CN207486447U - The control guiding device of liquefied natural gas core process module pipeline gas pressure test - Google Patents

The control guiding device of liquefied natural gas core process module pipeline gas pressure test Download PDF

Info

Publication number
CN207486447U
CN207486447U CN201721380194.8U CN201721380194U CN207486447U CN 207486447 U CN207486447 U CN 207486447U CN 201721380194 U CN201721380194 U CN 201721380194U CN 207486447 U CN207486447 U CN 207486447U
Authority
CN
China
Prior art keywords
pipe
pressure
liquefied natural
process module
core process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721380194.8U
Other languages
Chinese (zh)
Inventor
徐庚
刘传丰
仝强
宋峥嵘
唐健
李家伟
韩雁凌
王娴
何小超
向娟
王佳
黄太安
李松
温振威
王春旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201721380194.8U priority Critical patent/CN207486447U/en
Application granted granted Critical
Publication of CN207486447U publication Critical patent/CN207486447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A kind of control guiding device of liquefied natural gas core process module pipeline gas pressure test, including:One pressure testing supervisor, the inlet tube being connected on pressure testing supervisor and several branched pipes, blow-off pipe, wherein, welding valve, several screw thread valves, safety valve, pressure gauge, reducing pipe collar are separately installed on inlet tube, each branched pipe and blow-off pipe;Detection pipe, outlet and pressure gauge branch pipe are separately installed on several branched pipes.The utility model is easy to operate, can not only complete the work pressure test of multiple pressure testing packets simultaneously, solves the problems, such as and realizes multiple compressor parallel pressurizations, greatly reduce pressing time;Moreover, also improving gas pressure test efficiency and the safety of liquefied natural gas core process module pipeline system, achieve the purpose that energy-saving and emission-reduction, cost efficiency.

Description

The control guiding device of liquefied natural gas core process module pipeline gas pressure test
Technical field
Experimental rig more particularly to one kind the utility model is related to pipeline air pressure are used for liquefied natural gas core process mould The control guiding device of block pipeline gas pressure test.Belong to Offshore Engineering field.
Background technology
At present, liquefied natural gas core process module generally, is completed to build, then, then by mould in build the side sub-module Block arrives at assembling through sea-freight.Since liquefied natural gas core process module need to be mounted on arctic Ji Han areas, it is existing Method be that gas pressure test quantity is more, it is dangerous high, wherein, highest test pressure 13.9MPa, highest air pressure volume 230M3, Highest air pressure energy storage 2606MJ.And since location Environment Design temperature is -40 degrees Celsius, these factors cause to pipeline drying Requirement it is extremely stringent.The shortcomings that existing method, is mainly reflected in the following aspects:
(1) operating personnel need to enter liquefied natural gas core process module, check and are mounted on the pressure gauge that pressure testing is wrapped, By compressor operating personnel under intercom notification module, increase the number for stopping pressure or pressure release, this is to the operating personnel in module It is extremely dangerous.
(2) someone, personnel do not concentrate at compressor and in liquefied natural gas core process module, issue the personnel of instruction In liquefied natural gas core process module, and boost operations personnel easily generate under liquefied natural gas core process module Maloperation.
(3) a compressor can only once carry out the pressure testing of a pressure testing packet, less efficient.
(4) when gas pressure test finishes, the gas in air pressure packet can only discharge, and the energy therein cannot efficiently use.
Utility model content
The main purpose of the utility model is that overcome disadvantages mentioned above of the existing technology, and it is natural to provide a kind of liquefaction The control guiding device of gas core process module pipeline gas pressure test, it is easy to operate, multiple pressure testings can not only be completed simultaneously The work pressure test of packet solves the problems, such as and realizes multiple compressor parallel pressurizations, greatly reduces pressing time;Moreover, Gas pressure test efficiency and the safety of liquefied natural gas core process module pipeline system are also improved, reaches energy-saving and emission-reduction, drop The purpose of this synergy.
The purpose of this utility model is realized by following technical scheme:
A kind of control guiding device of liquefied natural gas core process module pipeline gas pressure test, it is characterised in that:Including: One pressure testing supervisor, the inlet tube being connected on pressure testing supervisor and several branched pipes, blow-off pipe, wherein, inlet tube, each branched pipe And welding valve, several screw thread valves, safety valve, pressure gauge, reducing pipe collar are separately installed on blow-off pipe;On several branched pipes It is separately installed with detection pipe, outlet and pressure gauge branch pipe.
The inlet tube, several branched pipes and pressure testing are responsible for be connected by tube socket.
The beneficial effects of the utility model:The utility model is due to the adoption of the above technical scheme, easy to operate, can not only Enough work pressure tests for completing multiple pressure testing packets simultaneously solve the problems, such as and realize multiple compressor parallel pressurizations, subtract significantly Pressing time is lacked;Moreover, also improve the gas pressure test efficiency and safety of liquefied natural gas core process module pipeline system Property, achieve the purpose that energy-saving and emission-reduction, cost efficiency.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
Major Symbol explanation in figure:
1. weld valve, 2. first screw thread valves, 3. second screw thread valves, 4. safety valves, 5. pressure gauges, 6. reducer pipes Hoop, 7. pressure testings supervisor, 8. inlet tubes, 9. first branched pipes, 10. second branched pipes, 11. third branched pipes, 12. detection pipes, 13. Outlet, 14. pressure gauge branch pipes, 15. blow-off pipes.
Specific embodiment
As shown in Figure 1, the utility model includes:Pressure testing supervisor 7, be connected to using welding manner on pressure testing supervisor 7 into (the present embodiment is for mouthful pipe 8 and several branched pipes:First branched pipe 9, second branched pipe 10, third branched pipe 11), blow-off pipe 15, wherein, welding valve 1, several screw thread valve (the present embodiment are separately installed on inlet tube 8, each branched pipe and blow-off pipe For:First screw thread valve 2, the second screw thread valve 3), safety valve 4, pressure gauge 5, reducing pipe collar 6;First branched pipe 9 and second point Detection pipe 12, outlet 13 and pressure gauge branch pipe 14 are separately installed with using welding manner on branch pipe 10.
Above-mentioned 1 and second screw thread valve 3 of welding valve mainly plays a part of to turn off and control buck speed;First screw thread Valve 2 is located in detection pipe 12, is under normal circumstances normally off, when detecting whether string pressure, can open the first screw thread valve 2 and examine It looks into.
Above-mentioned inlet tube 8, the first branched pipe 9, second branched pipe 10, third branched pipe 11 and pressure testing supervisor 7 pass through tube socket It is weldingly connected;4 can effectively protect pressure testing personnel of safety valve and equipment safety, prevent superpressure;Pressure gauge 5 can real-time display experiment pressure The state of power;Reducing pipe collar 6 mainly plays reducing, is connected with adapting to smaller size of hose.
The utility model can implement function such as:
1. the long-range monitoring of pressure testing packet, remote operation, it is ensured that in boost process, in pressure testing packet safety zone nobody into Enter, so as to improve the safety of pressure testing operating personnel;
2. instruction issuing personnel concentrate on pressure testing device region with site operation personnel, all operations are on pressure testing device It completes;
3. it can realize that a compressor to wrapping pressurization, improves the efficiency of gas pressure test, i.e., more:One compressor connection is originally The pressure testing supervisor 7 of utility model by the first branch line 9 and second branched pipe line 10, can simultaneously rise two pipelines Reduced pressure operation;
4. the air-flow between can realizing several pressure testing packets that pneumatic shuttle is connected transmits, when a packet pressure testing terminates Afterwards, another packet can be connected by device, pressure transmission is gone over, so as to save device resource.I.e.:First branched pipe, 9 He Transmission between third branched pipe 11;
5. for the pressure testing packet that volume is larger, multiple compressor parallel pressurizations can be realized, to reduce pressing time.I.e.: It is in parallel by inlet tube 8, air-flow is converged into Trunk Line 7 and connects the larger pipeline of volume.
The above descriptions are merely preferred embodiments of the present invention, and not the utility model is made in any form Limitation, it is every according to the technical essence of the utility model to above example made it is any it is simple modification, equivalent variations with Modification, in the range of still falling within technical solutions of the utility model.

Claims (2)

1. a kind of control guiding device of liquefied natural gas core process module pipeline gas pressure test, it is characterised in that:Including:One Pressure testing supervisor, be connected to pressure testing supervisor on inlet tube and several branched pipes, blow-off pipe, wherein, inlet tube, each branched pipe and Welding valve, several screw thread valves, safety valve, pressure gauge, reducing pipe collar are separately installed on blow-off pipe;Divide on several branched pipes Detection pipe, outlet and pressure gauge branch pipe are not installed.
2. the control guiding device of liquefied natural gas core process module pipeline gas pressure test according to claim 1, It is characterized in that:The inlet tube, several branched pipes and pressure testing are responsible for be connected by tube socket.
CN201721380194.8U 2017-10-25 2017-10-25 The control guiding device of liquefied natural gas core process module pipeline gas pressure test Expired - Fee Related CN207486447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721380194.8U CN207486447U (en) 2017-10-25 2017-10-25 The control guiding device of liquefied natural gas core process module pipeline gas pressure test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721380194.8U CN207486447U (en) 2017-10-25 2017-10-25 The control guiding device of liquefied natural gas core process module pipeline gas pressure test

Publications (1)

Publication Number Publication Date
CN207486447U true CN207486447U (en) 2018-06-12

Family

ID=62477215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721380194.8U Expired - Fee Related CN207486447U (en) 2017-10-25 2017-10-25 The control guiding device of liquefied natural gas core process module pipeline gas pressure test

Country Status (1)

Country Link
CN (1) CN207486447U (en)

Similar Documents

Publication Publication Date Title
CN200996527Y (en) Pipeline band-pressure leaking stoppage
CN207686687U (en) A kind of jet stream gas production system of concatenation high-pressure gas well and low-pressure gas well
CN207486447U (en) The control guiding device of liquefied natural gas core process module pipeline gas pressure test
CN204831736U (en) Mould water -cooling pipeline equipment
CN208011287U (en) A kind of gas transmission emergency shutoff device
CN204664860U (en) A kind of concentrated nitrogen gas supply system
CN204964103U (en) A transition interface arrangement that is used for storage tank vacuum to detect and bleed
CN102705702B (en) Auxiliary unit used for hydraulic horizontal-pushing pressurizer and hydraulic horizontal-pushing pressurizer
CN208847417U (en) A kind of portable pipe package seal checker
CN205101855U (en) Multislot car is to parallelly connected filling device of ship
CN206694735U (en) Spliced pipeline maintenance dedicated connecting sleeve
CN203534912U (en) Pipeline pressure test device
CN202338732U (en) Hydraulic pipe-clamping leak stopper
CN207364665U (en) The cleaning of pipeline and low pressure gas check
CN204083656U (en) A kind of for the online bucket patch device with pressure of non-combustible gas pipeline
CN208171591U (en) A kind of safety valve inspection dedicated unit
CN202791320U (en) Nitrogen filling device for test to liquefied natural gas filling machine
CN202791137U (en) Diversion type leak stopper under pressure
CN203273289U (en) Compressed air pipeline
CN207061321U (en) Geldart-D particle plug-back device
CN205261207U (en) Novel instrument wind sled at liquefied natural gas filling station
CN207999657U (en) It is a kind of for liquid nitrogen cryopreservation system into liquid control system
CN205297805U (en) Double -walled high pressure fuel pipe sealing mechanism
CN205778795U (en) Carbon dioxide dry method pressure break high pressure pipe joint
CN201209742Y (en) Portable pipeline clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

CF01 Termination of patent right due to non-payment of annual fee