CN207497911U - A kind of engineering construction hanging device - Google Patents

A kind of engineering construction hanging device Download PDF

Info

Publication number
CN207497911U
CN207497911U CN201721539042.8U CN201721539042U CN207497911U CN 207497911 U CN207497911 U CN 207497911U CN 201721539042 U CN201721539042 U CN 201721539042U CN 207497911 U CN207497911 U CN 207497911U
Authority
CN
China
Prior art keywords
rotation axis
clamp system
rack
hinged
partial gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721539042.8U
Other languages
Chinese (zh)
Inventor
王博
宗辉
熊巍
牛金凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Oil Field Peng Peng Construction Engineering Co Ltd
Original Assignee
Nanyang Oil Field Peng Peng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Oil Field Peng Peng Construction Engineering Co Ltd filed Critical Nanyang Oil Field Peng Peng Construction Engineering Co Ltd
Priority to CN201721539042.8U priority Critical patent/CN207497911U/en
Application granted granted Critical
Publication of CN207497911U publication Critical patent/CN207497911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of engineering construction hanging device,It is dumb effectively to solve arm activity,It is inconvenient for operation,Poor safety performance,The problems such as unprotect measure,Including revoking hole,It revokes hole lower end and is fixed with transverse slat,Transverse slat left end is hinged with the first clamp system,First clamp system includes left shell,Left shell is rotatably connected to the first rotation axis,First rotation axis right end is fixed with the first clamping jaw,First rotation axis left end is fixedly connected with the first partial gear,The first rack that first partial gear external toothing is slidably connected with left shell,First rack lower end is hinged with head rod,The head rod other end is hinged with the first chuck to horizontally slip with left shell,The left pin for sliding up and down and connecting with the first rotation axis is installed on left shell,Transverse slat right end is arranged with the second clamp system,Second clamp system is identical with the first clamp system structure.

Description

A kind of engineering construction hanging device
Technical field
The utility model is related to construction engineering technical field, more particularly to a kind of engineering construction hanging device.
Background technology
At present, with the quickening of social paces, various economic items are constantly accelerated, and various economic items arrived rapidly Development, building trade also arrived development at full speed, while also promote in the market build corollary equipment rapid development, When building every profession and trade is constructed, it usually needs the equipment of practicality lifting and hoist engine, it is in most cases, much live under normal conditions Since conditions permit is difficult to use large-scale hanging device, because the required space of large scale equipment and condition are difficult to meet, together When even more a kind of waste when carrying small workpiece, existing small-sized hanging device arm activity is dumb, poor safety performance, no guarantor Shield measure, is susceptible to contingency, damages to the safety of operating personnel.
It is therefore desirable to a kind of engineering construction solves the problems, such as this with hanging device.
Utility model content
For the above situation, to overcome the defect of the prior art, the purpose of the utility model is just to provide a kind of engineering and applies Work hanging device, it is dumb effectively to solve arm activity, inconvenient for operation, poor safety performance, and unprotect measure etc. is asked Topic.
Its technical solution solved is that the utility model includes revoking hole, revokes hole lower end and is fixed with transverse slat, transverse slat left end The first clamp system is hinged with, the first clamp system includes left shell, and left shell is rotatably connected to the first rotation axis, the first rotation Axis right end is fixed with the first clamping jaw, and the first rotation axis left end is fixedly connected with the first partial gear, the first partial gear The first rack that external toothing is slidably connected with left shell, the first rack lower end are hinged with head rod, and head rod is another End is hinged with the first chuck to horizontally slip with left shell, and the first clamping jaw drives the first rotation axis to move downward, the first rotation axis The first partial gear is driven to be rotated up, the first partial gear drives the first rack to move upwards, and then controls the first card Disk slides to the right, and the left pin for sliding up and down and connecting with the first rotation axis is equipped on left shell, and transverse slat right end is arranged with second Clamp system, the second clamp system are identical with the first clamp system structure.
The utility model clever structure, flexibly practical, security performance is high, easy to operate, quick rapid, improves work effect Rate facilitates staff to operate, and has more ensured operating personnel's safety.
Description of the drawings
Fig. 1 is the schematic diagram of the utility model front view.
Fig. 2 is the schematic diagram of the first chuck structure in the utility model.
Specific embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with attached drawing.
It is provided by Fig. 1 to Fig. 2, a kind of engineering construction hanging device, including revoking hole 1, revokes 1 lower end of hole and be fixed with horizontal stroke Plate 2,2 left end of transverse slat are hinged with the first clamp system, and the first clamp system includes left shell 3, and left shell 3 is rotatably connected to first Rotation axis 4,4 right end of the first rotation axis are fixed with the first clamping jaw 8, and 4 left end of the first rotation axis is fixedly connected with first not exclusively Gear 5, the first rack 6 that 5 external toothing of the first partial gear and left shell 3 are slidably connected, 6 lower end of the first rack are hinged with the One connecting rod 7,7 other end of head rod are hinged with the first chuck 9 to horizontally slip with left shell 3, and the first clamping jaw 8 drives the One rotation axis 4 moves downward, and the first rotation axis 4 drives the first partial gear 5 to be rotated up, and the first partial gear 5 drives First rack 6 moves upwards, and then the first chuck 9 is controlled to slide to the right, is equipped on left shell 3 with the first rotation axis about 4 The left pin 10 being slidably connected, 2 right end of transverse slat are arranged with the second clamp system, the second clamp system and the first clamp system structure It is identical.
Second clamp system includes right shell body 11, and right shell body 11 is rotatably connected to the second rotation axis 12, second turn 12 left end of moving axis is fixed with the second clamping jaw 13, and 12 right end of the second rotation axis is fixedly connected with the second partial gear 14, and second The second rack 15 that 14 external toothing of partial gear is slidably connected with right shell body 11,15 lower end of the second rack is hinged with the second connection Bar 16,16 other end of the second connecting rod are hinged with the second chuck 17 to horizontally slip with right shell body 11, are equipped on right shell body 11 The right pin 18 connecting is slided up and down with the second rotation axis 12.
The left shell 3 is equipped with the wedge groove being slidably connected with the first rack 6.
The right shell body 11 is equipped with the wedge groove being slidably connected with the second rack 15.
Resilient rubbber cushion is equipped on first clamping jaw 8 and the second clamping jaw 13.
11 lower end of right shell body is hinged with the motion bar 19 being connect with left shell 3, and motion bar 19 is equipped with multiple pins Hole 20.
When the utility model is used, left 10 the first rotation axis of clamping 4 of pin, right 18 the second rotation axis of clamping 12 of pin ensure First rotation axis 4 and the second rotation axis 12 do not rotate, when needing to lift weight, left shell 3 and right shell body 11 Weight is clamped so that suitable angle in 2 times left-right rotations of transverse slat, can be found in this way, personnel is conveniently operated and clamps weight, then Motion bar 19 links together left shell 3 and right shell body 11, and motion bar 19 is equipped with multiple pin holes 20, for fixed different The left shell 3 of angle of release degree and right shell body 11, prevent weight from shaking, and revoke hole 1 during upwards, under the effect of gravity, Left shell 3 and right shell body 11 are drawn close to centre, can ensure that the first clamping jaw 8 and the second clamping jaw 13 simultaneously clamp on weight in this way, During lifting, if when misoperation or overload, left pin 10 is broken, and weight will drive the first clamping jaw 8 to move downward, First clamping jaw 8 drives the first rotation axis 4 to move downward, and the first rotation axis 4 drives the first partial gear 5 to be rotated up, and first Partial gear 5 drives the first rack 6 to move upwards, and the first rack 6 controls the first chuck 9 under the action of connecting rod It slides to the right, quick clamping or picking-up weight ensure that weight will not be fallen off, article avoided to damage and cause unnecessary Personnel injure, and have a safety feature;
When right pin 18 is broken, weight will drive the second clamping jaw 13 to move downward, and the second clamping jaw 13 drives the second rotation Axis 12 moves downward, and the second rotation axis 12 drives the second partial gear 14 to be rotated up, and the second partial gear 14 drives the Two racks 15 move upwards, and the second rack 15 controls the second chuck 17 to slide to the left under the action of connecting rod, rapid card Tight or picking-up weight;
When left pin 10 and right pin 18 are broken simultaneously, weight will drive the first clamping jaw 8 and the second clamping jaw 13 downward simultaneously Movement, the first rack 6 and the second rack 15 are upward simultaneously, in the case where 7 and second connecting rod 16 of head rod acts on simultaneously, first 9 and second chuck 17 of chuck is drawn close simultaneously to centre, quick clamping or picking-up weight, support personnel's safety.
The more traditional device of the utility model has following benefit:1)Structure novel, operation is flexible, is conducive to adjust open-angle Degree, motion bar connection more ensure the globality of left shell and right shell body;2)Increase one of safety precautions, if left pin or Right pin is broken, and the first chuck or the second chuck can quickly be drawn close to centre, and support or clamping weight prevent weight from falling It falls.
The utility model clever structure, security performance is high, easy to operate, quick rapid, improves work efficiency, facilitates work Make personnel's operation, more ensured operating personnel's safety, there are good market prospects.

Claims (6)

1. a kind of engineering construction hanging device, which is characterized in that including revoking hole(1), revoke hole(1)Lower end is fixed with transverse slat (2), transverse slat(2)Left end is hinged with the first clamp system, and the first clamp system includes left shell(3), left shell(3)Rotation connection There is the first rotation axis(4), the first rotation axis(4)Right end is fixed with the first clamping jaw(8), the first rotation axis(4)Left end, which is fixed, to be connected It is connected to the first partial gear(5), the first partial gear(5)External toothing and left shell(3)The first rack being slidably connected (6), the first rack(6)Lower end is hinged with head rod(7), head rod(7)The other end is hinged with and left shell(3)It is left First chuck of right slip(9), the first clamping jaw(8)Drive the first rotation axis(4)It moves downward, the first rotation axis(4)Drive the One partial gear(5)It is rotated up, the first partial gear(5)Drive the first rack(6)It moves upwards, and then controls first Chuck(9)It slides to the right, left shell(3)On be equipped with and the first rotation axis(4)Slide up and down the left pin of connection(10), transverse slat (2)Right end is arranged with the second clamp system, and the second clamp system is identical with the first clamp system structure.
A kind of 2. engineering construction hanging device according to claim 1, which is characterized in that second clamp system Including right shell body(11), right shell body(11)It is rotatably connected to the second rotation axis(12), the second rotation axis(12)Left end is fixed with Second clamping jaw(13), the second rotation axis(12)Right end is fixedly connected with the second partial gear(14), the second partial gear (14)External toothing and right shell body(11)The second rack being slidably connected(15), the second rack(15)Lower end is hinged with the second connecting rod (16), the second connecting rod(16)The other end is hinged with and right shell body(11)The second chuck to horizontally slip(17), right shell body(11) On be equipped with and the second rotation axis(12)Slide up and down the right pin of connection(18).
A kind of 3. engineering construction hanging device according to claim 1, which is characterized in that the left shell(3)On Equipped with the first rack(6)The wedge groove being slidably connected.
A kind of 4. engineering construction hanging device according to claim 2, which is characterized in that the right shell body(11)On Equipped with the second rack(15)The wedge groove being slidably connected.
A kind of 5. engineering construction hanging device according to claim 1 or 2, which is characterized in that first clamping jaw (8)With the second clamping jaw(13)On be equipped with resilient rubbber cushion.
A kind of 6. engineering construction hanging device according to claim 2, which is characterized in that the right shell body(11)Under End is hinged with and left shell(3)The motion bar of connection(19), motion bar(19)It is equipped with multiple pin holes(20).
CN201721539042.8U 2017-11-17 2017-11-17 A kind of engineering construction hanging device Active CN207497911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721539042.8U CN207497911U (en) 2017-11-17 2017-11-17 A kind of engineering construction hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721539042.8U CN207497911U (en) 2017-11-17 2017-11-17 A kind of engineering construction hanging device

Publications (1)

Publication Number Publication Date
CN207497911U true CN207497911U (en) 2018-06-15

Family

ID=62505219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721539042.8U Active CN207497911U (en) 2017-11-17 2017-11-17 A kind of engineering construction hanging device

Country Status (1)

Country Link
CN (1) CN207497911U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485726A (en) * 2020-03-20 2020-08-04 唐云 Prefabricated plate assembly equipment of prefabricated building
CN112320566A (en) * 2020-11-18 2021-02-05 湖北秦鸿新材料股份有限公司 Hanging clamp
CN112809294A (en) * 2021-02-03 2021-05-18 山东兴泰新型材料科技有限公司 Aluminum template welding tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485726A (en) * 2020-03-20 2020-08-04 唐云 Prefabricated plate assembly equipment of prefabricated building
CN112320566A (en) * 2020-11-18 2021-02-05 湖北秦鸿新材料股份有限公司 Hanging clamp
CN112809294A (en) * 2021-02-03 2021-05-18 山东兴泰新型材料科技有限公司 Aluminum template welding tool

Similar Documents

Publication Publication Date Title
CN208566093U (en) A kind of adjustable height type computer cabinet support device
CN207497911U (en) A kind of engineering construction hanging device
CN205097189U (en) Tongs with self -locking function
CN107838943B (en) Multi-angle installation type industrial transfer robot
CN209922749U (en) Gantry hoisting module
CN107640576B (en) High temperature aluminum ingot tong frock
CN211920644U (en) Crane hook capable of quickly hooking heavy object
CN210192774U (en) Anti-falling gripper
CN210633693U (en) Manipulator and robot
CN213216695U (en) Towel rapid-curing cutback device for clinical care
CN211239232U (en) Bus duct fixing support frame
CN204280690U (en) A kind of unpowered automatic stirring device
CN103626028A (en) Unpowered fixture
CN207662550U (en) A kind of double-walled intersection bending deformed spring folder clamping force test device
CN221165628U (en) Bridge crane lifting hook
CN208171551U (en) A kind of power module vibration tong
CN207747064U (en) A kind of grabber
CN219152906U (en) Manipulator special fixture
CN213279004U (en) Pipeline fixing device on construction frame
CN205781858U (en) Suspension type notebook computer bracket
CN207890887U (en) A kind of hanging device of building prefabrication block
CN208617238U (en) A kind of catching device mounting structure
CN211003043U (en) Building engineering is with removing brick clamp and getting device
CN109213281A (en) A kind of fixation device of computer hardware
CN211333240U (en) Pile up neatly machine people snatchs structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant