CN207455790U - Building air purification processing equipment - Google Patents

Building air purification processing equipment Download PDF

Info

Publication number
CN207455790U
CN207455790U CN201721554808.XU CN201721554808U CN207455790U CN 207455790 U CN207455790 U CN 207455790U CN 201721554808 U CN201721554808 U CN 201721554808U CN 207455790 U CN207455790 U CN 207455790U
Authority
CN
China
Prior art keywords
air
pipe
aeration tube
water tank
processing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721554808.XU
Other languages
Chinese (zh)
Inventor
赵圣兆
申德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Eyre Internet Technology Co Ltd
Original Assignee
Shanghai Eyre Internet Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Eyre Internet Technology Co Ltd filed Critical Shanghai Eyre Internet Technology Co Ltd
Priority to CN201721554808.XU priority Critical patent/CN207455790U/en
Application granted granted Critical
Publication of CN207455790U publication Critical patent/CN207455790U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building air purification processing equipments.It includes water tank, air blower, underwater aeration tube, purification air and enters pipeline, dehumidifier, pipe pressurizing wind turbine;Underwater aeration tube includes top supervisor, lower part Duo Gen branch pipes, and the top supervisor of underwater aeration tube is inserted perpendicularly into water tank, and the lower part Duo Gen branch pipes of underwater aeration tube are laid in the bottom, and many pores are provided on every branch pipe top;Blower export is responsible for entrance with the top of underwater aeration tube by communicating pipe and is connected;Purification air is equipped with above water tank and enters pipeline;Purification air enters pipeline, dehumidifier, pipe pressurizing wind turbine and is linked in sequence.The building air purification processing equipment of the utility model, is fairly effective to local air purification, according to test data, PM particles can be effectively removed, sterilizes, and takes away Water in Water Tanks part, the humidity that effusion air is made to contain more than 50% can improve the humidity of air in building in northern area.

Description

Building air purification processing equipment
Technical field
The utility model belongs to building technical field of air purification, is related to a kind of building air purification processing equipment.
Background technology
Air pollution has become a unavoidable reality in whole world life of urban resident.Industrial civilization and city hair While great wealth is created for the mankind, exhaust gas and waste that also billions of tons are counted are discharged into air, and the mankind depend on for existence for exhibition Atmospheric thermodynamics into aerial garbage warehouse and poison gas storehouse.It, will be right when pernicious gas and pollutant in air reach a certain concentration The mankind and environment bring huge disaster.
All building for having central air-conditioning including buildings such as airport, hospital, all kinds of hotels, office buildings, have sucking certainly The new Ventilator Room of right air, effect is to be improved by the cold and hot medium of central unit or lower air themperature, and is played more Change the effect of air in building.General new Ventilator Room (air inlet computer room) is arranged at the top layer or mechanical floor in building.Some air inlets Computer room is equipped with filter screen, to prevent bulky grain solid or flying bird from entering, but to improving air quality without too big help.
There are the building that central heating is freezed, sent natural air sucking to each ajutage of building by air-introduced machine (new wind turbine) Net is sent after cold and hot unit heats or cools down, then by branch pipe to each room.If there are Air haze or natural bacterium dirt in city Dye problem, then the air quality in building will not be high, and inside and outside air quality should be basically identical, and simply temperature changes .Existing pollution air is directly entered each room of building by original new Fan pipeline, and the filter screen set in pipeline can only The pollution air of building part is purified, clean-up effect is not good enough, and filter screen need to often clean annual replacement, and use cost is high.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of good purification, building at low cost Space air purification processing equipment.
The device of the utility model gives processing scope for air, will first be carried out into the air before the original new wind turbine that oneself has Purified treatment takes the mode having a bath to air to remove a certain proportion of pollutant, PM particles, bacterium and other dirts that can be dissolved Contaminate object.
The technical solution of the utility model is as follows:
A kind of building air purification processing equipment, it includes:Water tank, air blower, underwater aeration tube, purification air enter pipe Connecting pipe between road, dehumidifier, pipe pressurizing wind turbine and dehumidifier and pipe pressurizing wind turbine;Underwater aeration tube includes Top supervisor, lower part Duo Gen branch pipes, the top supervisor of underwater aeration tube are inserted perpendicularly into water tank, the lower part Duo Gen of underwater aeration tube Branch pipe is laid in the bottom, and many pores are provided on every branch pipe top;Blower export passes through communicating pipe and underwater aeration tube Top supervisor's entrance connection;Purification air is equipped with above water tank and enters pipeline;Purification air enters pipeline, dehumidifier, pipeline and increases Pressure fan is linked in sequence.
Further, accurate filter, the precision are equipped in the connecting pipe between dehumidifier and pipe pressurizing wind turbine Filter can kill Most bacterial.
Further, threeway there are one entering in the connecting pipe between pipeline and dehumidifier and set in purification air, threeway The external natural air of another port connection enter pipeline, external natural air enters pipeline equipped with fore filter.
Further, the lower part Duo Gen branch pipes of underwater aeration tube are arranged in king's font.
Further, water tank upper is equipped with water inlet pipe, and cistern water level is controlled by small-sized inlet valve, and water tank bottom is equipped with row Dirt pipe and sewage draining valve, reciprocation cycle.Water tank upper is additionally provided with overflow pipe, excessively high to prevent cistern water level.
Further, 9 cubic metres of water tank capacity.Air quantity is by number or areal calculation in building.
The utility model sets a water tank before original air blower, and underwater aeration tube built in water tank will be certainly by air blower Right air is squeezed under water, through underwater aeration tube cutting and grinding into minute bubbles, the water surface is escaped after stopping the several seconds in water, because empty Gas aerator has powerful pressure and thrust, so, the air of effusion also has pressure, is naturally entered by connecting pipe Original new Ventilator Room.
The operation principle of the utility model:Underwater aeration tube (the stainless steel being pressed into air by force with air blower in water tank Pipe) in, then be aerated and escape from the micropore (pore on water-bed branch pipe) of underwater aeration tube, air ultimately forms high speed under water Microbubble stream is evenly distributed in water.The average diameter of minute bubbles is 2.0mm, after being escaped from water, have passed through bathing process, empty Gas is purified.Air through bathing enters pipeline by purifying air and send to dehumidifier dehumidifies, accurate filter filters, then send To new Ventilator Room.
The beneficial effects of the utility model:
The building air purification processing equipment of the utility model, is fairly effective to local air purification.According to test Data can effectively remove PM particles, sterilizing, and take away Water in Water Tanks part, the humidity that effusion air is made to contain more than 50%, in north Square area can improve the humidity of air in building.
There are the building that central heating is freezed, natural air sucking is sent to building by new wind turbine and is respectively blown pipe network, through cold Heat engine group is heated or sent again by branch pipe to each room after cooling down.If there are Air haze or natural germ contamination problem in city, Air quality so in building will not be high, and inside and outside air quality should be basically identical, and simply temperature changes.This reality It is first in air cleaning unit (water tank by the natural air before the new wind turbine of entrance with new building air purification processing equipment With underwater aeration tube) washing a few minutes, new Ventilator Room is entered back into, can reach the effect of local removal air pollutants.
Description of the drawings
Fig. 1 is a kind of main structure diagram of building air purification processing equipment of the utility model;
Fig. 2 is the overlooking the structure diagram of the building air purification processing equipment of the utility model;
Fig. 3 is the A-A sectional views in Fig. 1.
In figure:1st, water tank 2, air blower 3, underwater aeration tube 31, supervisor 32, branch pipe
4th, purification air enters pipeline 5, dehumidifier 6, pipe pressurizing wind turbine 7, accurate filter
8th, fore filter 9, water inlet pipe 10, blow-off pipe 11, overflow pipe
Specific embodiment
The utility model is further described below in conjunction with drawings and examples.
Embodiment
As shown in Figure 1 and Figure 2, a kind of building air purification processing equipment of the utility model, it includes:Water tank 1, air blower 2nd, underwater aeration tube 3, purification air enter pipeline 4, dehumidifier 5, pipe pressurizing wind turbine 6 (pipeline air-introduced machine) and dehumidifier With the connecting pipe between pipe pressurizing wind turbine;The air outlet of air blower is connected with underwater aeration tube inlet, and underwater aeration tube 3 wraps Top supervisor 31, lower part Duo Gen branch pipes 32 are included, the top supervisor 31 of underwater aeration tube is inserted perpendicularly into water tank, underwater aeration tube Lower part Duo Gen branch pipes 32 are laid in the bottom;Blower export is responsible for entrance with the top of underwater aeration tube by communicating pipe and is connected; Purification air is equipped with above water tank and enters pipeline 4;Purification air enters pipeline 4, dehumidifier 5,6 order of pipe pressurizing wind turbine and connects It connects.Accurate filter 7 is equipped in connecting pipe between dehumidifier and pipe pressurizing wind turbine, which can kill absolutely Most of bacterium.Set in the connecting pipe that enters between pipeline 4 and dehumidifier 5 of purification air there are one threeway, threeway it is another One external natural air of port connection enters pipeline, and external natural air enters pipeline equipped with fore filter 8.
As shown in figure 3, the water-bed lower part Duo Gen branch pipes 32 that are laid in of underwater aeration tube 3 are arranged in king's font, at every The first half of branch pipe 32 is provided with many pores 33.
Water tank upper is equipped with water inlet pipe 9, and cistern water level is controlled by small-sized inlet valve, and water tank bottom is equipped with blow-off pipe 10 And sewage draining valve, reciprocation cycle.Water tank upper is additionally provided with overflow pipe 11 (higher than at 50 meters of the ordinary water level water surface), with caisson Water level is excessively high.
Underwater aeration tube is stainless steel pipes.9 cubic metres of water tank capacity.Air quantity is by number or areal calculation in building.
The operation principle of the utility model:Underwater aeration tube (the stainless steel being pressed into air by force with air blower in water tank Pipe) in, then be aerated and escape from the micropore (pore on water-bed branch pipe) of underwater aeration tube, air ultimately forms high speed under water Microbubble stream is evenly distributed in water.The average diameter of minute bubbles is 2.0mm, after being escaped from water, have passed through bathing process, empty Gas is purified.Air through bathing enters pipeline by purifying air and send to dehumidifier dehumidifies, accurate filter filters, then send To new Ventilator Room.

Claims (6)

1. a kind of building air purification processing equipment, which is characterized in that it includes:Water tank, air blower, underwater aeration tube, purification Air enters the connecting pipe between pipeline, dehumidifier, pipe pressurizing wind turbine and dehumidifier and pipe pressurizing wind turbine;Under water Aeration tube includes top supervisor, lower part Duo Gen branch pipes, and the top supervisor of underwater aeration tube is inserted perpendicularly into water tank, underwater aeration tube Lower part Duo Gen branch pipes be laid in the bottom, be provided with many pores on every branch pipe top;Blower export passes through communicating pipe and water Top supervisor's entrance connection of lower aeration tube;Purification air is equipped with above water tank and enters pipeline;Purification air enters pipeline, dehumidifying Machine, pipe pressurizing wind turbine are linked in sequence.
2. building air purification processing equipment as described in claim 1, which is characterized in that in dehumidifier and pipe pressurizing wind turbine Between connecting pipe be equipped with accurate filter.
3. building air purification processing equipment as claimed in claim 2, which is characterized in that enter pipeline with removing in purification air It is set in connecting pipe between wet machine there are one threeway, the external natural air of another port connection of threeway enters pipeline, outside Portion's natural air enters pipeline equipped with fore filter.
4. the building air purification processing equipment as described in claim 1,2 or 3, which is characterized in that the lower part of underwater aeration tube More branch pipes are arranged in king's font.
5. the building air purification processing equipment as described in claim 1,2 or 3, which is characterized in that water tank upper is equipped with water inlet Pipe, cistern water level are controlled by small-sized inlet valve, and water tank bottom is equipped with blow-off pipe and sewage draining valve.
6. building air purification processing equipment as claimed in claim 5, which is characterized in that water tank upper is additionally provided with overflow pipe.
CN201721554808.XU 2017-11-20 2017-11-20 Building air purification processing equipment Expired - Fee Related CN207455790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721554808.XU CN207455790U (en) 2017-11-20 2017-11-20 Building air purification processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721554808.XU CN207455790U (en) 2017-11-20 2017-11-20 Building air purification processing equipment

Publications (1)

Publication Number Publication Date
CN207455790U true CN207455790U (en) 2018-06-05

Family

ID=62276760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721554808.XU Expired - Fee Related CN207455790U (en) 2017-11-20 2017-11-20 Building air purification processing equipment

Country Status (1)

Country Link
CN (1) CN207455790U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114870548A (en) * 2022-04-07 2022-08-09 南京明捷动力科技有限公司 Ground dust removal device for research and development of synchronous brushless alternating-current generator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114870548A (en) * 2022-04-07 2022-08-09 南京明捷动力科技有限公司 Ground dust removal device for research and development of synchronous brushless alternating-current generator

Similar Documents

Publication Publication Date Title
JP7297864B2 (en) Biological system and method for air purification
CN103256675B (en) A kind of Simple air purification drying device
CN106931516A (en) Environmental indoor air-purification device and method
CN207455790U (en) Building air purification processing equipment
CN204534904U (en) building indoor purifying haze air system
CN208620475U (en) A kind of indoor air circulation purification low-purity oxygen plant
CN110068095B (en) Oxygen supply and carbon discharge bed head air supply device
CN110270177A (en) A kind of system of novel purification waste gas air and artificial waterfall generation anion
CN206858264U (en) A kind of energy-saving MBR sewage-treatment plants
CN203060998U (en) Washing type air purifier
WO2018133632A1 (en) Microecological air purifier
CN109224744A (en) A kind of industrial air filtering system
CN106512592A (en) Air purifier used for constant-temperature, constant-humidity, constant-oxygen and constant-cleanness high speed rail air conditioner system
CN207294304U (en) A kind of device that microbial aerosol pollutant in sewage is reduced from source
CN209985206U (en) Glass fiber reinforced plastic biological deodorization tower
CN209623189U (en) A kind of freezer Parallel sets with Waste Heat Recovery
CN206965340U (en) A kind of dry type and wet type industrial waste gas multiple-effect purification unit
CN208312631U (en) A kind of Household fresh air device
CN207570065U (en) Fresh air system advanced treating integrating device
CN205398234U (en) But freedom disassembly's constructed wetland purifier
CN205740410U (en) Liquid jet concentrator
CN205641178U (en) Air purification and reuse of reclaimed water's processing apparatus
CN101469894A (en) Air purification and humidification method and system thereof
RU84738U1 (en) MOBILE COMPLEX FOR MICROBIOLOGICAL CLEANING OF AIR FLOWS FROM VAPORS OF TOXIC AND FULFORENTLY Smelling Volatile ORGANIC COMPOUNDS
CN207907365U (en) A kind of wall-mounted aeration device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180605

Termination date: 20181120

CF01 Termination of patent right due to non-payment of annual fee