927U true CN207512927U (en) 2018-06-19

Family

ID=62542861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721655583.7U Active CN207512927U (en) 2017-12-01 2017-12-01 Prefabricated components articulated mounting and prefabricated components

Country Status (1)

Country Link
CN (1) CN207512927U (en)

Similar Documents

Publication Publication Date Title
CN105113708B (en) The assembled architecture of precast reinforced concrete structure and its composition
CN207553315U (en) Prefabricated components articulated mounting and prefabricated components
CN207525898U (en) Prefabricated components articulated mounting and prefabricated components
CN207512927U (en) Prefabricated components articulated mounting and prefabricated components
CN207727762U (en) Assembled beam-column connecting node
CN210396138U (en) Pour and use section bar mounting structure
CN210173850U (en) Window opening mold for prefabricated wall board
CN213682616U (en) Horizontal joint connecting structure of prefabricated shear wall
CN216075699U (en) Assembly type building connection structure
CN214401377U (en) Ramp sectional type steel box girder
CN211523432U (en) Municipal works production is with pouring template
CN209304758U (en) Stair are prefabricated to pour mold
CN211250567U (en) Pouring die for balcony
CN209194271U (en) Concealed beam node pavement structure is poured after a kind of prefabricated board
CN109235709B (en) Full cast-in-place outer wall structure of building
CN208870498U (en) A kind of enclosing basis and enclosing
CN103382700B (en) Movable die frame girder device and method suitable for construction of single side widening box girder with large width
CN209975501U (en) High-efficient underground continuous wall leads wall and pours device
CN217292756U (en) Stair mould of commonality
CN110409820A (en) The working erecting device of cantilevered structure and its construction method
CN209907588U (en) Prefabricated component hinge device
CN218061437U (en) Cast-in-place concrete double-limb column framework for industrial factory building construction
CN216865951U (en) Building templates section bar
CN218111142U (en) Aluminum detachable prefabricated wall formwork
CN109208890A (en) Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Patentee after: Sany Construction Technology Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.