CN207469245U - Hydraulic pile hammer - Google Patents

Hydraulic pile hammer Download PDF

Info

Publication number
CN207469245U
CN207469245U CN201721519782.5U CN201721519782U CN207469245U CN 207469245 U CN207469245 U CN 207469245U CN 201721519782 U CN201721519782 U CN 201721519782U CN 207469245 U CN207469245 U CN 207469245U
Authority
CN
China
Prior art keywords
hammer
hammer body
framework
hydraulic pile
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721519782.5U
Other languages
Chinese (zh)
Inventor
林登
林永安
彭振琦
陆红
王栓让
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongan Zhejiang Engineering Machinery Co Ltd
Original Assignee
Yongan Zhejiang Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongan Zhejiang Engineering Machinery Co Ltd filed Critical Yongan Zhejiang Engineering Machinery Co Ltd
Priority to CN201721519782.5U priority Critical patent/CN207469245U/en
Application granted granted Critical
Publication of CN207469245U publication Critical patent/CN207469245U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of engineering machinery, more particularly to a kind of hydraulic pile hammer.Technical solution is:A kind of hydraulic pile hammer, include hammer body and can be along the hammer core of hammer body axial displacement in hammer body, have in hammer body for the placement of hammer core and mobile space, hammer body is columnar framework, axial one end of the framework is connecting pin, and the other end is punching press end, is equipped at the punching press end of hammer body and is fixedly connected with hammer body and staking punch that cross section is tapered, the taper big end of the staking punch is connect with hammer body, and taper small end extends towards hammer body outside;External its axial direction of end face upper edge of framework offers several openings climbed for operating personnel;The inner wall of framework is equipped with the wear rib being detachably connected with it;Being equipped in the middle part of framework induction hammer core and can promote the protective device of its start and stop with that can send the signal to external hydraulic system.Using above-mentioned technical proposal, provide a kind of resistance reduced when impacting, prevent hammer core and hammer body abrasion, the hydraulic pile hammer of easy access.

Description

Hydraulic pile hammer
Technical field
The utility model is related to a kind of engineering machinery, more particularly to a kind of hydraulic pile hammer.
Background technology
Hydraulic pile hammer belongs to impact type pile hammer, pile body is mainly hit by way of freely falling body, and can lead to After crossing hydraulic system promotion desired height, acceleration energy is obtained from hydraulic system to improve impact velocity strike pile body.
Traditional hydraulic pile hammer is connect for hammer body and the hammer core in hammer body, the top of hammer body with hydraulic system, separately One end is the working end for implementing strike with pile body.The working end of hammer body is consistent with hammer body cross section, and the area of cross section is got over Greatly, resistance is bigger, for large-scale pile hammer, how to reduce its resistance during piling neck always The problem that field technique personnel can not overcome.
Hammer body is worn in use in order to prevent, it will usually in the external setting wear rib of hammer body, however be hammered into shape In use easily with causing to rub inside hammer body, prolonged friction not only results in hammer core and is damaged, while also can core It causes hammer body inside thinning, so as to influence its stress intensity, is susceptible to the situation of deformation.
The volume of hydraulic pile hammer is larger, when being in use state, is suspended on arm, at this point, right if necessary When it implements maintenance, operating personnel need to take by removing on arm, can directly influence project progress it.Or pass through Aerial ladder is set up, makes operating personnel that can implement to overhaul to pile hammer, however the carrying of aerial ladder and use undoubtedly increase engineering cost. Therefore, how quickly to implement maintenance to impact cone is always the problem that field technology personnel can not overcome.
In use, hammer core is implemented to be promoted by hydraulic system to it, then hammers core into shape by release, and hammer core drives hammer Body fast ram pile pipe implements piling, if hammer core is not run during release to the position that can implement shock with hammer body, Then the impact force of pile pipe can be reduced, can not realize expected piling effect, while certain damage can be also caused to hammer body.It should Technical barrier is always the direction of technical field technical staff research and development.
Utility model content
In view of the deficienciess of the prior art, the utility model provides a kind of resistance reduced when impacting, prevents hammer core And hammer body abrasion, the hydraulic pile hammer of easy access.
To achieve the above object, the utility model provides following technical solution:A kind of hydraulic pile hammer, includes hammer body It and can be along the hammer core of hammer body axial displacement, the interior space having for the placement of hammer core and movement of hammer body, the hammer in hammer body Body is columnar framework, and axial one end of the framework is connecting pin, and the other end is punching press end, it is characterised in that:The hammer body Connect at punching press end equipped with the staking punch being fixedly connected with hammer body and cross section is tapered, taper big end and the hammer body of the staking punch It connects, taper small end extends towards hammer body outside;External its axial direction of end face upper edge of the framework is offered for operating personnel Several openings of climbing;The inner wall of the framework is equipped with the wear rib being detachably connected with it;Being equipped in the middle part of framework can feel Core should be hammered into shape and promote the protective device of its start and stop with external hydraulic system can be sent the signal to.
Using above-mentioned technical proposal, staking punch is set as taper, the area at the punching press end of hammer body is promoted to reduce, so as to subtract Resistance during punching press is lacked, has made effect during hydraulic pile hammer implementation piling more preferable and simple in structure;By in framework Outside sets several openings, and when operating personnel need to implement it maintenance, the position overhauled to needs can be climbed by the opening, Without, by being removed on arm, saving the repair time by other tools or by pile hammer, having saved production cost;Pass through Wear rib is set on the inner wall of framework, when hammer core, which is in space, to be moved, directly will not cause to rub with framework inner wall, it is right Hammer core and framework provide protection, extend its service life, and disassembly and assembly structure is simple;The setting of protective device can be to cone core reality Detection is applied, during implementing to drive piles, hammer core tenesmus, if the protective device is not sensed by cone core at this moment, then protective device External hydraulic system is sent a signal to, promotes to hammer core into shape and hammer body is stopped, hammer body is implemented to protect, while can also avoid shadow It rings to piling effect.
The utility model is further arranged to:Staking punch includes at least two sections of diminishing conically shapeds of angle, taper It is connected respectively by flanged plate and fastener between cylinder and hammer body and conically shaped and conically shaped.
Using above-mentioned technical proposal, setting in this way can reduce the length of each conically shaped in staking punch, so as to promote to make it have The stress intensity of bigger prevents deformation or damaged.
The utility model is further set as:The cross section of framework is rectangular, framework include four interconnection Side is connected respectively by rectangle connection strap between four sides, and the wear rib is installed on the rectangle by fastener and connects In narrow bars.
Using above-mentioned technical proposal, set so easy to process, simple in structure, wear rib is on rectangle connection strap and dismounts It is convenient.
The utility model is further set as:It is open as rectangular aperture.
Using above-mentioned technical proposal, personnel easy to operation is set to climb and trample in this way.
The utility model is further set as:Hammer body is located at is evenly equipped with several convex ribs with the joining place of staking punch.
Using above-mentioned technical proposal, the stress that setting can promote the joining place of hammer body and staking punch that can bear bigger in this way is strong Degree.
The utility model is further set as:Protective device includes the installing frame being fixedly arranged in framework and is set up in Sensor in installing frame.
Using above-mentioned technical proposal, such setting structure is simple, convenient for disassembly and assembly, and can prevent protective device by framework It comes off.
The utility model is further described below in conjunction with the accompanying drawings.
Description of the drawings
Fig. 1 is the stereoscopic schematic diagram of the utility model embodiment;
Fig. 2 is the A-A diagrammatic cross-sections of Fig. 1.
Specific embodiment
A kind of hydraulic pile hammer as shown in Figure 1 and Figure 2, includes hammer body 1 and can be along the axial position of hammer body 1 in hammer body 1 The hammer core of shifting has in hammer body 1 and is placed for hammer core and mobile space 11, and hammer body 1 is columnar framework, and axial the one of the framework It holds as connecting pin 12, the other end is punching press end 13, is equipped with and is fixedly connected with hammer body 1 and cross section is at the punching press end 13 of hammer body 1 The staking punch 2 of taper, the taper big end of the staking punch 2 are connect with hammer body, and taper small end extends towards 1 outside of hammer body;Framework External its axial direction of end face upper edge offers several openings 14 climbed for operating personnel;The inner wall of framework is equipped with removable with it Unload the wear rib 3 of connection;Be equipped in the middle part of framework induction hammer core and can promote it to open with that can send the signal to external hydraulic system The protective device 4 stopped.In said program, staking punch 2 is set as taper, the area at the punching press end 13 of hammer body 1 is promoted to reduce, from And resistance when reducing punching press, effect when making the hydraulic pile hammer implement piling are more preferable and simple in structure;By in frame Several openings 14 of external setting of body when operating personnel need to implement it maintenance, can be climbed to needing to examine by the opening 14 The position repaiied, without, by being removed on arm, saving the repair time by other tools or by pile hammer, having saved production Cost;By on the inner wall of framework set wear rib 3, when hammer into shape core be in space 11 move when, will not directly in framework Wall causes to rub, and provides protection to hammer core and framework, extends its service life, and disassembly and assembly structure is simple;Protective device Setting can be to cone core examinations, during implementing to drive piles, hammer core tenesmus, if the protective device 4 is not sensed by this moment Cone core, then protective device 4 send a signal to external hydraulic system, promote to hammer core into shape and hammer body 1 be stopped, hammer body 1 is implemented Protection, while can also avoid influencing piling effect.
In the utility model embodiment, in order to make staking punch 2 that there is the stress intensity of bigger, deformation or damaged is prevented. Staking punch 2 includes the diminishing conically shaped 21 of at least two sections of angles, conically shaped 21 and hammer body 1 and conically shaped 21 and taper It is connected respectively by flanged plate 22 and fastener 23 between cylinder 21.Setting can reduce the length of each conically shaped 21 in staking punch 2 in this way Degree, makes stress intensity be guaranteed.
For the ease of dismounting, the cross section of framework is rectangular, and framework includes the side 15 of four interconnections, four sides It is connected respectively by rectangle connection strap 16 between side 15, wear rib 3 is installed on by fastener 23 on the rectangle connection strap 16.
It in the utility model embodiment, climbs and tramples for the ease of operating personnel, opening 14 is rectangular aperture.Certainly, The opening 14 or round or triangular shape and feasible.In order to ensure the stress intensity of hammer body 1 and 2 junction of staking punch, Hammer body 1 is located at is evenly equipped with several convex ribs 17 with the joining place of staking punch 2.
In the utility model embodiment, protective device 4 includes the installing frame 41 being fixedly arranged in framework and is set up in Sensor 42 in installing frame 41.Setting structure is simple in this way, convenient for disassembly and assembly, and can prevent protective device 4 by being taken off in framework It falls.

Claims (10)

1. a kind of hydraulic pile hammer, include hammer body and can have in hammer body along the hammer core of hammer body axial displacement in hammer body It is placed for hammer core and mobile space, the hammer body is columnar framework, and axial one end of the framework is connecting pin, the other end For punching press end, it is characterised in that:Equipped with the punching press being fixedly connected with hammer body and cross section is tapered at the punching press end of the hammer body Head, the taper big end of the staking punch are connect with hammer body, and taper small end extends towards hammer body outside;The external end face of the framework Its axial direction of upper edge offers several openings climbed for operating personnel;The inner wall of the framework is equipped with detachably to be connected with it The wear rib connect;Be equipped in the middle part of the framework induction hammer core and can promote it to open with that can send the signal to external hydraulic system The protective device stopped.
2. hydraulic pile hammer according to claim 1, it is characterised in that:The staking punch includes at least two sections of angles Diminishing conically shaped is connected between conically shaped and hammer body and conically shaped and conically shaped by flanged plate and fastener respectively It connects.
3. hydraulic pile hammer according to claim 1 or 2, it is characterised in that:The cross section of the framework is rectangular, framework Include the side of four interconnections, connected respectively by rectangle connection strap between four sides, the wear rib passes through Fastener is installed on the rectangle connection strap.
4. hydraulic pile hammer according to claim 1 or 2, it is characterised in that:The opening is rectangular aperture.
5. hydraulic pile hammer according to claim 3, it is characterised in that:The opening is rectangular aperture.
6. hydraulic pile hammer according to claim 1 or 2, it is characterised in that:The hammer body is located to be connected with staking punch Place is evenly equipped with several convex ribs.
7. hydraulic pile hammer according to claim 3, it is characterised in that:The hammer body is located at equal with the joining place of staking punch It is furnished with several convex ribs.
8. according to the hydraulic pile hammer described in claims 1 or 2 or 5 or 7, it is characterised in that:The protective device includes The installing frame being fixedly arranged in framework and the sensor being set up in installing frame.
9. hydraulic pile hammer according to claim 3, it is characterised in that:The protective device, which includes, is fixedly arranged on framework On installing frame and the sensor that is set up in installing frame.
10. hydraulic pile hammer according to claim 4, it is characterised in that:The protective device, which includes, is fixedly arranged on frame Installing frame on body and the sensor being set up in installing frame.
CN201721519782.5U 2017-11-15 2017-11-15 Hydraulic pile hammer Active CN207469245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721519782.5U CN207469245U (en) 2017-11-15 2017-11-15 Hydraulic pile hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721519782.5U CN207469245U (en) 2017-11-15 2017-11-15 Hydraulic pile hammer

Publications (1)

Publication Number Publication Date
CN207469245U true CN207469245U (en) 2018-06-08

Family

ID=62260458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721519782.5U Active CN207469245U (en) 2017-11-15 2017-11-15 Hydraulic pile hammer

Country Status (1)

Country Link
CN (1) CN207469245U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724390A (en) * 2017-11-15 2018-02-23 浙江永安工程机械有限公司 Hydraulic pile hammer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724390A (en) * 2017-11-15 2018-02-23 浙江永安工程机械有限公司 Hydraulic pile hammer

Similar Documents

Publication Publication Date Title
US9416514B2 (en) Post driver with limited movement floating post anvil
CN207469245U (en) Hydraulic pile hammer
CN202170537U (en) Fixing connection device of operational space framework of machine and machine
CN108411916A (en) Hydraulic pile hammer
CN104526324A (en) Pin shaft dismounting device for coal mine hydraulic support
CN107724390A (en) Hydraulic pile hammer
CN204470927U (en) Coal mine hydraulic supporting eliminator
CN204789200U (en) Hardness test hammer
CN213410270U (en) Mould is used in preparation of disc cutter ring
CN203866862U (en) Hooking device of inspection well protective screen
CN106049498A (en) Guiding and swinging pile pressing construction method and equipment for steel pipe pile
CN207432092U (en) A kind of integral type attaching/detaching apparatus of labyrinth-type excluder interior sealing component
CN216811072U (en) Elevartor shaft entrance to a cave protector
CN206366963U (en) A kind of comprehensive pick equipment means for tearing-down pin shaft of fully mechanized mining
CN206891878U (en) Object lateral impact experimental rig
CN206016295U (en) A kind of towed horizontal protective device
CN201013265Y (en) Lifting ring fending-rod plug hole inclined pipe elevator
CN220725085U (en) Novel knuckle bearing of hydraulic impact hammer
CN211992759U (en) Disassembling tool for hammer shaft pin of coarse crusher
CN210288392U (en) Device for jointly recovering steel casing
CN204326045U (en) A kind of pricker visits device and rod-pulling device thereof
CN204919380U (en) A hanging flower basket that is used for blasting of large -scale bridge to demolish
CN202787219U (en) Rammer convenient to climb
CN204661174U (en) A kind of hydraulically extensible boom device of climbing type tower machine
CN207268175U (en) Vertical shaft Tunnel Blasting construction protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant