CN207470146U - Retractable three-stage sealing blowout preventer - Google Patents
Retractable three-stage sealing blowout preventer Download PDFInfo
- Publication number
- CN207470146U CN207470146U CN201721468688.1U CN201721468688U CN207470146U CN 207470146 U CN207470146 U CN 207470146U CN 201721468688 U CN201721468688 U CN 201721468688U CN 207470146 U CN207470146 U CN 207470146U
- Authority
- CN
- China
- Prior art keywords
- choke tube
- nipple
- sealing
- cable
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及油田测井领域中的测井密封防喷盒。The utility model relates to a well logging sealing blowout prevention box in the field of oil field logging.
背景技术Background technique
传统的单级测井密封防喷盒使用时溢流量过大,后来研制的多级密封防喷装置,包括密封短节三组、阻流管三支、泄压短接一个、高压快速接头一个、高压阀门一个,总长为1.2米,测井滚筒中固定防喷盒和电缆头的空间最大长度为0.9米,当需要转到其它测井项目更换电缆时,这种多级密封防喷装置就无法固定在滚筒上,此时必须剁电缆,拆下防喷装置才能固定,等再次进行同位素吸水剖面测井时又要进行做电缆头、校电缆等一系列操作。这些操作大大地增加了测井成本、降低了测井效率、影响了测井施工进度。The traditional single-stage logging sealing blowout preventer has too much overflow when used, and the multi-stage sealing blowout preventer developed later includes three sets of sealing nipples, three choke pipes, one pressure relief short, and one high-pressure quick connector 1. One high-pressure valve with a total length of 1.2 meters. The maximum length of the space for fixing the blowout preventer and the cable head in the logging drum is 0.9 meters. It cannot be fixed on the drum. At this time, the cable must be chopped, and the blowout preventer must be removed to fix it. When the isotope water absorption profile logging is performed again, a series of operations such as making the cable head and calibrating the cable must be performed. These operations greatly increase the cost of logging, reduce the efficiency of logging, and affect the progress of logging construction.
发明内容Contents of the invention
有鉴于此,本实用新型提供一种可伸缩式三级密封防喷装置,在测井结束时防喷盒长度可缩短,保证防喷装置与电缆头同时固定在滚筒中间,避免剁电缆、做电缆头、校电缆等一系列操作,从而降低测井成本、提高测井效率。In view of this, the utility model provides a retractable three-stage sealing blowout preventer, the length of the blowout preventer box can be shortened at the end of well logging, ensuring that the blowout preventer and the cable head are fixed in the middle of the drum at the same time, avoiding cutting cables and making A series of operations such as cable head and calibration cable can reduce the cost of well logging and improve the efficiency of well logging.
为了实现上述发明目的,本实用新型采用的技术方案是:In order to realize the above-mentioned purpose of the invention, the technical scheme that the utility model adopts is:
一种可伸缩式三级密封防喷装置,包括:A retractable three-stage sealing blowout preventer, comprising:
三个密封短节、泄压短节及阻流管;Three sealing nipples, pressure relief nipples and choke tubes;
所述泄压短节上连接高压管,所述密封短节之一连接溢流管;The pressure relief joint is connected to a high-pressure pipe, and one of the sealing joints is connected to an overflow pipe;
所述测试电缆密封在由所述密封短节、所述泄压短节及所述阻流管连接组成的管串中心;The test cable is sealed in the center of the pipe string composed of the sealing pup joint, the pressure relief pup joint and the choke tube connection;
所述阻流管,包括固定阻流管和替换阻流管;The choke tube includes a fixed choke tube and a replacement choke tube;
所述替换阻流管可从所述管串及所述测试电缆上拆卸下来;The replacement choke tube is detachable from the tube string and the test cable;
所述替换阻流管置于所述泄压短节内,拆卸下来的替换阻流管的位置由所述密封短节及固定阻流管进入所述泄压短节内进行填充。The replacement choke tube is placed in the pressure relief sub-joint, and the position of the disassembled replacement choke tube is entered into the pressure relief sub-joint by the sealing sub-joint and the fixed choke tube for filling.
优选地,所述替换阻流管,其壁上设有贯穿其长度的电缆出口。Preferably, the wall of the replacement choke tube is provided with a cable outlet running through its length.
优选地,所述固定阻流管与所述密封短节密封连接后的组件,与所述泄压短节插接后,再通过转接接头及固定螺栓与所述泄压短节固定连接。Preferably, the assembly of the fixed choke tube and the sealing sub-joint is sealed and connected to the pressure-relieving sub-joint, and then fixedly connected to the pressure-relieving sub-joint through an adapter joint and fixing bolts.
优选地,所述密封短节内设置密封垫片。Preferably, a sealing gasket is arranged in the sealing short joint.
优选地,所述密封垫片包括密封胶垫和铁垫。Preferably, the sealing gasket includes a sealing rubber gasket and an iron gasket.
优选地,所述替换阻流管的长度为0.3-0.4米。Preferably, the replacement choke tube has a length of 0.3-0.4 meters.
本实用新型的有益效果:The beneficial effects of the utility model:
本申请的可伸缩式三级密封防喷装置,是在原有多级密封防喷装置的基础上,设计一个可拆卸的阻流管,并改变泄压短节的结构,将可拆卸的阻流管置于泄压短节内,同时改变泄压短节与固定阻流管的连接方式,使得防喷装置在不使用的情况下,固定阻流管能深入泄压短节中,替代被拆卸下来的阻流管的位置,达到缩短防喷装置整体长度的目的。The retractable three-stage seal blowout preventer of this application is based on the original multi-stage seal blowout preventer, and a detachable choke tube is designed, and the structure of the pressure relief nipple is changed, and the detachable choke The pipe is placed in the pressure relief nipple, and the connection mode between the pressure relief nipple and the fixed choke pipe is changed at the same time, so that when the blowout preventer is not in use, the fixed choke pipe can go deep into the pressure relief nipple instead of being disassembled The position of the down choke pipe is shortened to achieve the purpose of shortening the overall length of the blowout preventer.
当需要转到其它测井项目更换电缆时,使用该可伸缩式三级密封防喷装置,能快速与电缆头一起固定在滚筒上,不必剁电缆,省去了做电缆头、校电缆等一系列额外操作,避免了材料的消耗和时间的浪费,因此节约了可观的测井成本。另外,使用过程中装置的组装方便,仪器下井顺利,溢流量低,安全性高,投资小。When it is necessary to switch to other logging projects to replace the cable, the retractable three-stage sealing blowout preventer can be quickly fixed on the drum together with the cable head, without having to chop the cable, saving the trouble of making the cable head and calibrating the cable. A series of additional operations avoid material consumption and time waste, thus saving considerable logging costs. In addition, the assembly of the device is convenient during use, the instrument goes down well smoothly, the overflow is low, the safety is high, and the investment is small.
附图说明Description of drawings
通过以下参考附图对本实用新型实施例的描述,本实用新型的上述以及其它目的、特征和优点更为清楚,在附图中:Through the following description of the embodiments of the utility model with reference to the accompanying drawings, the above-mentioned and other purposes, features and advantages of the utility model are more clear, in the accompanying drawings:
图1是本实用新型实施例的一种可伸缩式三级密封防喷装置的结构示意图。Fig. 1 is a structural schematic diagram of a retractable three-stage sealing blowout preventer according to an embodiment of the utility model.
图2是替换阻流管的结构示意图。Fig. 2 is a structural schematic diagram of a replacement choke tube.
图3是图2的剖视图。FIG. 3 is a sectional view of FIG. 2 .
图4是可伸缩式三级密封防喷装置施工过程中的结构示意图。Fig. 4 is a structural schematic view of the retractable three-stage sealing blowout preventer during construction.
图5是可伸缩式三级密封防喷装盒缩短后的结构示意图。Fig. 5 is a schematic diagram of the structure of the retractable three-stage sealed anti-blowout box after shortening.
具体实施方式Detailed ways
以下基于实施例对本实用新型进行描述,但是值得说明的是,本实用新型并不限于这些实施例。在下文对本实用新型的细节描述中,详尽描述了一些特定的细节部分。然而,对于没有详尽描述的部分,本领域技术人员也可以完全理解本实用新型。The following describes the present invention based on examples, but it should be noted that the present invention is not limited to these examples. In the following detailed description of the present utility model, some specific details are described in detail. However, those skilled in the art can also fully understand the utility model for the parts that are not described in detail.
此外,本领域普通技术人员应当理解,所提供的附图只是为了说明本实用新型的目的、特征和优点,附图并不是实际按照比例绘制的。In addition, those of ordinary skill in the art should understand that the provided drawings are only for illustrating the purpose, features and advantages of the present utility model, and the drawings are not actually drawn to scale.
同时,除非上下文明确要求,否则整个说明书和权利要求书中的“包括”、“包含”等类似词语应当解释为包含的含义而不是排他或穷举的含义;也就是说,是“包含但不限于”的含义。At the same time, unless the context clearly requires, the words "include", "include" and other similar words in the entire specification and claims should be interpreted as an inclusive meaning rather than an exclusive or exhaustive meaning; that is, "include but not limited to the meaning of ".
图1是本实用新型实施例的一种可伸缩式三级密封防喷装置的结构示意图。如图1所示,一种可伸缩式三级密封防喷装置,包括:Fig. 1 is a structural schematic diagram of a retractable three-stage sealing blowout preventer according to an embodiment of the utility model. As shown in Figure 1, a retractable three-stage sealing blowout preventer includes:
第一密封短节1、第二密封短节3、第三密封短节6、泄压短节4及阻流管;The first sealing pup 1, the second sealing pup 3, the third sealing pup 6, the pressure relief pup 4 and the choke tube;
泄压短节4上设置高压管接头10,第一密封短节1上设置溢流管接头7;A high-pressure pipe joint 10 is provided on the pressure relief joint 4, and an overflow pipe joint 7 is provided on the first sealing joint 1;
测试电缆密封在由第一密封短节1、第二密封短节3、第三密封短节6、泄压短节4及阻流管连接组成的管串中心;The test cable is sealed in the center of the pipe string composed of the first sealing pup 1, the second sealing pup 3, the third sealing pup 6, the pressure relief pup 4 and the choke tube connection;
阻流管,包括固定阻流管2和替换阻流管5;A choke tube, including a fixed choke tube 2 and a replacement choke tube 5;
替换阻流管5可从管串及测试电缆上拆卸下来;The replacement choke tube 5 can be disassembled from the tube string and test cable;
替换阻流管5置于泄压短节4内,拆卸下来的替换阻流管5的位置由第二密封短节3及固定阻流管2进入泄压短节4内进行填充,管串整体长度缩短。The replacement choke tube 5 is placed in the pressure relief sub-joint 4, and the position of the removed replacement choke tube 5 is filled by the second sealing sub-joint 3 and the fixed choke tube 2 into the pressure relief sub-joint 4, and the pipe string as a whole shortened in length.
进一步地,由图2和图3所示:替换阻流管5,其壁上设有贯穿其长度的电缆出口。Further, as shown in FIG. 2 and FIG. 3 : the choke tube 5 is replaced, and the wall thereof is provided with a cable outlet running through its length.
进一步地,由图1所示:固定阻流管2与第二密封短节3密封连接后的组件,与泄压短节4插接后,再通过转接接头8及固定螺栓与泄压短节4固定连接。Further, as shown in Figure 1: the assembly after the fixed choke tube 2 is sealed and connected with the second sealing sub-section 3 is plugged with the pressure relief sub-section 4, and then connected to the pressure relief sub-section through the adapter 8 and the fixing bolt. Section 4 is fixedly connected.
进一步地,由图1所示:第一密封短节1、第二密封短节3、第三密封短节6内均设置密封胶垫和铁垫9。Further, as shown in FIG. 1 : the first sealing pup joint 1 , the second sealing pup joint 3 , and the third sealing pup joint 6 are all provided with sealing rubber pads and iron pads 9 .
进一步地,替换阻流管5的长度为0.3-0.4米。Further, the length of the replacement choke tube 5 is 0.3-0.4 meters.
具体地,结合图1、图4和图5,对本实用新型的安装及使用进行详细的描述:Specifically, in conjunction with Fig. 1, Fig. 4 and Fig. 5, the installation and use of the utility model are described in detail:
测井时:When logging:
1、将测井电缆依次穿过第一密封短节1、固定阻流管2、转接接头8、第二密封短节3、第三密封短节6、泄压短节4;1. Pass the logging cable sequentially through the first sealing nipple 1, the fixed choke tube 2, the adapter 8, the second sealing nipple 3, the third sealing nipple 6, and the pressure relief nipple 4;
2、然后分别在第一密封短节1、第二密封短节3和第三密封短节6内加入密封胶皮垫和铁垫9;2. Then add sealing rubber pads and iron pads 9 in the first sealing pup joint 1, the second sealing pup joint 3 and the third sealing pup joint 6;
3、在泄压短节4和第三密封短节6中间装上替换阻流管5,然后将替换阻流管5两头分别插入第二密封短节3和第三密封短节6内连为一体;3. Install the replacement choke tube 5 between the pressure relief sub-joint 4 and the third sealing sub-joint 6, and then insert the two ends of the replacement choke tube 5 into the second sealing sub-joint 3 and the third sealing sub-joint 6 to connect as One;
4、将第二密封短节3、替换阻流管5和第三密封短节6利用转接接头8、固定螺栓及转接头11固定在泄压短节4上;4. Fix the second sealing nipple 3, the replacement choke tube 5 and the third sealing nipple 6 on the pressure relief nipple 4 by using the adapter 8, the fixing bolt and the adapter 11;
5、将固定阻流管2与两端的第一密封短节1和第二密封短节3分别螺纹连接,装置全部组装完毕;5. Thread the fixed choke tube 2 to the first sealing nipple 1 and the second sealing nipple 3 at both ends respectively, and the device is fully assembled;
6、装置连接完毕后,做电缆头并与仪器连接,依次将仪器、防喷装置插入防喷管中,泄压短节外部丝扣与防喷管接头连接;6. After the device is connected, make a cable head and connect it with the instrument, insert the instrument and the blowout preventer into the blowout preventer in turn, and connect the external thread of the pressure relief nipple to the blowout preventer joint;
7、将溢流管与第一密封短节1的溢流管接头7连接上,将高压管与泄压短节4上的高压管接头10连接上,就可以进行测试作业。7. Connect the overflow pipe to the overflow pipe joint 7 of the first sealing nipple 1, and connect the high-pressure pipe to the high-pressure pipe joint 10 on the pressure relief nipple 4, and then the test operation can be carried out.
固定时:When fixed:
1、不使用时,将密封短节4与防喷管上拆卸下来,然后拆卸转接头11,将第三密封短节6及替换阻流管5取出,拆下替换阻流管5;1. When not in use, remove the sealing nipple 4 from the blowout preventer, then disassemble the adapter 11, take out the third sealing nipple 6 and the replacement choke tube 5, and remove the replacement choke tube 5;
2、打开转接接头8的固定螺栓,将固定阻流管2及第二密封短节3推入泄压短节4内,填充可拆卸阻流管5空下的位置;2. Open the fixing bolt of the adapter joint 8, push the fixed choke tube 2 and the second sealing nipple 3 into the pressure relief nipple 4, and fill the empty space of the detachable choke tube 5;
3、将第三密封短节6与第二密封短节3对接,并通过转接头11与泄压短节4固定连接;3. Connect the third sealing nipple 6 with the second sealing nipple 3, and connect it with the pressure relief nipple 4 through the adapter 11;
4、拆掉替换阻流管5后,因替换阻流管5的长度为0.3-0.4米,所以装置总体长度也同时缩短0.3-0.4米,装置由原来的1.2米缩短为0.9-0.8米,满足测井滚筒中固定防喷装置和电缆头的空间最大长度为0.9米的要求,因此装置可快速与电缆头一起固定在滚筒上。4. After removing the replacement choke tube 5, because the length of the replacement choke tube 5 is 0.3-0.4 meters, the overall length of the device is also shortened by 0.3-0.4 meters at the same time, and the device is shortened from the original 1.2 meters to 0.9-0.8 meters. It meets the requirement that the maximum length of the space for fixing the blowout preventer and the cable head in the logging drum is 0.9 meters, so the device can be quickly fixed on the drum together with the cable head.
从以上的描述可以看出,在不使用时,并不需要破坏电缆,就可以缩短防喷装置的长度,省去了以往剁电缆后需要做电缆头、校电缆等一系列额外操作。也就省去了这些额外操作在时间和材料上的消耗。It can be seen from the above description that when not in use, the length of the blowout preventer can be shortened without damaging the cable, eliminating the need for a series of additional operations such as cable head and cable calibration after cutting the cable in the past. The time and material consumption of these additional operations is also saved.
该防喷装置连接高压管,在高压阀门打开时,防喷管内液体压力被衰减,泄压短节内的剩余压力较小,剩余压力对密封胶垫作用力也较小,所以电缆不会因为密封胶垫受高压作用变形而抱住电缆,保证仪器可顺利下井。The blowout preventer is connected to the high-pressure pipe. When the high-pressure valve is opened, the liquid pressure in the blowout pipe is attenuated, the residual pressure in the pressure relief joint is small, and the force of the remaining pressure on the sealing rubber pad is also small, so the cable will not The rubber pad is deformed by the high pressure and hugs the cable to ensure that the instrument can go down well smoothly.
以上所述实施例仅为表达本实用新型的实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形、同等替换、改进等,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiment is only to express the embodiment of the utility model, and its description is relatively specific and detailed, but it should not be understood as limiting the patent scope of the utility model. It should be pointed out that those skilled in the art can make several modifications, equivalent replacements, improvements, etc. without departing from the concept of the utility model, all of which belong to the protection scope of the utility model. Therefore, the scope of protection of the utility model patent should be based on the appended claims.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721468688.1U CN207470146U (en) | 2017-11-07 | 2017-11-07 | Retractable three-stage sealing blowout preventer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721468688.1U CN207470146U (en) | 2017-11-07 | 2017-11-07 | Retractable three-stage sealing blowout preventer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207470146U true CN207470146U (en) | 2018-06-08 |
Family
ID=62263188
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721468688.1U Expired - Fee Related CN207470146U (en) | 2017-11-07 | 2017-11-07 | Retractable three-stage sealing blowout preventer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207470146U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111946292A (en) * | 2020-09-09 | 2020-11-17 | 中国石油天然气集团有限公司 | Telescopic blowout prevention pipe |
-
2017
- 2017-11-07 CN CN201721468688.1U patent/CN207470146U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111946292A (en) * | 2020-09-09 | 2020-11-17 | 中国石油天然气集团有限公司 | Telescopic blowout prevention pipe |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107355194A (en) | A kind of annular preventer | |
| CN204040979U (en) | Hi-pot test well low frictional resistance logging cable sealer | |
| CN207145370U (en) | A kind of contractile two-stage hydraulic cylinder of fuel feed pump | |
| CN207246639U (en) | A kind of PE pipelines of convenient maintenance | |
| CN201738915U (en) | Sealing and suppressing device of well sealing device for oil field | |
| CN201943663U (en) | Blowout prevention oil stripper of sucker rod | |
| CN207485399U (en) | A kind of annular preventer | |
| CN206728433U (en) | A retractable and lengthened fastening sleeve for electrical equipment | |
| CN214699599U (en) | Short pipe with tooth-shaped interface for pipeline repair | |
| CN206234518U (en) | Split type petroleum pipeline pipe nipple | |
| CN104843621A (en) | Gas well oil jacket annular protecting fluid replacement device and method thereof | |
| CN203978369U (en) | Combined type annular damper blowout hookup | |
| CN208001123U (en) | The exposed spool protective device of electrical engineering | |
| CN204851147U (en) | A special tool for wellhead blowout prevention | |
| CN211258703U (en) | Telescopic pipe for gas drainage in coal mine | |
| CN201241691Y (en) | Pressure logging construction device capable of preventing cable brittle failure | |
| CN207795134U (en) | A blowout prevention box forward bias device | |
| CN201568001U (en) | An electric submersible pump sealing wellhead | |
| CN207905727U (en) | A kind of tubing coupling that leakproofness is strong | |
| CN219012560U (en) | Wellhead packing box | |
| CN103216204B (en) | Tool for repairing oil-water well inward concave sleeve | |
| CN108798585B (en) | Swabbing BOP | |
| CN206554856U (en) | Anti-puncture pollution device and packing box device | |
| CN218152979U (en) | Leak-proof device for connecting plastic pipes | |
| CN207194017U (en) | A kind of plastic spliced inspection shaft of light steel skeleton |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180608 |