CN207487775U - A kind of Rock and Soil Drilling water level in borehole measuring device - Google Patents
A kind of Rock and Soil Drilling water level in borehole measuring device Download PDFInfo
- Publication number
- CN207487775U CN207487775U CN201721647172.3U CN201721647172U CN207487775U CN 207487775 U CN207487775 U CN 207487775U CN 201721647172 U CN201721647172 U CN 201721647172U CN 207487775 U CN207487775 U CN 207487775U
- Authority
- CN
- China
- Prior art keywords
- measuring device
- conducting wire
- rock
- water level
- support column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses a kind of Rock and Soil Drilling water level in borehole measuring devices,Including measuring device pedestal,The measuring device the middle of the base is installed with control panel,The measuring device base top side is fixedly welded with the first support column,Winder is movably installed with by shaft at the top of first support column,The winder is electrical connected with control panel,The measuring device base top opposite side is fixedly welded with the second support column,Runner is fixedly mounted at the top of second support column,Conducting wire is wound on the winder,The conducting wire is hung down by runner to drilling,The conducting wire side is installed with compartment,Pulling force sensor is installed with inside the compartment,The pulling force sensor is electrical connected with control panel,It is cumbersome that the utility model solves traditional Rock and Soil Drilling water level in borehole measuring device transport,And it is complicated to survey the general road conditions in place,It is unable to fast transportation,The problem of being moved to the job site for needing to measure.
Description
Technical field
The utility model is related to geologic prospect technical field, specially a kind of Rock and Soil Drilling water level in borehole measuring device.
Background technology
From engineering construction viewpoint to forming any rock of the earth's crust and the general designation of soil, ground can be subdivided into hard ground
(hard rock), secondary hard (soft rock), it is weak it is being coupled, loosely without connection and with special composition, structure, state and property
Five major class, China's custom claims preceding two class to rock, and rear three classes claim soil, the meaning of general designations " ground, it is sharp in geological prospecting work
The larger column circular hole of the smaller depth of diameter that is drilled to underground with drilling equipment, also known as drilling well, drill for oil with natural gas with
And the bore diameter of underground water is more larger, bore diameter and depth size, depending on geological and mineral buried depth and the use of drilling
On the way, water level refers to that the table of water body is higher by elevation more than fixed base, and unit is rice, and level measuring is exactly in drilling
Measurement turns water level in borehole to provide data to successive projects.
But traditional Rock and Soil Drilling water level in borehole measuring device is in use there are some drawbacks, such as:
1st, traditional Rock and Soil Drilling water level in borehole measuring device is transported cumbersome, and it is complicated to survey the general road conditions in place, it is impossible to fast
Speed transport, is moved to the job site for needing to measure.
2nd, traditional Rock and Soil Drilling water level in borehole measuring device measurement method is not rapid accurate enough, is there is multiple measurement tasks
When work it is slow, have the problem of very big delay to the duration.
Utility model content
The purpose of this utility model is to provide a kind of Rock and Soil Drilling water level in borehole measuring device, to solve above-mentioned background technology
The problem of middle proposition.
To achieve the above object, the utility model provides following technical solution:A kind of Rock and Soil Drilling water level in borehole measuring device,
Including measuring device pedestal, the measuring device the middle of the base is installed with control panel, the measuring device base top
Side is fixedly welded with the first support column, and the first support column top is movably installed with winder, the spiral by shaft
Device is electrical connected with control panel, and the measuring device base top opposite side is fixedly welded with the second support column, and described second
Runner is fixedly mounted at the top of support column, is wound with conducting wire on the winder, the conducting wire is hung down by runner to drilling, described
Conducting wire side is installed with compartment, is installed with pulling force sensor inside the compartment, the pulling force sensor with
Control panel is electrical connected, and is fixedly connected with conducting wire at the top of the pulling force sensor, the pulling force sensor bottom is consolidated by conducting wire
Surely floating ball is connected with, the floating ball bottom is fixedly connected with clump weight by conducting wire.
Further, the measuring device base top inner wall is installed with hydraulic stem, and the hydraulic stem bottom is fixed
It is welded with support base.
Further, the measuring device base bottom is movably installed with wheel by bearing.
Further, the conducting wire is provided with scale.
Further, second support column extends measuring device chassis outer side.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model can be with traverse measuring device by wheel, can when measuring device is moved to suitable position
To open hydraulic stem, hydraulic stem is made to be extended downwardly with support base, measuring device is fixed.
2nd, the utility model opens winder into row conductor unwrapping wire by control panel, and conducting wire is from the gravity of clump weight to turning
Hole is hung down, and the gravity of clump weight can be read by pulling force sensor and control panel cooperation, when floating ball reaches the water surface, due to
The working tension sensor readings of buoyancy are reduced, and control panel reads numerical value change and stops winder work immediately, leads to
The scale crossed on conducting wire can read the water surface and the height of ground apart, and water level height can be obtained by passing through the depth pierced during turn hole
Degree, machine run speed is fast, and quickly drilling can be measured, save the plenty of time.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is schematic diagram at Figure 1A.
In Fig. 1-2:1- support bases;2- hydraulic stems;3- wheels;4- pedestals;The first support columns of 5-;6- winders;7- runners;
The second support columns of 8-;9- conducting wires;10- control panels;11- compartments;12- pulling force sensors;13- floating balls;14- clump weights.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Rock and Soil Drilling water level in borehole measuring device, packet
Measuring device pedestal 4 is included, 4 middle part of measuring device pedestal is installed with control panel 10, and the measuring device pedestal 4 pushes up
Portion side is fixedly welded with the first support column 5, and 5 top of the first support column is movably installed with winder 6 by shaft, described
Winder 6 is electrical connected with control panel 10, and the 4 top opposite side of measuring device pedestal is fixedly welded with the second support column 8,
Runner 7 is fixedly mounted in second support column, 8 top, is wound with conducting wire 9 on the winder 6, the conducting wire 9 passes through runner 7
It hangs down to drilling, 9 side of conducting wire is installed with compartment 11, and pull sensing is installed with inside the compartment 11
Device 12, the pulling force sensor 12 are electrical connected with control panel 10, and 12 top of pulling force sensor is fixedly connected with conducting wire 9,
12 bottom of pulling force sensor is fixedly connected with floating ball 13 by conducting wire 9, and 13 bottom of floating ball is fixedly connected by conducting wire 9
There is clump weight 14.
4 top inner wall of measuring device pedestal is installed with hydraulic stem 2, and 2 bottom of hydraulic stem is fixedly welded with
Support base 1 when measuring device is moved to suitable position, can open hydraulic stem 2, hydraulic stem 2 is made to be stretched downwards with support base 1
Go out, measuring device is fixed, ensure stabilization during measuring device running, 4 bottom of measuring device pedestal passes through bearing
Wheel 3 is movably installed with, wheel 3 is installed, is moved easily measuring device, the conducting wire 9 is provided with scale, is set on conducting wire 9
There is scale, convenient to be read out at any time to fathoming, second support column 8 extends on the outside of measuring device pedestal 4, and second
8 stretching measuring device pedestal 4 of support allows conducting wire 9 unobstructed, and vertical extends to drilling.
Operation principle:In use, suitable position can be moved in measuring device with traverse measuring device by wheel 3
When, hydraulic stem 2 can be opened, hydraulic stem 2 is made to be extended downwardly with support base 1, measuring device is fixed, passes through control panel
10 open winders 6 into 9 unwrapping wire of row conductor, the gravity of conducting wire 9 from clump weight 14 hangs down to turn hole, by pulling force sensor 12 with
Control panel 10 coordinates the gravity that can read clump weight 14, when floating ball 13 reaches the water surface, since the working tension of buoyancy passes
12 reading numerical values of sensor are reduced, and control panel 10 reads numerical value change to be stopped winder 6 and work immediately, can be with by conducting wire 9
The water surface and the height of ground apart are read, height of water level can be obtained by passing through the depth pierced during turn hole.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any this practical relationship or sequence.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those
Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of Rock and Soil Drilling water level in borehole measuring device, including measuring device pedestal (4), it is characterised in that:The measuring device
Control panel (10) is installed in the middle part of pedestal (4), measuring device pedestal (4) top side is fixedly welded with first
Dagger (5), the first support column (5) top are movably installed with winder (6), the winder (6) and control by shaft
Panel (10) is electrical connected, and opposite side is fixedly welded with the second support column (8) at the top of the measuring device pedestal (4), and described the
Runner (7) is fixedly mounted at the top of two support columns (8), conducting wire (9) is wound on the winder (6), the conducting wire (9) is by turning
Wheel (7) hangs down to drilling, and conducting wire (9) side is installed with compartment (11), and peace is fixed inside the compartment (11)
Equipped with pulling force sensor (12), the pulling force sensor (12) is electrical connected with control panel (10), the pulling force sensor
(12) top is fixedly connected with conducting wire (9), and pulling force sensor (12) bottom is fixedly connected with floating ball (13) by conducting wire (9),
Floating ball (13) bottom is fixedly connected with clump weight (14) by conducting wire (9).
2. a kind of Rock and Soil Drilling water level in borehole measuring device according to claim 1, it is characterised in that:The measuring device bottom
Seat (4) top inner wall is installed with hydraulic stem (2), and hydraulic stem (2) bottom is fixedly welded with support base (1).
3. a kind of Rock and Soil Drilling water level in borehole measuring device according to claim 1, it is characterised in that:The measuring device bottom
Seat (4) bottom is movably installed with wheel (3) by bearing.
4. a kind of Rock and Soil Drilling water level in borehole measuring device according to claim 1, it is characterised in that:The conducting wire (9) sets
It is equipped with scale.
