CN207480513U - Dismountable building drill bit chuck handle - Google Patents

Dismountable building drill bit chuck handle Download PDF

Info

Publication number
CN207480513U
CN207480513U CN201721188537.0U CN201721188537U CN207480513U CN 207480513 U CN207480513 U CN 207480513U CN 201721188537 U CN201721188537 U CN 201721188537U CN 207480513 U CN207480513 U CN 207480513U
Authority
CN
China
Prior art keywords
extension bar
key body
drill bit
chuck handle
force section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721188537.0U
Other languages
Chinese (zh)
Inventor
倪少波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huang Jing
Sichuan Shu source Decoration Engineering Co.,Ltd.
Wang Chunyan
Zheng Boqi
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721188537.0U priority Critical patent/CN207480513U/en
Application granted granted Critical
Publication of CN207480513U publication Critical patent/CN207480513U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model provides dismountable building drill bit chuck handle, including key body, the first extension bar and the second extension bar;The key body is extended transversely through by first through hole, and first extension bar and second extension bar stretch into the first through hole from the both sides of the first through hole respectively, and is pieced together with the key body T-shaped;The end of first extension bar far from the key body is equipped with the first force section, and the end of second extension bar far from the key body is equipped with the second force section, and first force section and second force section are in flat.The utility model proposes dismountable building drill bit chuck handle, can scrabble up T-shaped, and have there are two force section, therefore just compare when exerting a force to extension bar and save labour.

Description

Dismountable building drill bit chuck handle
Technical field
The utility model is related to building implement accessory technical fields, more particularly to removably build drill bit drill chuck key Spoon.
Background technology
For chuck handle for fastening and unclamping the drill bit on drill chuck, current drill chuck generally comprises positioning pin, cone Tooth, key body and extension bar.
Under normal circumstances, after extension bar and key body being assembled, key body is at one end of extension bar, because This causes not very convenient in force.For example, the force application part on extension bar exerts a force close to key body to extension bar When just seem that comparison is hard.
Utility model content
It, can be with the utility model proposes dismountable building drill bit chuck handle to solve the technical issues of above-mentioned It scrabbles up T-shaped, and has there are two force section, therefore just compare when exerting a force to extension bar and save labour.
To achieve the above object, the utility model provides following technical solution:
Dismountable building drill bit chuck handle, including key body, the first extension bar and the second extension bar;
The key body is extended transversely through by first through hole, and first extension bar and second extension bar are respectively from described The first through hole is stretched into the both sides of first through hole, and pieces together with the key body T-shaped;
The end of first extension bar far from the key body is equipped with the first force section, and second extension bar is far from institute The end for stating key body is equipped with the second force section, and first force section and second force section are in flat.
As a kind of embodiment, first extension bar is equipped with square protruding, institute close to the end of the key body It states the second extension bar and is equipped with square groove close to the end of the key body, first extension bar and second extension bar lead to It crosses the square protruding and the square groove connects in the first through hole, and piece together with the key body T-shaped.
As a kind of embodiment, first force section is equipped with the first via.
As a kind of embodiment, first force section be equipped with anti-skid chequer, the ridge orientation of the anti-skid chequer and The length direction of first extension bar is vertical.
As a kind of embodiment, second force section is equipped with the second via.
As a kind of embodiment, second force section be equipped with anti-skid chequer, the ridge orientation of the anti-skid chequer and The length direction of second extension bar is vertical.
As a kind of embodiment, the end of the key body is equipped with cone tooth, and the end of the cone tooth is equipped with positioning pin, And the key body, the cone tooth and positioning pin coaxial arrangement.
The beneficial effects of the utility model compared with the prior art lie in:
The utility model provides a kind of dismountable building drill bit chuck handle, due to have the first extension bar and Second extension bar, therefore can be pieced together with key body T-shaped.And in the end of the first extension bar and the end of the second extension bar The first force section and the second force section are respectively formed, therefore just compares when exerting a force to extension bar and saves labour.
Description of the drawings
Fig. 1 is the stereogram of dismountable building drill bit chuck handle that the utility model embodiment provides;
Fig. 2 is the installation diagram of the first extension bar that the utility model embodiment provides and the second extension bar.
In figure:1st, key body;2nd, the first extension bar;3rd, the second extension bar;4th, first through hole;5th, the first force section;6th, Two force sections;7th, square protruding;8th, square groove;9th, the first via;10th, the second via;11st, tooth is bored;12nd, positioning pin.
Specific embodiment
Below in conjunction with attached drawing, to the utility model, above-mentioned and other technical characteristic and advantage carry out clearly and completely Description, it is clear that described embodiment is only the section Example rather than whole embodiments of the utility model.
With reference to Fig. 1, a kind of dismountable building drill bit chuck handle is present embodiments provided, including key body 1, the One extension bar 2 and the second extension bar 3;Key body 1 is extended transversely through by first through hole 4, the first extension bar 2 and the second extension bar 3 First through hole 4 is stretched into from the both sides of first through hole 4 respectively, and is pieced together with key body 1 T-shaped;First extension bar 2 is far from key The end of body 1 is equipped with the first force section 5, and the second end of the extension bar 3 far from key body 1 is equipped with the second force section 6, the first force 5 and second force section 6 of portion is in flat.
In the present embodiment, due to having the first extension bar 2 and the second extension bar 3, it can be pieced together with key body 1 and be in It is T-shaped.And it is respectively formed the first force section 5 and the second force section in the end of the end of the first extension bar 2 and the second extension bar 3 6, therefore just compare when exerting a force to extension bar and save labour.Because of the stress point there are two tools when exerting a force to extension bar, So it opposite can save labour.In fact, artificially going rotation is limited with every 90 degree of corner in fact, there are one can during stress point 90 degree are turned over to rely on this stress point, and is not just worked to next 90 degree of this stress points.Therefore it provides two by Force practicallys guarantee that extension bar can be relied in all processes of rotation, use.
With reference to Fig. 2, in one embodiment, the first extension bar 2 is equipped with square protruding 7 close to the end of key body 1, and second Extension bar 3 is equipped with square groove 8 close to the end of key body 1, and the first extension bar 2 and the second extension bar 3 pass through 7 He of square protruding Square groove 8 is connected in the first through hole 4, and is pieced together with key body 1 T-shaped.
In the present embodiment, the first extension bar 2 and the second extension bar 3 are connected by square groove 8 and square protruding 7. Here, square groove 8 and square protruding 7 are interference fitted, and can be connected the first extension bar 2 and the second extension bar 3 by squeezing. The first extension bar 2 and the second extension bar 3 can be detached by directly extracting.Here, square groove 8 and square protruding 7 can also be Magnetic connection, the mode used is similar with interference fit, does not repeat herein.It can be pieced together after connection with key body 1 in T Type, this structure is similar to spanner, therefore just compares when exerting a force to extension bar and save labour.In another embodiment, may be used With respectively in the end of the first extension bar 2 and the end set internal thread and external screw thread of the second extension bar 3, so as to by the first reinforcing 2 and second extension bar 3 of bar connects.
With reference to Fig. 2, in one embodiment, the first force section 5 is equipped with the first via 9.First force section 5 is equipped with anti- The length direction of sliding line, the ridge orientation of anti-skid chequer and the first extension bar 2 is vertical.It in the present embodiment, can by the first via 9 The first force section 5 is fixed on power drill, the first extension bar 2 is tied on power drill by rope here.Also, Friction when exerting a force to the first extension bar 2 can be provided by anti-skid chequer, because of the direction and the of the first extension bar 2 of rotation The length direction of one extension bar 2 is coplanar, so when the ridge orientation of anti-skid chequer and the vertical length direction of the first extension bar 2, Also it is vertical with the direction of the first extension bar 2 of rotation.So it is also big painstakingly when rotating the first extension bar 2, convenient for rotation.
Correspondingly, in one embodiment, the second force section 6 is equipped with the second via 10.Second force section 6 is equipped with anti- The length direction of sliding line, the ridge orientation of anti-skid chequer and the second extension bar 3 is vertical.In the present embodiment, pass through the second via 10 Second force section 6 can be fixed on power drill, here be tied the second extension bar 3 on power drill by rope.And And friction when exerting a force to the second extension bar 3 can be provided by anti-skid chequer, because of the direction of the second extension bar 3 of rotation It is coplanar with the length direction of the second extension bar 3, so when the ridge orientation of anti-skid chequer and the length direction of the second extension bar 3 are vertical When, it is also vertical with the direction of the second extension bar 3 of rotation.So it is also big painstakingly when rotating the second extension bar 3, convenient for rotation.
Fig. 1 is referred again to, in one embodiment, the end of key body 1 is equipped with cone tooth 11, and the end of cone tooth 11 is equipped with positioning Pin 12, and key body 1, cone tooth 11 and positioning pin 12 are coaxially disposed.
In the present embodiment, key body 1, cone tooth 11 and positioning pin 12 are coaxially disposed, help to fasten and unclamp brill Drill bit on collet.Because three is coaxial, stress is concentrated and is not disperseed.
Particular embodiments described above has carried out into one the purpose of this utility model, technical solution and advantageous effect The detailed description of step, it should be understood that the foregoing is merely specific embodiment of the utility model, are not used to limit this reality With novel protection domain.Particularly point out, to those skilled in the art, it is all the spirit and principles of the utility model it Any modification, equivalent substitution, improvement and etc. that are interior, being done, should be included within the scope of protection of this utility model.

Claims (7)

1. removably building drill bit chuck handle, which is characterized in that including key body (1), the first extension bar (2), with And second extension bar (3);
The key body (1) is extended transversely through by first through hole (4), first extension bar (2) and second extension bar (3) point The first through hole (4) is not stretched into from the both sides of the first through hole (4), and is pieced together with the key body (1) T-shaped;
End of first extension bar (2) far from the key body (1) is equipped with the first force section (5), second extension bar (3) end far from the key body (1) is equipped with the second force section (6), first force section (5) and second force section (6) in flat.
2. dismountable building drill bit chuck handle according to claim 1, which is characterized in that first reinforcing Bar (2) is equipped with square protruding (7) close to the end of the key body (1), and second extension bar (3) is close to the key body (1) end is equipped with square groove (8), and first extension bar (2) and second extension bar (3) pass through the square protruding (7) it connects in the first through hole (4), and pieces together with the key body (1) T-shaped with the square groove (8).
3. dismountable building drill bit chuck handle according to claim 1, which is characterized in that first force Portion (5) is equipped with the first via (9).
4. dismountable building drill bit chuck handle according to claim 1, which is characterized in that first force Portion (5) is equipped with anti-skid chequer, and the length direction of the ridge orientation of the anti-skid chequer and first extension bar (2) is vertical.
5. dismountable building drill bit chuck handle according to claim 1, which is characterized in that second force Portion (6) is equipped with the second via (10).
6. dismountable building drill bit chuck handle according to claim 1, which is characterized in that second force Portion (6) is equipped with anti-skid chequer, and the length direction of the ridge orientation of the anti-skid chequer and second extension bar (3) is vertical.
7. dismountable building drill bit chuck handle according to claim 1, which is characterized in that the key body (1) end is equipped with cone tooth (11), and the end of the cone tooth (11) is equipped with positioning pin (12), and the key body (1), described Bore tooth (11) and the positioning pin (12) coaxial arrangement.
CN201721188537.0U 2017-09-16 2017-09-16 Dismountable building drill bit chuck handle Expired - Fee Related CN207480513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721188537.0U CN207480513U (en) 2017-09-16 2017-09-16 Dismountable building drill bit chuck handle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721188537.0U CN207480513U (en) 2017-09-16 2017-09-16 Dismountable building drill bit chuck handle

Publications (1)

Publication Number Publication Date
CN207480513U true CN207480513U (en) 2018-06-12

Family

ID=62482223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721188537.0U Expired - Fee Related CN207480513U (en) 2017-09-16 2017-09-16 Dismountable building drill bit chuck handle

Country Status (1)

Country Link
CN (1) CN207480513U (en)

Similar Documents

Publication Publication Date Title
CN207480513U (en) Dismountable building drill bit chuck handle
CN207863313U (en) A kind of reinforced bar straight thread sleeve Quick fastening device
CN205415460U (en) Bottle opener with locking function
CN204831898U (en) Self -plugging rivet tensile test pretension frock
CN206105470U (en) Pivot is frock clamp for parts machining
CN206029703U (en) Spanner of arm of force can extend
CN2394742Y (en) Triangular handle twist-drill
CN207160002U (en) A kind of anchor pole equipment
CN207432135U (en) A kind of Y types build chuck handle
CN206326537U (en) A kind of plastic head spanner
CN205950598U (en) Box spanner of self -adaptation chucking
CN206952846U (en) A kind of box spanner for being convenient for changing sleeve
CN206869807U (en) Anti- packing ring skew installation tool in bolted on connection
CN206588373U (en) A kind of small-sized hand, which is twisted, to be bored
CN201067881Y (en) Universal pipe jaw
CN216239379U (en) Double-tile type deformed steel bar connecting sleeve
CN212389630U (en) Hexagonal washer bores tail nail
CN208132875U (en) A kind of T-type can twist wire screw knife
CN219786665U (en) Split straight shank twist drill
CN204143018U (en) A kind of single-ended cable splice closure box body sealing-locking device
CN216044885U (en) Cross-shaped groove countersunk head self-tapping screw
CN206230427U (en) A kind of internal-external hexagon combination wrench
CN207432136U (en) For building the chuck component of electric drill
CN207906243U (en) A kind of guide pin
CN216940436U (en) Torque switching frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180719

Address after: 610000 6, 6 building, 1 building, 1 Jinfu garden, 10 Tian Xian Qiao Bei Road, Jinjiang District, Chengdu, Sichuan.

Patentee after: Sichuan Shu source Decoration Engineering Co.,Ltd.

Address before: 610000 Chenghua District, Chengdu, Sichuan, two pairs of Road 39, 7, 2 unit 6 floor 601

Co-patentee before: Wang Chunyan

Patentee before: Huang Jing

Co-patentee before: Zheng Boqi

Effective date of registration: 20180719

Address after: 610000 Chenghua District, Chengdu, Sichuan, two pairs of Road 39, 7, 2 unit 6 floor 601

Co-patentee after: Wang Chunyan

Patentee after: Huang Jing

Co-patentee after: Zheng Boqi

Address before: 325000 Hong Jing garden, Jinxiu Road, Lucheng District, Wenzhou, Zhejiang 6-302

Patentee before: Mei Zhaofu

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20180916