CN207469865U - A kind of proton beam collection device - Google Patents

A kind of proton beam collection device Download PDF

Info

Publication number
CN207469865U
CN207469865U CN201721360254.XU CN201721360254U CN207469865U CN 207469865 U CN207469865 U CN 207469865U CN 201721360254 U CN201721360254 U CN 201721360254U CN 207469865 U CN207469865 U CN 207469865U
Authority
CN
China
Prior art keywords
layer
collection device
proton beam
iron block
stainless steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721360254.XU
Other languages
Chinese (zh)
Inventor
袁斌
黄秋筠
冯亦文
李宏亮
钟生
单国威
黄少鹏
罗伟杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201721360254.XU priority Critical patent/CN207469865U/en
Application granted granted Critical
Publication of CN207469865U publication Critical patent/CN207469865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of proton beam collection device, including shielding iron block(1)And barrier shield, the shielding iron block(1)It is provided between barrier shield as thermal effect space(2)Space;The barrier shield includes armored concrete internal layer(3), stainless steel layer(4), armored concrete outer layer(5)And waterproof layer(8), the stainless steel layer(4)It is welded on armored concrete internal layer(3)Outer surface, the armored concrete outer layer(5)It is cast in stainless steel layer(4)Outer surface, the waterproof layer(5)It is attached to stainless steel layer(4)Outer surface.The proton beam collection device of the utility model is influenced for solving the problems, such as that peripheral concrete layer is generated heat by internal shield iron block.

Description

A kind of proton beam collection device
Technical field
The utility model is related to building fields, and in particular to a kind of proton beam collection device.
Background technology
Neutron scattering technology studies the static structure of substance and the micro kinetics property of substance using neutron scattering methods, It can be used for the scientific research of life, material etc..But neutron emits high levels of radiation, therefore pass through proton beam collection device Collect the proton beam that does not further accelerate, carry out radiation shield processing, generally shielded by shielding iron block, then with concrete outsourcing into One step shields, but the influence that conventional structural concrete is easily shielded iron block generation heat causes crack, so as to influence The use of proton beam collection device.
Utility model content
The technical issues of the utility model solves is to provide a kind of peripheral concrete layer and is not easily susceptible to the production of internal shield iron block The proton beam collection device that heat amount influences.
To achieve the above object, the utility model provides a kind of proton beam collection device, including shielding iron block and shielding Wall is provided with the space as thermal effect space between the shielding iron block and barrier shield;The barrier shield includes armored concrete Internal layer, stainless steel layer, armored concrete outer layer and waterproof layer, the stainless steel layer are welded on the appearance of armored concrete internal layer Face, the armored concrete outer layer are cast in the outer surface of stainless steel layer, and the waterproof layer is attached to the outer surface of stainless steel layer.
Further, concrete foundation is further included, the concrete foundation shields iron block and barrier shield for carrying.
Further, pre-embedded steel slab is further included, the pre-embedded steel slab is provided with right angle hook, and described right angle hook one end is welded on On pre-embedded steel slab, the right angle hook other end is free end and curves right angle;The right angle hook is embedded in inside concrete foundation, The pre-embedded steel slab exposes on concrete foundation surface, and the shielding iron block is welded on pre-embedded steel slab.
Further, four pre-embedded steel slabs are set altogether below the shielding iron block, each pre-embedded steel slab sets four right angles Hook.
Further, the armored concrete inner layer outer surface is provided with keel, and the stainless steel layer is welded on keel.
Further, the keel are welded by lateral, vertical and slanting shaped steel.
Further, the shielding iron block is welded by several horizontal and vertical steel plates.
Further, the stainless steel layer is welded by several stainless steel plates.
Further, the waterproof layer is the waterproof layer that single-component polyurethane water-proof paint is prepared.
Advantageous effect of the utility model mainly has the following:Thermal effect is set between shielding iron block and barrier shield Space, avoiding shielding iron block expansion causes the barrier shield of periphery to receive destruction;Stainless steel layer and the one-component of outside are set The waterproof layer that polyurethane water-proof paint is prepared, dual waterproof realize better waterproof effect;Shield iron block and concrete foundation Between pre-embedded steel slab is set, pre-embedded steel slab is firmly fixed in concrete foundation by right angle hook, shields iron block and concrete It is connected between basis by pre-embedded steel slab, shielding iron block is destroyed caused by avoiding earthquake etc..
Description of the drawings
Fig. 1 is the cross-sectional view of proton beam collection device in the utility model embodiment one;
Fig. 2 is the structure diagram of pre-embedded steel slab in the utility model embodiment one;
Fig. 3 is the attachment structure schematic diagram of armored concrete internal layer and stainless steel layer in the utility model embodiment one.
Reference sign:1- shields iron block, 2- thermal effects space, 3- armored concrete internal layers, 4- stainless steel layers, 5- reinforcing bars Concrete outer layer, 6- pre-embedded steel slabs, 61- right angle hooks, 7- concrete foundations, 8- waterproof layers, 9- keel.
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;It is attached in order to more preferably illustrate the present embodiment Scheme certain components to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable;The same or similar label corresponds to same or similar Component;The terms describing the positional relationship in the drawings are only for illustration, it is impossible to be interpreted as the limitation to this patent.
Specific embodiment
In order to facilitate the understanding of those skilled in the art, below in conjunction with attached drawing and embodiment to the utility model into traveling One step is described in detail.
Embodiment one
It please refers to Fig.1 and Fig. 3, a kind of proton beam collection device, including shielding iron block 1, barrier shield and concrete foundation 7, shielding iron block 1 is made of several blocks of steel plates, and barrier shield includes armored concrete internal layer 3, stainless steel layer 4, outside armored concrete Layer 5 and waterproof layer 8 is provided with pre-embedded steel slab 6 in concrete foundation 7, and there are four right angle hooks 61 for the welding of pre-embedded steel slab 6.
Referring to Fig. 1, during construction, ground is dug first, in accordance with the dimensions being pre-designed and has carried out reinforcing steel bar frame, on ground Four pre-embedded steel slabs 6, the right angle of each pre-embedded steel slab 6 are set on four angles immediately below the proposed proton beam collection device of base Downward, the steel plate top surface of pre-embedded steel slab 6 is equal with the top surface of the concrete foundation 7 of setting, so as to facilitate concrete for hook 61 Shielding iron block 1 is carried in concrete foundation 7 and can be welded on pre-embedded steel slab 6 after the completion of basis 7 pours, and realizes shielding The making of iron block 1 and the connection of concrete foundation 7, then casting concrete completion concrete foundation 7.
Referring to Fig. 1, shielding iron block 1 is made of several blocks of steel plates, be it is a kind of by it is intermediate around, it is assembled from inside to outside One block of steel plate of lowermost layer is first welded on four pre-embedded steel slabs 6 by structure, when construction, then successively by bottom surface 1/6th Lastblock steel plate is welded on following steel plate by steel plate with one heart successively from below to up;Center steel plate is welded on after the completion most upper On the steel plate of one layer of face;Then surrounding steel plate is installed from inside to outside, one block of outside steel plate is welded on adjacent inner layer steel plate, directly To the complete version surrounding steel plate of installation, the gap between installation process light plate is filled full with iron sand;Finally install above 1/6th Steel plate lastblock steel plate is welded on following steel plate with one heart successively from below to up;So as to complete applying for shielding iron block 1 Work.
It is armored concrete internal layer 3 first, reinforcing bar mixes referring to Fig. 1, carrying out the construction of barrier shield outside shielding iron block 1 With shielding 1 outer surface slot milling of iron block as thermal effect space 2, the effect in thermal effect space 2 is to shield iron block 1 solidifying soil internal layer 3 Heat is generated when collecting the proton beam not further accelerated causes its own volume expansion to increase, and the thermal expansion and contraction degree ratio of iron block Concrete becomes apparent from, and the barrier shield of periphery is caused to receive destruction by the way that thermal effect space 2 is set to avoid shielding iron block 1 and expand.
It please refers to Fig.1 and Fig. 2, armored concrete internal layer 3 first install framework of steel reinforcement, while setting in framework of steel reinforcement when constructing Lateral, the vertical and oblique keel 9 being welded, the outmost surface of keel 9 need to expose concrete table after concrete has been poured Face is used for soldering stainless steel layer 4, and support shuttering, casting concrete form armored concrete internal layer 3 after the completion;It then will be several small The stainless-steel sheet of block is welded on keel 9, while every piece of stainless-steel sheet is welded with the stainless-steel sheet of surrounding, forms one A whole stainless steel layer 4, realizes the effect of water proof;After stainless steel layer 4 completes, reinforcing bar is installed against stainless steel layer 4 Frame, support shuttering, casting concrete form armored concrete outer layer 5;Finally the poly- ammonia of one-component is coated on 5 surface of concrete outer layer The waterproof layer 8 that ester water-repellent paint is prepared.
Obviously, above-described embodiment of the utility model is only intended to clearly illustrate the utility model example, and It is not the restriction to the embodiment of the utility model.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments It is exhaustive.All any modification, equivalent and improvement made within the spirit and principles of the present invention etc., should be included in Within the protection domain of the utility model claims.

Claims (9)

1. a kind of proton beam collection device, which is characterized in that including shielding iron block(1)And barrier shield, the shielding iron block(1) It is provided between barrier shield as thermal effect space(2)Space;The barrier shield includes armored concrete internal layer(3), it is stainless Steel layer(4), armored concrete outer layer(5)And waterproof layer(8), the stainless steel layer(4)It is welded on armored concrete internal layer(3)'s Outer surface, the armored concrete outer layer(5)It is cast in stainless steel layer(4)Outer surface, the waterproof layer(8)It is attached to stainless Steel layer(4)Outer surface.
2. proton beam collection device according to claim 1, which is characterized in that further include concrete foundation(7), it is described Concrete foundation(7)Iron block is shielded for carrying(1)And barrier shield.
3. proton beam collection device according to claim 2, which is characterized in that further include pre-embedded steel slab(6), it is described pre- Bury steel plate(6)It is provided with right angle hook(61), the right angle hook(61)One end is welded on pre-embedded steel slab(6)On, the right angle hook (61)The other end is free end and curves right angle;The right angle hook(61)It is embedded in concrete foundation(7)Inside, the pre-buried steel Plate(6)Expose in concrete foundation(7)Surface, the shielding iron block(1)It is welded on pre-embedded steel slab(6)On.
4. proton beam collection device according to claim 3, which is characterized in that the shielding iron block(1)It sets altogether below Put four pre-embedded steel slabs(6), each pre-embedded steel slab(6)Four right angle hooks are set(61).
5. proton beam collection device according to claim 1, which is characterized in that the armored concrete internal layer(3)Outside Surface is provided with keel(9), the stainless steel layer(4)It is welded on keel(9)On.
6. proton beam collection device according to claim 5, which is characterized in that the keel(9)By laterally, it is vertical and Slanting shaped steel is welded.
7. according to claim 1 ~ 6 any one of them proton beam collection device, which is characterized in that the shielding iron block(1) It is welded by several horizontal and vertical steel plates.
8. according to claim 1 ~ 6 any one of them proton beam collection device, which is characterized in that the stainless steel layer(4) It is welded by several stainless steel plates.
9. according to claim 1 ~ 6 any one of them proton beam collection device, which is characterized in that the waterproof layer(8)For The waterproof layer that single-component polyurethane water-proof paint is prepared.
CN201721360254.XU 2017-10-21 2017-10-21 A kind of proton beam collection device Active CN207469865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721360254.XU CN207469865U (en) 2017-10-21 2017-10-21 A kind of proton beam collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721360254.XU CN207469865U (en) 2017-10-21 2017-10-21 A kind of proton beam collection device

Publications (1)

Publication Number Publication Date
CN207469865U true CN207469865U (en) 2018-06-08

Family

ID=62264572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721360254.XU Active CN207469865U (en) 2017-10-21 2017-10-21 A kind of proton beam collection device

Country Status (1)

Country Link
CN (1) CN207469865U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109041398A (en) * 2018-08-01 2018-12-18 合肥中科离子医学技术装备有限公司 It is a kind of to load the apparatus and method for realizing that high energy beam current absorbs using water cooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109041398A (en) * 2018-08-01 2018-12-18 合肥中科离子医学技术装备有限公司 It is a kind of to load the apparatus and method for realizing that high energy beam current absorbs using water cooling

Similar Documents

Publication Publication Date Title
CN106836238B (en) Construction method and structure for replacing support of vertical rib plate of drop-type deep foundation pit
CN106351511B (en) Prefabricated components Assembled surrounding wall and its installation method
CN104947682A (en) Foundation pit support construction method and device thereof
CN105155549A (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN207436070U (en) A kind of deep foundation pit supporting structure
CN108612233B (en) Construction method of cast-in-situ facing clear concrete wall
CN207469865U (en) A kind of proton beam collection device
CN210713388U (en) Efficient and rapid integrated forming energy-saving wall
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
CN104131570B (en) Steel case enclosure device and its construction method for foundation pit construction
CN108643133A (en) A kind of detachable arch dam and its construction, method for dismounting
CN204715364U (en) A kind of foundation pit support device
CN103993741A (en) Method for building anti-seismic bricked formwork constructional column
CN206928758U (en) A kind of prefabricated prison enclosure wall
CN208293599U (en) Basement top-down method Combined tower crane foundation structure
CN109944324A (en) Steel concrete combo box trestle and the combination assembled structural system of reinforced concrete frame column
CN206220558U (en) Old City Wall door opening ruggedized construction
CN109736597A (en) A kind of method of construction of process of villa building
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN102477745A (en) Split construction method of beam slab structure
CN101307602A (en) Elevated large-sized apparatus foundation structure
CN104120713A (en) Device and method for embedding assembled type steel box reserved hole in underground diaphragm wall
CN212175798U (en) Whole strutting arrangement of deep basal pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant