CN207452873U - A kind of civil engineering reinforced material with hole - Google Patents

A kind of civil engineering reinforced material with hole Download PDF

Info

Publication number
CN207452873U
CN207452873U CN201721487853.8U CN201721487853U CN207452873U CN 207452873 U CN207452873 U CN 207452873U CN 201721487853 U CN201721487853 U CN 201721487853U CN 207452873 U CN207452873 U CN 207452873U
Authority
CN
China
Prior art keywords
hole
layer
civil engineering
reinforced
right sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721487853.8U
Other languages
Chinese (zh)
Inventor
赵魁
叶直
肖义
陆言林
陈燕菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Education University
Original Assignee
Guizhou Education University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Education University filed Critical Guizhou Education University
Priority to CN201721487853.8U priority Critical patent/CN207452873U/en
Application granted granted Critical
Publication of CN207452873U publication Critical patent/CN207452873U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of civil engineering reinforced materials with hole of civil engineering reinforced material technical field,Reinforcing rib is both provided at left and right sides of the front end face of the plate of material,Frosted layer is both provided at left and right sides of the reinforcing rib,The inner cavity of the interior reinforcing layer is provided with reinforcing rib,The outer wall of the interior reinforcing layer is uniformly provided with supporting block and reinforced hole,Filter screen is both provided at left and right sides of the external reinforcement layer,The second ventilation opening to match with filter screen is both provided at left and right sides of the hexagon stiffener,The inner homogeneous of plate of material is provided with reinforced hole,Its structure is stablized using reinforcing rib and supporting block simultaneously,Stablize entire plate of material using external reinforcement layer and hexagon stiffener,The reinforcing rib surface set simultaneously is provided with frosted layer to increase the frictional force with soil,There is provided ventilation openings to be injected into the fast rapid-curing cutback of the soil of material internal simultaneously,Increase the intensity of soil and the reinforcement effects of structure.

Description

A kind of civil engineering reinforced material with hole
Technical field
The utility model is related to civil engineering reinforced material technical fields, are specially a kind of civil engineering reinforcement with hole Material.
Background technology
At present, Earthworking reinforced bar technology is used widely in water conservancy, railway, highway, harbour and architectural engineering, and is solved Technical barrier in many civil engineerings of having determined, achieves good social and economic benefit.In recent years, different types of muscle Material from the metal of low ductility to the high molecular polymer of high ductility, is all used in earth structure, however in current engineering The traditional reinforcement material or manufacture craft problem used, the interaction of earth working material and soil do not give full play to, serious shadow The reinforcement effects of civil engineering material are rung, the reinforcement material of soil mass consolidation usually there are two major classes:TGXG and geotechnical grid, soil Work grid is to banket to achieve the purpose that increase intensity of banketing to constrain using the frictional force on its surface, in order to reach this mesh , on the one hand improve contact surface, increase the frictional force of plane;On the other hand the creep and deformation of material are reduced as far as possible, Increase the effect of contraction to filler, traditional Earthworking reinforced bar technology has ignored material sheet when adding the area contacted with soil The stability of body, while also ignore material and contact the corrosivity generated for a long time with building, therefore it is proposed that a kind of band hole Civil engineering reinforced material.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering reinforced material with hole, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides following technical solution:A kind of civil engineering reinforcement material with hole Material including plate of material, is both provided with ventilation opening, the front end face left and right sides of the plate of material is at left and right sides of the plate of material It is provided with reinforcing rib, is both provided with frosted layer at left and right sides of the reinforcing rib, in the inner cavity of the plate of material is provided with Reinforcing layer, the inner cavity of the interior reinforcing layer are provided with reinforcing rib, the outer wall of the interior reinforcing layer be uniformly provided with supporting block with Reinforced hole, the one end of the supporting block away from interior reinforcing layer are provided with external reinforcement layer, are all provided at left and right sides of the external reinforcement layer Filter screen is equipped with, the outside of the external reinforcement layer is provided with hexagon stiffener, is all provided at left and right sides of the hexagon stiffener It is equipped with the second ventilation opening to match with filter screen.
Preferably, the supporting block is both provided with six groups with reinforced hole, and every group of reinforced hole is uniformly arranged on two groups successively Between supporting block.
Preferably, the frosted layer is layer of silica gel, and frosted layer is provided with fixing bolt with reinforcing the junction of rib.
Preferably, the hexagon stiffener be regular hexagon, and hexagon stiffener thickness in millimeter between millimeter.
Preferably, the inner cavity of the reinforced hole is coated with inorganic mineral coating, and inorganic mineral coating is by alkali metal The aqueous dispersions of aqueous silicate solution and colloidal silicon dioxide add pigment, filler and various auxiliary agents, manufactured silicate With Ludox inorganic coating.
Preferably, be uniformly provided with filter hole on the filter screen, and the diameter of filter hole millimeters to millimeter it Between.
Compared with prior art, the beneficial effects of the utility model are:The civil engineering reinforced material with hole, structure Simply, it is easy to use, the inner homogeneous of plate of material is provided with reinforced hole, while it is stablized using reinforcing rib and supporting block Structure stablizes entire plate of material using external reinforcement layer and hexagon stiffener, while the reinforcing rib surface set is provided with Frosted layer increases the frictional force with soil, while there is provided ventilation openings to be injected into the fast rapid-curing cutback of the soil of material internal, increase soil Intensity and structure reinforcement effects.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model positive structure diagram;
In figure:1 plate of material, 101 ventilation openings, 2 reinforce ribs, 201 frosted layers, reinforcing layer in 3,4 reinforcing ribs, 5 supporting blocks, 6 reinforced holes, 7 external reinforcement layers, 701 filter screens, 8 hexagon stiffeners, 801 second ventilation openings.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of civil engineering reinforced material with hole, Including plate of material 1, the left and right sides of plate of material 1 is both provided with ventilation opening 101, is respectively provided at left and right sides of the front end face of plate of material 1 Have and reinforce rib 2, the left and right sides for reinforcing rib 2 is both provided with frosted layer 201, and the inner cavity of plate of material 1 is provided with interior reinforcing layer 3, the inner cavity of interior reinforcing layer 3 is provided with reinforcing rib 4, and the outer wall of interior reinforcing layer 3 is uniformly provided with supporting block 5 and reinforced hole 6, branch The one end of bracer 5 away from interior reinforcing layer 3 is provided with external reinforcement layer 7, and the left and right sides of external reinforcement layer 7 is both provided with filter screen 701, The outside of external reinforcement layer 7 is provided with hexagon stiffener 8, and 8 left and right sides of hexagon stiffener is both provided with and 701 phase of filter screen Matched second ventilation opening 801.
Wherein, supporting block 5 is both provided with six groups with reinforced hole 6, and every group of reinforced hole 6 is uniformly arranged on two groups of supports successively Between block 5, set multigroup reinforced hole 6 that can fill more soil wherein, and supporting block 5 has the work(for stablizing bracing reinforcement hole 6 Can, frosted layer 201 is layer of silica gel, and frosted layer 201 is provided with fixing bolt with reinforcing the junction of rib 2, is increased and soil Frictional force, hexagon stiffener 8 is regular hexagon, and 8 thickness of hexagon stiffener has between 20 millimeters to 40 millimeters Higher intensity, while can also prevent the inner-cavity structure of hexagon stiffener 8 from deforming, the inner cavity of reinforced hole 6 are coated with inorganic Mineral coating, and inorganic mineral coating is the aqueous dispersions by alkali metal silicate aqueous solution and colloidal silicon dioxide, is added Pigment, filler and various auxiliary agents, manufactured silicate and Ludox inorganic coating have good water-fast, alkaline-resisting, resistant It contaminates, gasproof performance, is uniformly provided with filter hole on filter screen 701, and the diameter of filter hole is between 0.5 millimeter to 1 millimeter.
Operation principle:Reinforced hole 6 can banket with interior reinforcing layer 3, and reinforced hole 6 in spraying inorganic mineral coating prevent with The soil corrosion that contact generates for a long time, and interior reinforcing layer 3 is inherently made with corrosion-resistant material, reinforced hole 6 is inserting native lead to Cross supporting block 5 and carry out rock-steady structure, interior reinforcing layer 3 when inserting soil by reinforcing rib 4 come rock-steady structure, and hexagon stiffener 8 The effect of the existing entire plate of material 1 of stabilization, while the reinforcement effects of three-dimensional reinforcement are also increased, frosted layer 201, which has to increase, to rub Power is wiped, increases the resistance between soil, aids in stable effect.And ventilation opening, the second ventilation opening, the filter screen set can make material Flitch 1 is in a kind of sublimity of drying, accelerates the desiccation of soil.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of civil engineering reinforced material with hole, including plate of material (1), it is characterised in that:A left side for the plate of material (1) Right both sides are both provided with ventilation opening (101), are both provided at left and right sides of the front end face of the plate of material (1) and reinforce rib (2), institute It states to reinforce at left and right sides of rib (2) and is both provided with frosted layer (201), the inner cavity of the plate of material (1) is provided with interior reinforcing layer (3), the inner cavity of the interior reinforcing layer (3) is provided with reinforcing rib (4), and the outer wall of the interior reinforcing layer (3) is uniformly provided with branch Bracer (5) and reinforced hole (6), the one end of the supporting block (5) away from interior reinforcing layer (3) is provided with external reinforcement layer (7), described outer Filter screen (701) is both provided at left and right sides of reinforcing layer (7), the outside of the external reinforcement layer (7) is provided with hexagon reinforcement Part (8), hexagon stiffener (8) left and right sides are both provided with the second ventilation opening to match with filter screen (701) (801)。
2. a kind of civil engineering reinforced material with hole according to claim 1, it is characterised in that:The supporting block (5) six groups are both provided with reinforced hole (6), and every group of reinforced hole (6) is uniformly arranged on successively between two groups of supporting blocks (5).
3. a kind of civil engineering reinforced material with hole according to claim 1, it is characterised in that:The frosted layer (201) it is layer of silica gel, and frosted layer (201) is provided with fixing bolt with reinforcing the junction of rib (2).
4. a kind of civil engineering reinforced material with hole according to claim 1, it is characterised in that:The hexagon adds Rib (8) is regular hexagon, and hexagon stiffener (8) thickness is between 20 millimeters to 40 millimeters.
5. a kind of civil engineering reinforced material with hole according to claim 1, it is characterised in that:The reinforced hole (6) inner cavity is coated with inorganic mineral coating, and inorganic mineral coating is by alkali metal silicate aqueous solution and colloid dioxy The aqueous dispersions of SiClx add pigment, filler and various auxiliary agents, manufactured silicate and Ludox inorganic coating.
6. a kind of civil engineering reinforced material with hole according to claim 1, it is characterised in that:The filter screen (701) filter hole is uniformly provided on, and the diameter of filter hole is between 0.5 millimeter to 1 millimeter.
CN201721487853.8U 2017-11-09 2017-11-09 A kind of civil engineering reinforced material with hole Expired - Fee Related CN207452873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721487853.8U CN207452873U (en) 2017-11-09 2017-11-09 A kind of civil engineering reinforced material with hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721487853.8U CN207452873U (en) 2017-11-09 2017-11-09 A kind of civil engineering reinforced material with hole

Publications (1)

Publication Number Publication Date
CN207452873U true CN207452873U (en) 2018-06-05

Family

ID=62254674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721487853.8U Expired - Fee Related CN207452873U (en) 2017-11-09 2017-11-09 A kind of civil engineering reinforced material with hole

Country Status (1)

Country Link
CN (1) CN207452873U (en)

Similar Documents

Publication Publication Date Title
CN207452873U (en) A kind of civil engineering reinforced material with hole
CN206328896U (en) A kind of lattice pillar compound shear wall
CN204530617U (en) A kind of dam with buffering slope
CN206070797U (en) A kind of thermal-insulating and anti-cracking external wall structure
CN203856130U (en) Novel light wallboard
CN211286117U (en) Fireproof wall body with anti-seismic effect
CN105019401A (en) Fender pile structure
CN205857636U (en) A kind of Mortar spraying machine with elevating function
CN208718204U (en) A kind of prefabricated board with antiskid function
CN204456090U (en) A kind of static pressure pipe pile
CN207512999U (en) A kind of wear-resisting building corner brick of tenon joint type
CN209602954U (en) A kind of no bracket is without the rapid construction steel concrete combined bridge front panel of template
CN205805015U (en) Distress in concrete Rapid-Repair instrument
CN206752755U (en) A kind of constructional column, which pours, exempts from formwork prefabricated components
CN206752819U (en) A kind of shaped steel expansible steel reinforced concrete combination dry wall with ribbing
CN206545320U (en) A kind of reinforced concrete prefabricated board for air-raid shelter
CN206581287U (en) A kind of retaining wall
CN111894195A (en) Withstand voltage type composite insulation evaporates presses aerated brick
CN205557466U (en) High height above sea level is gate structure for ground
CN205153151U (en) Joint construction of I shaped steel roof beam and rectangle counterfort
CN208266911U (en) A kind of retaining wall for hydraulic engineering
CN206368480U (en) A kind of H types interlocking concrete block
CN207567973U (en) A kind of external wall of high-rise building draining water storage formed steel construction
CN203654234U (en) Double-layer flood control wall
CN203893209U (en) Composite anti-corrosion structure for corbel, top opening and dust stratification platform of chimney

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180605

Termination date: 20191109

CF01 Termination of patent right due to non-payment of annual fee