CN207486249U - A kind of direct-burried prefabricated thermal insulation fixes pipe fitting - Google Patents

A kind of direct-burried prefabricated thermal insulation fixes pipe fitting Download PDF

Info

Publication number
CN207486249U
CN207486249U CN201721325101.1U CN201721325101U CN207486249U CN 207486249 U CN207486249 U CN 207486249U CN 201721325101 U CN201721325101 U CN 201721325101U CN 207486249 U CN207486249 U CN 207486249U
Authority
CN
China
Prior art keywords
thermal insulation
outer casing
pipe fitting
direct
steel outer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721325101.1U
Other languages
Chinese (zh)
Inventor
于宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721325101.1U priority Critical patent/CN207486249U/en
Application granted granted Critical
Publication of CN207486249U publication Critical patent/CN207486249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a kind of direct-burried prefabricated thermal insulations to fix pipe fitting, including:Working steel tube, steel outer casing, thermal insulation material, power transmission gusset, WELDING STUDS;The steel outer casing is set on outside working steel tube, the working steel tube and steel outer casing are welded as overall structure by the uniformly distributed rectangle power transmission gusset of polylith circumferential direction between the two, thermal insulation material is filled between the working steel tube and steel outer casing, the WELDING STUDS group being made of several WELDING STUDSs is welded on the steel outer casing.The utility model structure entirety uniform force, concrete anchor block on pipeline axial direction can continuous reinforcement, the continuous arrangement of thermal insulation material ensure that the reliability of insulation construction.

Description

A kind of direct-burried prefabricated thermal insulation fixes pipe fitting
Technical field
The utility model is related to fixed pipe fittings, especially provide a kind of direct-burried prefabricated thermal insulation and fix pipe fitting.
Background technology
The effect of fixed pipe fitting is exactly a certain node location of directly-buried thermal insulation pipes system to be made to exist using concrete anchor block It is fixed in soil, and thrust Fx, Fy, Fz from three directions of directly buried pipeline system are born together with concrete anchor block.It passes The fixed pipe fitting of system adopts Northern Europe technology, i.e., thrust disc as shown in Figs. 1-3 fixes pipe fitting, it is by working steel tube 1, thrust disc 2 It is formed with stiffener plate 3, steel outer casing 4 and thermal insulation material 5.Thrust Fx, Fy, Fz from work steel pipe are by fixing pipe fitting in figure Thrust disc 2 is transferred to armored concrete anchor block 6, and back pressure, earth bearing strength between armored concrete anchor block 6 and soil 7 and Frictional force can balance thrust Fx, Fy, Fz from working steel tube, therefore the relative position of the node and soil 6 is fixed.With The increasingly increasing of work caliber, pumped (conveying) medium pressure is continuously improved, and the thrust from working steel tube 1 is also more and more big by (~500 Ton), the drawbacks of thrust disc fixes pipe fitting, is also more apparent, and main problem is as follows:
1st, 3~4 times of thrust disc 2 and 1 Wall-Thickness Difference of working steel tube do not wait walls welding to cause 1 intensity of working steel tube insufficient;
2nd, it fixes pipe fitting axial direction arrangement of reinforcement along thrust disc by thrust disc 2 to be separated, leads to 6 larger of armored concrete anchor block At least 50%;
3rd, thrust disc 2 is welded with conveying the working steel tube 1 of thermal medium, and heat is directly conducted by thrust disc, not only generates heat Loss, more seriously since 2 surface heat accumulation of thrust disc causes 2 surface temperature rise of thrust disc to~90 DEG C, and concrete Long-term heatproof ≯ 80 DEG C.This will lead to normal concrete hydraulic performance decline;
4th, thrust disc 2 is annular medium plate not only high material consumption and utilization rate is low;
5th, thermal insulation material partition is made its both sides insulation construction discontinuous by thrust disc 2, so as to reduce insulation construction can By property.
Therefore, there is an urgent need to a kind of direct-burried prefabricated thermal insulation fixation pipe fittings of function admirable by people.
Utility model content
The purpose of this utility model is to provide a kind of direct-burried prefabricated thermal insulations to fix pipe fitting, can effectively solve above-mentioned ask Topic.
The technical solution of the utility model is:A kind of direct-burried prefabricated thermal insulation fixes pipe fitting, including:Working steel tube 1, outer shield steel Pipe 4, thermal insulation material 5, power transmission gusset 8, WELDING STUDS 9;The steel outer casing 4 is set on outside working steel tube 1, the working steel tube 1 Overall structure, the working steel tube 1 are welded as by the uniformly distributed rectangle power transmission gusset 8 of polylith circumferential direction between the two with steel outer casing 4 Thermal insulation material 5 is filled between steel outer casing 4, the WELDING STUDS being made of several WELDING STUDSs 9 is welded on the steel outer casing 4 Group.
Preferably, 8 quantity of power transmission gusset is 3~20 pieces.
Preferably, the WELDING STUDS group is made of the uniformly distributed WELDING STUDS 9 of multiple rows of circumferential direction.
Preferably, the quantity of the WELDING STUDS 9 is 3~200.
Preferably, the distance between adjacent WELDING STUDS 9 is not less than 100mm.
The utility model has following beneficial effect:
1st, structure entirety uniform force, and with concrete anchor block is molten is integrated;
2nd, concrete anchor block on pipeline axial direction can continuous reinforcement, reduce concrete anchor block appearance and size;
3rd, the heat of working steel tube outflow is evenly distributed on each WELDING STUDS, and the concentration for avoiding temperature is transmitted, It ensure that concrete anchor block performance reliably and with long-term;
4th, specific thrust disk saves steel 90%, stock utilization 97.5%;
5th, working steel tube, steel outer casing are not influenced the company of thermal insulation material by circumferential uniformly distributed rectangle power transmission gusset therebetween Continuous arrangement, ensure that the reliability of insulation construction.
Description of the drawings
Fig. 1 is the front view that existing thrust disc fixes pipe fitting;
Fig. 2 is the sectional view along A-A of Fig. 1;
Fig. 3 is the stereogram that existing thrust disc fixes pipe fitting;
Fig. 4 is the front view of the utility model;
Fig. 5 is the B-B direction sectional view of Fig. 4;
Fig. 6 is the stereogram of the utility model;
In figure:1st, working steel tube;2nd, thrust disc;3rd, stiffener plate;4th, steel outer casing;5th, thermal insulation material;6th, reinforced concrete Native anchor block;7th, soil;8th, power transmission gusset;9th, WELDING STUDS.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and examples.
As Figure 4-Figure 6, a kind of direct-burried prefabricated thermal insulation fixes pipe fitting, including:Working steel tube 1, steel outer casing 4, thermal insulating material Material 5, power transmission gusset 8, WELDING STUDS 9;Steel outer casing 4 is set on outside working steel tube 1, working steel tube 1 and steel outer casing 4 by the two it Between the uniformly distributed rectangle power transmission gusset 8 of polylith circumferential direction be welded as overall structure, and wall thickness is adapted between them, 1 He of working steel tube Thermal insulation material 5 is filled between steel outer casing 4, the WELDING STUDS group being made of several WELDING STUDSs 9 is welded on steel outer casing 4.
Wherein:8 quantity of power transmission gusset is 3~20 pieces;WELDING STUDS group is made of the uniformly distributed WELDING STUDS 9 of multiple rows of circumferential direction, shearing The quantity of nail 9 is 3~200, and the distance between adjacent WELDING STUDS 9 is not less than 100mm.
The thrust that such working steel tube 1 generates is uniformly transferred by power transmission gusset 8 to steel outer casing 4, and be averaged and be assigned to It is welded on each WELDING STUDS 9 of 4 appearance of steel outer casing, thrust is passed to armored concrete by 3~200 WELDING STUDS groups again Anchor block 6.
Above-described embodiment is only the technical concepts and features for illustrating the utility model, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement according to this, can not the scope of protection of the utility model be limited with this. It is all according to the spirit of the present invention substantially equivalent change or modification for being made, should all cover the scope of protection of the utility model it It is interior.

Claims (5)

1. a kind of direct-burried prefabricated thermal insulation fixes pipe fitting, which is characterized in that including:Working steel tube (1), steel outer casing (4), thermal insulating material Expect (5), power transmission gusset (8), WELDING STUDS (9);The steel outer casing (4) is external set on working steel tube (1), the working steel tube (1) and steel outer casing (4) is welded as overall structure, the work by the uniformly distributed rectangle power transmission gusset (8) of polylith circumferential direction between the two Make to be filled with thermal insulation material (5) between steel pipe (1) and steel outer casing (4), be welded on the steel outer casing (4) by several shearings Follow closely the WELDING STUDS group that (9) are formed.
2. a kind of direct-burried prefabricated thermal insulation described in accordance with the claim 1 fixes pipe fitting, which is characterized in that the power transmission gusset (8) Quantity is 3~20 pieces.
3. a kind of direct-burried prefabricated thermal insulation described in accordance with the claim 1 fixes pipe fitting, which is characterized in that the WELDING STUDS group is by more The circumferential uniformly distributed WELDING STUDS (9) of row is formed.
4. a kind of direct-burried prefabricated thermal insulation described in accordance with the claim 3 fixes pipe fitting, which is characterized in that the WELDING STUDS (9) Quantity is 3~200.
5. fix pipe fitting according to a kind of direct-burried prefabricated thermal insulation described in claim 4, which is characterized in that adjacent WELDING STUDS (9) The distance between be not less than 100mm.
CN201721325101.1U 2017-10-16 2017-10-16 A kind of direct-burried prefabricated thermal insulation fixes pipe fitting Active CN207486249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721325101.1U CN207486249U (en) 2017-10-16 2017-10-16 A kind of direct-burried prefabricated thermal insulation fixes pipe fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721325101.1U CN207486249U (en) 2017-10-16 2017-10-16 A kind of direct-burried prefabricated thermal insulation fixes pipe fitting

Publications (1)

Publication Number Publication Date
CN207486249U true CN207486249U (en) 2018-06-12

Family

ID=62480272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721325101.1U Active CN207486249U (en) 2017-10-16 2017-10-16 A kind of direct-burried prefabricated thermal insulation fixes pipe fitting

Country Status (1)

Country Link
CN (1) CN207486249U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364359A (en) * 2020-04-08 2020-07-03 五冶集团上海有限公司 Anchor pipe type cable beam anchoring structure of cable-stayed bridge concrete main beam and positioning method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364359A (en) * 2020-04-08 2020-07-03 五冶集团上海有限公司 Anchor pipe type cable beam anchoring structure of cable-stayed bridge concrete main beam and positioning method thereof

Similar Documents

Publication Publication Date Title
CN204187150U (en) Socket joint jointing type plastic lining steel-plastic composite pipe
KR101298656B1 (en) Shape tube for district heating heat pipe having shear control ring
CN207486249U (en) A kind of direct-burried prefabricated thermal insulation fixes pipe fitting
CN210164243U (en) Wall bushing structure
CN206545746U (en) With the spacing socket joint interconnection system composite insulating pipe of installation
CN108638591A (en) A kind of carbon steel-concrete/compound submarine pipeline of cement mortar-stainless steel
CN205383384U (en) Intelligence straight tube pressure balance type compensator
CN204559911U (en) Mineral insulation heating cable
CN210396130U (en) Bury sleeve structure behind basement structure outer wall
CN204254068U (en) A kind of deep-sea oil transportation multiple tube
CN205207940U (en) Anticorrosive compound incubation pipeline that buries of diameter -variable high temperature resistantly
CN202469378U (en) Prefabricated directly buried steam diameter-varying flat bottom heat-insulating pipe
CN202484511U (en) Plunger type multifunctional pipeline compensator
CN102242831A (en) Integrated buckle arrestor
CN210567017U (en) A adiabatic insulating fixed bolster for burying ground heating power pipeline
CN201772157U (en) High pressure-resistant reinforced concrete and glass fiber reinforced plastics composite pipe
CN202469376U (en) Belt separation and heat isolation type fixing bracket of prefabricated directly-buried steam heat-preservation pipe
CN106813019A (en) A kind of iron pipe for transporting sewage
CN207486308U (en) A kind of self-balancing overhead heat distribution pipeline system
CN107061927A (en) A kind of corrosion resistant ductile iron pipe
CN206694717U (en) Direct embedment steel pipe drain pipe and direct embedment steel pipe system
CN210069139U (en) External sliding type direct-buried steel sleeve heat preservation supporting device
CN203868533U (en) Polyurethane rigid foam PP-R heat preservation anticorrosion pipeline
CN203671018U (en) Right-angle elbow pipe full fixing joint structure
CN203963285U (en) A kind of corrosion resistant type steel pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant