CN207452660U - Repair fixing device in a kind of road and bridge crack - Google Patents

Repair fixing device in a kind of road and bridge crack Download PDF

Info

Publication number
CN207452660U
CN207452660U CN201721746201.1U CN201721746201U CN207452660U CN 207452660 U CN207452660 U CN 207452660U CN 201721746201 U CN201721746201 U CN 201721746201U CN 207452660 U CN207452660 U CN 207452660U
Authority
CN
China
Prior art keywords
support plate
fixedly connected
road
crack
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721746201.1U
Other languages
Chinese (zh)
Inventor
王天达
陈静
王建伟
季丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721746201.1U priority Critical patent/CN207452660U/en
Application granted granted Critical
Publication of CN207452660U publication Critical patent/CN207452660U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of road and bridge cracks to repair fixing device,Including crack,The inside in the crack is fixedly connected with the first support plate,The second support plate is fixedly connected with below first support plate,The centre of first support plate and the second support plate is fixedly connected with supporting rod,The supporting rod is through the first support plate and the second support plate and the lower section for extending to the second support plate,The bottom of the supporting rod is fixedly connected with triangle joint frame,Connecting rod is fixedly connected at left and right sides of the bottom of second support plate,Repair fixing device in the road and bridge crack,By the way that triangle wedge vertebra is set to significantly increase the pulling force between fracture road surface,The lasting increase in crack is effectively delayed,By setting supporting block in the bottom of triangle joint frame,Its effective increased support force and fixed effect protrusion,Increase the service life on road and bridge road surface.

Description

Repair fixing device in a kind of road and bridge crack
Technical field
The utility model belongs to pavement construction technical field, and in particular to repairs fixing device in a kind of road and bridge crack.
Background technology
Road and bridge is generally made of several majors such as roadbed, road surface, bridge, Tunnel Engineering and traffic engineering facilities, And road surface is often present with crack, crack can cause rainwater to penetrate into roadbed, influence the use of road and bridge due to many reasons Service life.
Existing road surface is repaired, and completes repairing by simply filling, such repairing method, the duration is short, can not keep away Exempt from the expansion in crack, causing the service life of bridge pavement reduces.
Utility model content
The purpose of this utility model is to provide a kind of road and bridge cracks to repair fixing device, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical solution:Repair fixed dress in a kind of road and bridge crack It puts, including crack, the inside in the crack is fixedly connected with the first support plate, is fixedly connected below first support plate There is the second support plate, the centre of first support plate and the second support plate is fixedly connected with supporting rod, and the supporting rod runs through First support plate and the second support plate and the lower section for extending to the second support plate, the bottom of the supporting rod are fixedly connected with three Angle link, is fixedly connected with connecting rod at left and right sides of the bottom of second support plate, the bottom of the connecting rod and is located at The position in crack is provided with baffle fixed block, the top of first support plate and is filled with bitumen layer positioned at the position in crack.
Preferably, the connecting rod is fixedly connected with baffle fixed block by axis pin.
Preferably, the surface of the baffle fixed block is provided with triangle wedge vertebra.
Preferably, the top of the triangle joint frame and fixing nut is provided at left and right sides of the supporting rod, it is described The bottom of fixing nut is fixedly connected with fixed connecting rod.
Preferably, the top of the triangle joint frame and it is fixedly connected with wedge vertebra away from the position of fixing nut.
Preferably, the bottom of the triangle joint frame is provided with supporting block.
The technique effect and advantage of the utility model:Fixing device is repaired in the road and bridge crack, by the way that triangle is set to carve Shape vertebra significantly increases the pulling force between fracture road surface, has effectively delayed the lasting increase in crack, by triangle joint frame Bottom supporting block is set, its effective increased support force and fixed effect protrudes, increase road and bridge road surface uses the longevity Life.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the tripod structure enlarged diagram of the utility model;
Fig. 3 is the structure enlargement diagram at the utility model A.
In figure:1 crack, 2 first support plates, 3 second support plates, 4 supporting rods, 5 triangle joint framves, 6 connecting rods, 7 baffles Fixed block, 8 bitumen layers, 9 axis pins, 10 triangle wedge vertebras, 11 fixing nuts, 12 fixed connecting rods, 13 wedge vertebras, 14 supporting blocks.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, to the technical scheme in the embodiment of the utility model into Row clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise Lower all other embodiments obtained, shall fall within the protection scope of the present invention.
The utility model provides a kind of road and bridge crack as shown in Figs. 1-3 and repairs fixing device, including crack 1, The inside in the crack 1 is fixedly connected with the first support plate 2, and the lower section of first support plate 2 is fixedly connected with the second support Plate 3, the centre of 2 and second support plate 3 of the first support plate are fixedly connected with supporting rod 4, and the supporting rod 4 runs through first 2 and second support plate 3 of support plate simultaneously extends to the lower section of the second support plate 3, and the bottom of the supporting rod 4 is fixedly connected with three Angle link 5, is fixedly connected with connecting rod 6 at left and right sides of the bottom of second support plate 2, the bottom of the connecting rod 6 and The position in crack 1 is provided with baffle fixed block 7, the top of first support plate 2 and the position filling for being located at crack 1 There is bitumen layer 8, fix it by the inside fill concrete in its crack 1, and waterproof is filled at the top of the first connecting plate 1 Layer makes it effectively avoid the infiltration of rainwater, reduces its service life, then outermost layer filled bitumen layer 8, it is made to increase road The service life of bridge pavement.
Specifically, the connecting rod 6 is fixedly connected with baffle fixed block 7 by axis pin 9.
Specifically, the surface of the baffle fixed block 7 is provided with triangle wedge vertebra 10, its fracture 1 is made to carry out button company, Prevent crack 1 from further expanding.
Specifically, the top of the triangle joint frame 5 and the left and right sides of supporting rod 4 is provided with fixing nut 11, The bottom of the fixing nut 11 is fixedly connected with fixed connecting rod 12.
Specifically, the top of the triangle joint frame 5 and being fixedly connected with wedge vertebra away from the position of fixing nut 11 13。
Specifically, the bottom of the triangle joint frame 5 is provided with supporting block 14, it is made effectively to increase its support force, and Increase the service life on road and bridge road surface.
Operation principle:Fixing device is repaired in the road and bridge crack, passes through the first support plate 2 and the second support plate 3 Its crack 1, which reduce, avoids crack 1 from continuing to expand, and reduces its amount weighed by supporting rod 4, passes through the second connecting plate 3 The baffle fixed block 7 of 6 bottom of connecting rod 6 and connecting rod of bottom more further prevent crack 1 from continuing to expand, pass through triangle The supporting block of 5 bottom of link, its effective increased support force and fixed effect protrusion, increase making for road and bridge road surface Use the service life.
Finally it should be noted that:The above is only the preferred embodiment of the utility model only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical solution recorded in foregoing embodiments or to which part technical characteristic Equivalent substitution is carried out, within the spirit and principle of the utility model, any modifications, equivalent replacements and improvements are made, It should be included within the scope of protection of this utility model.

Claims (6)

1. fixing device is repaired in a kind of road and bridge crack, including crack (1), it is characterised in that:The inside of the crack (1) is consolidated Surely the first support plate (2) is connected with, is fixedly connected with the second support plate (3) below first support plate (2), described first The centre of support plate (2) and the second support plate (3) is fixedly connected with supporting rod (4), and the supporting rod (4) runs through the first support plate (2) and the second support plate (3) and the lower section of the second support plate (3) is extended to, the bottom of the supporting rod (4) is fixedly connected with three Angle link (5), the bottom left and right sides of second support plate (3) are fixedly connected with connecting rod (6), the connecting rod (6) Bottom and the position of crack (1) is provided with baffle fixed block (7), the top of first support plate (2) and positioned at splitting The position for stitching (1) is filled with bitumen layer (8).
2. fixing device is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that:The connecting rod (6) it is fixedly connected with baffle fixed block (7) by axis pin (9).
3. fixing device is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that:The baffle is fixed The surface of block (7) is provided with triangle wedge vertebra (10).
4. fixing device is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that:The triangle joint The top of frame (5) and fixing nut (11), the bottom of the fixing nut (11) are provided at left and right sides of the supporting rod (4) It is fixedly connected with fixed connecting rod (12).
5. fixing device is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that:The triangle joint The top of frame (5) and it is fixedly connected with wedge vertebra (13) away from the position of fixing nut (11).
6. fixing device is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that:The triangle joint The bottom of frame (5) is provided with supporting block (14).
CN201721746201.1U 2017-12-14 2017-12-14 Repair fixing device in a kind of road and bridge crack Expired - Fee Related CN207452660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721746201.1U CN207452660U (en) 2017-12-14 2017-12-14 Repair fixing device in a kind of road and bridge crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721746201.1U CN207452660U (en) 2017-12-14 2017-12-14 Repair fixing device in a kind of road and bridge crack

Publications (1)

Publication Number Publication Date
CN207452660U true CN207452660U (en) 2018-06-05

Family

ID=62275900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721746201.1U Expired - Fee Related CN207452660U (en) 2017-12-14 2017-12-14 Repair fixing device in a kind of road and bridge crack

Country Status (1)

Country Link
CN (1) CN207452660U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594794A (en) * 2019-01-24 2019-04-09 天津建工集团建筑设计有限公司 A kind of the repairerment structure and repairerment method of plate surface crack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594794A (en) * 2019-01-24 2019-04-09 天津建工集团建筑设计有限公司 A kind of the repairerment structure and repairerment method of plate surface crack
CN109594794B (en) * 2019-01-24 2020-08-25 天津建工集团建筑设计有限公司 Repairing structure and repairing method for plate surface cracks

Similar Documents

Publication Publication Date Title
CN105386778A (en) Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method
CN102587689A (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN207512622U (en) A kind of road and bridge crack ruggedized construction
CN111119073B (en) Road and bridge crack reinforcing apparatus
CN104652261B (en) Expansion joint based on elastic concrete fast repairing method and system
CN207891756U (en) A kind of road and bridge crack reparation telescopic device
CN106437189A (en) Method of reinforcing and restoring earthquake-damaged reinforced concrete frame
CN108360365A (en) A kind of assembled steel bridge and its installation method
CN104480867A (en) Replacement and maintenance method of bridge foundation support padstone
CN108755454A (en) A kind of highway concrete-bridge expansion joint transition region repairs structure and construction method
CN207259954U (en) The structure stitched using self-healing Concrete Filled road and bridge
CN207452660U (en) Repair fixing device in a kind of road and bridge crack
CN105064202A (en) Profile steel and reinforced concrete slab assembled light composite beam bridge and construction method thereof
CN210315265U (en) Crack repairing and fixing structure for road and bridge
CN105463986A (en) Construction method of bridge expansion joint
CN103741597A (en) Bridge expansion joint device without transition section concrete and mounting method of bridge expansion joint device
CN203768800U (en) Non-transition-section concrete bridge expansion joint device
CN206418788U (en) A kind of novel bridge construction safety protective separation device
CN205295969U (en) Fixing device is restoreed in road and bridge crack
CN203559345U (en) Non-concrete bridge expansion joint device
CN102041760B (en) System and method for repairing asphalt pavement
CN109825658A (en) The method that processing hot wind drop-bottom leaks out
CN103510468A (en) Non-concrete type bridge expansion joint device
CN108385454A (en) A kind of railway plate-type ballastless track working drawing review operational method
CN205821963U (en) Fixing device is repaired in road and bridge crack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180605

Termination date: 20191214