CN207469333U - A kind of bucket for being used to excavate inter-pile soil - Google Patents

A kind of bucket for being used to excavate inter-pile soil Download PDF

Info

Publication number
CN207469333U
CN207469333U CN201721458817.9U CN201721458817U CN207469333U CN 207469333 U CN207469333 U CN 207469333U CN 201721458817 U CN201721458817 U CN 201721458817U CN 207469333 U CN207469333 U CN 207469333U
Authority
CN
China
Prior art keywords
plate
bucket
toothholder
lengthened
inter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721458817.9U
Other languages
Chinese (zh)
Inventor
王悦
孙世立
张雪
冉茂飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhong Yi Building Engineering Co Ltd
Original Assignee
Beijing Zhong Yi Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhong Yi Building Engineering Co Ltd filed Critical Beijing Zhong Yi Building Engineering Co Ltd
Priority to CN201721458817.9U priority Critical patent/CN207469333U/en
Application granted granted Critical
Publication of CN207469333U publication Critical patent/CN207469333U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of for excavating the bucket of inter-pile soil.Its key points of the technical solution are that including bottom plate, multiple toothholders and multiple lengthened plates, toothholder is fixed in one end of bottom plate cutting soil, and lengthened plate is fixed in bottom plate, and the lengthened plate extends along the direction of toothholder, beyond the end of toothholder.The bucket can efficiently excavate between stake laterally soil, save machinery and artificial.

Description

A kind of bucket for being used to excavate inter-pile soil
Technical field
The utility model is related to a kind of excavator, more particularly to a kind of bucket.
Background technology
As shown in Figure 1, at present, in building lot construction, through the method consolidated subsoil frequently with CFG or pile pile, stake After the completion of base construction, cutouts inter-pile soil 1 is needed.During due to cutting the earth, the spacing of adjacent two piles body 2 is smaller, general to only have 1.5 ~ 2.5m, and pile body 2 cannot rigidly be touched by the bucket of digging machine, otherwise can be damaged, so when excavating, it need to be by digging machine It puts in the middle of two campsheds, is excavated when falling back, longitudinal direction is excavated one by one.Because longitudinal direction soil and digging machine among two campsheds Horn return and hook direction and be located at a line, so easily excavate, but be then difficult to per lateral native 3 between adjacent two pile of campshed Excavate.As shown in Fig. 2, after bucket stretches into laterally two pile bodies, 2 centre, activity space is small, returns hook action and easily encounters pile body 2. In the prior art there are three types of solutions, one kind is artificial removing laterally soil 3, second is that using ting model bucket instead so that bucket is in horizontal stroke It is excavated among two pile bodies 2, third, laterally soil 3 is excavated in the middle of laterally two campsheds with another digging machine pendulum, it is preceding Two methods shoveling efficiency is low, and later approach need to increase a digging machine, cuts the earth of high cost.
Utility model content
The purpose of this utility model is to provide a kind of bucket for being used to excavate inter-pile soil, which can efficiently excavate between stake Laterally soil, it is mechanical and artificial to save.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of bucket for being used to excavate inter-pile soil, bottom plate is fixed in including bottom plate, multiple toothholders and multiple lengthened plates, toothholder One end of soil is cut, lengthened plate is fixed in bottom plate, and the lengthened plate extends along the direction of toothholder, beyond the end of toothholder.
By using above-mentioned technical proposal, bucket is in the laterally soil between excavating two pile bodies, it is not necessary to by entire bucket Be put between pile body, the cutting portion of lengthened plate can excavate lateral soil, reduce cause to touch damage to pile body can Energy;For the excavation of the laterally soil of deeper position between two pile bodies, following methods may be used:Lengthened plate is inserted vertically first Enter in laterally soil, then bucket is swung laterally, and by lateral soil zone from two pile body centre positions, finally longitudinally excavates quilt with bucket The laterally soil taken out of is simultaneously abandoned outside, and therefore, which can efficiently excavate between stake laterally soil, saves machinery and artificial.
Preferably, lengthened plate includes cutting portion, and cutting portion is located remotely from the direction of toothholder, and cutting portion is blade-like.
By using above-mentioned technical proposal, lengthened plate is easier to cut soil, improves shoveling efficiency.
Preferably, lengthened plate further includes those widened sections, and those widened sections are located at the one end of lengthened plate far from cutting portion, described to add Wide portion is bolted to the outer surface of bottom plate.
By using above-mentioned technical proposal, being detachably connected, while those widened sections make lengthening for lengthened plate and bottom plate is realized Plate has the contact area of bigger with bottom plate, to increase the distance between two bolts, makes the connection of lengthened plate and bottom plate more Securely.
Preferably, every piece of lengthened plate corresponds to the position of toothholder and is vertically connected with two pieces of connecting plates, the connecting plate point It is distributed in the both sides of toothholder;Each toothholder further includes horizontal pin hole of its inside of break-through, and connecting plate is equipped with corresponding with horizontal pin hole Through-hole, the connecting plate and toothholder are perforated with pin and connected.
By using above-mentioned technical proposal, by the connection of connecting plate and toothholder, lengthened plate and bucket are further enhanced Connection, lengthened plate operating time is improved.
Preferably, lengthened plate is vertically connected with rib sword beyond the upper surface of toothholder end portion, and the rib sword is separate The end face of lengthened plate is blade-like.
By using above-mentioned technical proposal, rib sword has not only acted as the effect for reinforcing lengthened plate, and convenient preferably right Soil is cut, and improves the excavation efficiency of bucket.
Preferably, lengthened plate, connecting plate and rib sword are integrally formed.
By using above-mentioned technical proposal, the installation of lengthened plate is not only facilitated, but also lengthened plate is more durable.
Preferably, length of the lengthened plate beyond toothholder end is 30 ~ 50cm.
By using above-mentioned technical proposal, both meet the requirement for excavating laterally soil, will not when lengthened plate is too long by It fractures, influences to excavate efficiency.
Preferably, two blocks of side plates are further included, the side plate is fixed in the upper surface of bottom plate both sides, the lateral surface of side plate Fixed plate is connected with, the outer surface of fixed plate is connected with more steel strand wires.
By using above-mentioned technical proposal, steel strand wires have good flexibility, can be in the situation for not damaging pile quality Under, the attachment soil of pile body is effectively cleared up.
Preferably, steel strand wires are mutually entwined by more steel wires, to prevent more steel wires of steel strand wires itself loose Jag, every steel strand wires are at least bound together with iron wire.
By using above-mentioned technical proposal, subtracting for toughness that steel strand wires are caused due to the steel wire of steel strand wires is loose is reduced It is weak, improve the service life of steel strand wires.
Preferably, steel strand wires length is 7 ~ 20cm.
By using above-mentioned technical proposal, bucket side plate is allow to keep certain distance with pile body, is reduced because bucket touches Pile body causes to damage to pile body;Steel strand wires are longer, and toughness is lower, and the low steel strand wires of toughness lose the function of cleaning attachment soil.
In conclusion the utility model has the advantages that:
1st, the bucket can efficiently excavate inter-pile soil, particularly can efficiently excavate between stake laterally soil, save machinery and artificial;
2nd, after increasing lengthened plate, bucket, which can not have to whole stretch into, can excavate lateral inter-pile soil, bucket among two piles With being easier to keep certain distance among pile body, reduce bucket and the possibility that pile body is caused to damage is touched to pile body;
3rd, increased rib sword can preferably cut soil, further improve shoveling efficiency;
4th, increased steel strand wires can clear up the attachment soil around pile body under the premise of ensureing not damaging pile quality, It further saves artificial.
Description of the drawings
Fig. 1 is that digging machine excavates inter-pile soil operating diagram;
Fig. 2 is that bucket excavates lateral native operating diagram between stake;
Fig. 3 is one operating diagram of embodiment;
Fig. 4 is the structure diagram of bucket in embodiment two and embodiment three;
Fig. 5 is the structure diagram given prominence to the key points in embodiment two and embodiment three inside bucket;
Fig. 6 is that bucket removes pile body attachment soil operating diagram in embodiment three.
In figure, 1, inter-pile soil;2nd, pile body;21st, adhere to soil;3rd, it is laterally native;4th, bottom plate;5th, toothholder;51st, horizontal pin hole; 6th, lengthened plate;61st, cutting portion;62nd, those widened sections;63rd, bolt;64th, arc panel;7th, connecting plate;71st, through-hole;72nd, pin;8th, rib Sword;9th, side plate;10th, fixed plate;11st, steel strand wires;112nd, steel wire;12nd, iron wire.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The identical attached drawing of wherein identical parts Label represents.It should be noted that word "front", "rear" used in the following description, "left", "right", " on ", " under ", " bottom Face " and " top surface " refer to the direction in attached drawing, and word " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment one:
As shown in figure 3, a kind of for excavating the bucket of inter-pile soil, including bottom plate 4, multiple toothholders 5 and multiple lengthened plates 6, Toothholder 5 is fixed in one end that bottom plate 4 cuts soil;Multiple lengthened plates 6 are welded in the inner surface of bottom plate 4, and along the side of toothholder 5 To extension, beyond the end 30cm of toothholder 5;For convenience of cutting soil, lengthened plate 6 includes cutting portion 61, and cutting portion 61 is located at remote Direction from toothholder 5, cutting portion 61 are blade-like.
The course of work:Bucket is in the laterally soil 3 between excavating two pile bodies 2(With reference to figure 1), it is not necessary to entire bucket is put Between entering pile body 2, the cutting portion 61 of lengthened plate 6 can excavate laterally soil 3, reduce and pile body 2 is caused to touch damage Possibility.For the excavation of the laterally soil 3 of deeper position between two pile bodies 2, following methods may be used:First by lengthened plate 6 are inserted vertically into laterally soil 3, and then bucket is swung laterally, and laterally soil 3 is taken away two pile bodies, 2 centre position, finally uses bucket It excavates the laterally soil 3 being carried over and abandons outside in longitudinal direction.
Embodiment two:
As shown in Figure 4 and Figure 5, with embodiment one the difference lies in:Lengthened plate 6 further includes those widened sections 62, those widened sections 62 Positioned at the one end of lengthened plate 6 far from cutting portion 61, those widened sections 62 are fixed on the outer surface of bottom plate 4 with multiple bolts 63.Widen Portion 62 makes lengthened plate 6 and bottom plate 4 have the contact area of bigger, to increase the distance between two bolts 63, makes 6 He of lengthened plate The connection of bottom plate 4 is more secured.In addition, those widened sections 62 connect transition with the part that lengthened plate 6 is not widened using arc panel 64.
Every piece of lengthened plate 6 corresponds to two pieces of connecting plates 7 of position vertical welding of toothholder 5, and two pieces of connecting plates 7 are located at toothholder respectively 5 both sides;Each toothholder 5 further includes horizontal pin hole 51 of its inside of break-through(With reference to figure 3), connecting plate be equipped with and horizontal pin hole 51 corresponding through-holes 71, connecting plate 7 are perforated with pin 72 with toothholder 5 and connected.
Lengthened plate 6 is 50cm beyond the length of 5 end portion of toothholder, and the upper surface of this section of lengthened plate 6 is vertically connected with rib Sword 8, rib sword 8 play the role of reinforcing lengthened plate 6, and lengthened plate 6 is made to be not easy to be broken off;End face of the rib sword 8 far from lengthened plate 6 It is convenient that preferably soil is cut for blade-like, it improves and excavates efficiency.In order to facilitate processing and installation, lengthened plate 6 connects Fishplate bar 7 and rib sword 8 are integrally formed.
The course of work:Multiple lengthened plates 6 with connecting plate 7 and rib sword 8 are fixedly connected on bolt 63 and pin 72 On bottom plate 6 and toothholder 5;The lengthened plate 6 of bucket is inserted vertically into the laterally soil 3 to be excavated;Bucket makees back hook action, rib sword 8 Laterally soil 3 is cut with cutting portion 61;Then bucket makees traversing action, using lengthened plate 6 and rib sword 8 to lateral native 3 frictional force Laterally soil 3 is taken away into two pile bodies, 2 centre position;The laterally soil 3 being carried over finally longitudinally is excavated with bucket and is abandoned outside.
Embodiment three:
As shown in Figure 4 and Figure 5, with embodiment two the difference lies in:Bucket further includes two blocks of side plates 9, the outside of side plate 9 Surface is provided with fixed plate 10 and Duo Gen steel strand wires 11.More 11 vertical weldings of steel strand wires are in fixed plate 10, and fixed plate 10 is with two A bolt is fixed in side plate 9.Steel strand wires 11 are mutually entwined by more steel wires 112, to prevent more steel of steel strand wires 11 itself 112 loose jags of silk, every steel strand wires 11 iron wire 12 are at least bound together.11 length of steel strand wires is 7 ~ 20cm.For example, work as steel When 11 length of twisted wire is 20cm, one of iron wire 12 is bound in the 10cm positions of steel strand wires 11.
The course of work:The fixed plate 10 for being welded with steel strand wires 11 is fixed on to the outside of the side plate 9 of bucket with two bolts Then surface carries out digging;As shown in fig. 6, when side plate 9 is close to pile body 2, more steel strand wires 11 are slided jointly along pile body It moves, attachment soil 21 is broken up, is scraped;Finally the attachment soil 21 scraped is excavated with bucket and abandon outside.
Since steel strand wires 11 have good flexibility, flexural deformation can be generated when it encounters pile body 2, it will not be to pile body 2 Architecture quality damages, and after it is detached from the contact with pile body 2, and restores to the original state.
Bucket does back hook action always during due to digging, so steel strand wires 11 are always single load bearing, uses one section Time, steel strand wires 11 can generate flexural deformation.At this point, removing fixed plate 10, it is mounted on side plate 9, makes again after rotating 180 degree The bending direction for obtaining steel strand wires 11 changes, and such steel strand wires 11 can continue to clear up the attachment soil 21 on pile body 2.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.

Claims (10)

1. it is a kind of for excavating the bucket of inter-pile soil, including bottom plate(4)With multiple toothholders(5), toothholder(5)It is fixed in bottom plate(4) Cut one end of soil, it is characterised in that:It further includes and is fixed in bottom plate(4)Multiple lengthened plates(6), the lengthened plate(6)Edge Toothholder(5)Direction extension, beyond toothholder(5)End.
2. a kind of bucket for being used to excavate inter-pile soil according to claim 1, it is characterised in that:Lengthened plate(6)Including cutting Cut portion(61), cutting portion(61)It is located remotely from toothholder(5)Direction, cutting portion(61)For blade-like.
3. a kind of bucket for being used to excavate inter-pile soil according to claim 2, it is characterised in that:Lengthened plate(6)It further includes Those widened sections(62), those widened sections(62)Positioned at lengthened plate(6)Far from cutting portion(61)One end, the those widened sections(62)Consolidated with bolt Due to bottom plate(4)Outer surface.
4. a kind of bucket for being used to excavate inter-pile soil according to claim 3, it is characterised in that:Every piece of lengthened plate(6)It is right Answer toothholder(5)Position be vertically connected with two pieces of connecting plates(7), the connecting plate(7)It is distributed in toothholder(5)Both sides;Each Toothholder(5)Further include horizontal pin hole of its inside of break-through(51), connecting plate(7)It is equipped with and horizontal pin hole(51)Corresponding through-hole (71), the connecting plate(7)With toothholder(5)Use pin(72)Perforation connection.
5. a kind of bucket for being used to excavate inter-pile soil according to claim 4, it is characterised in that:Lengthened plate(6)Beyond tooth Seat(5)The upper surface of end portion is vertically connected with rib sword(8), the rib sword(8)Far from lengthened plate(6)End face be blade Shape.
6. a kind of bucket for being used to excavate inter-pile soil according to claim 5, it is characterised in that:Lengthened plate(6), connecting plate (7)With rib sword(8)It is integrally formed.
7. a kind of bucket for being used to excavate inter-pile soil according to any one in claim 1 ~ 6, it is characterised in that:It lengthens Plate(6)Beyond toothholder(5)The length of end is 30 ~ 50cm.
8. a kind of bucket for being used to excavate inter-pile soil according to any one in claim 1 ~ 6, it is characterised in that:Also wrap Include two blocks of side plates(9), the side plate(9)It is fixed in bottom plate(4)Upper surface, side plate(9)Outer surface be connected with fixed plate (10), fixed plate(10)Outer surface be connected with more steel strand wires(11).
9. a kind of bucket for being used to excavate inter-pile soil according to claim 8, it is characterised in that:Steel strand wires(11)By more Steel wire(112)It is mutually entwined, to prevent steel strand wires(11)Itself more steel wire(112)Loose jag, every steel strand wires (11)Use iron wire(12)At least one of binding.
10. a kind of bucket for being used to excavate inter-pile soil according to claim 9, it is characterised in that:Steel strand wires(11)Length For 7 ~ 20cm.
CN201721458817.9U 2017-11-03 2017-11-03 A kind of bucket for being used to excavate inter-pile soil Active CN207469333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721458817.9U CN207469333U (en) 2017-11-03 2017-11-03 A kind of bucket for being used to excavate inter-pile soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721458817.9U CN207469333U (en) 2017-11-03 2017-11-03 A kind of bucket for being used to excavate inter-pile soil

Publications (1)

Publication Number Publication Date
CN207469333U true CN207469333U (en) 2018-06-08

Family

ID=62262417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721458817.9U Active CN207469333U (en) 2017-11-03 2017-11-03 A kind of bucket for being used to excavate inter-pile soil

Country Status (1)

Country Link
CN (1) CN207469333U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604960A (en) * 2017-11-03 2018-01-19 北京中易房建筑工程有限公司 A kind of bucket for being used to excavate inter-pile soil

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604960A (en) * 2017-11-03 2018-01-19 北京中易房建筑工程有限公司 A kind of bucket for being used to excavate inter-pile soil

Similar Documents

Publication Publication Date Title
CN105556040B (en) Equipment end cut drill bit
CN207469333U (en) A kind of bucket for being used to excavate inter-pile soil
CN211922630U (en) Steel-pipe pile assembled hat beam
CN206157793U (en) Scraper bowl and excavator for excavator
CN208379658U (en) A kind of bull-dozer
CN105065006A (en) Bucket and excavator
CN211057770U (en) Grab bucket combined shovel brush device for grooving machine
CN206233296U (en) A kind of excavator bucket device
JP2007224549A (en) Bit
CN107604960A (en) A kind of bucket for being used to excavate inter-pile soil
CN208650130U (en) A kind of mini-excavator bucket
CN203684277U (en) Underground diaphragm wall of shield tunnel
CN202509545U (en) Scarifier and engineering machinery
CN202831029U (en) Excavator ripper
CN207608943U (en) A kind of bucket
CN208152128U (en) A kind of excavator-type shovel clamshell excavator and excavator with soil-loosening function
CN205617465U (en) Scraper bowl for hydraulic shovel
CN219411020U (en) Double-purpose scraper bowl is pushed out to dig soil and forklift thereof
CN107956232A (en) Lithosphere ground is crushed with multibuchet hook-type bucket device
CN215442076U (en) Grooving machine for edge operation
CN211774004U (en) Bulldozer scarifier
CN203795498U (en) Soil loosening device of loader
CN217734152U (en) Excavator dozer blade with fixed and reinforced connecting structure
CN209011188U (en) A kind of loosening device for bull-dozer
CN214143860U (en) Bulldozer for forest work

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant