A kind of assembled power distribution equipment Download PDF

Info

Publication number
CN207490346U
CN207490346U CN201721604872.4U CN201721604872U CN207490346U CN 207490346 U CN207490346 U CN 207490346U CN 201721604872 U CN201721604872 U CN 201721604872U CN 207490346 U CN207490346 U CN 207490346U
Authority
CN
China
Prior art keywords
small box
module
interior
busbar modules
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721604872.4U
Other languages
Chinese (zh)
Inventor
温得良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721604872.4U priority Critical patent/CN207490346U/en
Application granted granted Critical
Publication of CN207490346U publication Critical patent/CN207490346U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Distribution Board (AREA)

Abstract

A kind of assembled power distribution equipment, is related to the manufacture of power distribution cabinet case and electric mounting technical field, structure are:Equipment Foundations and cable duct module(20)Top is provided with busbar modules(9), busbar modules(9)It is arranged on busbar modules shell(8)It is interior, busbar modules(9)On be disposed with total input-wire breaker module(2), disconnecting switch module(6), capacitance module(19), wire-outgoing breaker module(10), branch metric module(15).The beneficial effects of the utility model are:Simplify design;Assembly line standardization is manufactured;Facilitate construction and installation;Stable, easy maintenance.

Description

A kind of assembled power distribution equipment
Technical field
The utility model is related to the manufacture of power distribution cabinet case and electric mounting technical fields, and in particular to a kind of assembled matches Denso It puts.
Background technology
Current power distribution cabinet mainly has the drawout cubicle that GCS types are representative, and GGD types are the fixation cabinet of representative, and XL types are The fixation cabinet of representative, XM types are the distribution box of representative, and KYN28-12 types are the middle-placed switch cabinet of representative, and KYN61-40.5 types are The 35kV high-voltage boards of representative, whether 0.4kV, 10kV, 35kV power distribution cabinet or even electric power protection, measurement, control flow are all that will break The components such as road device, measure and control device, concentration are fixedly mounted in big a babinet or cabinet, are connected using copper aluminium row or conducting wire It connects;Major defect is:1st, several power distribution cabinets are divided into according to electrical equipment sharing of load situation, and be configured corresponding in design Breaker and control measuring cell, that is to say, that distributed all in accordance with power load size and by load nature of electricity consumed per station power distribution cabinet Situation is customized, once afterwards in use, load changes, it is difficult to carry out upgrading to the power distribution cabinet;2nd, match To carry out large-scale cabinet processing during the manufacture of electric cabinet, the installation of component, drainage row's installation, secondary wiring, manufacture debugging in cabinet Etc. processes, except in cabinet processing link it is a small number of using equipment such as numerically-controlled machine tools in addition to, all production processes are intended to manually complete, Artificial skills involved in the labour are required with height, labour intensive, processing process is longer, and artificial production is because neglecting easy production It is raw:Connector is not tightened, wiring mistake, and there are legacy etc., quality control difficulty is big;3rd, construction and installation link at the scene, because To be customized according to sharing of load situation, first have to 1,2 two link of waiting and complete, cargo transports to scene, Fang Kejin Secondly row construction and installation, will carry out the whole professionally-designed chart of power distribution cabinet or even transformer room system, complete power distribution cabinet arrangement row The blueprint design of row, outlet cable ditch, room lighting ground connection, secondary wiring, protection control etc., and with treating specialized management mechanism Electric company of area can construct after the approval, and third need to be carried out basic civil construction, device fabrication, arrival scene by figure The processes such as lifting, cabinet connection, busbar connection, secondary connection, observing and controlling debugging, it is high to the requirement of installation personnel skill level, it can not Mechanical work is carried out, it is long in time limit.
Invention content
The utility model problem to be solved is by breaker, capacitance, disconnecting switch, meter in view of the deficiencies of the prior art Electrometer element, which is mounted in a small-sized small case, forms standardized module, needs at the scene to insert these modules according to electricity consumption The drawbacks of being connected on busbar, comprising modules assembled low-voltage distribution system, overcoming the nonstandard manufacture of original power distribution cabinet, this practicality are new A kind of assembled power distribution equipment is used in type, structure is:Equipment Foundations and cable duct module(20)Top is provided with busbar mould Block(9), busbar modules(9)It is provided with interface(21), busbar modules(9)In busbar modules shell(8)It is interior, busbar modules(9) On be disposed with total input-wire breaker module(2), disconnecting switch module(27), capacitance module(19), wire-outgoing breaker module (10), branch metric module(15);The total input-wire breaker module(2)It is arranged on small box A(1)It is interior, small box A(1)On It is provided with control panel A(3)And breaker(4);The disconnecting switch module(27)It is arranged on small box B(5)It is interior, small box B (5)On be provided with control panel B(6)And disconnecting switch(7);The capacitance module(19)It is arranged on small box C(18)It is interior;It is described Wire-outgoing breaker module(10)It is arranged on small box D(12)It is interior, small box D(12)On be provided with control panel C(11)And outlet Breaker(13), the branch metric module(15)Be arranged on small box E(14)It is interior, small box E(14)On be provided with metering Mutual inductor(22)With metering ammeter observation window(16), the busbar modules(9)End set have sealing plate(17), the small box A(1), small box B(5), small box C(18), small box D(12), small box E(14)Outlet terminal(26)With busbar modules (9)Interface(21)Connection, the small box A(1), small box B(5), small box C(18), small box D(12), small box E (14)Structure all same, electric elements(24)It is arranged on small box shell(25)It is interior, electric elements(24)It is drained by transferring Row(23)With being arranged on small box shell(25)On outlet terminal(26)With busbar modules(9)Interface(21)Connection.With Go up the available PLC control panels of all modules observing and controlling and utilization real-time performance remote measurement and control on the spot.
The beneficial effects of the utility model are:
Simplify design:Designer can select corresponding module according to load current size, carry out electrical primary system diagram, The design of switchgear house door and window, ground connection illumination etc., as a result of assembly type cable slot, without carrying out cable duct and Equipment Foundations etc. Civil Engineering Design simplifies design work.
Assembly line standardization is manufactured:Manufactory can in advance produce various according to circuit breaker frame, drop-away current etc. Module, according to designing institute's electrical primary system diagram, the module that will be produced in advance, entrucking is sent to building site, since module standard is fixed, Production process can be used transports in the production of assembly line standard metaplasia and factory, greatly improves production efficiency, shortens manufacturing schedule.
Facilitate construction and installation:Since various modules are small, actually by original large-scale power distribution cabinet, it is divided into several small-sized Module, largely can manually be transported to construction site power distribution room, use is hung at reduction scene, and all links can be used, leading-out terminal The interface plug-in of son and busbar is installed, and improves installation efficiency.
Stable, easy maintenance:Such as changing load is damaged, it is only necessary to pull up the module and replace, be powered During operation, all mould components in the block are sealed in housing, which can be used insulating materials or metal material manufacture, When short circuit occurs for operation, arc light will not cause to burn out to surrounding devices, expand short circuit accident.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the busbar modules schematic diagram of Fig. 1;
Fig. 3 is the module connection diagram of Fig. 1;
Fig. 4 is the partial enlarged view of small box in Fig. 1;
Wherein, 1, small box A, 2, total input-wire breaker module, 3, control panel A, 4, drawout breaker, 5, small box B, 6, control panel B, 7, disconnecting switch, 8, busbar modules shell, 9, busbar modules, 10, wire-outgoing breaker module, 11, control Panel C, 12, small box D, 13, wire-outgoing breaker, 14, small box E, 15, branch metric module, 16, metering ammeter observation window, 17th, sealing plate, 18, small box C, 19, capacitance module, 20, Equipment Foundations and cable duct module, 21, interface, 22, metering mutual inductance Device, 23, switching drainage row, 24, electric elements, 25, small box shell, 26, outlet terminal, 27, disconnecting switch module.
Specific embodiment
Embodiment 1, a kind of assembled power distribution equipment, structure are:Equipment Foundations and cable duct module(20)Top is set There are busbar modules(9), busbar modules(9)It is arranged on busbar modules shell(8)It is interior, busbar modules(9)On be disposed with always into Line breaker module(2), disconnecting switch module(27), capacitance module(19), wire-outgoing breaker module(10), branch metric module (15);The total input-wire breaker module(2)It is arranged on small box A(1)It is interior, small box A(1)On be provided with control panel A(3) And breaker(4);The disconnecting switch module(27)It is arranged on small box B(5)It is interior, small box B(5)On be provided with control panel B(6)And disconnecting switch(7);The capacitance module(19)It is arranged on small box C(18)It is interior;The wire-outgoing breaker module(10) It is arranged on small box D(12)It is interior, small box D(12)On be provided with control panel C(11)And wire-outgoing breaker(13), the branch Metering module(15)Be arranged on small box E(14)It is interior, small box E(14)On be provided with metering transformer(22)And metering ammeter Observation window(16), the busbar modules(9)End set have sealing plate(17), the small box A(1), small box B(5), small case Body C(18), small box D(12), small box E(14)Outlet terminal(26)With busbar modules(9)Interface(21)Connection, institute State small box A(1), small box B(5), small box C(18), small box D(12), small box E(14)Structure all same, electric appliance Element(24)It is arranged on small box shell(25)It is interior, electric elements(24)Pass through the drainage row that transfers(23)With being arranged on outside small box Shell(25)On outlet terminal(26)With busbar modules(9)Interface(21)Connection;The outlet terminal(26)For duckbill Plug can directly be plugged in busbar modules(9)Interface(21).
Embodiment 2, a kind of assembled power distribution equipment, structure are:Equipment Foundations and cable duct module(20)Top is set There are busbar modules(9), busbar modules(9)It is arranged on busbar modules shell(8)It is interior, busbar modules(9)On be disposed with always into Line breaker module(2), disconnecting switch module(27), capacitance module(19), wire-outgoing breaker module(10), branch metric module (15);The total input-wire breaker module(2)It is arranged on small box A(1)It is interior, small box A(1)On be provided with control panel A(3) And breaker(4);The disconnecting switch module(27)It is arranged on small box B(5)It is interior, small box B(5)On be provided with control panel B(6)And disconnecting switch(7);The capacitance module(19)It is arranged on small box C(18)It is interior;The wire-outgoing breaker module(10) It is arranged on small box D(12)It is interior, small box D(12)On be provided with control panel C(11)And wire-outgoing breaker(13), the branch Metering module(15)Be arranged on small box E(14)It is interior, small box E(14)On be provided with metering transformer(22)And metering ammeter Observation window(16), the busbar modules(9)End set have sealing plate(17), the small box A(1), small box B(5), small case Body C(18), small box D(12), small box E(14)Outlet terminal(26)With busbar modules(9)Interface(21)Connection, institute State small box A(1), small box B(5), small box C(18), small box D(12), small box E(14)Structure all same, electric appliance Element(24)It is arranged on small box shell(25)It is interior, electric elements(24)Pass through the drainage row that transfers(23)With being arranged on outside small box Shell(25)On outlet terminal(26)With busbar modules(9)Interface(21)Connection;The outlet terminal(26)Connect for metal Fishplate bar can be directly bolted in busbar modules(9)Interface(21).

Claims (1)

1. a kind of assembled power distribution equipment, it is characterised in that:Equipment Foundations and cable duct module(20)Top is provided with busbar mould Block(9), busbar modules(9)It is provided with interface(21), busbar modules(9)In busbar modules shell(8)It is interior, busbar modules(9) On be disposed with total input-wire breaker module(2), disconnecting switch module(27), capacitance module(19), wire-outgoing breaker module (10), branch metric module(15);The total input-wire breaker module(2)It is arranged on small box A(1)It is interior, small box A(1)On It is provided with control panel A(3)And breaker(4);The disconnecting switch module(27)It is arranged on small box B(5)It is interior, small box B (5)On be provided with control panel B(6)And disconnecting switch(7);The capacitance module(19)It is arranged on small box C(18)It is interior;It is described Wire-outgoing breaker module(10)It is arranged on small box D(12)It is interior, small box D(12)On be provided with control panel C(11)And outlet Breaker(13), the branch metric module(15)Be arranged on small box E(14)It is interior, small box E(14)On be provided with metering Mutual inductor(22)With metering ammeter observation window(16), the busbar modules(9)End set have sealing plate(17), the small box A(1), small box B(5), small box C(18), small box D(12), small box E(14)Outlet terminal(26)With busbar modules (9)Interface(21)Connection, the small box A(1), small box B(5), small box C(18), small box D(12), small box E (14)Structure all same, electric elements(24)It is arranged on small box shell(25)It is interior, electric elements(24)It is drained by transferring Row(23)With being arranged on small box shell(25)On outlet terminal(26)With busbar modules(9)Interface(21)Connection.
CN201721604872.4U 2017-11-27 2017-11-27 A kind of assembled power distribution equipment Expired - Fee Related CN207490346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721604872.4U CN207490346U (en) 2017-11-27 2017-11-27 A kind of assembled power distribution equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721604872.4U CN207490346U (en) 2017-11-27 2017-11-27 A kind of assembled power distribution equipment

Publications (1)

Publication Number Publication Date
CN207490346U true CN207490346U (en) 2018-06-12

Family

ID=62472628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721604872.4U Expired - Fee Related CN207490346U (en) 2017-11-27 2017-11-27 A kind of assembled power distribution equipment

Country Status (1)

Country Link
CN (1) CN207490346U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658732A (en) * 2017-11-27 2018-02-02 温得良 A kind of assembled power distribution equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658732A (en) * 2017-11-27 2018-02-02 温得良 A kind of assembled power distribution equipment

Similar Documents

Publication Publication Date Title
EP2420402B1 (en) New autotransformer traction power supply system equipped with 2×27.5kv outdoor modularized electric apparatus in electrified railway
CN205901146U (en) Horizontal integration power distribution station
CN210155227U (en) Intelligent monitoring device for temporary electricity utilization in construction site
CN207490346U (en) A kind of assembled power distribution equipment
CN109861119A (en) A kind of skid-mounted movable type substation
CN107658732A (en) A kind of assembled power distribution equipment
CN101510671A (en) Interchanging type whole solid insulation fixing switch loop
CN206490323U (en) A kind of integrated intelligent power distribution cabinet
CN209561989U (en) A kind of prefabricated cabin formula Wind Power Project electrical equipment
CN108811415A (en) A kind of control cabinet for street lamp
CN202737364U (en) 35 kV no-one-entering modularization transformer station
CN211377569U (en) Outdoor installation full voltage level integration transformer protection device
CN202586129U (en) 110kV combination electric appliance GIS applied to integrated, prefabricated and box type substation
CN202703324U (en) Electrified railway traction power supply outdoor device
CN201263050Y (en) Integrated premounting transformer substation
CN204905742U (en) Middling pressure looped netowrk vacuum circuit breaker cabinet
CN211908175U (en) Inversion boosting device
CN113451930B (en) Electrical design method and design device for 110kV transformer substation in industrial park
CN114914874B (en) Feeder terminal relay terminal box and installation method
CN204464852U (en) Automatically controlled integrated device of oil field combined station
CN216215267U (en) Intelligent assembled box transformer substation for railway
CN218300682U (en) Integrated mobile power transformation and distribution station
Taur et al. Testing of local control cabinet in gas insulated switchgear using design of simulation kit-Revista
CN216085853U (en) Quick access box on low-voltage column
CN212571893U (en) Ring main unit secondary chamber and ring main unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20201127