5. a kind of Rock and Soil Drilling water level in borehole measuring device according to claim 1, it is characterised in that:Second support column
(8) extend on the outside of measuring device pedestal (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721647172.3U CN207487775U (en) | 2017-12-01 | 2017-12-01 | A kind of Rock and Soil Drilling water level in borehole measuring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721647172.3U CN207487775U (en) | 2017-12-01 | 2017-12-01 | A kind of Rock and Soil Drilling water level in borehole measuring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207487775U true CN207487775U (en) | 2018-06-12 |
Family
ID=62472436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721647172.3U Expired - Fee Related CN207487775U (en) | 2017-12-01 | 2017-12-01 | A kind of Rock and Soil Drilling water level in borehole measuring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207487775U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109540247A (en) * | 2018-12-13 | 2019-03-29 | 南昌大学 | A kind of drilling level of ground water real-time monitoring device |
CN109632051A (en) * | 2019-01-10 | 2019-04-16 | 安宝山 | A kind of hydrogeologic prospecting observation of groundwater levels device |
CN110318738A (en) * | 2019-07-26 | 2019-10-11 | 贵州省水利水电勘测设计研究院 | A kind of inclined drill level measurement device |
CN110595577A (en) * | 2019-10-18 | 2019-12-20 | 中国地质科学院岩溶地质研究所 | Drilling underground water level measuring device |
CN111765834A (en) * | 2020-06-24 | 2020-10-13 | 中国二十冶集团有限公司 | Measuring tool for hole depth or water level and using method thereof |
-
2017
- 2017-12-01 CN CN201721647172.3U patent/CN207487775U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109540247A (en) * | 2018-12-13 | 2019-03-29 | 南昌大学 | A kind of drilling level of ground water real-time monitoring device |
CN109632051A (en) * | 2019-01-10 | 2019-04-16 | 安宝山 | A kind of hydrogeologic prospecting observation of groundwater levels device |
CN109632051B (en) * | 2019-01-10 | 2020-07-31 | 安宝山 | Hydrogeology exploration ground water level observer |
CN110318738A (en) * | 2019-07-26 | 2019-10-11 | 贵州省水利水电勘测设计研究院 | A kind of inclined drill level measurement device |
CN110595577A (en) * | 2019-10-18 | 2019-12-20 | 中国地质科学院岩溶地质研究所 | Drilling underground water level measuring device |
CN110595577B (en) * | 2019-10-18 | 2024-05-21 | 中国地质科学院岩溶地质研究所 | Underground water level measuring device for drilling |
CN111765834A (en) * | 2020-06-24 | 2020-10-13 | 中国二十冶集团有限公司 | Measuring tool for hole depth or water level and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207487775U (en) | A kind of Rock and Soil Drilling water level in borehole measuring device | |
CN104990640A (en) | Drill hole inner wall soil temperature rapid determination apparatus | |
CN207231367U (en) | A kind of underground vertical hole hole depth survey tool | |
CN101591921A (en) | Method for detecting length of reinforcing cage of concrete poured columnar pile through magnetic field intensity | |
CN106437692A (en) | Deep karst leakage passage detection structure and method based on drill rod inner pipe water level | |
CN207472247U (en) | A kind of excavation slope slope measuring control device | |
CN211600027U (en) | Hydraulic ring geological crack measuring device | |
CN206903579U (en) | A kind of geological mapping drilling rig | |
CN207456799U (en) | A kind of experimental rig of analog orbit traffic tunnel differential settlement | |
CN207423101U (en) | A kind of coal mine roadway roof and floor displacement measuring device based on resistance | |
CN211179421U (en) | Directional drilling fluid viscosity measuring device for trenchless technology | |
CN202937253U (en) | Tester for depth, dip angle and azimuth angle of blast hole | |
CN205936593U (en) | Structure is surveyed to dark karst seepage passageway based on drilling rod inner tube water level | |
CN209131771U (en) | One kind is for the Groundwater level measuring arrangement that drills | |
CN108489746A (en) | The device and method that earth pressure gauge monitoring model shield machine is laid in soil output | |
CN203948090U (en) | Horizontal well mud is invaded the analogue experiment installation on resistivity logging response impact | |
CN207675470U (en) | A kind of geological exploration drawing out soil equipment | |
CN205895170U (en) | Drilling tool | |
CN206146897U (en) | A simulation experiment monitoring system for top of roadway board absciss layer | |
CN208588447U (en) | Drill underground water level measurement device | |
CN203570303U (en) | Rock core geologic body occurrence condition calibration instrument for inclined shaft | |
CN208568029U (en) | A kind of underground water level measurement device | |
CN203948091U (en) | The analogue experiment installation of high angle hole resistivity logging Influence from Eccentric | |
CN208751653U (en) | A kind of geotechnical engineering investigation dip meter | |
CN209163794U (en) | Core drilling floodometer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180612 Termination date: 20181201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |